W91ZLK-13-R-0005-0002.pdf
PDF 139 KB Posted
- Attached to
- JTCG/ME Analytical Services
- Solicitation number
- W91ZLK-13-R-0005
About this file
W91ZLK-13-R-0005-0002
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W23SR30166ME21
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment required to:
a. Provide questions and answ ers as of 23 November 2012 (see follow ing pages).
b. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Nov-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91ZLK-13-R-0005
X 9B. DATED (SEE ITEM 11)
25-Oct-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Nov-2012
CODE
ACC APG, AICD - W91ZLK
ABERDEEN INSTALLATION CONTRACTING DIV.
4118 SUSQUEHANNA AVENUE
ABERDEEN PROVING GROUND MD 21005-3013
W91ZLK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91ZLK-13-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been added by full text:
L.4. DISCUSSIONS
In accordance with FAR 15.306(d), oral/written discussion with each offeror may be held.
After completion of oral/written discussions with each offeror in the competitive range and in accordance with FAR 15.307(b), all offerors in the competitive range will be allowed a minimum of seven calendar days to submit Final Proposal Revisions.
Oral Discussions Scheduling. If oral discussions are conducted, the Contracting Officer will schedule the oral discussion sessions, and each offeror will be notified of the time and place at least three (3) business days prior to their oral discussion session. Appropriate security clearances should be provided in sufficient time to process the requests. The Contracting
Officer will provide additional instructions with the notification. To the maximum extent possible electronic media will be utilized for discussion. If face to face discussions occur, the oral discussion sessions will take place at the Government’s facility.
L.5. MULTIPLE AWARDS
a. This solicitation contemplates the issuance of multiple awards. Offerors may be considered for award both as a prime contractor, as well as a subcontractor as part of another offeror’s proposal.
b. It is the government’s intention to award six (6) ID/IQ contracts, including three (3) to small businesses.
The following have been modified:
L.1. INSTRUCTIONS TO OFFERORS
L.1. SUBMISSION OF PROPOSALS
L.1.1. Mailing Address. The offeror’s proposal package (one hard copy of the entire proposal with original signatures, along with one copy on CD ROM. Files on CD ROM may be .PDF format and/or MS Office, i.e. Word, Excel, Powerpoint), along with the required proposal volumes as listed in subparagraph 1.3., shall be submitted to:
Army Contracting Command – Aberdeen Proving Ground
ATTN: CCAP-SCI, Mr. David Macintyre
4118 Susquehanna Avenue
Aberdeen Proving Ground, MD 21005-3013
L.1.2. Sample Tasks. There are two (2) sample tasks included in Section J of this solicitation which will be used in the evaluation of proposals submitted in response to this solicitation.
Sample Task #1 is applicable to both large and small businesses alike. Sample Task #2 is ONLY applicable to large businesses. The NAICS code for this procurement is 541712; the small business size standard is 500 employees.
L.1.3. Format. The offeror’s proposal shall consist of five (5) volumes:
Volume I – Technical. One original, plus five (5) copies, of the Technical proposal, comprised of separate sections for Sample Tasks #1 and #2 (if applicable). One original plus five (5) copies of the Quality Control (QC) Plan.
Volume II – Management. One original, plus five (5) copies, of the Management proposal, comprised of separate sections for Sample Tasks #1 and #2 (if applicable).
Volume III - Cost. One original, plus one copy, of the Cost/Price proposal, comprised of separate sections for Sample Tasks #1 and #2 (if applicable).
Volume IV - Past Performance and Small Business Participation. One original, plus five
(5) copies, of each of the following: Past Performance information, Small Business
Participation Plan, the Small Business Subcontracting Plan (if applicable), and the
Organizational Conflict of Interest (OCI) Plan.
Volume V - Solicitation, Offer, and Award Documents and
Certifications/Representations; one (original) copy.
L.1.3. The proposal package shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be included.
L.1.4. Page Limitation. Volumes I (Technical) and II (Management), cumulatively, shall not exceed 240 pages.
L.1.5. Timeliness. Proposals are required to be submitted by the due date and time as specified on the Request for Proposal IAW FAR 15.208(b).
L.2. GENERAL INFORMATION
L.2.1. These instructions provide guidance to the offeror in preparing the proposal and describe the approach for development and presentation of the proposed data in response to this solicitation.
L.2.2. The proposal must comply fully with these instructions. FAILURE TO DO SO MAY BE
CAUSE FOR REJECTION. The proposal shall include all of the information requested in these instructions. Alternate proposals are not allowed and will not be considered or evaluated by the
Government.
L.2.3. The offeror shall clearly state in its proposal how it intends to accomplish this contract.
Mere acknowledgment or restatement of a requirement or task is not acceptable. Relevance to the effort listed herein is critical. Each volume shall be specific and complete. All the requirements under the solicitation are mandatory. The information in the proposal shall be presented in a clear, coherent, and concise manner.
L.2.4. Proposals shall be UNCLASSIFIED.
L.3. VOLUME DESCRIPTIONS:
L.3.1. Volume I – Technical. The Offeror is responsible for including sufficient details (without reference to contract cost) to permit a complete and accurate evaluation.
L.3.1.1. Format: The Technical Proposal shall provide a narrative discussion that addresses the basic Statement of Work (SOW) in Section C as well as Sample Tasks #1 and #2 (if applicable) in Section J. This section shall have an index that contains narrative titles referencing the paragraph number of the Basic SOW and in the Sample Task(s) as well as the page numbers. The narrative discussions shall be related to the applicable SOW and the task SOW paragraphs by referencing the appropriate SOW paragraph number, task number and, if applicable, task SOW paragraph numbers at the beginning of the discussion text.
L.3.1.2. Content: The Technical Proposal shall contain the following:
(a) Understanding the Requirements: The offeror shall include a discussion of its understanding of the requirements in the SOW (Section C) and Sample Tasks #1 and #2
(if applicable) (Section J). The offeror shall identify major problems anticipated in meeting the requirements, shall identify technical uncertainties and assumptions associated with the Basic SOW and the Sample Task(s) and provide specific proposals for resolution.
(b) Technical Approach to Basic SOW and Sample Tasks #1 and #2 (if applicable): The offeror shall include the planned sequence of steps to be taken, critical path, milestones, and interface and integration among tasks. The offeror shall present a technical approach that is clear, logical, practical, efficient and complete. The offeror shall identify potential risks as well as a means to mitigate them.
(c) Resources Required (For the Sample Tasks Only): The offeror shall include a matrix of labor hours showing the number of hours by labor category, skill level, and grade for each phase of work in the task, identification of any subcontractor labor used and a discussion of all work to be performed by the subcontractor in the Task(s), a travel schedule listing number of trips and number of personnel, and a description of all assumptions used to respond to Sample Tasks #1 and #2 (if applicable) to include assumptions used to calculate costs for labor, materials, equipment, subcontracts and travel (actual costs shall not be included in the technical proposal). The offeror shall discuss all equipment and materials to be used in the Sample Task(s).
L.3.2. Volume II –Management. The Offeror is responsible for including sufficient details
(without reference to contract cost) to permit a complete and accurate evaluation strictly from a management standpoint.
L.3.2.1. Format: This section shall have an index that contains narrative titles which are cross-referenced to the applicable paragraph number of the Basic SOW and Sample Tasks #1 and #2
(if applicable) as well as the proposal paragraph and page numbers, which discuss the title. The narrative discussions shall be related to the applicable Basic SOW and Sample Task SOW paragraphs by referencing the appropriate Basic SOW paragraph or, if applicable, Sample Task
SOW paragraph numbers.
L.3.2.2. Content: The Management Proposal shall contain the following:
(a) Personnel: The offeror shall provide resumes of personnel including subcontractor personnel proposed for the contractual effort. The resumes (no more than one page per person) shall also include a description of the individual's responsibilities. The certified resume shall be signed by both the offeror and the person the resume represents certifying that the information is true and complete and that the individual will be available to perform under the proposed contract. The offeror shall provide the percent availability of each proposed technical person with required skills for this contract and Sample Tasks #1 and #2 (if applicable). The offeror's discussion shall demonstrate availability of sufficient numbers of personnel having direct experience in engineering, management and technical writing.
(b) Project Management and Schedule: The offeror shall identify and explain specific project management tools which shall be employed to track cost and performance. The offeror’s discussion will include evidence of the following: adequate program visibility of this contract at Senior Management Levels, timely reaction to problems and adequate schedule and cost control. The offeror shall provide an organization plan for contract performance illustrating the interface between various elements of the organization during performance, including interface with any subcontractors and the Government, method of recognizing and reacting to problems, method of reporting actual performance versus projected progress, and techniques for controlling expenditures. The offeror shall explain its understanding of the contract requirements as well as the sequence, complexity and interrelationship of events in implementing the work of Sample Tasks #1 and #2 (if applicable). The offeror shall explain how it will schedule and track multiple tasks and deliverables. The offeror shall also provide a discussion of subcontracting involvement.
(c) Facilities: The offeror shall include a description of all facilities proposed for use in this contract and for Sample Tasks #1 and #2 (if applicable). The offeror must identify the primary facilities at which the majority of the effort will be performed. The discussion shall demonstrate the suitability of the facilities for timely and effective completion of the work described in the solicitation. The offeror must indicate which facilities are owned, leased, subcontracted, or Government-owned.
L.3.3. Volume III - Cost Proposal. Sample Tasks #1 and #2 (if applicable) shall be priced on a cost-plus-fixed fee basis. The Cost Proposal shall contain the following:
L.3.3.1. Content and Format. The offeror shall prepare a cost proposal that shall include a separate breakout of cost and fee/profit for Sample Tasks #1 and #2 (if applicable) including DD
Form 1861, “Contract Facilities Capital Cost of Money”, if applicable. Proposed costs and fee for each cost element shall be adequately broken down and explained in sufficient detail to permit a thorough analysis. Costs shall be based on an offeror's normal work week and predicated on the work set forth in the statements of work for Sample Tasks #1 and #2 (if applicable). If an offeror's normal work week is more or less than 40 hours per week, the offeror shall so state in the proposal.
(a) The offeror shall also provide a summary sheet, that incorporates each cost element for all work proposed under the solicitation.
(b) Offerors are cautioned to include all estimated per diem and travel costs involved.
(c) The offeror shall submit verifiable cost or pricing data, which will adequately support its proposal. For materials and subcontracting effort, the offeror shall provide such data as vendor quotes, invoice prices, subcontracted services, sources, quantities, prices, degree of competition, type of subcontract, etc. This data is required to support cost realism analysis. In the event adequate price competition does not result for this solicitation, the
Government reserves the right to request a Certificate of Current Cost and Pricing Data pursuant to FAR 15.804.
(d) The offeror shall provide a summary of all direct and indirect rates (labor, overhead, G&A, etc.) applicable to the total period of performance of the contract, to include the bases for estimates. Indicate how indirect cost were computed and applied, including cost breakdowns. List all other costs (e.g., travel, and computer usage) and provide bases for pricing. For travel specify each trip, from/to, number of people, duration, airfare, per diem, rental car, local mileage amount, total cost per trip, and total cost for travel.
(e) Compensation Plan. The offeror shall provide a compensation plan in accordance with
FAR 52.222-46, setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract. If the offeror proposes specific personnel for key positions on this contract (who are not current employees of the offeror) the offeror shall present letters of commitment. The letters of commitment shall indicate that the individual acknowledges intent to accept a reasonable offer of employment should an award to the offeror be made.
(f) The cost proposal shall contain the information requested in this part and shall not use the information as an extension of1he technical proposal. However, the hours and labor categories contained in the technical proposal must agree with and be traceable to the cost proposal.
(g) The offeror shall submit supporting computations and summaries contained in the cost proposal on CD-ROM using MS Excel.
(h) In order to be considered for award, an offeror must be able to have in place an-accounting system approved by Defense Contract Audit Agency before award.
(i) Subcontractors are required to submit the same information required of the prime contractor. Subcontractor cost information that is proprietary may be submitted through the prime contractor in a separate sealed package. A proposal will not be accepted directly from subcontractors. It must be submitted through the prime contractor as part of the total proposal package.
(j) The offeror shall furnish all information that could have a bearing on cost and financial matters and which is of mutual interest in the contemplated acquisition; for example, if the proposal is to be a joint venture arrangement, explain how the financial matters are to be handled.
L.3.3.2. Cost Realism. A proposal is presumed to represent an offeror's best efforts to respond to the solicitation, Any inconsistency, whether real or apparent, between promised performance and cost, shall be explained in the proposal, For example, if the intended use of new and innovative techniques is the basis for an abnormally low estimate, the nature of these techniques and their impact on cost must be explained, Any significant inconsistency, if unexplained, which raises a fundamental issue of the offeror's understanding of the nature and scope of the work required and of its financial ability to perform the contract, may be grounds for rejection of the proposal or grounds for adjusting the proposed cost. THE BURDEN OF PROOF AS TO COST
CREDIBILITY RESTS WITH THE OFFEROR.
L.3.4. Volume IV - Past Performance and Small Business Participation.
L.3.4.1. Past Performance. The offeror is responsible for including sufficient details (without reference to contract cost) to permit a complete and accurate evaluation strictly from a past performance standpoint.
L.3.4.1.1. Format: This part shall have a narrative discussion and shall be segregated to a separate section of the proposal to be used for a Performance Risk Assessment.
L.3.4.1.2. Content: The Past Performance Information shall contain the following:
(a) The offeror shall identify the extent to which it, or its proposed major subcontractors, has been involved as either a prime or a subcontractor on previous contracts for work similar to that required under this solicitation during the past five (5) years, technical, management, and cost performance will also be considered,
(b) The offeror shall provide a Performance Evaluation for at least three (3) Government or private-sector contracts or task orders physically completed within the past five (5) years.
Only contracts/task orders that have been physically completed (i.e., no work in progress) shall be considered acceptable to satisfy this requirement. Performance Evaluations for subcontractors (as part of teammate contracts) are acceptable. Agency personnel for whom the offeror has performed work must complete the Past Performance
Questionnaire found in Appendix H. A sample cover letter is also included. These Past
Performance Evaluation Questionnaires must be provided by the offeror to those who can further provide information on past performance, Once completed, the person(s) who completed the evaluations must email these evaluations directly to david.a.macintyre.civ@mail.mil and the persons completing these evaluations shall be informed that their names will be held in confidence, These evaluations must be received by the Government no later than the date the offeror's proposal is due. Additionally, the offeror shall provide the following information about each of these completed projects:
A detailed narrative for each contract cited
Similarities/relevance of that work to the work required by this solicitation
Objectives achieved
Cost growths and/or schedule delays encountered.
(c) Offerors shall provide copies of any Quality Deficiency Reports and Corrective Actions submitted by the Defense Contract Management Agency (DCMA) office within the past
3 years. For Government contracts that did not nor do not meet original requirements with regard to either cost) schedule or technical performance the contractor shall provide a brief explanation of the reason(s) for such factor(s) and any corrective actions taken to avoid recurrence.
(d) The offeror shall include the following prime or subcontractor information:
Name, address and telephone number of the Government contracting activity and the Procuring Contracting Officer (for subcontracts, the Administrative
Contracting Officer).
Name and telephone number of the Government contracting activity's technical representative or Contracting Officer's Representative (for subcontracts, the
Government Contract Administration Activity).
Contract or subcontract number.
Type of contract.
Award Cost/Price.
Final or projected final, Cost/Price.
Original delivery schedule.
Final or projected final delivery schedule.
mailto:david.a.macintyre.civ@mail.mil
If the offeror has not held Government contracts, include comparable data regarding non-Government contracts.
(e) The offeror shall also provide the aforementioned information for all contracts terminated in whole or In part, for any reason during the past three (3) years, to include those currently in the process of such termination as well as those that are not for work similar to the proposed effort. The offeror shall also provide the aforementioned information for any proposed subcontractor who will perform significant portions of the effort.
(f) New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by these individuals in the prior contracts cited.
(g) Offerors shall include in their proposal the written consent of their proposed significant subcontractors to allow the Government to discuss the subcontractor's past performance evaluation with the offeror during negotiations.
L.3.4.2. Small Business Participation. All offerors, both small and large businesses, are required to submit Small Business Participation Plan information in accordance with DFARS 215.304.
The proposal will (at a minimum) describe the activities anticipated to be subcontracted, proposed targets based on total acquisition value of the contract, and past performance in achieving small business goals.
L.3.4.2.1. The following is the required format:
(a) Type of Business of Prime Contractor (check all applicable boxes)
{} Large
{} Small (also check type of Small Business below)
{} Small Non-Disadvantaged Business
{} Small Disadvantaged Business
{} Woman-Owned Small Business
{} HUB Zone Small Business
{} Veteran Owned Small Business
{} Service Disabled Veteran Owned Small Business (SDVOB)
(b) Percentage of Total Contract Value as a Prime Contractor %_______
(c) Percentage of Total Contract Value of Subcontracts Planned For:
(d) Percentage of Total Contract Value of Subcontracts:
Large %_________
Total Small %_________
Small (Non-Disadvantaged) %________
Small (Disadvantaged) %________
Woman Owned SB %________
HUB Zone SB %________
Veteran Owned SB %________
SDVOB %________
Each participation percentage above shall be accompanied by detailed supporting documentation regarding the individual commitments.
NOTE: The sum of the dollar values and percentages of Small
NonDisadvantaged and Small Disadvantaged should equal the entries for “Total
Small”.
(e) List principal supplies/services to be subcontracted to:
Company Type of Service/
Business Type Name/CAGE Supply (incl. NAICS code)
Large:
Total Small:
Small (Non-Disadvantaged):
Small (Disadvantaged):
Woman-Owned SB:
HUB Zone SB:
Veteran-Owned SB:
SDVOB:
NOTE: For purpose of subcontracting, Historically Black Colleges and
Universities/Minority Institutions (HBCUs/MIs) are considered as disadvantaged and should be broken out separately.
(f) Prior Performance Information: Provide any information substantiating the offeror’s track record of utilizing small business on past contracts. For Large Business: include ACO rating and SF 295 Information. For Large and Small businesses: provide descriptive information for all small business categories. Any information concerning long term relationships with Small Business subcontractors, such as mentor protégé relationships, should be provided.
(g) Extent of Commitment: Provide documentation regarding enforceable commitments to utilize any Small Business category, as defined in FAR Part 19, as subcontractors.
(h) Each Large Business offeror shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR 52.2199. This plan shall be submitted separately from the Small Business Participation Plan information required above, which applies to both large and small businesses. The Small Business Subcontracting Plan is not a requirement for evaluation in source selection, but rather a requirement for award to a large business and will be incorporated into any resultant contract.
L.3.4.3. Organizational Conflict of Interest Plan. The offeror shall:
(a) Explain how actual or potential organizational conflicts of interest are identified, to include a discussion relating to a review of the offeror's corporate structure, existing contracts, and procedures for overseeing, implementing and updating the plan.
(b) Explain the strategy to mitigate the effects of a conflict if a conflict is identified.
(c) Describe the mechanisms in place for notification when an actual or potential conflict is discovered, to include a description of how information is protected, the methods employed by the offeror to ensure the plan is working, a description of the training for the employees, an example of the offeror's nondisclosure agreements(s), whether or not the plan is subject to independent verification, and an enforceable mechanism for disciplinary action in the event there is a violation of the plan's procedures.
L.3.5. VOLUME V – Solicitation, Offer, and Award Documents and
Certifications/Representations
L.3.5.1. Certifications and Representations. Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the solicitation. An authorized official of the firm shall sign the SF 33 and all certifications requiring original signature. An Acrobat PDF file shall be created to capture the signatures for submission.
Section A – Standard Form (SF) 33, “Solicitation, Offer and Award”
Section K – Representations, Certifications and Other Statements of Offerors
The following have been deleted:
L.2. DISCUSSIONS
L.3. MULTIPLE AWARDS
(End of Summary of Changes)
File details come from the government source that posted it. Updated .