B08 - PWS Attachment III - Electric Elevator Test.docx

DOCX document 81 KB Posted

Attached to
Elevator Repair and Maintenance Support Services
Solicitation number
W91RUS-27-R-A002
Issued by

About this file

This is a Performance Work Statement (PWS) attachment establishing quality assurance inspection procedures for electric elevators at Fort Huachuca under the elevator repair and maintenance support services contract. The document specifies a standardized checklist for periodic testing of electric elevator systems, organized by inspection frequency and scope of work.

The PWS requires three levels of inspections conducted in compliance with ASME A17.1 standards: bi-annual inspections covering static and relief pressure tests plus safety tests; annual inspections addressing oil buffers, safeties, governors, slack-rope devices, terminal stopping devices, firefighters' emergency operation, standby power operation, door system power operation, broken rope/tape/chain switches, and electrical protective devices; and five-year inspections encompassing car and counterweight safeties, governors, oil buffers, braking systems, emergency and standby power operation, emergency terminal stopping and speed limiting devices, power opening of doors, leveling zone and speed, inner landing zone, and emergency stopping distance. The checklist documents building and unit information, test results (pass/fail/not applicable), contractor details including firm name and address, mechanic identification, and test performance dates. This attachment serves as the quality assurance framework for the Army Contracting Command Aberdeen Proving Ground's elevator maintenance contract, requiring all work to be performed in strict accordance with applicable specifications and contract terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Huachuca, Directorate of Public Works Periodic tests of Electric Elevators Quality Assurance Check List

Test Performed: Bi-Annual ☐ Annual ☐ Five (5) Year ☐

Building & Unit Information

Building Name
Owner/Building Management Name
Building Address
Unit Identification / Unit PIN
BI-ANNUAL INSPECTIONS
ASME Section
Pass
Fail
N/A
Static and relief pressure test
1005.1
Safety test
1002.1
ANNUAL INSPECTIONS
ASME Section
Pass
Fail
N/A
Oil Buffers
8.11.2.2.1
Safeties
8.11.2.2.2
Governors
8.11.2.2.3
Slack-Rope Devices on Winding Drum Machines
8.11.2.2.4
Normal and Final Terminal Stopping Devices
8.11.2.2.5
Firefighters’ emergency Operation
8.11.2.2.6
Standby or emergency Power Operation
8.11.2.2.7
Power Operation of Door System
8.11.2.2.8
Broken Rope, Tape, or Chain Switch
8.11.2.2.9
E/E/PES Electrical Protective Devices
8.11.2.2.10
FIVE (5) YEAR INSPECTION
ASME Section
Pass
Fail
N/A
Car and Counterweight Safeties
8.11.2.3.1
Governors
8.11.2.3.2
Oil Buffers
8.11.2.3.3
Braking System
8.11.2.3.4
Emergency and Standby Power Operation
8.11.2.3.5
Emergency Terminal Stopping and Speed Limiting Devices
8.11.2.3.6
Power Opening of Doors
8.11.2.3.7
Leveling Zone and Leveling Speed
8.11.2.3.8
Inner Landing Zone
8.11.2.3.9
Emergency Stopping Distance
8.11.2.3.10

The Above Tests Were Performed In Compliance With ASME A17.1

Firm Performing Test/Service
Elevator Contractor Number
Firm Address
Firm City/State/Zip
Name of Mechanic Performing Test/Service
Date of Test/Service

image1.jpg image2.png