Questions and Answers.docx

DOCX document 18 KB Posted

Attached to
Fire Alarm System Install Federal contract opportunity
Solicitation number
W91RUS25R0004
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This is a Questions and Answers document for a Fire Alarm System installation project at Fort Huachuca. The Q&A clarifies that the project is a design-build effort requiring installation of a Monaco MAAP-X or + panel, while maintaining an existing Notifier NFS-320 panel for the pre-action Novec suppression system. The building is classified under NFPA occupancy standards rather than International Building Code, and will be used for equipment testing with minimal personnel occupancy.

Key technical requirements include compliance with UFC 3-600-01 and NFPA-72 guidelines, installation of scrolling message signs above doors to display alarm status, and digital display capability for supervisory and trouble alarms. Design submissions must be approved by the Post Fire Chief/Inspector as the Authority Having Jurisdiction (AHJ). The building is described as an industrial facility housing a testing chamber, without offices or restrooms, typically occupied by only 1-2 people for equipment testing setup.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Alarm System Install, newest first.
File Type Posted
Questions and Answers.docx DOCX document
Fort Huachuca Project Specific Requirements.pdf PDF
Architectural Drawings.pdf PDF
B08 Solicitation Amendment -W91RUS25R000400002-.pdf PDF
B08 Solicitation -W91RUS25R0004-.pdf PDF
Amendment -W91RUS25R0004P00001-.pdf PDF
Solicitation -W91RUS25R0004-.pdf PDF
Limit Comp. JA -Monaco Fire Alarm-_Redact.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers:

1. Do we have Architectural drawings?

· YES – please refer to the attached Architectural drawings.

2. May we get the code analysis sheet to determine occupancy group, load etc?

· I believe this building is an Industrial occupancy as it is for equipment testing and only 1 or 2 people with work in there to set up equipment under test. The building houses a chamber to test equipment. No personnel offices or latrines.

3. Are there any spec sheets for the project?

· This is a design build based on the scope of work. Once we receive the design it is to be submitted to Authority Having Jurisdiction (AHJ) for approval. That is the Post Fire Chief/Inspector.

4. The building classification for occupancy group is U?

· We do not use the International Building Code here on Fort Huachuca we utilize NFPA for occupancy classifications

5. The Fire Alam Panel is to be a Monaco MAAP-X panel?

· Monaco MAAP-X or +, this is in the Fort Huachuca Project Specific Requirements (attached for reference).

6. The Notifier NFS -320 panel is to remain as the pre-action system for the Novec suppression system?

· Yes, This system is to remain as part of the fire protection system.

· Must be tied in with the Fire Alarm System.

7. The system should conform to design practices Per UFC 3-600-01 and corresponding NFPA-72 guidelines?

· Yes, this is in the Fort Huachuca Project Specific Requirements

8. Are scrolling messaging signs required for the application?

· There should be a digital display of any supervisory or trouble alarms logged with the system.

· This is in reference to the signs above the doors which will have a scrolling message for what the alarm is. And Yes.