This file contains architectural drawings for a pre-engineered metal building project, showing floor plans, elevations, sections, and technical details. The building is designed to house a constellation chamber (not in contract) with dimensions of 60' x 60' clear space, surrounded by a larger structure measuring approximately 90' x 83' overall.
The drawings detail a single-story metal building with a ridge height of 64'11", featuring a 20' x 20' motorized overhead door, two 3' x 7' personnel access doors, and specific electrical and HVAC requirements including eight 3000 CFM exhaust fans with shutters and eight 3' x 3' louvers. The structure includes pre-finished roof panels, metal wall panels, concrete apron slabs, transformer pad, HVAC pad, and a comprehensive grounding system with copper ground rods. The building's lighting system consists of surface-mounted LED fixtures, including emergency battery pack units, and the electrical system includes provisions for both building and chamber power distribution panels.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.docx | DOCX document | |
| B08 Solicitation Amendment -W91RUS25R000400002-.pdf | ||
| Fort Huachuca Project Specific Requirements.pdf | ||
| Questions and Answers.docx | DOCX document | |
| B08 Solicitation -W91RUS25R0004-.pdf | ||
| Amendment -W91RUS25R0004P00001-.pdf | ||
| Limit Comp. JA -Monaco Fire Alarm-_Redact.pdf | ||
| Solicitation -W91RUS25R0004-.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOOR PLAN
SCALE: 1/8"=1'-0"
PERSONNEL ACCESS
DOOR 3'x7' TYP 2 PLCS
OVER HEAD DOOR 20-0" H x 20'-0" W
E
DCBA
ROOF PLAN
SCALE: 1/8"=1'-0"
SL
OP
E
SL
OP
E
CL RIDGE
22'-6" 22'-6" 22'-6" 22'-6"
'-3
'-3
'-0
'-3
'-3
(92'-1") OUT TO OUT OF BUILDING (SUBJECT TO PROVIDING INTERNAL CLEARANCES AT FRAMES)
(8 5'-
1" ) O
UT
T
O
OU
T
OF
B
UI
LD
IN
G (S
UB
JE
CT
T
O
PR
OV
ID
IN
G
IN
TE
RN
AL
C
LE
AR
AN
CE
S
AT
F
RA
ME
S)
94'-5" (OUT TO OUT OF ROOF)
'-0
OU
T
TO
O
UT
O F
RO
OF
E
DCBA
6'-51 2"
CLEAR
5'- 0"
MI
N
CL
EA
R
'-0 " C
LE
AR
C
ON
ST
EL
LA
TI
ON
C
HA
MB
ER
(N
OT
IN
C
ON
TR
AC
T)
'-0
OU
T
TO
O
UT
O F
CH
AM
BE
R
ST
RU
CT
UR
E (N
OT
IN
C
ON
TR
AC
T)
60'-0" CLEAR CONSTELLATION CHAMBER
(NOT IN CONTRACT)
5'- 0"
MI
N
CL
EA
R
6'-51 2"
CLEAR
76'-0" OUT TO OUT CHAMBER STRUCTURE
(NOT IN CONTRACT)
CONCRETE APRON
SLAB-ON-GROUND
(NOT IN CONTRACT)
PRE-ENGINEERED METAL BUILDING
HVAC PAD
CONCRETE STOOP
PRE-ENGINEERED METAL BUILDING
PRE-FINISHED ROOF PANELS BY BUILDING
SUPPLIER
BRACED BAY AS REQUIRED BY
METAL BUILDING SUPPLIER TYP
BOLLARD 2 PLCS TYP
TRANSFORMER PAD
CL DOOR
CL DOOR AND
BUILDING
CL DOOR
'-0
'-0
3'-8"(±)
3'- 2"
ROOF GIRTS TYP
ROOF PURLINS TYP
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8
5'-0"
CLEAR
'-6
T
O
RI
GI
D
FR
AM
E
'-0
O
UT
T
O
OU
T
OF
C
HA
MB
ER
'-6
E
AV
E
HE
IG
HT
83'-0"
END WALL ELEVATION
SCALE: 1/8"=1'-0"
WEST VIEW
OUTLINE OF CHAMBER
(NOT IN CONTRACT)
METAL ROOF PANELS
METAL WALL PANELS TYP
5'-0"
CLEAR
'-6
T
O
RI
GI
D
FR
AM
E
'-0
O
UT
T
O
OU
T
OF
C
HA
MB
ER
END WALL ELEVATION
SCALE: 1/8"=1'-0"
EAST VIEW
OUTLINE OF CHAMBER BEYOND
(NOT IN CONTRACT)
METAL WALL PANELS TYP
20'-0"X20'-0" MOTORIZED
OVERHEAD DOOR
PERSONNEL DOOR
1 632 4 5
83'-0"
METAL ROOF PANELS
16 3 245
A C D E
22'-6" 22'-6" 22'-6" 22'-6"
'-0
" C
ON
ST
EL
LA
TI
ON
C
HA
MB
ER
O
UT
SI
DE
H
EI
GH
T (N
OT
IN
C
ON
TR
AC
T)
20" EXHAUST FAN WITH SHUTTERS -
8 REQUIRED - 3000 CFM SEE
SPECIFICATIONS FOR DETAILS
(6 0'-
6"
94'-5"±
GUTTER SLOPE
B
PERSONNEL DOOR
LEFT ELEVATION
SCALE: 1/8"=1'-0"
SOUTH VIEW
RIGHT ELEVATION
SCALE: 1/8"=1'-0"
NORTH VIEW
'-0
" C
ON
ST
EL
LA
TI
ON
C
HA
MB
ER
O
UT
SI
DE
H
EI
GH
T (N
OT
IN
C
ON
TR
AC
T)
3'X3' LOUVER - 8 REQUIRED SEE
SPECIFICATIONS FOR DETAILS
'-6
ACDE
22'-6" 22'-6" 22'-6" 22'-6"
94'-5"±
GUTTER SLOPE
B
PROVIDE GUTTERS AND
DOWNSPOUT - TYP
(6 4'-
11 2") R
ID
GE
H
EI
GH
T
4'- 6"
M
IN
C
LE
AR
AT
LO
W
ES
T
PO
IN
T
FFE 0.00
PROVIDE GUTTERS AND
DOWNSPOUT - TYP
3'-3"
DOOR OPEN POSITION
BRACED BAY AS REQUIRED BY
METAL BUILDING SUPPLIER TYP
6'-51 2"
CLEAR
6'-51
2"
CLEAR
87'-0" (OUT TO OUT OF ROOF)
87'-0" (OUT TO OUT OF ROOF)
6'-51 2"
CLEAR
6'-51
2"
CLEAR
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
E
DCBA
6'-0"
CLEAR
5'- 0"
CL
EA
R
FLOOR PLAN
SCALE: 1/8"=1'-0"
90'-0"
'-0
OVER HEAD DOOR 20-0" H x 20'-0" W
CONSTELLATION
CHAMBER
5'- 0"
CL
EA
R
6'-0"
CLEAR
20' x 20' CHAMBER
SLIDING DOOR
B E-003-02
A E-003-02
(2) 4" CONDUIT
1 SPARE &
1 OCCUPIED
4-500kCMIL &
1#3GND IN 4"C
EXISTING
13.2KV-208/120V,
225KVA, 3ɸ
TRANSFORMER
TO BUILDING
PANEL PP-1
CKT #6
TO BUILDING
PANEL PP-1
CKT#1, 3, & 5
EXISTING
COMM VAULT
NEW 2" PVC CONDUIT FOR
NEW COMMUNICATION LINE
CKT#7
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8
BUILDING EQUIPMENT
ITEM # DESCRIPTION LOCATION W D H WEIGHT (LBS)
1 PP-1 BUILDING PANEL BUILDING 20" 5.75 50" TBD
2 PP-2 CHAMBER PANEL BUILDING 20" 5.75 32" TBD
3 HVAC DISCONNECT SWITCH OUTSIDE BUILDING 7.5" 4.5" 14.6" TBD
4 75KVA ISOLATION TRANSFORMER OUTSIDE BUILDING 32" 27" 44" 1025
T/SLAB EL 0'-0"
6 5 4 3 2 1
" A
FF
SECTION
SCALE: 1/8"=1'-0"
A E-003-01
TO EXISTING
13.2KV-208/120V,
225KVA, 3ɸ
TRANSFORMER
E D C B A
T/SLAB EL 0'-0"
SECTION
SCALE: 1/8"=1'-0"
B E-003-01
TO BUILDING PANEL
PP-1 CKT #1, 3 & 5
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8
BUILDING EQUIPMENT
ITEM # DESCRIPTION LOCATION W D H WEIGHT (LBS)
1 PP-1 BUILDING PANEL BUILDING 20" 5.75 50" TBD
2 PP-2 CHAMBER PANEL BUILDING 20" 5.75 32" TBD
3 HVAC DISCONNECT SWITCH OUTSIDE BUILDING 7.5 4.5 14.6 TBD
E
DCBA
6'-0"
CLEAR
5'- 0"
CL
EA
R
FLOOR PLAN
SCALE: 1/8"=1'-0"
90'-0"
'-0
OVER HEAD DOOR 20-0" H x 20'-0" W
5'- 0"
CL
EA
R
6'-0"
CLEAR
TO BUILDING
PANEL PP-1
CKT #2
a
AB A AB
AB A AB
A
A
A
AB
C
C
CONSTELLATION
CHAMBER
20' x 20' CHAMBER
SLIDING DOOR
TO BUILDING
PANEL PP-1
CKT #4
LIGHT FIXTURE
W/BATTERY
PACK (TYP)
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8
LIGHTING FIXTURE SCHEDULE
TYPE QUANITY MANUFACTURER MODEL # DESCRIPTION LAMP VOLTS MOUNTING LUMENS WATTAGE
A 5 LITHONIA CLX LED LINEAR
CLX L24 5000LM SEF WDL
MVOLT GZ10 40K 80CRI WH LED 120/277V SURFACE 5657 41.5W
AB 5 LITHONIA CLX LED LINEAR
CLX L24 5000LM SEF WDL
MVOLT GZ10 40K 80CRI WH
WITH EMERGENCY BATTERY
PACK
LED 120/277V SURFACE 5657 41.5W
C 2 LITHONIA TWR1
12-15/16"W X 9"H X 7-1'2"D
DARK BRONZE 4000K LED
LUMINAIRE WITH PHOTO CELL
LED MVOLT 120-277 SURFACE 4900 59W
10'-0" BY 1" COPPER
GROUND ROD (TYP.)
6'-0"
CLEAR
5'- 0"
CL
EA
R
GROUNDING PLAN
SCALE: 1/8"=1'-0"
90'-0"
'-0
5'- 0"
CL
EA
R
6'-0"
CLEAR
GB
GROUND SYSTEM
TEST WELL WITH
ROD CONNECTION
TYP.
EXOTHERMIC
WELD GROUND
TERMINATION TYP.
CHAMBER EQUIP.
COPPER GROUND
BUS BAR
BUILDING EQUIP.
COPPER GROUND
BUS BAR
GB 15
CONSTELLATION
CHAMBER
20' x 20' CHAMBER
SLIDING DOOR
F
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
ROOF PLAN
SCALE: 1/8"=1'-0"
E
DCBA
AIR TERMINALS
TYP 4 PLCS
4/O DOWN CONDUCTOR
AT EACH CORNER OF BUILDING
ROUTED DOWN SURFACE OF
EXTERIOR IN PVC CONDUIT TO
BUILDING GROUND
TYP 4 PLCS
MAIN CONDUCTOR
CONNECTING
AIR TERMINALS
IN PVC CONDUIT
B E-006-02
A E-006-02
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
1 632 4 5
'-6
T
O
RI
GI
D
FR
AM
E
41'-6"
T/SLAB EL 0'-0"
'-6
E
AV
E
HE
IG
HT
T/ ROOF EL
41'-6"
83'-0"
PAD FOOTING BEYOND
AIR TERMINALS
TYP 4 PLCS
4/O DOWN CONDUCTOR
TYP 4 PLCS
SECTION
SCALE: 1/8"=1'-0"
A E-006-01
A B C D E
T/SLAB EL = 0'-0"
'-6
90'-0"
SECTION
SCALE: 1/8"=1'-0"
B E-006-01
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
6'-51 2"
CLEAR
5'- 0"
MI
N
CL
EA
R
FLOOR PLAN
SCALE: 1/8"=1'-0"
22'-6" 22'-6" 22'-6" 22'-6" 90'-0"
X-BRACING
LOCATIONS TBD
TYP
'-0
'-3
'-3
'-0
'-3
PERSONNEL ACCESS
DOOR 3'x7' TYP 2 PLCS
OVER HEAD DOOR 20-0" H x 20'-0" W
E
DCBA
CONSTELLATION CHAMBER
'-3
'-0
" C
LE
AR
C
ON
ST
EL
LA
TI
ON
C
HA
MB
ER
'-0
OU
T
TO
O
UT
O F
CH
AM
BE
R
ST
RU
CT
UR
E
60'-0" CLEAR CONSTELLATION CHAMBER
5'- 0"
MI
N
CL
EA
R
6'-51 2"
CLEAR
76'-0" OUT TO OUT CHAMBER STRUCTURE
20' x 20' CHAMBER SLIDING DOOR
PRE-ENGINEERED METAL BUILDING
6 7 8
CONCRETE SLAB 8" ± THICK
EFF 0'-0"
CL DOOR AND
BUILDING
A
IF-011
HVAC PAD
12'-2"
'-9
9'-
0"
1'-1"
TRANSFORMER PAD
4'- 0"
1'-11"
4'-0"
4'- 01 4"
CL DOOR
'-0
'-0
3'- 2"
CL DOOR
3'-8"
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
60'-0" CLEAR CONSTELLATION CHAMBER
4'- 6"
CL
EA
R
SLOPE SLOPE
'-6
T
O
RI
GI
D
FR
AM
E
1" 1'-0"
'-0
O
UT
T
O
OU
T
OF
C
HA
MB
ER
20'-0"
7'- 0"
3'-0"
41'-6"
14'-2"
CONSTELLATION CHAMBER
PERSONNEL DOOR T/SLAB EL 0'-0"
'-6
E
AV
E
HE
IG
HT
T/ ROOF EL
41'-6"
83'-0"
71'-0" OUT TO OUT OF CHAMBER STRUCTURE
PAD FOOTING BEYOND
GRADE BEAM
ENTIRE PERIMETER
8" SOG
'-0
" C
LE
AR
C
ON
ST
EL
LA
TI
ON
CH
AM
BE
R
PRE-ENGINEERED METAL BUILDING
6 7
MI
N.
SECTION
SCALE: 1/8"=1'-0"
A
IF-010
BACK WALL SIMILAR
'-0
CL OVERHEAD DOOR
1 632 4 5 22'-0"15'-3"15'-3" 15'-3" 15'-3"
TIE BEAM
TRANSFORMER PAD
SEE CIVIL DRAWINGS
TYP EACH SIDE
FINISHED GRADE SLOPE
AWAY FROM BUILDING
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
FLOOR PLAN
SCALE: 3/16"=1'-0"
(22'-57 8") (22'-57
8") (22'-57 8")
(89'-119 16")
(8 2'-
9 16
(1 5'-
27 8"±
(1 5'-
27 8"±
(2 2'- 0"
(1 5'-
27 8"±
PERSONNEL ACCESS
DOOR 4'x7' TYP 2 PLCS
OVER HEAD DOOR 20-0" H x 20'-0" W
E
DCBA
CONSTELLATION CHAMBER
(1 5'-
27 8"±
20' x 20' CHAMBER SLIDING DOOR
7'- 71 2"
11'-3" 22'-6"
'-0
7'-
71 2"
'-0
20" X 30" SA (10) D1
20" X 24" RA (10) D1
20" X 30" SA (10) D1
20" X 24" RA (10) D1
26" X 30" RA (10) D1
9'- 0"
1'-011 16"
A P-011
B P-011
C P-011
20" X 24" RA (10) D1
14" X 16" SA (10) D1
24" X 24" SA (10) D1
14" X 16" SA (10) D1
24" X 24" SA (10) D1
22" X 20" RA (10) D1
22" X 20" RA (10) D1
PCHU
RGD
RGD
RGD
RGD
SGD
SGD
SGD
SGD
PAD PROVIDED
BY OTHERS
CLEAN-AGENT FIRE
SUPPRESSION BOTTLES
PROVIDED BY OTHER
(8 PLACES)
DP
DP
DP
DP
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
(5 5'-
6"
T O
RI
GI
D
FR
AM
E
(5 1'-
0"
O
UT
T O
OU
T
OF
C
HA
MB
ER
(6 0'-
6"
E
AV
E
HE
IG
HT
(82'-111 2")
SECTION
SCALE: 3/16"=1'-0"
A P-010
OUTLINE OF CHAMBER
BY OTHERS
METAL ROOF PANELS
BY OTHERS
1 632 4 5
'-6
'-1
01 2"
8'- 0"
20" X 24" RA (10) D1 22" X 20" RA (10) D126" X 30" RA (10) D1
20" X 30" SA (10) D1
26" X 30" RA (10) D1
22" X 20" RA (10) D1
14" X 16" SA (10) D1
24" X 24" SA (10) D1
24" X 24" SA (10) D1
PCHU
SGD
1001 SGD
ACCESS DOOR
PAD PROVIDED BY
OTHERS
RGD
RGD
CLEAN-AGENT FIRE
SUPPRESSION BOTTLES
PROVIDED BY OTHER
(8 PLACES)
DP
DP
14" X 16" SA (10) D1
24" X 24" SA (10) D1
SECTION
SCALE: 1"=1'-0"
C P-010
5'-
20" X 24" RA (10) D1
22" X 20" RA (10) D1
CHAMBER
WALL
CHAMBER
CEILING
SECTION
SCALE: 1"=1'-0"
B P-010
SGD
RGD
AF
AF
HONEYCOMB FILTER
CONNECTION
PLATECONNECTION
PLATE
HONEYCOMB
FILTER
TYPICAL RETURN AIR COMPONENTS
AND CONNECTION TO CHAMBER
TYPICAL SUPPLY AIR COMPONENTS
AND CONNECTION TO CHAMBER
A
E SIZE (34X44)
B
C
D
E
F
G
H
2 3 4 5 6 7 8
A
B
C
D
E
F
G
| General |
| Civil |
| Arch |
| Struc |
| Elect |
| Interface |
| Proc |
File details come from the government source that posted it. Updated .