This is a performance work statement for a non-personal services contract to provide military human resources, military personnel division, transition center, retirement services office, and non-personnel services delivery redesign S1 services for soldiers, command sponsored dependents, DoD civilians, and retirees assigned to the US Army in the Republic of Korea. Key requirements include providing MPD, TC, RSO, and non-PSDR S1 functions at four garrison locations, conducting in-processing and out-processing, managing personnel actions and applications, processing awards and decorations, leaves and passes, military pay and entitlements, and publishing orders. The period of performance is a 30-day phase-in period followed by an 11-month base period and two 12-month option periods. The closing date for proposals is December 14, 2019.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A21_Amendment 0002 to W91QVN-20-R-0015.pdf | ||
| A21_Summary - Amendment 0002.pdf | ||
| A21_Vendor Day_Q&A_.xlsx | XLSX spreadsheet | |
| A21_Amendment 0001 to W91QVN-20-R-0015_Public.pdf | ||
| A21_Summary - Amendment 0001_Public.docx | DOCX document | |
| A21_Questions and Answers_Public.xlsx | XLSX spreadsheet | |
| MPD PSDR and NonPSDR listAttachment 3.pdf | ||
| W91QVN20R0015 MPD&TC.PDF | ||
| MPD SOPAttachment2.xlsx | XLSX spreadsheet | |
| MPD PRSAttachment 1.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
X
A X B X C
D
EX
X G F 86 - 92
93 - 98 X H 99 - 105
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 105
(If other than Item 7) W91QVN
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W91QVN 8. ADDRESS OFFER TO
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 13
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
14 - 68 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
70 - 71
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 72 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 73 - 77 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
78 - 85
PART II - CONTRACT CLAUSES
411TH CONTRACTING SUPPORT BRIGADE, KOREA
SERVICES DIV, UNIT #15289
APO AP 96271
UNITED STATES
411TH CSB, KOREA - CONST & SUPPLY TEAM
POC: CPT LEE, ROBERT S.
TEL: 0503-355-3406
E-MAIL: ROBERT.S.LEE60.MIL@MAIL.MIL
APO AP 96271
UNITED STATESFAX:
TEL:
FAX:
TEL: 0503-355-3406
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
13 Nov 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W91QVN20R0015
14 Dec 2019Bldg #12601, 4th Floor, Services Division, Reception Desk, Unit 15289 until 1000 local time thomas.e.brannen2.civ@mail.milThomas E. Brannen 011-82-503-355-3376
W91QVN20R0015
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 11 Months
AREA I - MPD & TC SUPPORT
FFP
Area I Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Mar 2020 - 14 Feb 2021 FOB: Destination
PSC CD: R699
NET AMT
0002 11 Months
AREA II - MPD & TC SUPPORT
FFP
Area II Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Mar 2020 - 14 Feb 2021
0003 11 Months
AREA III - MPD & TC SUPPORT
FFP
Area III Support Activity for Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Mar 2020 - 14 Feb 2021
0004 11 Months
AREA IV - MPD & TC SUPPORT
FFP
Area IV Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Mar 2020 - 14 Feb 2021
0005 Job
TUITION
COST
This CLIN has a Not to Exceed (NTE) amount of $896,000.00.
ESTIMATED COST
0006 Job
TRAVEL
COST
Travel will be reimbursed at a rate IAW FAR 31.205-46 and Joint Travel Regulation (JTR). Costs submitted for payment shall be substantiated by receipts or other verifiable evidence to determine allowability. The Government will not pay for any unauthorized travel. No fee. Overhead and G&A rates applied to Travel ODC's in accordance with the Contractor's approved accounting system are allowable costs.
DO NOT PROPOSE A PRICE FOR THIS COST REIMBURSABLE CLIN.
PoP: 15 Mar2020 - 14 Feb2021
0007 1 Job DBA Insurance
FFP
The amount listed by the offeror on this CLIN is the fixed price for the DBA insurance premium. Offerors shall refer to the Claims Reporting and Failure to Comply clauses to correctly price this CLIN. The fixed price shall include all DBA insurance premiums and any administrative costs associated with the Claims Reporting and Failure to Comply clauses.
0008 1 Job Accounting for Contract Services
FFP
CMR (Contractor Manpower Reporting) requirement must be reported by 31 October of each calendar year during the life of the contract IAW local clause 5152.242-4038.
ESTIMATED WAR HAZARD LOSSES
COST
Estimated War Hazard Losses is Zero (0)
0010 1 Months Phase-In Period
FFP
Area I, II, III, and IV Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
Phase-in Period will be from 15 Feb 20 - 14 Mar 20.
1001 12 Months
OPTION AREA I - MPD & TC SUPPORT
FFP
Area I Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Feb 2021 - 14 Feb 2022
1002 12 Months
OPTION AREA II - MPD & TC SUPPORT
FFP
Area II Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Feb 2021 - 14 Feb 2022
1003 12 Months
OPTION AREA III - MPD & TC SUPPORT
FFP
Area III Support Activity for Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Feb 2021 - 14 Feb 2022
1004 12 Months
OPTION AREA IV - MPD & TC SUPPORT
FFP
Area IV Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Feb 2021 - 14 Feb 2022
1005 Job
OPTION TUITION
COST
This CLIN has a Not to Exceed (NTE) amount of $896,000.00.
1006 Job
OPTION TRAVEL
COST
Travel will be reimbursed at a rate IAW FAR 31.205-46 and Joint Travel Regulation (JTR). Costs submitted for payment shall be substantiated by receipts or other verifiable evidence to determine allowability. The Government will not pay for any unauthorized travel. No fee. Overhead and G&A rates applied to Travel ODC's in accordance with the Contractor's approved accounting system are allowable costs.
DO NOT PROPOSE A PRICE FOR THIS COST REIMBURSABLE CLIN.
PoP: 15 Feb 2021 - 14 Feb 2022
1007 1 Job OPTION DBA Insurance
FFP
The amount listed by the offeror on this CLIN is the fixed price for the DBA insurance premium. Offerors shall refer to the Claims Reporting and Failure to Comply clauses to correctly price this CLIN. The fixed price shall include all DBA insurance premiums and any administrative costs associated with the Claims Reporting and Failure to Comply clauses.
1008 1 Job OPTION Accounting for Contract Services
FFP
CMR (Contractor Manpower Reporting) requirement must be reported by 31 October of each calendar year during the life of the contract IAW local clause 5152.242-4038.
OPTION ESTIMATED WAR HAZARD LOSSES
COST
Estimated War Hazard Losses is Zero (0)
2001 12 Months
OPTION AREA I - MPD & TC SUPPORT
FFP
Area I Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Feb 2022 - 14 Feb 2023
2002 12 Months
OPTION AREA II - MPD & TC SUPPORT
FFP
Area II Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Feb 2022 - 14 Feb 2023
2003 12 Months
OPTION AREA III - MPD & TC SUPPORT
FFP
Area III Support Activity for Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Feb 2022 - 14 Feb 2023
2004 12 Months
OPTION AREA IV - MPD & TC SUPPORT
FFP
Area IV Support Activity For Military Personnel Division (MPD) & Transition Center (TC) Services IAW PWS.
PoP: 15 Feb 2022 - 14 Feb 2023
2005 Job
OPTION TUITION
COST
This CLIN has a Not to Exceed (NTE) amount of $896,000.00.
2006 Job
OPTION TRAVEL
COST
Travel will be reimbursed at a rate IAW FAR 31.205-46 and Joint Travel Regulation (JTR). Costs submitted for payment shall be substantiated by receipts or other verifiable evidence to determine allowability. The Government will not pay for any unauthorized travel. No fee. Overhead and G&A rates applied to Travel ODC's in accordance with the Contractor's approved accounting system are allowable costs.
DO NOT PROPOSE A PRICE FOR THIS COST REIMBURSABLE CLIN.
PoP: 15 Feb 2022 - 14 Feb 2023
2007 1 Job OPTION DBA Insurance
FFP
The amount listed by the offeror on this CLIN is the fixed price for the DBA insurance premium. Offerors shall refer to the Claims Reporting and Failure to Comply clauses to correctly price this CLIN. The fixed price shall include all DBA insurance premiums and any administrative costs associated with the Claims Reporting and Failure to Comply clauses.
2008 1 Job OPTION Accounting for Contract Services
FFP
CMR (Contractor Manpower Reporting) requirement must be reported by 31 October of each calendar year during the life of the contract IAW local clause 5152.242-4038.
OPTION ESTIMATED WAR HAZARD LOSSES
COST
Estimated War Hazard Losses is Zero (0)
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
INSTALLATION MANAGEMENT COMMAND PACIFIC, KOREA (IMCOM P Korea)
UNITED STATES ARMY MILITARY PERSONNEL DIVISION (MPD),
TRANSITION CENTERS (TC), RETIREMENT SERVICES OFFICE (RSO), AND NON -PERSONNEL
SERVICES DELIVERY REDESIGN S1
PART 1
General Information
1. GENERAL: This is a non-personal services contract to provide Military Human Resources (HR), Military Personnel Division (MPD), Transition Center (TC), Retirement Services Office (RSO) and non-PSDR (Personnel Services Delivery Redesign) S1 services for Soldiers, Command Sponsored Dependents, DoD Civilians and Retiree’s assigned to US Army in the Republic of Korea (ROK). The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide military HR required for MPD, TC, RSO and non-PSDR S1 services for Soldiers, Command Sponsored Dependents, DoD Civilians and Retiree’s assigned to US Army in the Republic of Korea (ROK).
1.2 Background: The primary workload shall be performed at four Garrisons for support at site organizations.
The contractor shall provide all MPD, TC, RSO and non-PSDR S1 military HR services to Installation Management Command Pacific (IMCOM P) Korea at four (4) Garrisons (Areas I, II, III, IV (see TAB C-Map of Areas I-IV)), and the non-PSDR units located across the Korean peninsula (see TAB D List of Organizations to include non-PSDR Units).
1.3 Type of Contract: The government will award a Firm-Fixed Price contract.
1.4 Objectives:
Data Accuracy: Accuracy of information impacts not only on decisions made by Commanders, it affects readiness and the common operating picture, and impacts Soldiers and their Families. For Soldiers, accurate information impacts their careers, retention, compensation, promotions, and general well-being.
For Family members, accuracy of information is critical for next of kin (NOK) notification if a Soldier becomes a casualty. HR providers must understand the dynamic nature of the Army’s HR Information System (HRIS) architecture and the fact that data input at the lowest level has direct impact on decisions being made at the highest level.
Timeliness: Timeliness ensures decision makers have access to relevant HR information and analysis that supports current and future operations. It also supports a near real-time common operational picture across all echelons of HR support.
Responsiveness: Responsiveness is providing the right support to the right place at the right time. It is the ability to meet ever-changing requirements on short notice and to apply HR support to meet changing circumstances during current and future operations. It involves identifying, accumulating, and maintaining sufficient resources, capabilities, and relevant information to enable commanders to make rapid decisions.
Integration: Maximize effectiveness by joining all elements of HR support (tasks, functions, systems, processes, and organizations) with operations ensuring unity of purpose and effort to accomplish the mission. Innovation and technology play a tremendous role in these objectives since only throughout innovation HR professional can keep remain relevant and provide the most effective ways for mission accomplishment.
Anticipation: Foresee events and requirements in order to initiate the appropriate HR support.
1.5 Scope: The contractor shall conduct daily functions under the general guidance of an appropriate Government/Military Official from IMCOM-P.
1.6 Period of Performance: The period of performance (PoP) will include a phase-in period (30 days), a base period (11 months), and two (2), 12-month option periods. The PoP reads as follows: The Period of Performance reads as follows:
Base Period (Phase-In): 15 February 2020 – 14 March 2020 Base Period (Full Performance): 15 March 2020 – 14 February 2021 Option Period I: 15 February 2021 – 14 February 2022 Option Period II: 15 February 2022 – 14 February 2023
1.6.1 Phase-In Period: The contractor shall execute an effective phase-in period to address all requirements with minimal disruption to operations. The contractor shall assume full responsibility for work in each functional area by the end of the phase-in period. The contract awardee shall exercise their transition plan (submitted in conjunction with their Phase-In Plan) to the government, during the phase in and phase out period between contract award and termination.
1.6.2 Phase- Out Period: The services provided by this contract are vital to the Government’s overall effort and services must be maintained without interruption. Therefore, during the 45-calendar day period immediately prior to the end of the contract, the current contractor shall, if applicable, permit the successor contractor or the government MPD to observe and become familiar with all operations under this contract. The contractor shall not defer any needed services for the purpose of avoiding responsibility or transferring such responsibility to the successor contractor or the government MPD.
1.7 Performance: The contractor shall perform all military HR MPD, TC,RSO, and non-PSDR S1 military HR functions in accordance with Department of Defense and Army regulations, policies, directives, local regulation and directives, and the contract. The contractor shall perform the administrative tasks required for the daily operation of the MPD, TC, RSO and non-PSDR S1.
1.7.1 Administrative: The contractor shall perform these tasks at each MPD, TC and RSO:
a. Coordinate with the designated Contracting Officer Representative (COR) and/or Assistant Contracting Officer Representative (ACOR) concerning daily work flow requirements and priorities.
b. Perform general administrative tasks required for the daily operation of the MPD, , TC and RSO.
c. Maintain a customer service area to handle inquiries and refer clients to the appropriate MPD, TC and RSO section. Customer service areas shall operate during the established business hours.
d. Perform administrative duties such as data entry, desktop publishing, word processing, general clerical duties, uploading documents to iPERMS, taking notes at meetings, filing, photocopying, correspondence, daily distribution of requirements, and answering MPD, TC and RSO telephone lines.
e. Maintain work areas in a safe, clean and orderly manner at all times.
f. Each specific task for MPD, TC, and RSO are required to have a desk side Standard Operating Procedures (SOP). These SOPs will be kept current, pen and pencil updated as changes occur, then reprinted quarterly.
g. At Government’s request, the contractor may be required to assist third party agencies during official investigations and inquiries such as Military Law Enforcement Agencies and Army Career Counselors. Assistance may include the following: provide Government’s copies of inventories/logs, reports, and Soldier’s personal files, and generate memorandum for record. The contractor shall ensure all releases of information to third parties are in accordance with the Freedom of Information Act (FOIA).
1.8 Quality Control. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services
1.8.1 Quality Control Plan (QCP). The contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with this PWS. The QCP must be a comprehensive plan to execute and deliver quality services to the Government. The contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract.
a. The contractor shall submit a QCP to the Government within 30 calendar days after the contract is awarded for review and acceptance.
b. The QCP shall be used by the contractor to collect data, evaluate and document performance against standards associated with each specific requirement. Performance is measured by assessing the required workload quantity in terms of quality and timeliness
c. Include the requirement to maintain documentation of all contractor quality control inspections and corrective actions to be maintained by the contractor throughout the term of this contract. Inspection documents and the corrective action taken shall be made available to the COR/ACOR and the KO or designated representative.
d. Must include a Quality Control Report (QCR).
e. After acceptance of the QCP the contractor will receive the COR’s acceptance in writing of any proposed change to his QC system.
1.8.2. Quality Control Report (QCR).
a. Shall meet the objectives of the QCP, shall cover and prioritize all services described in this contract, and mirror the requirements of the Performance Requirements Summary (PRS) table.
b. Contain specific quality control techniques and standards for contract services identified in the PRS and Inspection of Services Clause list. The quality control methods of following the deskside Standard Operating Procedures (SOP) shall be comprehensive and adaptable to the reporting systems of the QCP. Control measures must be specified and metrics developed to ensure accurate program monitoring.
c. Establish a monthly inspection system covering all services required by this contract following the task performance guidance as outlined in the SOP. This plan shall specify areas/tasks from the SOP to be inspected on either a scheduled or an unscheduled basis and the title of the individual who will do the inspection.
d. Submitted to the government COR/ACOR by the 5th working day of every month
e. The contractor shall use the format below to create the QCR and measure each line item in the PRS table.
See example below.
1.8.3 Performance Requirements Summary (PRS) table and Standard Operating Procedures (SOP).
Describes a method acceptable to the Government of identifying deficiencies in the quality of service performed under this contract before the level of performance becomes unacceptable and address processes for corrective actions without dependence upon Government direction.
1.8.4. Customer Complaint Feedback. Include a customer complaint feedback system that is monitored for correction of validated complaints and to inform the Government of corrections using Interactive Customer Evaluation (ICE), a web-based tool that collects feedback on services provided by various organizations throughout the Department of Defense (DoD). The ICE system allows customers to submit online comment cards to provide feedback to the service providers they have encountered at military installations and related facilities around the world. It is designed to improve customer service by allowing managers to monitor the satisfaction levels of services provided through reports and customer comments. The QCP shall describe how the Government may identify problem areas or situations to the contractor. The customer complaint program shall be compatible with the reporting and communication systems of the QCP.
1.8.5. Quality Assurance: The government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). The QASP is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (AQLs).
1.9 Hours of Operation: The contractor is responsible for conducting business between the hours of 0800-1700, Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential. Each MPD, S1, TC and RSO shall be open and operational at least forty (40) hours per week. The hours of operation shall be established from 0800-1700 hours; not to exceed more than nine (9) consecutives hours per day, Monday – Friday except on legal holidays listed in this PWS 1.9.2. The COR/ACOR will establish each Garrison hours of operation in accordance with each Garrison Commander’s guidance. The hours of operation may vary during installation closing due to inclement weather, force protection exercises, and/or special operations in which the contractor may not be permitted in the work area. Each Area Site Manager, or afore designated alternate, shall be physically available at the MPD area government facility between 0800 to 1700, Monday thru Friday except Federal holidays or when the government facility is closed as mentioned above.
1.9.1 No proposed or directed change in working hours shall be effective until approved in writing by the KO.
Required Service
PWS
Paragraph
PERFORMANCE
STANDARD
What level of performance is required to meet the
Performance Objective or Task?
Acceptable Quality Level
(AQL)
WHAT/DATA
SOURCE
What are you going to inspect?
HOW/METHOD
OF
ASSESSMENT
How are you going to inspect?
see drop down list
CALCULATION
How will you determine if the AQL and Standard are being achieved?
REMEDY
Contract Management
Para The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS
100% Contractor submits based on PWS requirement.
Random Monitoring, 100% Inspection, Periodic
Inspection, Customer
Complaints, Periodic
Sampling
Contractor will submit
(Pass/Fail)/AQL
Corrected within 24 hours
1.9.2 The contractor shall observe the following as legal public holidays. As such, the MPD and TC shall not be required to conduct normal operations on these holidays:
US Government legal holidays are as follows:
1st January (New Year's Day) 3rd Monday, January (Dr. King’s Birthday) 3rd Monday, February (President's Day) Last Monday, May (Memorial Day) 4th July (Independence Day) 1st Monday, September (Labor Day) 2nd Monday, October (Columbus Day) 11th November (Veterans' Day) 4th Thursday, November (Thanksgiving Day) 25th December (Christmas Day)
1.10 Place of Performance: The work to be performed under this contract will be performed at Camp Casey, Yongsan, Camp Humphreys, and Camp Walker. Satellite sites might be established at other locations in order to support training exercises and the Korea Relocation Program. Contractor personnel may be required to visit other installation offices in the execution of their duties.
1.10.1. The Project Manager, or afore designated alternate, shall be physically available at the Camp Humphreys MPD government facility between 0800 to 1700, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons or when conducting quarterly Quality Control Inspections at other Area MPDs.
1.10.2. Each Area Site Manager, Area Site Lead, Sr. Transition Analyst, Retirement Services Officer, PAS Chief, and Quality Assurance Specialist, or afore designated alternate, shall be physically available at their designated MPD area government facility between 0800 to 1700, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.10.3. Place of performance is subject to change as personnel and resources shift from one garrison to another. The government reserves the right to direct/govern place of performance as required and necessary to support new mission requirements. No additional cost or price change will be made for relocations that may occur between the four MPD locations.
1.11 Special Qualifications: Contractor employees in key position shall have HR (Military) Automation experience, have knowledge of HR (Military) doctrine, qualified, certified or licensed under the requirements specified in individual sections of the PWS prior to starting work. The contractor (Program Manager) shall maintain records of all HR (US Army military) automation training qualifications, certifications, and licenses on each employee for the duration of their employment. These records shall be available to the COR/ACOR or designated representative upon request. The contractor (Program Manager) shall initiate all NIPRNET and HR (US Army military) System(s) access requests and submit to COR for further processing within 30 days of employee receiving their CAC I.D. The contractor shall provide internal HR (Military) systems and technical training to ensure that employees remain qualified, certified, and licensed.
a. The government reserves the right to ask contractor to conduct and complete other required training.
This training might include: Information Security/Assurance, Anti-Terrorism Training, Operations Security Training, Suicide Prevention Program, and Sexual Harassment Assault Response Prevention (SHARP) Program Training and any HR system(s) job specific training to gain access to the HRIS. IMCOM Operation Excellence (OPEX) Customer Service Training and Annual Refresher Training. New employees should complete OPEX within their first 30-90 days of employment. OPEX is a four-hour course for all employees. Key Position personnel shall attend the initial four-hour OPEX training to include OPEX for Leaders an additional four-hours of training. The cost of mandatory/required training is the full responsibility of the government.
b. Application for Status of Forces Agreement: Contractor shall submit the following documentation for each employee (1) Complete USFK Form 700-19A-R-E, IAW USFK, FKAQ Contractor SOFA Designation Request Process Guide, regardless if employee is TDY, part time employee or full time employee; (2) USFK Form 237-E, Provost Marshal Record Check; (3) Certification of Ordinary Residence Memorandum; (4) Copy of Passport Data Page for employee and/ or dependents. Additional documentation shall be required in some cases at the request of USFK, FKAQ. These requirements are subject to change at any time and without notice. All documentation shall be submitted thirty (30) calendar days after contract award. New Arrival SOFA Designation request shall be submitted to Responsible Officer (RO) and/ or COR within two weeks before the contractor start date whenever a new contractor employee is hired IAW USFK Regulation 700-19. Change of Data SOFA Designation requests shall be submitted to RO and/ or COR within one week after change has occurred and within three weeks of current 700-19 expiration date.
c. The contractor shall have knowledge of HR (US Army military) Systems required to provide military HR services and support i.e. CITRIX, PERNET, EDAS, WebEdas, TOPMIS II, AIM2 and eMILPO, DAMPS-OCO- TCS, TRANSPROC, ISM (INPROC and OUTPROC) (not all inclusive) and any Korea specific military HR programs or programs required by the NEC. (IPPS-A upon implementation by Army)
d. Local National employees must have the ability to speak, comprehend, read and write English proficiently and have some knowledge of HR (US Army military) procedures and HR (US Army military) HR Systems
1.12 Contracting Officer Representative (COR)/Assistant Contracting Officer Representative (ACOR): The COR/ACOR shall be designated in writing by the KO to act as his or her authorized representative to assist in administering this contract.. The COR/ACOR is responsible for technical administration of this contract and ensures proper government surveillance of the contractor’s performance. The COR/ACORT is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor contractor's performance and notifies both the KO and contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR/ACOR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions of the resulting order.
1.13 Key Positions: The contractor shall provide qualified personnel to fill each of the Key Positions and perform the Key Position duties stated in Technical Exhibit 3. A single person may not fill more than one (1) Key Position at the same time. The contractor shall designate in writing, a primary and alternate Key Position point of contact.
The contractor shall provide the names, telephone numbers, fax numbers, and e-mail addresses, as well as the individuals' level of authority. The contractor shall submit the same information and criteria for any person acting as an alternate to the COR/ACOR. Key personnel shall not be replaced or relocated without prior approval of the COR/ACOR and KO.
a. The contractor shall provide resumes within 10 working days of start date for any new Key Position.
Each resume shall detail each of the supporting qualifications that meet all of the requirements stated in Technical Exhibit 3 for each Key Position. If the contractor fails to meet this requirement for any of the individual Key Positions, this shall be a material breach of this contract by the contractor and may result in the government terminating this contract for cause. The KO and COR/ACOR retains authority to approve and disapprove the persons to fill each Key Position based on the established criteria in Technical Exhibit 3. The KO will notify the contractor after receipt of all required information of the KO’s decision to approve or disapprove each person for each Key Position. If the contractor fails to obtain the KO’s approval for any of the personnel who are to fill Key Positions in advance of the date of any required performance by the Key Position, this shall be a material breach of this contract by the contractor and may result in the government terminating this contract for cause.
b. Through out the duration of this contract performance, the KO and COR/ACOR retains authority to approve and disapprove the changing of any of the personnel in any of the Key Positions. Prior to substituting, removing, replacing, diverting, or otherwise changing any of the individuals in the Key Positions, the contractor shall notify the KO and COR/ACOR no less than 10 working days in advance of the proposed change, and at the time of notice to the KO and COR/ACOR the contractor shall submit the resume of the person that the contractor proposes to fill the Key Position. At this same time (no less than ten (10) working days prior to the proposed start date for the personnel change to begin contract performance), the resume shall detail each of the supporting qualifications that meet all of the Key Position requirements stated in Technical Exhibit 3. The KO and COR/ACOR will notify the contractor after receipt of all required information of the KO and COR/ACOR’s decision to approve or disapprove the personnel change for the Key Position. If the contractor fails to meet this requirement within the specified timeframe for any of the individual Key Positions, this shall be a material breach of this contract by the contractor and may result in the government terminating this contract. If the contractor fails to obtain the KO and COR/ACOR approval for any of the personnel who are to fill Key Positions in advance of the date of any required performance by the Key Position, this shall be a material breach of this contract by the contractor and may result in the government terminating this contract for cause.
1.8.16. The organizational chart shall include names, addresses, and telephone numbers of the contractor’s point of contact, supervisory personnel, and key management personnel who shall serve as a focal point between the contractor and the Government to resolve problems and emergency situations. The contractor shall ensure that the chart shall remain current at all times and shall notify the KO/COR immediately, in writing, whenever changes are made.
1.8.17 Personnel: All contractor employees shall abide by pertinent regulations set forth in this PWS and all applicable Federal and local installation laws, policy or regulations. The contractor shall develop and update standing operating procedures (SOPs) as required in the performance of this PWS to sustain operations and process customer products. This shall be done IAW applicable regulations and as directed by the COR.
a. The contractor shall provide a workforce possessing the skills, knowledge, and training to satisfactorily perform the requirements of services included in this PWS. Contractor employees shall have the ability to proficiently communicate in the English language. Personnel performing work under this PWS shall remain employees of the contractor and shall not be considered employees of the Government.
b. The contractor shall be responsible for its employees’ work performance, conduct, and behavior on duty and off duty. As this is a customer service oriented requirement, the contractor shall train all employees in good customer service skills, techniques and etiquette. The contractor shall maintain provisions for the immediate removal of employees for misconduct or other causes prejudicial to the maintenance of health, welfare, morale or security. The contractor shall be aware of the Installation Commander's responsibility for the general security and well-being of personnel, and shall ensure that personnel removal provisions support the Installation Commander in this regard.
c. The Government has an inherent right under law, practice and regulation, to control access to its facilities, property and data, including those that are the subject of this contract. Access control privileges will be tailored to individual contractor personnel responsibilities. The Government and/ or COR will be the final authority in determining access privileges. The Government's exercise of its right to grant and revoke access by particular individual(s) to its facilities and automation systems and will not constitute a breach or change to this contract, regardless of whether said individual(s) are employed by the contractor, and regardless of whether said individuals are thereby precluded from performing work under this PWS.
1.8.18 Attire and Identification: The contractor shall develop dress code requirements subject to Government approval 14 calendar days after contract award. Contractor shall provide nametags and employees shall wear them at all times. Nametags shall be visible to customers and others at all times.
1.8.19 Travel: The Contractor shall be required to travel in performance of this contract. The contractor may be required to travel between installations within the Republic of Korea. The contractor (Program Manager or Quality
Control Specialist) shall be required to conduct one quality control visit monthly to the contractor-operated MPDs, TCs and RSOs. RSO for Area II is responsible for traveling to Area I to provide RSO customer service not to exceed twice a month. RSO for Area III is responsible for traveling to Area IV to provide RSO customer service not to exceed twice a month. Contractors shall only be trained and funded by the Government in skills they are not required to bring to the job, such, command unique rules, practices, procedures and/ or systems that are essential for the contractor’s satisfactory contract performance. The cost of Government mandatory/required training is the full responsibility of IMCOM- P. All travel shall be conducted in accordance with FAR 31.205-46, “Travel Costs,” and the Joint Travel Regulations (JTR) and shall be pre-approved by the COR/ACOR. For mission requirements the number of trips and personnel travelling shall be limited to the minimum number required to accomplish work requirements and shall be coordinated with the COR/ACOR. Travel may only be approved by the COR/ACOR if adequate funds are obligated and unexpended on the travel CLIN to cover the proposed travel costs.
1.8.20. Inspections and Acceptance: The monthly QCR must be approved by the COR/ACOR.
1.8.21. Information Security and Government Systems Access: Contractor personnel shall require Common Access Cards, user accounts and system passwords for access to the Government’s personal computer networks.
Contractor staff shall be required to initiate paperwork for a national agency check as applicable and apply for HRIS access within thirty (30) calendar days after contract award and effective date of newly hired employees. All systems access request forms shall be signed by COR/ACOR.
1.8.22. Army Knowledge Online (AKO) accounts. Within thirty (30) calendar days of contract award, all contract employees shall apply for Army Knowledge Online (AKO) accounts. An AKO account is a prerequisite to access Korea domain and AHRS. Contract employees who are unable to apply for an AKO account in their own right or who choose to register as a DoD Contract Employee will use the COR/ACOR as the sponsor. Once the COR/ACOR certifies/validates the account, the contract employee will receive an email message confirming the account is active. After establishment of the Korea domain account, each contract employee shall update their AKO profile to have the AKO emails automatically forwarded to their Korea domain account. AKO accounts are verified/validated on a periodic basis and will be cancelled upon termination of employment or expiration of contract.
1.8.23. Security Requirements: Contractors are required to hold National Agency Check with Inquiry (NACI).
Additionally, they are responsible for safeguarding official and sensitive information. Failure to safeguard any official and sensitive information which may involve the contractor or the contractor’s personnel or to which they may have access may subject the contractor and/or the contractor’s employees to criminal liability under Title 18, section 793 and 7908 of the United States Code. Provisions of the Privacy Act apply to all records and reports maintained by the contractor. All programs and materials developed at government expense during the course of this contract are the property of the government. Contractor personnel shall be required to adhere to the security requirements of the Republic of Korea Theater of operation.
1.8.24. Key Control: The contractor shall appoint the Site Manager as the Key Control custodian, who will establish, implement and maintain records for ensuring that all keys issued to contractor employees by the Government are not lost or misplaced, and are not used by unauthorized persons by utilizing the Army’s Key Control Official Log IAW Army regulations. The COR/ACOR/DHR will initially furnish all keys required for access to offices and buildings. Keys issued to contractor personnel by the Government shall not be duplicated without the express written consent of the Government. The cost of any changes to locks as a result of keys lost by contractor employees shall be paid by the contractor. Prior to departing the ROK, all contract personnel will ensure if issued a key that the key is turned into the appointed Key Control custodian. Key Control custodians shall not be replaced or relocated without prior approval of the KO and COR/ACOR.
1.8.25. Common Access Card (CAC). The Government will issue a CAC to each contract employee. This card will be utilized for access to the installation, and for other identification purposes as required. Employees shall meet security background vetting requirements to be issued a CAC. This includes ensuring the employee has a valid NACI (Tier 1) or DoD-equivalent background investigation submitted to OPM and, the completion of an FBI fingerprint check with the return of favorable results before a CAC can be issued by the Trusted Agent. .Upon employment termination or CAC Card expiration, whichever comes first, the Contractor Program Manager or
Contractor Site Manager shall collect and turn-in CAC Card to the local ID card section. Additionally, the Program Manager or Contract Site Manager shall provide applicable documentation to COR proving that CAC Card has been turn-in.
a. Reference Secretary of the Army Memorandum dated 28 Jun 06, Subject: Contractor Verification System (CVS) Implementation guidance and instructions for the implementation of the CVS Army-wide. IAW with this guidance, the authorizing official (Contracting Officer Representative (COR), the designated KO assigned to the installation contracting office, the installation’s designated representative, or other approving officials) will approve issuance of the CAC through the automated CVS system. The TASM will be the designated TASM as described in the Secretary of the Army guidance.
b. The contractor’s CVS applications under this contract should clearly cite the contract and contract numbers identified on the DD Form 1144 for this contract.
1.8.26 Safety Requirements. The contractor shall take safety precautions during the performance of this contract to protect the lives of contractor personnel, the property of the U.S. Government and the Republic of Korea, as well as the private individuals and firms who may be exposed to or endangered by the contractor’s actions to maintain minimal accidents/incidents, zero loss of life and minimal damage to property. The contractor shall provide a written safety plan with policies, procedures and safety checklist with the bid proposal. The safety plan will be confirmed by the COR then accepted by the KO r within five (5) working days if there are any changes after award.
The safety program shall comply with OSHA 2206, General Industry, Occupational Safety and Health Standards (29 CFR 1910) and Korean Occupational Safety and Health Act (KOSHA). The contractor agrees to comply with its written program for the life of the contract. Any changes or modification to its safety program shall be coordinated and reviewed by the COR, or his/her duly authorized representative.
1.8.27. Risk Management Process. The safety plan shall include detailed job related hazards and controls for each work activity. The plan shall include an Activity Hazard Analysis (AHA) for each work activity. The AHA shall include at a minimum the name of the activity/job, the job steps, the job hazards, the tools or equipment required to perform the job, control measures to eliminate or reduce the hazard(s), and a Risk Assessment Code (Risk Assessment Code is an assessment of the probability of the hazard occurring and its potential impact). The contractor shall assure that the safety control measures are implemented. The contractor may use the sample AHA forms in http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx or develop their own.
a. Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 4 hours of accident occurrence to the Contracting Officer/Representative (KO/COR). The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum:
(1) Contract number and contract name/description.
(2) Name of contractor
(3) Date/time of accident
(4) Date report was completed
(5) Detail description of events that lead to the accident
(6) Root cause of accident
(7) Contributing factors
(8) Corrective action(s) to prevent recurrence
b. The following require immediate accident notification and written accident report:
(1) A fatality;
(2) A permanent total or permanent partial disability;
(3) The hospitalization of three or more people resulting from a single occurrence;
(4) Property damage of $200 or more.
1.8.28. Performance Assessment: The Government reserves the right to evaluate all areas of contractor’s performance under this contract without any advance notice to the contractor.
1.8.29 DoDDS TUITION to Contractor. School allowances are applicable only to SOFA contractor personnel permanently assigned to locations supported under this PWS and must be allowable in accordance with FAR 31.205-44. These costs are directly reimbursable and no fee or profit will be paid on the actual costs incurred.
Enrollment is a logistic privilege subject to eligibility, availability, and approval. Approved contractor employees’ children are eligible to attend the DoD Dependent Schools (DoDDS) at established tuition rates per the Department of State Standardized Regulations (DSSR) at https://aoprals.state.gov/ . Contractors are authorized to enroll their children in an international or off-installation school. However, the Contractor will only be reimbursed at the established tuition rates per the Department of State Standardized Regulations (DSSR) at https://aoprals.state.gov/.
Contractor shall provide Government with a copy of payment receipts for each employee.
1.8.30 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (example; cost or pricing information, budget information or analyses, specifications or work statements) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.8.31 The Contractor's technical proposal related to (e.g., personnel qualification, technical approach and staffing plan), in accordance with paragraph 1.6.20 of the PWS, shall be incorporated into the resultant contract as part of the PWS. The Contractor shall be obligated to perform in accordance with the incorporated proposal. Nothing contained in the incorporated proposal shall be interpreted as permitting the Contractor to perform less than required by the unincorporated portions of the PWS or other terms of the contract, or otherwise constituting a waiver of other requirements of the contract.
1.832. Accounting for Army Service Contracts: The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .