ATTACHMENT_27-Govt_Response_to_Contractors_Questions.-Gwangju.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Gwangju Communications Infrastructure Engineering and Installation
Solicitation number
W91QVN-19-R-0295
Issued by

About this file

Response to Offerors Questions

View the file

Other files

File Type Posted
W91QVN-19-D-0295_0003.pdf PDF
W91QVN-19-R-0295-0002.pdf PDF
W91QVN-19-R-0295-0001.pdf PDF
ATTACHMENT_3__Gwangju_&_45800;&_52404;_&_51068;&_44292;_&_48124;&_44036;&_51064;_&_52636;&_51077;&_49888;&_52397;_&_50577;&_49885;(2003).xls XLS spreadsheet
ATTACHMENT_24_Gwangju_AB_OSP_One-line_Diagram.pdf PDF
ATTACHMENT_4_Supplemental_Price__Sheet.xlsx XLSX spreadsheet
W91QVN-19-R-0295-27_Sept_19.pdf PDF
ATTACHMENT_5B__Building.pdf PDF
ATTACHMENT_22_Maps.pdf PDF
ATTACHMENT_26_Visio-Rack_drawing-2.pdf PDF
ATTACHMENT_8_Building.pdf PDF
ATTACHMENT_14_Building.pdf PDF
ATTACHMENT_15_Building.pdf PDF
ATTACHMENT_20_Maps.pdf PDF
ATTACHMENT_10_Building_.pdf PDF
ATTACHMENT_9_Building.pdf PDF
ATTACHMENT_23_Maps.pdf PDF
ATTACHMENT_25_GwangJu_ITN_Floor_Plan_Drawings.pdf PDF
ATTACHMENT_7_Building.pdf PDF
ATTACHMENT_11_Building.pdf PDF
ATTACHMENT_17_Manhole-Handhole.pdf PDF
ATTACHMENT_5C__Building.pdf PDF
ATTACHMENT_21_Maps_.pdf PDF
ATTACHMENT_13_Building.pdf PDF
ATTACHMENT_12_Building.pdf PDF
ATTACHMENT_2_EDP_GwangJu_Revision_30JULY2019.docx DOCX document
ATTACHMENT_19_Manhole-Handhole.pdf PDF
ATTACHMENT_1_-_Past_Performance_Questionnaire_(PPQ).docx DOCX document
ATTACHMENT_18__Manhole-Handhole.pdf PDF
ATTACHMENT_16_Manhole-Handhole.pdf PDF
ATTACHMENT_5A__Building.pdf PDF
ATTACHMENT_6_Building.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gwangju

QuestionsPWS RefQuestions from ContractorGovernment Response
1GeneralNot ProvidedWhen constructing, can we get the information of underground and/or beneath the ground for the whole construction area?Per 2.14 of the EDP the contractor is responsible for obtaining authorizations, permits and licenses as required. During the permit process the appropriate offices will identify and or mark utilities. It is at the time of permit approval that the contractor will know information on underground utilities of construction area.
2GeneralNot ProvidedIf there are obstacles such as containers, side walk, walls and etc., can we detour the route?Yes. Per 2.1.1 of the EDP construction can be modified if approved by the COR in writing.
3GeneralNot ProvidedOn the spread sheet, it say there are 28 HHs. But, on the site visit, we found that there are 27 HHs. Which one is correct?During the site visit we identified that we have 27 HHs on-hand which is the correct amount.
4GeneralNot ProvidedOn the OSP ONE-LINE DIAGRAM and OSP MAP, there are Existing Cables from BD 2159(ITN) to total 7 buildings including BD2130 and BD2134. What are these existing cables for?The existing cables provide communications infrastructure to the buildings. We will not be removing any communications cables during this contract. All installations will be new.
4-1Question relates to #4Not ProvidedDo we only have to remove the existing cable?No. We will not be removing any communications cables during this contract. All installations will be new.
4-2Question relates to #4Not ProvidedDo we have to remove the existing cable and install new cable?No. We will not be removing any communications cables during this contract. All installations will be new.
4-3Question relates to #4Not ProvidedDo we have to leave the existing cable and install new cable?Yes. All existing cable will remain in place and per the EDP new cable will be installed as designed.
4-4Question relates to #4Not ProvidedDo we have to ignore the existing cable?All existing cable will remain in place and per the EDP new cable will be installed as designed.
5GeneralNot ProvidedIf we have to deal with the existing cable, we must have detail information on the existing cable.All existing cable will remain in place and per the EDP new cable will be installed as designed.
6GeneralNot ProvidedPlease provide all material Q'ty for quotation each site.( how to collect total cable and other materials). Item FOC size Q'ty

Fiber cable 144c 48c 12c Rack 44U Rack 22U Fiber Distribution Panel 4U 3U 2U 1U 12C LC Adapter Boring for 4" PVC duct

The SOW and EDP are inclusive of the survey that the government has completed. The Contract documents included with the solicitation ( SOW/EDP, Drawings and all attachments) shall be utilize to determine type of materials and quantities for each site.
7GeneralNot ProvidedPlease mark the cable length on OSP_Map_and_One-line_DiagramRefer to Table 3 (Cable Quantities) of the EDP for approximate footage of fiber to be installed. Note that the approximate footage does not include slack or maintenance loops.
Questions asked at the Site Visit
8The EDP page 43 says 28 handholes will be provided. The PWS page 23 says 33 handholes will be provided.The correct # of GFE manholes is listed in the PWS/EDP: 6.
9GeneralNot ProvidedQuestions related to boring.Boring is recommended when crossing major roadways, taxiways, runways, etc. Otherwise, crossing of paved surfaces may be performed by pavement cuts and resurfacing with appropriate matching road material as long as access is not restricted. This does not prevent the Contractor from using directional drilling if it is more cost effective. Boring is required in FASC areas when crossing these areas.
10GeneralEDP:para 2.1.6 and 2.1.6.1Do the manholes have to be grounded?Yes. The EDP calls for manholes to be grounded in para 2.1.6 and 2.1.6.1.
11GeneralNot ProvidedWhat is the weight of the manholes/handholes?Manholes (15 Ton), Handholes (4.5 Ton)
12GeneralNot ProvidedDoes the pullboxes need to be installed on a metal base plate?No. Pull boxes will be Pre-cast In-ground with dimensions of 17" X 30" X 24"
What does FASC stands for?Facilities Areas Sub Committee.