ATTACHMENT_10_Building_.pdf

PDF 3 MB Posted

Attached to
Gwangju Communications Infrastructure Engineering and Installation
Solicitation number
W91QVN-19-R-0295
Issued by

About this file

ATTACHMENT # 10 Building Drawing

View the file

Other files

File Type Posted
W91QVN-19-D-0295_0003.pdf PDF
W91QVN-19-R-0295-0002.pdf PDF
ATTACHMENT_27-Govt_Response_to_Contractors_Questions.-Gwangju.xlsx XLSX spreadsheet
W91QVN-19-R-0295-0001.pdf PDF
ATTACHMENT_3__Gwangju_&_45800;&_52404;_&_51068;&_44292;_&_48124;&_44036;&_51064;_&_52636;&_51077;&_49888;&_52397;_&_50577;&_49885;(2003).xls XLS spreadsheet
ATTACHMENT_24_Gwangju_AB_OSP_One-line_Diagram.pdf PDF
ATTACHMENT_4_Supplemental_Price__Sheet.xlsx XLSX spreadsheet
W91QVN-19-R-0295-27_Sept_19.pdf PDF
ATTACHMENT_5B__Building.pdf PDF
ATTACHMENT_22_Maps.pdf PDF
ATTACHMENT_26_Visio-Rack_drawing-2.pdf PDF
ATTACHMENT_8_Building.pdf PDF
ATTACHMENT_14_Building.pdf PDF
ATTACHMENT_15_Building.pdf PDF
ATTACHMENT_20_Maps.pdf PDF
ATTACHMENT_9_Building.pdf PDF
ATTACHMENT_23_Maps.pdf PDF
ATTACHMENT_25_GwangJu_ITN_Floor_Plan_Drawings.pdf PDF
ATTACHMENT_7_Building.pdf PDF
ATTACHMENT_11_Building.pdf PDF
ATTACHMENT_17_Manhole-Handhole.pdf PDF
ATTACHMENT_5C__Building.pdf PDF
ATTACHMENT_21_Maps_.pdf PDF
ATTACHMENT_13_Building.pdf PDF
ATTACHMENT_12_Building.pdf PDF
ATTACHMENT_2_EDP_GwangJu_Revision_30JULY2019.docx DOCX document
ATTACHMENT_19_Manhole-Handhole.pdf PDF
ATTACHMENT_1_-_Past_Performance_Questionnaire_(PPQ).docx DOCX document
ATTACHMENT_18__Manhole-Handhole.pdf PDF
ATTACHMENT_16_Manhole-Handhole.pdf PDF
ATTACHMENT_5A__Building.pdf PDF
ATTACHMENT_6_Building.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(2) 12 SM FO TO BLDGS 1421

& 1429 FROM BLDG 1427

I

I

10I llOI. ■

EXISTING WALL

MOUNTCA NET 12 SM FO

IOI

X:

• lmL ., -------

'J"t.. .. -

�--------------+�--+------------,-, 12 SM FO TO BLDG

1421 FROM BLDG 1427

HH5-1A

GWANGJU AIR BASE BUILDING 1429

SCALE 3116" : 1 '-0"

LEGEND:

NEW USAF FIBER

NEW USAF ENTRANCE CONDUIT

EXISTING USAF ENTRANCE CONDUIT

NEW USAF WALL MOUNTED CABINET

EXISTING USAF WALL MOUNTED CABINET

.---..... ID+ FR OJlftl

,.._me, 0 4' 8' -- -

Scale: 3/16" = 1'-0" ffi DRAFTSMAN:

ENGINEER:

8- DRAFTSMAN:

ill ENGINEER:

8- DRAFTSMAN:

� ENGINEER:

/\ DRAFTSMAN:

ffi ENGINEER:

NOTES:

REVISIONS

ADD DEL REV DATE

DESTRUCTION NOTlCE: Destroy by any method that will prevent cisdosura of contents of reoonstnmtion of the dooument.

EXPORT CONTROL NOTICE: WARNING - EMport controled IAW Ml'ls E:q)ortcontrol Act (1llle 22, USC 2751)or ExportAdmlnlslratlon Al:t.ol 1979, as ammended (T�le W, US, App 24D1).

DISTRIBUTION AUTHORIZED TO US. GOVERNMENT AGENCIES AND THEIR CONlRACTORS FOR ADMINISTRATIVE OR OPERATIONAL USE, 01 MAY

1986. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE ORIGINATOR

DEPARTMENT OF THE AIR FORCE

PACIFIC AIR FORCES REPUBLIC OF KOREA

OSAN AIR BASE

7AF/A6X

OSAN AB BLDG 949 SINJANG DONG

PYEONGTAEK CITY

KR 17759

DSN:

607TH MMS/DET 1

GWANGJU AB

DSN:

PROJECT NUMBER:

PROJECT TITLE: INSTALLATION OF NEW SM

FOCA'S & UG MH DUCT SYSTEM

PROJECT DRAWING

I ENGINEER:

SMSGT. THOMAS BELISLE

I DRAFI'SMAN: TSGT. JAMES B. DODSON

DRAWING TITLE:

GWANGJU AIR BASE

BUILDING 1429

I

DRAWING NUMBER:

DRAWING SCALE:

3/16" = 1 '-0"

DATE:

31 MAY 19

I

SHEET NO.

. 1 OF 1

101 102

110 (

MAIN -

114E

MECH

ROOM

n ,n

TERMINATE IN NEW FOP'S IN NEW CABINETS.

REFER TO ITN LAYOUT FOR CABINET LOCATIONS

" \_ (3) 4" C.

105 106 107 108

114F 114A 114B 115 118

ENTRANCjl_

L======:::::'....=:i�i=-.'.===========::::::...--======================----======::::::::!:=======eea::::.-'===========-i

GWANGJU AIR BASE BUILDING 1808

SCALE 1/8": 1'-0"

LEGEND:

NEW USAF FIBER

NEW USAF ENTRANCE CONDUIT

EXISTING USAF ENTRANCE CONDUIT

NEW USAF WALL MOUNTED CABINET

EXISTING USAF WALL MOUNTED CABINET

HH1

r

,~ (2) 144 SM FO TO BLDG 2159 FROM BLDG 1808,

(1) 144 SM FO TO PB-4 FROM BLDG 1808,

HH1A

(1) 144 SM FO TO BLDG 246 FROM BLDG 1808 &

(1) 144 SM FO TO BLDG 1427 FROM BLDG 1808

4' 8

16' - - 0

Scale: 1/8" = 1'-0" ffi DRAFTSMAN:

ENGINEER:

8- DRAFTSMAN:

ill ENGINEER:

8- DRAFTSMAN:

� ENGINEER:

/\ DRAFTSMAN:

ffi ENGINEER:

NOTES:

REVISIONS

ADD DEL REV

DESTRUCTION NOTlCE: Destroy by any method that will prevent cisdosura of contents of reoonstnmtion of the dooument.

DATE

EXPORT CONTROL NOTICE: WARNING - EMport controled IAW Ml'ls E:q)ortcontrol Act (1llle 22, USC 2751)or ExportAdmlnlslratlon Al:t.ol 1979, as ammended (T�le 5{1, US, App 24D1).

DISTRIBUTION AUTHORIZED TO US. GOVERNMENT AGENCIES AND THEIR CONlRACTORS FOR ADMINISTRATIVE OR OPERATIONAL USE, 01 MAY

1986. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE ORIGINATOR

DEPARTMENT OF THE AIR FORCE

PACIFIC AIR FORCES REPUBLIC OF KOREA

OSAN AIR BASE

7AF/A6X

OSAN AB BLDG 949 SINJANG DONG

PYEONGTAEK CITY

KR 17759

DSN:

607TH MMS/DET 1

FOCA'S & UG MH DUCT SYSTEM

PROJECT DRAWING

I ENGINEER:

SMSGT. THOMAS BELISLE

I DRAFI'SMAN: TSGT. JAMES B. DODSON

DRAWING TITLE:

GWANGJU AIR BASE

BUILDING 1808

I

DRAWING NUMBER:

DRAWING SCALE:

1/8" = 1'-0"

DATE:

31 MAY 19

I

I lo b

I

1-8

105 106

1s· ·- o"' g• - O"

94' - •

6'-(f

WAITING

AREA

FROM MH2-1

1) 4" C.

12 SM FO

[ EXISTING FLOOR

MOUNT CABINET

CORRlDOR

107 108 a' -·o· · ·12' - rt

84' - a·

2.0' - Cf

GWANGJU AIR BASE BUILDING 2106

SCALE 3116" : 1 '-0"

111·

'JfJ' - s·

6, MECH. RM

LEGEND:

NEW USAF FIBER

NEW USAF ENTRANCE CONDUIT

EXISTING USAF ENTRANCE CONDUIT

NEW USAF WALL MOUNTED CABINET

EXISTING USAF WALL MOUNTED CABINET

'b

I

'b

-·------1--------+-+-

0 4' 8' -- -- - Scale: 3/16" = 1'-0" ffi DRAFTSMAN:

ENGINEER:

8- DRAFTSMAN:

ill ENGINEER:

8- DRAFTSMAN:

� ENGINEER:

/\ DRAFTSMAN:

ffi ENGINEER:

NOTES:

REVISIONS

ADD DEL REV DATE

DESTRUCTION NOTlCE: Destroy by any method that will prevent cisdosura of contents of reoonstnmtion of the dooument.

EXPORT CONTROL NOTICE: WARNING - EMport controled IAW Ml'ls E:q)ortcontrol Act (1llle 22, USC 2751)or ExportAdmlnlslratlon Al:t.ol 1979, as ammended (T�le W, US, App 24D1).

DISTRIBUTION AUTHORIZED TO US. GOVERNMENT AGENCIES AND THEIR CONlRACTORS FOR ADMINISTRATIVE OR OPERATIONAL USE, 01 MAY

1986. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE ORIGINATOR

DEPARTMENT OF THE AIR FORCE

PACIFIC AIR FORCES REPUBLIC OF KOREA

OSAN AIR BASE

7AF/A6X

OSAN AB BLDG 949 SINJANG DONG

PYEONGTAEK CITY

KR 17759

DSN:

607TH MMS/DET 1

FOCA'S & UG MH DUCT SYSTEM

PROJECT DRAWING

I ENGINEER:

SMSGT. THOMAS BELISLE

I DRAFI'SMAN: TSGT. JAMES B. DODSON

DRAWING TITLE:

GWANGJU AIR BASE

BUILDING 2106

I

DRAWING NUMBER:

DRAWING SCALE:

3/16" = 1 '-0"

DATE:

31 MAY 19

I

FROM MH2-1

y ' ' ' ' ' ' ' '

(1) 4" C.

OFFICE ( MECH R.M. MENS LAT. NEWFIRE

ALARM OFFICE

W.LAT.

NEW FIRE

( (� ul\ \

ALARM OFFICE

r '-l ( _I\

,+-12 SM FO

' - L- ' ' -

\_� w\_ -

� EXISTING WALL

EXISTING WALL MOUNT CABINET

MOUNT CABINET

- FED OFFICE

Room4 FINANCE

OFFICE

FCO. OFFICE

Room4A � l)_ Room4B �

I I I I I I I I ' ' '

I

GWANGJU AIR BASE BUILDING 2107

SCALE 3116" : 1 '-0"

LEGEND:

NEW USAF FIBER

NEW USAF ENTRANCE CONDUIT

EXISTING USAF ENTRANCE CONDUIT

NEW USAF WALL MOUNTED CABINET

EXISTING USAF WALL MOUNTED CABINET

0 4' 8' -- -- - Scale: 3/16" = 1'-0" ffi DRAFTSMAN:

ENGINEER:

8- DRAFTSMAN:

ill ENGINEER:

8- DRAFTSMAN:

� ENGINEER:

/\ DRAFTSMAN:

ffi ENGINEER:

NOTES:

REVISIONS

ADD DEL REV

DESTRUCTION NOTlCE: Destroy by any method that will prevent cisdosura of contents of reoonstnmtion of the dooument.

DATE

EXPORT CONTROL NOTICE: WARNING - EMport controled IAW Ml'ls E:q)ortcontrol Act (1llle 22, USC 2751)or ExportAdmlnlslratlon Al:t.ol 1979, as ammended (T�le W, US, App 24D1).

DISTRIBUTION AUTHORIZED TO US. GOVERNMENT AGENCIES AND THEIR CONlRACTORS FOR ADMINISTRATIVE OR OPERATIONAL USE, 01 MAY

1986. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE ORIGINATOR

DEPARTMENT OF THE AIR FORCE

PACIFIC AIR FORCES REPUBLIC OF KOREA

OSAN AIR BASE

7AF/A6X

OSAN AB BLDG 949 SINJANG DONG

PYEONGTAEK CITY

KR 17759

DSN:

607TH MMS/DET 1

FOCA'S & UG MH DUCT SYSTEM

PROJECT DRAWING

I ENGINEER:

SMSGT. THOMAS BELISLE

I DRAFI'SMAN: TSGT. JAMES B. DODSON

DRAWING TITLE:

GWANGJU AIR BASE

BUILDING 2107

I

DRAWING NUMBER:

DRAWING SCALE:

3/16" = 1 '-0"

DATE:

31 MAY 19

I

-� • H

• t

I - t' I - s

' - rf hZ.Tr(r.r) t I � ca-...e.,·1 I .I

H e.

I r

I l4IOG[41.a'J • U

-.,.---l'"'it--------------=�.-■.---------+-41...· ____ ..-_.

GWANGJU AIR BASE BUILDING 2109

SCALE 3116" : 1 '-0"

12 SM FO

.... ,,-m ..... , FROM MH2-2

I •

NEW WALL

MOUNT CABINET

LEGEND:

NEW USAF FIBER

NEW USAF ENTRANCE CONDUIT

EXISTING USAF ENTRANCE CONDUIT

NEW USAF WALL MOUNTED CABINET

EXISTING USAF WALL MOUNTED CABINET

0 4' 8' -- -- - Scale: 3/16" = 1'-0" ffi DRAFTSMAN:

ENGINEER:

8- DRAFTSMAN:

ill ENGINEER:

8- DRAFTSMAN:

� ENGINEER:

/\ DRAFTSMAN:

ffi ENGINEER:

NOTES:

REVISIONS

ADD DEL REV DATE

DESTRUCTION NOTlCE: Destroy by any method that will prevent cisdosura of contents of reoonstnmtion of the dooument.

EXPORT CONTROL NOTICE: WARNING - EMport controled IAW Ml'ls E:q)ortcontrol Act (1llle 22, USC 2751)or ExportAdmlnlslratlon Al:t.ol 1979, as ammended (T�le W, US, App 24D1).

DISTRIBUTION AUTHORIZED TO US. GOVERNMENT AGENCIES AND THEIR CONlRACTORS FOR ADMINISTRATIVE OR OPERATIONAL USE, 01 MAY

1986. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE ORIGINATOR

DEPARTMENT OF THE AIR FORCE

PACIFIC AIR FORCES REPUBLIC OF KOREA

OSAN AIR BASE

7AF/A6X

OSAN AB BLDG 949 SINJANG DONG

PYEONGTAEK CITY

KR 17759

DSN:

607TH MMS/DET 1

FOCA'S & UG MH DUCT SYSTEM

PROJECT DRAWING

I ENGINEER:

SMSGT. THOMAS BELISLE

I DRAF"I'SMAN: TSGT. JAMES B. DODSON

DRAWING TITLE:

GWANGJU AIR BASE

BUILDING 2109

I

DRAWING NUMBER:

DRAWING SCALE:

3/16" = 1 '-0"

DATE:

31 MAY 19

I

. 1 OF 1

Gwangju AB Building 1429
Gwangju AB Building 1808
Gwangju AB Building 2106
Gwangju AB Building 2107
Gwangju AB Building 2109

File details come from the government source that posted it.