ATTACHMENT_2_EDP_GwangJu_Revision_30JULY2019.docx

DOCX document 77 KB Posted

Attached to
Gwangju Communications Infrastructure Engineering and Installation
Solicitation number
W91QVN-19-R-0295
Issued by

About this file

ATTACHMENT #2 EDP

View the file

Other files

File Type Posted
W91QVN-19-D-0295_0003.pdf PDF
W91QVN-19-R-0295-0002.pdf PDF
ATTACHMENT_27-Govt_Response_to_Contractors_Questions.-Gwangju.xlsx XLSX spreadsheet
W91QVN-19-R-0295-0001.pdf PDF
ATTACHMENT_3__Gwangju_&_45800;&_52404;_&_51068;&_44292;_&_48124;&_44036;&_51064;_&_52636;&_51077;&_49888;&_52397;_&_50577;&_49885;(2003).xls XLS spreadsheet
ATTACHMENT_24_Gwangju_AB_OSP_One-line_Diagram.pdf PDF
ATTACHMENT_4_Supplemental_Price__Sheet.xlsx XLSX spreadsheet
W91QVN-19-R-0295-27_Sept_19.pdf PDF
ATTACHMENT_5B__Building.pdf PDF
ATTACHMENT_22_Maps.pdf PDF
ATTACHMENT_26_Visio-Rack_drawing-2.pdf PDF
ATTACHMENT_8_Building.pdf PDF
ATTACHMENT_14_Building.pdf PDF
ATTACHMENT_15_Building.pdf PDF
ATTACHMENT_20_Maps.pdf PDF
ATTACHMENT_10_Building_.pdf PDF
ATTACHMENT_9_Building.pdf PDF
ATTACHMENT_23_Maps.pdf PDF
ATTACHMENT_25_GwangJu_ITN_Floor_Plan_Drawings.pdf PDF
ATTACHMENT_7_Building.pdf PDF
ATTACHMENT_11_Building.pdf PDF
ATTACHMENT_17_Manhole-Handhole.pdf PDF
ATTACHMENT_5C__Building.pdf PDF
ATTACHMENT_21_Maps_.pdf PDF
ATTACHMENT_13_Building.pdf PDF
ATTACHMENT_12_Building.pdf PDF
ATTACHMENT_19_Manhole-Handhole.pdf PDF
ATTACHMENT_1_-_Past_Performance_Questionnaire_(PPQ).docx DOCX document
ATTACHMENT_18__Manhole-Handhole.pdf PDF
ATTACHMENT_16_Manhole-Handhole.pdf PDF
ATTACHMENT_5A__Building.pdf PDF
ATTACHMENT_6_Building.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING DEVELOPMENT PLAN (EDP)

FOR

INSTALLATION OF NEW SINGLE MODE FIBER OPTICS CABLES AND UNDERGROUND MAINTENANCE-HOLE DUCT SYSTEM

AT

GwangJu Co-located Operating Base Republic of Korea

29 July 2019

TABLE OF CONTENTS

SECTION PAGE

1. DESCRIPTION OF SERVICES 3

2. GENERAL INFORMATION 12

3. SERVICE SUMMARY 18

4. GOVERNMENT FURNISHED PROPERTY AND SERVICE 21

Engineer Develop Plan and Technical Specifications For INSTALLATION OF NEW SINGLE MODE FIBER OPTICS CABLES AND UNDERGROUND MAINTENANCE-HOLE DUCT SYSTEM DESCRIPTION OF SERVICES: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the Installation of New Single Mode Fiber Optics Cables And Underground Maintenance-hole Duct System except for those items specified as U.S. Air Force furnished property and services.

Construction Completion : Performance period for this contract will be no more than 365 days from the date of award, and will run continuously for 12 months with the provision for 1 extension(s) of this contract for an additional 6 month period.

Place Of Performance: GwangJu Co-Located Operating Base, Republic of Korea Specific Requirements: The Contractor shall design and provide Customer-Owned OSP Telecommunications Infrastructure in accordance with ANSI/TIA-758. Each cable installation shall be coordinated with 607 MMS so that the impact on the building users is properly coordinated. The sequence of installation is at the Contractor’s discretion.

Measurements; Distances provided in this SOW were measured using a calibrated civil engineering survey wheel to within five feet (1524 mm). Duct/cable lengths were specified to account for five foot (1524 mm) variance. Therefore the measurements in this EDP has a variance of plus or minus (+-) five (5) feet.

The contractor shall perform the following tasks:

Maintenance-holes (MH) and Hand Holes (HH) NOTE: All new MHs and HHs installed shall be manufactured with pre-case concrete material and have galvanized hinged lids rated for roadway traffic. Each MH and HH wall that is opposite to a duct entrance way shall have one pulling-in iron installed 6 inches (153mm) to 12 inches (305 mm) below the duct entrance level. MHs and HHs must have security locks.

The Contractor shall provide eighteen (18) new [4 feet (1.22 meters) x 4 feet (1.22 meters) x 4 feet (1.22 meters)] HH and labeled as shown in Attachments.

7AF/A6X and/or 607 MMS shall provide final numbering/IDs for the new MHs/HHs installed in accordance with paragraphs above.

Table 1: MH/HH Quantities

Quantity of Hand holes (HH) to be Installed
Quantity of Maintenance-holes (MH) to be Installed
Quantity of Pull Boxes (PB) to be Installed
46
6
16

Duct bank Infrastructure: The Contractor shall provide duct banks in accordance with Table 2 Conduit Quantities, unless indicated otherwise.

Provide two ducts between MH/HH unless otherwise specified.

Provide two ducts to ITN’s and one duct to buildings Provide four duct back run from HH 1 to HH 5-1 Approximate run distances of 4 inch PVC is 44,996 feet (13,715 meters)

Table 2: MH/HH Quantities

Source
Destination
Qty.
Distance

(+/- 5 Ft) Comment

HH 2-4
HH 2-5
2
48
Drill 2 new holes in existing HH 2-4
HH 2-5
HH 2-6
2
385
HH 2-6
Bldg.2129
1
75
HH 2-6
Bldg.2127
1
96
(1) 90 degree elbow
HH 2-6
HH 2-7
2
347
HH 2-7
Bldg.2125
1
38
HH 2-7
MH 2-2
2
74
MH 2-2
Bldg.104
1
347
FASC Task required / (1) 90 degree elbow

Replace existing pull box

MH 2-2
Bldg.2109
1
191
(1) 90 degree elbow
MH 2-2
HH 2-8
2
322
HH 2-8
Bldg.2123
-

2 inches (50.8 mm) pipe (44 feet (13.4 meters) to Bldg.)

HH 2-8
HH 2-9
2
398
HH 2-9
Bldg.2122
1
113
(1) 90 degree elbow
HH 2-9
Bldg.2121
1
64
(1) 90 degree elbow
HH 2-9
HH 4-8
2
220
Drill 2 new holes in existing HH 4-8
HH 4-7
HH 4-6
2
242
Drill 2 new holes in existing HH 4-7
HH 4-6
HH 4-5
2
410
HH 4-5
HH 4-4
2
73
HH 4-4
Bldg.2292
1
189
HH 4-2
MH 4-1
1
269
Drill 2 new holes in existing MH 4-1
MH 4-1
Bldg.2275
1
24
MH 4-1
Bldg.2285
1
168
FASC Task
HH 4-1
Bldg.PB3
1
226
(1) 90 degree elbow. 1 Pull Box
HH 4-1
Bldg.PB4
2
29
(2) 90 degree elbows. 1 Pull Box
HH 4-1A
Bldg.PB6
1
75
(1) 90 degree elbow. 1 Pull Box
Bldg.PB6
Bldg.PB5
1
78
1 Pull Box
MH 2-1
Bldg.2107
1
90
(1) 90 degree elbow
MH 2-1
HH 2-2
2
99
(1) 90 degree elbow
MH 2-1
Bldg.2106
1
51
MH 2-1
HH 2-2A
2
153
HH 2-2A
Bldg.2153
1
67
HH 2-2A
Bldg.2158
1
84
(1) 90 degree elbow
HH 2-2A
HH 2-2B
2
112
HH 2-2B
Bldg.2156
1
64
(1) 90 degree elbow
HH 2-2B
HH 2-2C
2
123
HH 2-2C
Bldg.2154
1
65
(1) 90 degree elbow
HH 2-2C
Bldg.2140
1
309
HH 2-2C
Bldg.2155
1
93
(1) 90 degree elbow
HH 2-2C
HH 2-2D
2
103
HH 2-2D
Bldg.2151
1
57
10 feet (3.048 meters) elevation with pipe into bldg.
HH 2-2D
Bldg.2152
1
125
20 feet (6.096 meters) elevation with pipe into Bldg.(1) 90 degree elbow
HH 2-2D
Bldg.2150
1
85
(1) 90 degree elbow
ITN 246
HH 3-1
2
10
HH 3-1
MH 3-1
2
78
MH 3-1
HH 3-2
1
244
(1) 90 degree elbow
HH 3-2
Bldg.130
1
56
HH 3-2
Bldg.217
1
41
(1) 90 degree elbow
MH 3-1
MH 3-2
2
204
MH 3-2
HH 3-3
2
166
HH 3-3
Bldg.245
1
85
HH 3-3
Bldg.241
1
160
(1) 90 degree elbow
HH 3-3
Bldg.243
1
122
(1) 90 degree elbow
HH 3-3
Bldg.244
1
146
Pipe enters Bldg.10 feet (3.048 meters) elevation
MH 3-2
Bldg.235
1
176
(1) 90 degree elbow
MH 3-2
HH 3-4
2
304
HH 3-4
Bldg.233
1
125
(1) 90 degree elbow
HH 3-4
Bldg.236
1
149
(2) 90 degree elbow
HH 3-4
HH 3-5
2
148
HH 3-5
Bldg.232
1
108
(2) 90 degree elbow
HH 3-5
MH 3-3
2
160
MH 3-4
HH 3-6
2
73
FASC Task
HH 3-6
Bldg.122
1
60
(1) 90 degree elbow
HH 3-6
HH 3-7
2
247
HH 3-7
Bldg.151
1
82
(1) 30 degree sweep
HH 3-7
Bldg.123
1
252
(1) 90 degree elbow
HH 3-7
Bldg.159
1
105
(1) 90 degree elbow. 1 Pull Box
HH 3-7
HH 3-8
2
198
HH 3-8
Bldg.153
1
92
(1) 90 degree elbow
HH 3-8
Bldg.150
1
169
(1) 90 degree elbow. 1 Pull Box
HH 3-8
HH 9
2
232
HH 9
HH 8
2
369
FASC Task
HH 8
HH 7
2
76
FASC Task
HH 1
HH 5-8
4
480
FASC Task drill 2 new holes in existing HH1
HH 5-8
HH 5-7
4
480
FASC Task
HH 5-7
HH 5-6
4
480
FASC Task
HH 5-6
HH 5-5
4
480
FASC Task
HH 5-5
HH 5-4
4
480
FASC Task
HH 5-4
HH 5-3
4
480
FASC Task
HH 5-3
HH 5-2
4
235
FASC Task
HH 5-2
HH 5-1
4
168
FASC Task
HH 5-1
ITN 1427
2
24
HH 5-1
HH 5-1A
2
229
FASC Task
HH 5-1A
Bldg.1429
1
65
FASC Task
HH 5-1A
HH 5-1B
2
206
FASC Task
HH 5-1B
HH 5-1C
2
480
FASC Task
HH 5-1C
HH 5-1D
2
318
FASC Task
HH 5-1D
HH 5-1E
1
156
FASC Task
HH 5-1E
Bldg.1421
1
26
HH 5-1B
HH 5-1B-1
2
426
HH 5-1B-1
HH 5-1B-2
2
211
FASC Task (2) 90 degree elbow
HH 5-1B-2
PB8
1
480
FASC Task
HH 5-2
HH 5-2A
2
480
FASC Task
HH 5-2A
HH 5-2B
2
424
FASC Task
HH 5-2B
MH 5-1
2
248
FASC Task
MH 5-1
Bldg.1207
1
123
TMO Conex. (1) 90 degree elbow
MH 5-1
Bldg.1209
1
262
(1) 90 degree elbow
MH 5-1
Bldg.1210
1
293
MH 5-1
HH 5-2C
2
443
FASC Task
HH 5-2
Bldg.1204
1
43
HH 5-2C
HH 5-2D
2
325
FASC Task
HH 5-2D
HH 5-2E
2
500
FASC Task
HH 5-2E
HH 5-2F
1
143
FASC Task
HH 5-2F
Bldg.710
1
69
HH 5-2F
Bldg.700
1
155
PB8
PB9
1
480
PB9
PB10
1
480
PB10
PB11
1
480
PB11
NB1
1
445
(1) nonmetallic PVC to metal adapter
NB2
PB12
1
45
FASC Task (1) nonmetallic PVC to metal adapter
PB12
PB13
1
480
PB13
PB14
1
480
PB14
PB15
1
50
PB15
PB16
1
480
PB16
HH 1501
1
50
(1) 90 degree elbow
HH 1501
Bldg.1501
1
20
(1) 90 degree elbow
HH 1501
HH 1501-1
2
465
HH 1501
HH 1503
2
356
HH 1503
Bldg. 1503
1
112

Geo-textile Fabric ( or Inner duct) Installation Provide two 3-3 inches (76 mm) Geo-textile fabrics in a single 4 inch (102 mm) conduit, e.g. for every two-way 4 inch (102 mm) duct bank installed, one of the new 4 inch (102 mm) ducts shall have two 3-3 inches (76 mm) geo-textile fabrics installed within it; for all single 4 inch (102 mm) conduits installed to a bldg., the 4 inch (102 mm) duct shall have two 3-3 inches (76 mm) geo-textile fabrics installed.

One of three geo-textile fabrics shall contain a metallic trace member. Provide pull string in spare 4 inch (102 mm) conduits.

Provide one HH named (HH 2-5) approx. 48 feet (14.6 meters) north of existing HH 2-4. Drill two holes in existing HH 2-4 and Provide two 4 inch (102 mm) diameter PVC connecting both HH’s. Provide two three cell Maxcell in the right Conduit and provide pull string in the left conduit. (Ref: GwangJu OSP Map) (Ref: HH 2-4 & HH 2-5) Provide one HH named (HH 2-6) and approx. 385 feet (117.4 meters) of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 2-5. Provide two Maxcell in the right conduit staying consistent through the entire run. Always provide pull string in the empty conduit. Provide one 4 inch (102 mm) PVC, 75 feet (22.9 meters) and penetrating directly to Building 2129. Provide one Maxcell. For exact location (Ref: Bldg.2129.dwg). Provide 76 feet (23.2 meters) of (1) 4 inch (102 mm) PVC, Provide one 90 degree elbow and provide an additional 20 feet (6.096 meters) of 4 inch (102 mm) PVC penetrating directly to building 2127. Provide one Maxcell (Ref: Bldg.2127.dwg) (Ref: HH 2-6) Provide one HH named (HH 2-7) and approx. 347 feet (105.8 meters) of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 2-6. Provide two Maxcell in the right of the newly installed conduit. Provide one 4 inch (102 mm) PVC 38 feet (11.6 meters) and penetrating directly to Building 2125. (Ref: Bldg.2125.dwg & HH 2-7) Provide one Maintenance-hole named (MH 2-2) and approx. 74 feet (22.6 meters) of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 2-7. Provide two Maxcell in the right conduit. FASC TASK approval needed for next operation: Provide approx. 347 feet (105.8 meters) of (1) 4 inch (102 mm) PVC towards building 104. Directional boring recommended under fence and under roadway (FASC Task). Replace existing pull box outside of Bldg.104. Provide one 90 degree elbow and provide 5 feet of (1) PVC to the newly installed PB. Provide Maxcell (Ref: Bldg.104.dwg & MH 2-2) From the newly installed MH 2-2, provide one 4 inch (102 mm) PVC approx. 100 feet (30.48 meters) towards the next HH, Provide one 90 degree elbow and continue approx. 91 feet (27.7 meters) to the center of Bldg.2109. Provide Maxcell. (Ref: Bldg.104.dwg & MH 2-2) Provide one HH named (HH 2-8) and approx. 322 feet (98.1 meters) of (2) PVC and connect to the newly installed MH 2-2. Provide two Maxcell in the right conduit. Provide one 2 inches (50.8 mm) conduit approx. 44 feet (13.4 meters) to Bldg.2123. Pop 2 holes in existing pull box on exterior of bldg. continue 2 inches (50.8 mm) pipe 6 feet to roof and approx. 18 feet to interior of comm. room. (Ref: Bldg.2123.dwg & HH 2-8 Provide one HH named (HH 2-9) and approx. 398 feet of (2) 4 inch (102 mm) PVC and connect to newly provide HH 2-8. Conduit will need to sweep to connect to HH 2-9. Provide one Maxcell. Provide approx. 112 feet (34.1 mm) of (1) 4 inch (102 mm) PVC towards Bldg.2122. Provide one 90 degree elbow and continue approx. 1 feet to Bldg.2122. Penetrate directly into bldg. provide one Maxcell. Provide approx. 63 feet (19.2 meters) of (1) 4 inch (102 mm) PVC towards Bldg.2121. Provide one 90 degree elbow and continue approx. 1 feet (304.8 mm) to Bldg.2121. Penetrate directly into bldg. provide one Maxcell. (Ref: Bldg.2122.dwg, Bldg.2121.dwg & HH 2-9) Provide approx. 220 feet (67.1 meters) of (2) 4 inch (102 mm) PVC from the newly provide HH 2-9 to existing HH 4-8. Two new holes will need to be drilled in existing HH 4-8 above the existing 6 inch (153 mm) conduit. Provide one Maxcell in the right conduit. Using the existing pull string, provide one Maxcell in the existing 6 inch (153 mm) conduit between existing MH 4-8 and existing MH 4-7 (Approx. 493 feet.) (Ref. HH 4-8 & HH 4-7) Provide one HH named (HH 4-6) and 242 feet (73.8 meters) of (2) 4 inch (102 mm) PVC and connect to existing HH 4-7. Two new holes will need to be drilled in existing HH 4-7. The new conduit will sweep approx. 45 degrees. (Ref: HH 4-7 & HH 4-6) Provide one HH named (HH 4-5) and 410 feet (125.0 meters) of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 4-6. Recommend directional boring through berm and under fence. Provide one Maxcell in right conduit. (Ref: HH 4-6 & HH 4-5) Provide one HH named (HH 4-4) approx. 73 feet (22.3 meters) south of the newly installed HH 4-5 and approx. 238 feet (75.5 meters) away from existing HH 4-3. Dig until exposing existing 6 inch conduit with non-working dead ended 300 pair cable. Cable can be removed, it is cut in HH 4-3. If unable to reuse existing 6 inch conduit. Provide two 4 inch (102 mm) PVC (approx. 238 feet (75.5 meters)) and connect to existing HH 4-3. Provide approx. 73 feet (22.3 meters) of (2) 4 inch (102 mm) PVC and connect to newly installed HH 45. Plug unused 6 inch conduit at both ends to prevent rodents / water. Provide approx. 189 feet (57.6 meters) of (1) 4 inch (102 mm) PVC from newly installed HH 4-4 and connect to Bldg.2292 (Ref: HH’s 4-3, 4-4 & 4-5, Bldg.2292.dwg) Provide two Maxcell in the existing 6 inch conduit from existing HH 4-3 to existing HH 4-2 (approx. 282 feet (86.0 meters)). Provide one Maxcell in the existing 6 inch conduit from existing HH 4-2 to existing HH 4-1 (approx. 275 feet (83.8 meters). This conduit is congested, but should be able to fit (1) Maxcell along with (2) Fiber cables (to be called out later in this EDP). Last resort option would be to add a new conduit. (Ref: HH’s 4-1 & 4-2) Provide one Maintenance-hole named (MH 4-1) and approx. 269 feet (82 meters) of (2) 4 inch (102 mm) PVC and connect to existing HH 4-2. Need to drill two holes into existing HH 4-2. Provide two Maxcell in the right conduit. Provide approx. 24 feet (7.3 meters) of (1) 4 inch (102 mm) PVC to Bldg.2275. The next operation will need FASC Task approval. Directional boring is recommended for the next task. Provide approx. 168 feet of (1) 4 inch (102 mm) PVC to the outside of bldg.2285. The existing 4 inch (102 mm) PVC that sets in the interior of building should be accessed from a couple feet outside of building. (Ref. Bldg.2275.dwg, Bldg.2285.dwg, MH 4-1) Drill three new holes in existing HH 4-1 (side wall Bldg. PB4 side). In the two holes closer to PB4, Provide two 4 inch (102 mm) PVC approx. 13 feet, Provide two 90 degree elbow and continue approx. 16 feet and penetrate directly to ITN Bldg. PB4. In the third hole Provide one 4 inch (102 mm) PVC approx. 38 feet, Provide 90 degree elbow and continue approx. 136 feet, Provide one pull box and continue approx. 5 feet to Bldg.PB3. Provide (3) Maxcell into PB4 and (1) Maxcell into PB3 (Ref: ITN.Bldg. PB4.dwg, Bldg.PB3.dwg & HH 4-1) Drill one new hole in existing HH 4-1A (side wall Bldg. PB6 side). Provide one 4 inch (102 mm) PVC approx. 46 feet, Provide one 90 degree elbow, continue 4 inch (102 mm) PVC approx. 23 feet, Provide one pull box, continue 4 inch (102 mm) PVC approx. 6 feet to Bldg. PB6, Provide one 4 inch (102 mm) PVC from newly provide Pull box approx. 72 feet (21.9 meters) and Provide one pull box outside of Bldg. PB5, Provide one 4 inch (102 mm) PVC from newly installed pull box approx. 6 feet to Bldg. PB5. Provide one Maxcell into Bldg. PB5 & Bldg. PB6. (Ref: Bldg.PB5.dwg, Bldg.PB6.dwg, HH 4-1A) On the back side of ITN 2159, in existing HH 2-2, drill two new holes on the back wall, Provide two 4 inch (102 mm) PVC approx. 41 feet (12.5 meters), Provide two 90 degree elbows. Provide one maintenance-hole named (MH 2-1). Provide two 4 inch (102 mm) PVC approx. 58 feet from the newly installed MH 2-1 to the 90 degree elbows. From MH 2-1, Provide one 4 inch (102 mm) PVC approx. 58 feet (17.7 meters), Provide one 90 degree elbow and continue the 4 inch (102 mm) PVC approx. 32 feet (9.8 meters) and connect to Mech. room of Bldg.2107. Provide one 4 inch (102 mm) PVC approx. 51 feet from the newly provide MH 2-1 and enter next to the existing pipe to Bldg.2106. Provide (3) Maxcell in the left conduit looking towards MH 2-1 and (1) each into the bldgs.(Ref: MH 2-1, HH 2-2, Bldg.2107.dwg & Bldg.2106.dwg) Provide one HH named (HH 2-2A) and approx. 153 feet of (2) 4 inch (102 mm) PVC and connect to the newly installed MH 2-1. Provide one 4 inch (102 mm) PVC approx. 80 feet towards Bldg.2158. Provide one 90 degree elbow and continue approx. 3.5 feet to Bldg.2158. Provide one 4 inch (102 mm) PVC approx. 67 feet to the wall of Bldg.2153 (Bldg.2153 is currently under construction). Provide (3) Maxcell in the left 4 inch (102 mm) conduit and (1) Maxcell to Mech. Room of Bldg.2158. (Ref Bldg.2158.dwg, MH 2-1 & HH 2-2A) Provide one HH named (HH 2-2B) and approx. 112 feet (34.1 meters) of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 2-2A. Provide one 4 inch (102 mm) PVC approx. 61 feet towards Bldg.2156, Provide one 90 degree elbow and continue 3 feet into Mech. room of Bldg.2156. Provide (3) Maxcell in left main conduit and (1) to Bldg.2156. (Ref: Bldg.2156, HH 2-2A & HH 2-2B) Provide one HH named (HH 2-2C) and approx. 123 feet of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 2-2B. Provide one 4 inch (102 mm) PVC approx. 37 feet towards Bldg.2154, Provide one 90 degree elbow and cont. approx. 28 feet to Bldg.2154. Provide one 4 inch (102 mm) PVC approx. 309 feet to Bldg.2140. Recommend directional boring under fence. Provide conduit next to existing pipe to Bldg.2140. Provide one 4 inch (102 mm) PVC approx. 29 feet ahead towards next new HH, Provide one 90 degree elbow and continue 64 feet (19.5 meters) towards Bldg.2155. Provide one 90 degree elbow and cont. approx. 3 feet to Bldg.2155. Penetration of Bldg.2155 should be between the doors. Provide (3) Maxcell in the left main conduit and (1) to bldgs.(Ref. Bldg.2154.dwg, Bldg.2140.dwg, Bldg.2155.dwg, HH 2-2B & HH 2-2C) Provide one HH named (HH 2-2D) and approx. 103 feet of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 2-2C. Provide two 4 inch (102 mm) PVC approx. 65 feet between bldgs. 2150 & 2152. Provide one 90 degree elbow and continue 40 feet to Bldg.2152, penetration to Bldg.2152 should be approx. 20 feet (6.096 meters) from ground. Provide one 90 degree elbow onto the other conduit and continue 20 feet (6.096 meters) to Bldg.2150. Provide one 4 inch (102 mm) PVC approx. 47 feet to Bldg.2151. Penetration to bldg. should be 10 feet (3.048 meters) from ground. Provide Maxcell. (Ref. Bldg.2150.dwg, Bldg.2151.dwg, Bldg.2152.dwg, HH 2-2C & HH 2-2D) Outside of ITN 246, Provide one HH named (HH 3-1) and Provide two 4 inch (102 mm) PVC approx. 10 feet (3.048 meters) into the comm. room of ITN 246. Provide one Maintenance-hole named (MH 3-1) and approx. 78 feet of (2) PVC and connect to the newly installed HH 3-1. Provide (3) Maxcell into ITN 246 and to MH 3-1. (Ref: ITN.246.dwg, HH 3-1 & MH 3-1) Provide one HH (named HH 3-2) in between bldgs. 217 & 230. Provide one 4 inch (102 mm) PVC out of MH 3-1 approx. 50 feet, provide one 90 degree elbow and continue approx. 194 feet (59.1 meters) and connect to the newly installed HH 3-2. Provide one 4 inch (102 mm) PVC approx. 56 feet to Bldg.230. Provide one 4 inch (102 mm) PVC approx. 38 feet towards Bldg.217, Provide one 90 degree elbow and continue approx. 3 feet to Bldg.217. Provide one Maxcell to each Bldg.(Ref: Bldg.217.dwg, Bldg.230.dwg, MH 3-1 & HH 3-2) Provide one maintenance hole (named MH 3-2) and approx. 204 feet (62.2 meters) of (2) 4 inch (102 mm) PVC and connect to the newly installed MH 3-1. Provide (3) Maxcell. (Ref: MH 3-1 & MH 3-2) Provide one HH (named HH 3-3) and approx. 166 feet of (2) 4 inch (102 mm) PVC and connect to the newly installed MH 3-2. Provide one 4 inch (102 mm) PVC towards Bldg.245 approx. 85 feet to the mech. room of Bldg.245. Provide one 4 inch (102 mm) PVC approx. 147 feet between bldgs. 241 & 243. Provide a 90 degree elbow and cont. 13 feet to Bldg.241. Provide one 4 inch (102 mm) PVC approx. 96 feet between bldgs. 241 & 243. Provide a 90 degree elbow and cont. approx. 26 feet to Bldg.243. Provide one 4 inch (102 mm) PVC approx. 135 feet, 45 degree sweeping between bldgs. 243 & 244. Provide one Pull Box, continue approx. 11 feet to Bldg.244. Entry should be 10 feet (3.048 meters) from ground into bldg. Provide one Maxcell in each newly installed conduit to each bldg. provide two Maxcell in main run. (Ref: Bldg.241.dwg, Bldg.243.dwg, Bldg.244.dwg, Bldg.245.dwg, HH 3-3 & MH 3-2) From newly installed MH 3-2 Provide one PVC approx. 118 feet towards Bldg.235. Provide one 90 degree elbow and continue approx. 58 feet to corner of Bldg.258. (Ref: Bldg.235.dwg & MH 3-2) Provide one HH (named HH 3-4) between bldgs. 233 & 236 and approx. 304 feet (92.7 meters) of (2) 4 inch (102 mm) PVC and connect to MH 3-2. Provide one 4 inch (102 mm) PVC approx. 113 feet between bldgs. 233 & 236, Provide one 90 degree elbow and cont. approx. 12 feet (3.7 meters) to Bldg.233. Provide one 4 inch (102 mm) PVC approx. 34 feet (10.4 meters) towards next HH. Provide one 90 degree elbow and continue 110 feet (3.048 meters), Provide one 90 degree elbow and cont. 5 feet to Bldg.236. (Ref: Bldg.233.dwg, Bldg.236.dwg, HH 2-4 & MH 3-2) Provide one HH (named HH 3-5) and approx. 148 feet of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 3-4. Provide one 4 inch (102 mm) PVC approx. 45 feet back towards Bldg.232, Provide one 90 degree elbow and cont. approx. 60 feet, Provide one 90 degree elbow and cont. approx. 3 feet to Bldg.232. From the newly installed HH 3-5 Provide two 4 inch (102 mm) PVC approx. 160 feet and connect to existing MH 3-3. (Ref: Bldg.232.dwg, HH 3-5 & MH 3-3) The next operation will need FASC Task approval. From existing MH 3-4, Provide two 4 inch (102 mm) PVC approx. 73 feet, recommend directional boring under road, Provide one HH (named HH 3-6) outside of Bldg.122 and connect new conduit. Provide one 4 inch (102 mm) PVC approx. 10 feet (3.048 meters) and Provide one 90 degree elbow, cont. approx. 50 feet to Bldg.122. (Ref: MH 3-4, HH 3-6 & Bldg.122.dwg) Provide one HH (named HH 3-7) and approx. 247 feet of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 3-6. Provide one 4 inch (102 mm) PVC approx. 44 feet (13.4 meters), Provide one 30 degree sweep and continue approx. 38 feet to the mech. Room of Bldg.151. Provide one 4 inch (102 mm) PVC approx. 217 feet towards Bldg.123, Provide one 90 degree elbow and cont. approx. 35 feet to Bldg.123. Provide one 4 inch (102 mm) PVC approx. 40 feet, Provide one 90 degree elbow, cont. approx. 65 feet and Provide one pull box, continue approx. 4 feet (1.22 meters) to corner (mech room) of Bldg.159. (Ref: HH 3-7, HH 3-6, Bldg.151.dwg, Bldg.123.dwg & Bldg.159.dwg) Provide one HH (named HH 3-8) and approx. 198 feet of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 3-7. Provide one 4 inch (102 mm) PVC approx. 86 feet, Provide one 90 degree elbow and cont. 6 feet to Bldg.153. Provide one 4 inch (102 mm) PVC approx. 127 feet ahead towards next HH 9, Provide one 90 degree elbow, cont. approx. 39 feet and Provide one pull box, cont. approx. 3 feet to Bldg.150. (Ref: HH 3-8, HH 3-6, Bldg.153.dwg & Bldg.150.dwg) Provide one HH (named HH 9) and approx. 232 feet (70.7 meters) of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 3-8. (Ref: HH 9 & HH 3-8 The next operation will need FASC Task approval. From newly installed HH 9, provide approx. 369 feet of (2) 4 inch (102 mm) PVC south, parallel with road. Provide one HH (named HH 8) connecting HH’s 8 & 9. Drill two new holes in existing HH 7 (above the two existing holes). Provide two 4 inch (102 mm) PVC approx. 76 feet connecting the newly installed HH 8 and existing HH 7. Recommend directional boring under roads. (Ref: HH7 – HH9) FASC Task needed for all of the HH installations heading towards ITN 1427. Starting from existing HH1, Provide one HH (named HH 5-8) 480 feet towards ITN 1427. Drill two new holes above the existing knockouts in HH 1. Provide (4) 4 inch (102 mm) PVC and connect both HH 1 and the newly installed HH 5-8. Cont. an additional 480 feet, provide one HH (named HH 5-7), Provide (4) 4 inch (102 mm) PVC and connect to HH 5-8. Cont. an additional 480 feet, provide one HH (named HH 5-6), Provide (4) 4 inch (102 mm) PVC and connect to HH 5-7. Cont. an additional 480 feet, provide one HH (named HH 5-5), Provide (4) 4 inch (102 mm) PVC and connect to HH 5-6. Cont. an additional 480 feet, provide one HH (named HH 5-4), Provide (4) 4 inch (102 mm) PVC and connect to HH 5-5. . Cont. an additional 480 feet, provide one HH (named HH 5-3), Provide (4) 4 inch (102 mm) PVC and connect to HH 5-4. . Cont. an additional 235 feet, on the corner before road, provide one HH (named HH 5-2), Provide (4) 4 inch (102 mm) PVC and connect to HH 5-3. Cont. approx. 168 feet, Provide one HH (named HH 5-1) just outside ITN 1427. Provide (4) 4 inch (102 mm) PVC and connect to HH 5-2. Provide two 4 inch (102 mm) PVC approx. 24 feet (7.3 meters) from the newly installed HH 5-1 to ITN 1427. Provide two 3 cell Maxcell in the lower left conduit of each run heading to 1427. Provide pull string in all empty conduits. (Ref: HH1, HH5-1 to HH5-8 & ITN 1427) FASC Task needed for the installation of HHs (named HH 5-1A to HH 5-1D). Provide one HH (named HH 5-1A) approx. 229 feet towards Bldg.1429, staying along the side of the road, and connect (2) 4 inch (102 mm) PVC to the newly installed HH 5-1.

FASC Task. Recommend directional boring under berm to Bldg.1429. Provide one 4 inch (102 mm) PVC approx. 65 feet to Bldg.1429 (comm. Room). (Ref: Bldg.1429.dwg, HH 5-1 & HH 5-1A) FASC Task. Provide one HH (named HH 5-1B) approx. 206 feet to just after intersection. Provide two 4 inch (102 mm) PVC and connect to the newly installed HH 5-1A.

Provide one HH (named HH 5-1B-1) approx. 426 feet northwest of HH 5-1B. Provide two 4 inch (102 mm) PVC and connect to the newly installed HH 5-1B. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B & HH 5-1B-1) FASC Task. Provide one HH (named HH 5-1B-2) approx. 211 feet northwest of HH 5-1B-1, at approx. 125 feet recommend directional boring under road (approx. 57 feet of road). Provide two 4 inch (102 mm) PVC and connect to the newly installed HH 5-1B-1. Provide 90 degree elbow, approx. 29 feet from HH- 5-1B-2. (Ref: Bldg.1427.dwg, HH 5-1 & HH 5-1A, HH 5-1B, HH 5-1B-1 & HH 5-1B-2) Provide one HH (named HH 1501) approx. 50 feet south of PB16, at approx. 50 feet recommend directional boring under road. Provide one 4 inch (102 mm) PVC and connect to the newly installed PB16. Provide one 4 inch (102 mm) PVC 20 feet with 90 degree elbow to the rear of Bldg. 1501. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9 & PB10, PB11, NB1, NB2, PB12, PB13, PB14, PB15, PB16, HH 1501 Bldg.1501.dwg) Provide one HH (named HH 1501-1) approx. 465 feet south of HH 1501. Provide two 4 inch (102 mm) PVC and connect to the newly installed HH 1501. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9 & PB10, PB11, NB1, NB2, PB12, PB13, PB14, PB15, PB16, HH 1501 & HH 1501-1) Provide one HH (named HH 1503) approx. 356 feet south of HH 1501-1. Provide two 4 inch (102 mm) PVC and connect to the newly installed HH 1501-1. Provide one 4 inch (102 mm) PVC 112 feet on the west side of Bldg. 1503. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9 & PB10, PB11, NB1, NB2, PB12, PB13, PB14, PB15, PB16, HH 1501, HH 1501-1, HH 1503 & Bldg.1503.dwg) Provide one HH (named HH 5-1C) 480 feet up road towards Bldg.1421, staying on the left side of road and Provide two 4 inch (102 mm) PVC and connect to HH 5-1B. Provide one HH (named HH 5-1D) and approx. 318 feet of (2) 4 inch (102 mm) PVC and connect to HH 5-1C. Provide one HH (named HH 5-1E) approx. 156 feet in parking lot in front of Bldg.1421. Recommend directional boring under fence. Provide one 4 inch (102 mm) PVC and connect to HH 5-1D. Provide one 4 inch (102 mm) PVC approx. 26 feet and connect to Bldg.1421. (Ref: HH 5-1A to HH 5-1E & Bldg.1421.dwg) FASC Task needed for the installation of HHs (named HH 5-2A to HH 5-2F) and MH (named MH 5-1). From newly installed HH 5-2, provide one HH (named HH 5-2A) 480 feet up the road, staying on the right side of the road, towards the 1200 area. Provide two 4 inch (102 mm) PVC and connect to HH 5-2. Recommend directional boring under road. Cont. an approx. 424 feet (129.2 meters) to the corner and Provide one HH (named HH 5-2B). Provide two 4 inch (102 mm) PVC and connect to the newly installed HH 5-2A. (Ref: HH 5-2 to HH 5-2B) Provide one Maintenance-hole (named MH 5-1) and approx. 248 feet of (2) 4 inch (102 mm) PVC and connect to the newly installed HH 5-2B. Provide approx. 115 feet of (1) 4 inch (102 mm) PVC, Provide one 90 degree elbow and cont. 8 feet to the Conex just outside of 1207 (TMO). From MH 5-1, provide approx. 262 feet (79.9 meters) of (1) 4 inch (102 mm) PVC and Provide one 90 degree elbow and cont. approx. 32 feet (9.8 meters) of (1) 4 inch (102 mm) PVC to the corner of Bldg.1209. From MH 5-1 provide approx. 293 feet of (1) 4 inch (102 mm) PVC to the Conex outside of Bldg. 1210. (Ref: Bldg.1207TMO.dwg, Bldg.1209.dwg, Bldg.1210con.dwg, MH 5-1 & HH 5-2B) Provide one HH (named HH 5-2C) on the corner before Bldg.1204 and approx. 443 of (2) 4 inch (102 mm) PVC and connect to the newly installed MH 5-1. Provide approx. 43 feet of (1) 4 inch (102 mm) PVC to Bldg.1204. (Ref: Bldg.1204.dwg, HH 5-2C & MH 5-1) Provide one HH (named HH 5-2D) approx. 325 feet (99.1 meters), recommend directional boring across road and Provide two 4 inch (102 mm) PVC and connect to the newly installed HH 5-2C. Staying on the right side of road, provide HH (named HH 5-2E) and 500 feet of (2) 4 inch (102 mm) PVC and connect to HH 5-2D. (Ref: HH 5-2C to HH 5-2E) Provide one HH (named HH 5-2F) and approx. 143 feet of (1) 4 inch (102 mm) PVC and connect to the newly installed HH 5-2E. Provide one 4 inch (102 mm) PVC approx. 69 feet to the center of Bldg.710. Provide one 4 inch (102 mm) PVC approx. 155 feet to the right side of Bldg.700. (Ref: Bldg.710.dwg, Bldg.700.dwg, HH 5-2E & HH 5-2F) FASC Task. Provide one pull box (named PB8) approx. 480 feet south of HH 5-1B-2, at approx. 241 feet recommend directional boring under road (approx. 30 feet of road). Provide one 4 inch (102 mm) PVC and connect to the newly installed HH 5-1B-2. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2 & PB8) Provide one pull box (named PB9) approx. 480 feet south of PB8. Provide one 4 inch (102 mm) PVC and connect to the newly installed PB8. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8 & PB9) Provide one pull box (named PB10) approx. 480 feet south of PB9. Provide one 4 inch (102 mm) PVC and connect to the newly installed PB9. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9 & PB10) Provide one pull box (named PB11) approx. 480 feet south of PB10. Provide one 4 inch (102 mm) PVC and connect to the newly installed PB10. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9, PB10 & PB11) Provide one outdoor Nema Box (named NB1) approx. 445 feet south of PB11 and toward the rear direction of the existing Gwangju Air Base Instrument Landing System. Provide one 4 inch (102 mm) PVC and connect to the newly installed PB11. Provide a 4 inch (102 mm) PVC to metal EMT coupler and a metal EMT 90 degree elbow which will be installed at the bottom side of NB1. Also provide a channel strut metal pipe and all the appropriate channel strut fittings to house the newly installed NB1, which will be located an approx. 2 feet from the ground level. (Ref: Manufacture’s instruction for the installation of the outdoor Nema Box and the Manufacture’s instruction for the installation of channel strut) (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9, PB10, PB11 & NB1) Provide one outdoor Nema Box (named NB2) approx. 465 feet south of NB1 and toward the rear direction of the existing Gwangju Air Base Instrument Landing System. Provide one 2 inch (51 mm) liquid conduit and connect to the newly installed NB1. Also provide a channel strut metal pipes and all the appropriate channel strut fittings to house the newly installed NB2, which will be located an approx. 2 feet from the ground level. Affix the liquid conduit on the channel strut metal pipes about 2 feet distance separation from each other. (Ref: Manufacture’s instruction for the installation of the outdoor Nema Box and the Manufacture’s instruction for the installation of channel strut) (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9, PB10, PB11, NB1 & NB2) Provide one pull box (named PB12) approx. 45 feet south of NB2. Provide one 4 inch (102 mm) PVC and connect to the newly installed NB2, at approx.45 feet recommend directional boring under road. Provide a 4 inch (102 mm) PVC to metal EMT coupler and a metal EMT 90 degree elbow to be install at the bottom side of NB2. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9, PB10, PB11, NB1, NB2 & PB12) Provide one pull box (named PB13) approx. 480 feet south of PB12. Provide one 4 inch (102 mm) PVC and connect to the newly installed PB12. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9 & PB10, PB11, NB1, NB2, PB12 & PB13) Provide one pull box (named PB14) approx. 480 feet south of PB13. Provide one 4 inch (102 mm) PVC and connect to the newly installed PB13. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9 & PB10, PB11, NB1, NB2, PB12, PB13 & PB14) Provide one pull box (named PB15) approx. 50 feet south of PB14. Provide one 4 inch (102 mm) PVC and connect to the newly installed PB14. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9 & PB10, PB11, NB1, NB2, PB12, PB13, PB14 & PB15) Provide one pull box (named PB16) approx. 480 feet south of PB15. Provide one 4 inch (102 mm) PVC and connect to the newly installed PB15. (Ref: Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH 5-1B-2, PB8, PB9 & PB10, PB11, NB1, NB2, PB12, PB13, PB14, PB15 & PB16) In the vault of Bldg.1808, add (1) new cable entrance into the interior of the comm. Room of bldg.1808. Provide one 4 inch (102 mm) PVC approx. 3 feet from vault to interior. (Ref: Bldg.1808.dwg) Provide two each three cell Maxcell from the vault of Bldg.1808 to HH1A, HH 1, HH2, HH3, HH4, HH5, HH6, HH7, HH2-3, HH2-2, HH2-1, PB into ITN 2159. Ref: (HH1A, HH 1-7, HH 2-1 to HH 2-3, ITN 2159) Fiber Optic Cable Installation The Contractor shall Provide OSP SM FOCs as described in the following paragraphs and Table 3: Cable Quantities. The cable shall be all dielectric, loose buffer tube, water blocked, SM, OSP cable suitable for underground applications. The Contractor shall coordinate each cable installation with the KO, 607MMS, and 7AF/A6X so as to minimize the impact on building users.

The intent is to provide the cable in one continuous length, to the extent that it is practical. The Contractor shall determine whether or not there is some practical reason for an intermediate splice in the cable at some MH/HH between the cable end points.

If an underground splice is necessary, it shall be accomplished in accordance with commonly accepted telecommunications industry practices for fusion splicing FOC and sealed with a splice case suitable for the application. If a splice case is installed in a MH/HH it shall be pressure tested in accordance with the manufacturer’s instructions. If a splice case leaks, it shall be reinstalled and retested.

Provide/leave a coil of 50 feet (15.24 meters) maintenance loop cable slack at the following:

At each MH or HH outside a building At every third MH or HH along the duct bank route At every MH or HH where a splice case is located At very MH or HH that a FOC bends 90 degree or more Coordinate maintenance loop locations with 607 MMS. If FOC ends in a MH/HH, terminate appropriately for future splicing after FASC task or other future ROKAF coordination approval. FOC terminated in a building will be terminated at the new patch panel using UPC LC connectors.

Each FOC shall be one continuous length and contain no splices unless otherwise indicated in this paragraph except for terminations. The FOC shall utilize existing vacant inner duct and/or flexible geotextile multiple cell inner duct in the MH/HH/PBs along this route, if available.

Fiber optic cable specified will be 12 strand single mode FOC (12L8.3F), 96 strand single mode FOC (96L8.3F) and 144 strand single mode FOC (144L8.3F).

Approximate footage in Table 3: Cable Quantities does not include slack or maintenance loops. Approximate footage of fiber to be installed:

Fiber Strand Count
Measurement
144 Strand SM FOC
28,315 feet (8,631 meters)
96 Strand SM FOC
4,775 feet (1,455 meters)
12 Strand SM FOC
47,187 feet (14,383 meters)

Cable located in maintenance-holes, handholes, and ducts identified as a FASC tasks are also considered to be part of the FASC task. Refer to infrastructure installations paragraphs and drawings.

Table 3: Cable Quantities

Source
Destination
Strands
Distance (Feet)
Related Handhole/Maintenance-hole
Comments
1808
2159
144
3005
HH1A, HH1-7, HH2-1 to HH2-3
Label as 1-144A
1808
2159
144
3005
HH1A, HH1-7, HH2-1 to HH2-3
Label as 1-144B
1808
246
144
4845
HH1A, HH1-9, HH 3-1, HH 3-4 to HH 3-8, MH 3-1 to MH 3-3
Label as 1-144A
1808
246
144
4845
HH1A, HH1-9, HH 3-1, HH 3-4 to HH 3-8, MH 3-1 to MH 3-3
Label as 1-144B
1808
PB4
144
6785
HH1A, HH1-7, HH2-3 to HH2-7, MH 2-2, HH 2-8, HH2-9, HH4-1 to HH4-8
1808
1427
144
4005
HH1A, HH1, HH5-1 to HH 5-8
2159
MH 2-1
144
440
ITN.2159, HH 2-1, HH 2-2 MH 2-1
B2159 (1-144)
MH 2-1
2106
12
250
Bldg.2106 & MH 2-1
B2159 (1-12)
MH 2-1
2107
12
240
Bldg.2107 & MH 2-1
B2159 (13-24)
MH 2-1
2140
12
947
Bldg.2140, MH 2-1, HH2A to HH 2C
B2159 (25-36)
MH 2-1
2150
12
756
Bldg.2150, MH 2-1, HH2A to HH 2D
B2159 (37-48)
MH 2-1
2151
12
718
Bldg.2151, MH 2-1, HH2A to HH 2D
B2159 (49-60)
MH 2-1
2152
12
776
Bldg.2152, MH 2-1, HH2A to HH2D
B2159 (61-72)
MH 2-1
2153
12
470
Bldg.2153, MH2-1, HH2A
B2159 (73-84)
MH 2-1
2154
12
633
Bldg.2154, MH2-1, HH2A to HH2C
B2159 (85-96)
MH 2-1
2155
12
662
Bldg.2155, MH2-1, HH2A to HH2C
B2159 (97-108)
MH 2-1
2156
12
509
Bldg.2156, MH2-1, HH2A & HH2B
B2159 (109-120)
MH 2-1
2158
12
433
Bldg.2158, MH2-1, HH2A
B2159 (121-132)
2159
MH 2-2
96
1600
ITN.2159, HH 2-1 to HH 2-7 & MH 2-2
B2159 (1-96)
MH 2-2
104
12
497
Bldg.104 & MH 2-2
B2159 (1-12)
MH 2-2
2121
12
914
Bldg.2121.dwg, HH 2-8, HH 2-9 & MH 2-2
B2159 (13-24)
MH 2-2
2122
12
1053
Bldg.2122.dwg, HH 2-8, HH 2-9 & MH 2-2
B2159 (25-36)
MH 2-2
2123
12
560
Bldg.2123.dwg, HH 2-8 & MH 2-2
B2159 (37-48)
MH 2-2
2125
12
230
Bldg.2125 HH 2-7 & MH2-2
B2159 (49-60)
MH 2-2
2127
12
692
Bldg.2127.dwg, HH 2-6, HH 2-7 & MH 2-2
B2159 (61-72)
MH 2-2
2129
12
676
Bldg.2129.dwg, HH 2-6, HH 2-7 & MH 2-2
B2159 (73-84)
MH 2-2
2109
12
321
Bldg.2109.dwg & MH 2-2
B2159 (85-96)
246
MH 3-4
144
1385
ITN.246.dwg, HH3-1, HH3-4, HH3-5 & MH3-1 to MH3-4
B246 (1-144)
MH 3-4
122
12
293
Bldg.122.dwg, HH 3-6 & MH 3-4
B246 (1-12)
MH 3-4
123
12
772
Bldg.123.dwg, HH 3-6, HH 3-7 & MH 3-4
B246 (13-24)
MH 3-4
150
12
867
Bldg.151.dwg, HH 3-6 to HH 3-8 & MH 3-4
B246 (25-36)
MH 3-4
151
12
602
Bldg.151.dwg, HH 3-6, HH 3-7 & MH 3-4
B246 (37-48)
MH 3-4
153
12
790
Bldg.151.dwg, HH 3-6 to HH 3-8 & MH 3-4
B246 (49-60)
MH 3-4
159
12
625
Bldg.159.dwg, HH 3-6, HH 3-7 & MH 3-4
B246 (61-72)
MH 3-4
211
12
700
Bldg.211.dwg, MH 3-4 to MH 3-6
B246 (73-84)
MH 3-4
212
12
800
Bldg.212.dwg, MH 3-4 to MH 3-6
B246 (85-96)
MH 3-4
213
12
510
Bldg.211.dwg, MH 3-3 & MH 3-4
B246 (97-108)
MH 3-4
214
12
610
MH 3-3 & MH 3-4
B246 (109-120)
246
MH 3-2
96
522
ITN.246.dwg, HH 3-1, MH 3-1 & MH 3-2
B246 (1-96)
MH 3-2
232
12
737
Bldg.232.dwg, HH 3-4, HH 3-5 & MH 3-2
B246 (1-12)
MH 3-2
233
12
609
Bldg.233.dwg, HH 3-4 & MH 3-2
B246 (13-24)
MH 3-2
235
12
296
Bldg.235.dwg, MH 3-2
B246 (25-36)
MH 3-2
236
12
623
Bldg.236.dwg, HH 3-4 & MH 3-2
B246 (37-48)
MH 3-2
241
12
540
Bldg.241.dwg, HH 3-3 & MH 3-2
B246 (49-60)
MH 3-2
243
12
529
Bldg.243.dwg, HH 3-3 & MH 3-2
B246 (61-72)
MH 3-2
244
12
532
Bldg.244.dwg, HH 3-3 & MH 3-2
B246 (73-84)
MH 3-2
245
12
451
Bldg.245.dwg, HH 3-3 & MH 3-2
B246 (85-96)
246
217
12
602
Bldg.217.dwg, HH 3-1, HH 3-2 & MH 3-1
B246 (1-12)
246
230
12
538
Bldg.230.dwg, HH 3-1, HH 3-2 & MH 3-1
B246 (1-12)
PB-4
MH 4-1
96
1078
ITN.PB4.dwg, HH 4-1, HH 4-2 & MH 4-1
B.PB-4 (1-84) (85-96 DD)
MH 4-1
2275
12
154
Bldg.2275.dwg & MH 4-1
B.PB-4 (1-12)
MH 4-1
2281
12
461
Bldg.2281.dwg, HH 4-2 & MH 4-1
B.PB-4 (13-24)
MH 4-1
2285
12
298
Bldg.2285.dwg & MH 4-1
B.PB-4 (25-36)
MH 4-1
2292
12
1148
Bldg.2292.dwg, HH 4-2 to HH 4-4 & MH 4-1
B.PB-4 (37-48)
PB-4
2282
12
146
bldg.2282.dwg & HH 4-1
B.PB-4 (1-12)
PB-4
2283
12
605
bldg.2283.dwg, HH 4-1, HH 4-1A & HH 4-1B
B.PB-4 (1-12)
PB-4
PB-3
12
288
bldg.PB-3.dwg & HH 4-1
B.PB-4 (1-12)
PB-4
PB-5
12
581
bldg.PB-5.dwg, HH 4-1 & HH 4-1A
B.PB-4 (1-12)
PB-4
PB-6
12
509
bldg.PB-6.dwg, HH 4-1 & HH 4-1A
B.PB-4 (1-12)
1427
MH 5-1
96
1574
ITN.1427.dwg, HH 5-1, HH 5-2 to HH 5-2B & MH 5-1
B1427 (1-96)
MH 5-1
700
12
1868
Bldg.700.dwg, HH 5-2C to HH 5-2F & MH 5-1
B1427 (1-12)
MH 5-1
710
12
1670
Bldg.710.dwg, HH 5-2C to HH 5-2F & MH 5-1
B1427 (12-24)
MH 5-1
1204
12
1024
Bldg.1204.dwg, HH 5-2C & MH 5-1
B1427 (25-36)
MH 5-1
1207(TMO)
12
233
Bldg.1207 (TMO).dwg. & MH 5-1
B1427 (37-48)
MH 5-1
1209
12
382
Bldg.1209.dwg & MH 5-1
B1427 (49-60)
MH 5-1
1210 (Conex)
12
403
Bldg.1210 (Conex).dwg & MH 5-1
B1427 (61-72)
1427
1421
12
1639
Bldg.1421.dwg, HH 5-1, HH 5-1A to HH 5-1E
B1427 (1-12)
1427
1429
12
434
Bldg.1429.dwg, HH 5-1 & HH 5-1A
B1427 (1-12)
1427
1501
12
5524
Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH5-1B-2, PB8 to PB11, NB1, NB2, PB12 to PB16, HH 1501 & Bldg.1501.dwg
B1427 (1-12)
1427
1503
12
6457
Bldg.1427.dwg, HH 5-1, HH 5-1A, HH 5-1B, HH 5-1B-1, HH5-1B-2, PB8 to PB11, NB1, NB2, PB12 to PB16, HH 1501, HH 1501-1, HH 1503 & Bldg.1503.dwg
B1427 (1-12)

Provide two continuous runs of 144 strand SM FOC (144L8.3F) from the main Tech Control Bldg.1808 to ITN 2159 using the underground bank system, 1808 vault, HH1A, HH1 – HH7, HH 2-3, HH 2-2, HH 2-1, Interior ITN 2159 rack. Do not leave slack loop in HH 2-1 or HH 2-2 for congestion purposes. Leave 50 feet (15.24 meters) slack loops in 1808 vault, leave 50 feet (15.24 meters) slack loops in HH2, HH5 and HH2-3. Leave 30 feet (9.14 meters) slack (each cable) at rack location for terminating in Bldg.1808. Leave 20 feet (6.096 meters) of slack (each cable) at the rack in ITN 2159. Label first cable as: (From: B1808 to B2159, FOC 1-144A). Label second cable as: (From: B1808 to B2159 FOC 1-144B) (Ref: Bldg.1808.dwg, ITN.2159.dwg, HH1A, HH1-7, HH 2-1 to 2-3) Provide two continuous run of 144 strand SM FOC (144L8.3F) from the main Tech Control Bldg.1808 to ITN 246 using the underground bank system, 1808 vault, HH1A, HH1 – HH9, HH 3-8, HH 3-7, HH 3-6, MH 3-4, MH 3-3, HH 3-5, HH 3-4, MH 3-2, MH 3-1, HH 3-1, interior ITN 246 rack. Leave 50 feet (15.24 meters) slack loop in 1808 vault, leave 50 feet (15.24 meters) slack loops in HH 2, HH 5, HH 8, HH 3-7, MH 3-3 and a 50 feet (15.24 meters) slack loop in MH 3-1. Leave 30 feet (9.14 meters) slack at rack location for terminating in Bldg.1808. Leave 30 feet (9.14 meters) of slack in the new comm. room in ITN 246. Label cable as: (From: B1808 to B246, FOC 1-144 (Ref: Bldg.1808.dwg, ITN.246.dwg, HH1A, HH1 – HH9, HH 3-8, HH 3-7, HH 3-6, MH 3-4, MH 3-3, HH 3-5, HH 3-4, MH 3-2, MH 3-1, HH 3-1) Provide one continuous run of 144 strand SM FOC (144L8.3F) from the main Tech Control Bldg.1808 to ITN PB-4 using the underground bank system, 1808 vault, HH1A, HH1 – HH7, HH 2-3 to HH 2-7, MH 2-2, HH 2-8, HH 2-9, HH 4-8 to HH 4-1, interior ITN PB-4 rack. Leave 50 feet (15.24 meters) slack loop in 1808 vault, leave 50 feet (15.24 meters) slack loops in HH 3, HH 6, HH 2-5, MH 2-2, HH 2-9, HH 4-6, HH 4-4 and HH 4-1. Leave 30 feet (9.14 meters) slack at rack location for terminating in Bldg.1808. Leave 20 feet (6.096 meters) slack at each rack for terminating in PB4. Label cable as: (From: B1808 to B.PB-4, FOC 1-144). (Ref: Bldg.1808.dwg, Bldg.PB-4.dwg, HH1A, HH1 – HH7, HH 2-3 to HH 2-7, MH 2-2, HH 2-8, HH 2-9, HH 4-1 to HH 4-8) Provide one continuous run of 144 strand SM FOC (144L8.3F) from the main Tech Control Bldg.1808 to ITN 1427 using the underground bank system, 1808 vault, HH1A, HH 1, HH 5-8 to HH 5-1, interior ITN 1427 rack. Leave 50 feet (15.24 meters) slack loop in 1808 vault, leave a 25 feet (7.62 meters) slack loop at HH 5-8, HH 5-4 and 50 feet (15.24 meters) at HH 5-1. Leave 30 feet (9.14 meters) slack at rack location for terminating in Bldg.1808. Leave 20 feet (6.096 meters) slack at rack location in ITN 1427. Label cable as: (From: B1808 to B1427, FOC 1-144). (Ref: Bldg.1808.dwg, Bldg.1427.dwg, HH1A, HH 1, HH 5-1 to HH 5-8) Provide one continuous run of 144 strand SM FOC (144L8.3F) from ITN 2159 to MH 2-1. Leave 150 feet (45.72 meters) of slack in MH 2-1 for splicing / slack loop. Leave 20 feet (6.096 meters) of slack at rack of ITN 2159. Label cable as: (From: B2159 to MH 2-1, FOC 1-144). (Ref: ITN: 2159, HH 2-1 to 2-3 & MH 2-1) Provide one 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2106. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. In Bldg.2106 follow path of existing fiber to existing floor rack. Leave 20 feet (6.096 meters) of slack at rack. Label as: (FR: B2159 to B2106, FOC 1-12 via MH 2-1) (Ref: Bldg.2106, MH 2-1) Provide one 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2107. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 50 feet of slack in Mech. Room of 2107. Label as: ( FR: B2159 to B2107, FOC 13-24 via MH 2-1) (Ref: Bldg.2107 & MH 2-1) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2153. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 50 feet (15.24 meters) slack loop in HH 2A. Leave 100 feet (30.48 meters) of slack at Bldg.2153 (Bldg. currently under construction) Label as: (FR: B2159 to B2153, FOC 73-84 via MH 2-1) (Ref: MH 2-1 & HH 2A) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2158. Leave 150 feet (45.72 meters) of slack in MH 2-1 for splicing / slack loop. Leave 50 feet (15.24 meters) slack loop in HH 2A. Leave 50 feet of slack in Mech. Room of Bldg.2158. Label as: (FR: B2159 to B2158, FOC 121-132 via MH 2-1) (Ref: Bldg.2158.dwg, MH 2-1 & HH 2A) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2156. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 50 feet (15.24 meters) slack loop in HH 2B. From mech. Room run through ceiling over to existing wall mount cabinet. Leave 10 feet (3.048 meters) of slack at cabinet of Bldg.2156. Label as: (FR: B2159 to B2156, FOC 109-120 via MH 2-1) (Ref: Bldg.2156.dwg, MH 2-1, HH 2A & HH 2B) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2154. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Run through ceiling to existing wall mount cabinet of Bldg.2154. Leave 50 feet (15.24 meters) slack loop in HH 2C. Leave 10 feet (3.048 meters) of slack at cabinet. Label as: (FR: B2159 to B2154, FOC 85-96 via MH 2-1) (Ref: Bldg.2154.dwg, MH 2-1, HH 2A to HH 2C) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2155. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 50 feet (15.24 meters) slack loop in HH 2C. Leave 10 feet (3.048 meters) of slack at cabinet. Label as: (FR: B2159 to B2155, FOC 97-108 via MH 2-1) (Ref: Bldg.2155.dwg, MH 2-1, HH 2A to HH 2C) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2140. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 50 feet (15.24 meters) slack loop in HH 2C. Leave 100 feet (30.48 meters) of slack in Bldg.2140. Label as: (FR: B2159 to B2140, FOC 25-36 via MH 2-1) (Ref: Bldg.2140.dwg, MH 2-1, HH 2A to HH 2C) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2151. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Run across ceiling approx. 30 feet (9.14 meters) to existing wall mount cabinet of Bldg.2151. Leave 50 feet (15.24 meters) slack loop in HH 2D. Leave 10 feet (3.048 meters) of slack at existing cabinet. Label as: (FR: B2159 to B2151, FOC 49-60 via MH 2-1) (Ref: Bldg.2151.dwg, MH 2-1, HH 2A to HH 2D) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2152. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 50 feet (15.24 meters) slack loop in HH 2D. Run across ceiling approx. 30 feet (9.14 meters) to existing ½ floor rack in Bldg.2152. Leave 10 feet (3.048 meters) of slack at floor rack. Label as: (FR: B2159 to B2152, FOC 61-72 via MH 2-1) (Ref: Bldg.2152.dwg, MH 2-1, HH 2A to HH 2D) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-1 to Bldg.2150. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 50 feet (15.24 meters) slack loop in HH 2D. Leave 20 feet (6.096 meters) slack in entrance to Bldg.2150. Label as: (FR: B2159 to B2150, FOC 37-48 via MH 2-1) (Ref: Bldg.2150.dwg, MH 2-1, HH 2A to HH 2D) In MH 2-1, splice the SM 1-144 from ITN 2159 to the (11) 12 SM FOCs From Bldgs. and splice accordingly: B1206(1-12), B2107(13-24), B2140(25-36), B2150(37-48), B2151(49-60), B2152(61-72), B2153(73-84), B2154(85-96), B2155(97-108), B2156(109-120), B2158(121-132), Spare(133-144) Provide one continuous run of 96 strand SM FOC (96L8.3F) from ITN 2159 to MH 2-2. Leave 150 feet (45.72 meters) of slack in MH 2-2 for splicing / slack loop. Leave 25 feet (7.62 meters) slack loop in HH 2-3. Leave 50 feet (15.24 meters) slack loop in HH 2-5. Leave 20 feet (6.096 meters) of slack at rack of ITN 2159. Label cable as: (FR: B2159 TO: MH 2-2, FOC 1-96). (Ref: ITN.2159.dwg, HH 2-1 to HH 2-7 & MH 2-2) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-2 to Bldg.104. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 20 feet (6.096 meters) at the existing rack in Bldg.104. Label cable as: (FR: B2159 to B104, FOC 1-12 via MH 2-1). Ref: (Bldg.104.dwg & MH 2-2) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-2 to Bldg.2109. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 30 feet (9.14 meters) at the new bldg. entrance of Bldg.2109. Label cable as: (FR: B2159 to B2109, FOC 85-96 via MH 2-1). Ref: (Bldg.2109.dwg & MH 2-2) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-2 to Bldg.2125. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop. Leave 10 feet (3.048 meters) of slack at existing wall mounted cabinet in Bldg.2125. Label cable as: (FR: B2159 to B2125, FOC 49-60 via MH 2-1). Ref: (Bldg.2125.dwg, HH 2-7 & MH 2-2) Provide one continuous run of 12 strand SM FOC (12L8.3F) from MH 2-2 to Bldg.2127. Leave 100 feet (30.48 meters) of slack in MH 2-1 for splicing / slack loop.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.