Pages_29_from_H01_HS-00554-5J_DRAWING.pdf

PDF 3 MB Posted

Attached to
Repair deteriorated Bldg. 230 at Camp Carrol
Solicitation number
W91QVN19R0273
Issued by

About this file

Drawing5

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.

4. ALL WALL / FLOOR / ROOF OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND

AS DIRECTED BY THE CONTRACTING OFFICER.

EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS

5. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO

CEILING, ROOF, EQUIPMENT, PIPE, DUCT AND ELECTRICAL ITEMS.

PREVENTION SYSTEM WITH NO ADDITIONAL COST TO THE GOVERNMENT SUCH AS WALLS,

ITEMS TO MAKE WAY FOR THE INSTALLATION AND REPLACEMENT OF MECHANICAL AND FIRE

18. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE AND REINSTALL THE OBSTRUCTED

SPECIFICATIONS.

CONTRACT DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT

OF THE ACTUAL PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON

SYSTEM TO SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS

17. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL

9. ANY PIPES THAT PENETRATE FIRE RATED WALLS (EXISTING/ NEW) SHALL BE SEALED PER SPEC.

TO ENSURE PROPER OPERATION, AS ORIGINALLY INTENDED.

EQUIPMENT. THE CONTRACTOR SHALL TEST, ADJUST AND BALANCE EQUIPMENT AS REQUIRED

14. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY START-UP AND TESTING OF THE NEW

AND SHALL BE VERIFIED AT THE JOB SITE.

2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC, ARE APPROXIMATE

PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.

ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER

FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR

3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE

CONTRACTING OFFICER’S APPROVAL.

REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR

IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER’S

PRIOR TO COMMENCING ANY CONSTRUCTION OR REPAIR.

EQUIPMENT, DUCTWORK, PIPING, DIMENSIONS AND ETC. UNDER THE SUPERVISION OF C.O.R

1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION,

A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.

10. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING.

THE REQUIREMENTS OF SEAL CLASS C.

TO SMACNA STATIC PRESSURE CONSTRUCTION CLASS 500PA AND DUCTWORK SHALL MEET

7. THE SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED ACCORDING

START OF CONSTRUCTION.

PLAN SHALL BE SUBMITTED TO AND APPROVED BY DPW AND THE USER, PRIOR TO THE

USER TO FULLY UTILIZE THE FACILITY DURING THE CONSTRUCTION PERIOD. THIS PHASING

SHALL PROVIDE A PHASING PLAN FOR CONSTRUCTION COMPLETION ALLOWING FOR THE

FACILITY BE FULLY OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR

19. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, IF IT IS REQUIRED THAT THE

CONTRACTOR.

THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS

THE EXISTING EQUIPMENT, NEW EQUIPMENT, DUCT WORK, PIPING AND ETC. DAMAGES DUE TO

11. CONNECTIONS TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE

FOR APPROVAL.

DESIGN & TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION

12. THE CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE

SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".

15. ALL EQUIPMENT AND MATERIALS SHALL MEET THE REQUIREMENTS OF "STANDARD TECHNICAL

ADDITIONAL COST TO THE PROJECT CONTRACT.

THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE MECHANICAL SCOPE OF WORK AT NO

O & MA PROJECTS, KOREA (NOVEMBER 30, 2015)" FORM AS A PART OF THIS PROJECT.

16. THE MECHANICAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR

REVIEW BRANCH FOR APPROVAL BEFORE COMMENCING THE WORK.

13. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION TO THE DESIGN & TECHNICAL

SUCH AS ANCHORS, HANGERS, SUPPORTS, ETC.

8. ALL PIPES, DRAINS AND DUCTWORK TO BE REMOVED SHALL INCLUDE ALL ITS ACCESSORIES

AS ORIGINALLY INTENDED.

AND INSTALL NEW DUCTWORK AND MAKE ALL NECESSARY DUCT CONNECTION TO FUNCTION

ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION, REMOVE THE EXISTING DUCTWORK

& LOCATION PRIOR TO INSTALL NEW HAVC AND PLUMBING PIPING. IF THE EXISTING DUCT

6. THE CONTRACTOR SHALL COORDINATE WITH THE EXISTING DUCTWORK AND PIPING ELEVATION

CONSTRUCTION.

20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF CORE DRILLING DURING

M-3

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

E

AS SHOWN

DATE:

MECHANICAL

D - 19 - 17

A B C D F G H

NAM, TAE CHIN

CHANG, TAE HO

DOMESTIC HOT WATER HEATER

(KW)

OUTPUT

GROSS

111.6

(LPH)

RECOVERY

HEAT

ELEC. POWER

FLA: 2, 120 V, 1 PH, 60 HZ

TEMP.

SUPPLY

RISE

TEMP.

60 C 16.7 C

REDUCER AND STANDARD ACCESSORIES, AHRI & CSA CERTIFIED PRODUCT.

CASCADE SYSTEM, MODULE TYPE CONDENSING WATER HEATER WITH SCALE

DOMESTIC WATER EXPANSION TANK

WORKING PRESSURE, EQUIPPED W/ FDA APPROVED FIXED BUTYL BLADDER,

ASME CODE AND PRESSURE VESSEL CODE (ASME BPVC SEC VIII), MAX. 125 PSI

VERTICAL TYPE, PRE-CHARGE STEEL THERMAL TANK, SHELL CONFORMING TO

TANK SIZE: 12" DIA x 20" LG

TANK CAPACITY: 5 GALLONS (ACCEPTANCE VOLUME)

ACROSS-THE-LINE MAGNETIC CONTROLLER IN A NEMA 250 AND NEMA MG 1.

ALL BRONZE CONSTRUCTION. MOTORS SHALL BE EQUIPPED WITH AN

IN-LINE CLOSED COUPLED CENTRIFUGAL TYPE, FLANGE CONNECTION AND

DOMESTIC HOT WATER RE-CIRCULATING PUMP32

MOTOR: 1 HP, 115 V, 1 PH, 60 HZ, 3,250 RPM

CAPACITY: 6 GPM AT 63 FT TDH

THE BUILDING AS SHOWN ON THE DRAWINGS.

5. AUTOMATIC WET PIPE SPRINKLER PROTECTION SYSTEM SHALL BE PROVIDED THROUGHOUT

REQUIREMENTS AND SUBMIT FOR APPROVAL PRIOR TO INSTALLATION.

A COMPLETE FIRE SPRINKLER SHOP DRAWINGS BASED ON NFPA 13 AND SPECIFICATION

MEANS CONCEPTUAL REQUIREMENT ONLY. THE SPRINKLER CONTRACTOR SHALL SUBMIT

2. THE FIRE SPRINKLER SYSTEM SHOWN THESE DRAWING IS PERFORMANCE BASED WHICH

FIRE PROTECTION GENERAL NOTES

SYSTEM THROUGHOUT THE BUILDING TO FULLY PROTECT THIS FACILITY.

1. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC WET PIPE SPRINKLER

AND EQUIPMENT LISTINGS.

ACCORDANCE WITH NEPA 13 & 13R, UFC 3-600-1, MANUFACTURER’S RECOMMENDATIONS

SHOWN IN SUGGESTED LOCATIONS. FINAL QUANTITY AND LAYOUT SHALL BE IN

3. THE EQUIPMENT, VALVES, PIPING, HEADS AND OTHER ACCESSORIES & PARTS ARE

D E S C R I P T I O N

NO.

ITEM

Q’ TY

EQUIPMENT SCHEDULE

HS-00554-5J

29 JUL 19

CAMP CARROLL

EQUIPMENT SCHEDULE AND GENERAL NOTES

LIGHTING AND HVAC OUTLETS FOR THE SPRINKLER’S EXACT LOCATION.

4.THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURAL CEILING PLAN,

(2-1 ADA, HQ)

REPAIR BUILDING NO. S-230

28 81

7. THE CONTRACTOR SHALL PERFORM THE TRAINING ABOUT GAS SUPPLY SYSTEM TO O&M DIVISION.

AND GAS PIPING LINES TO DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.

5. THE CONTRACTOR SHALL SUBMIT THE DETAILED SHOP DRAWING OF GAS DISTRIBUTION SYSTEM

US ORIGIN MATERIALS:

AS INDICATED ON THE DRAWINGS.

INTERNET SITE HTTP:// WWW.CCKBID.COM). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE

DATED FEBRUARY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT

REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS",

ALL GENERIC US ORIGIN MATERIALS SHALL BE AS OFF-SHORE IN THE GENERIC SUBMITTAL

NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION.

TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)" SECTION 33 51 15,

1. GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE AS WELL AS "STANDARD

20151030)" SECTION 33 51 15, PART 2 PRODUCTS.

AS WELL AS "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 -

2. ALL MATERIALS OF GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE

THE DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.

6. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION OF GAS DISTRIBUTION SYSTEM TO

GAS DISTRIBUTION GENERAL NOTES

ADJUSTMENTS, RELOCATIONS AND/ OR REPAIRS WILL BE MADE AT THE CONTRACTOR’S COST.

AS A RESULT OF THE CONTRACTOR’S CONSTRUCTION. ALL DAMAGE TO GAS FACILITIES REQUIRING

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO GAS FACILITIES DURING OR

SCOPE OF WORK

ACCESSORIES.

8. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR THE INSTALLATIONS OF GAS PIPING AND

9. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR GAS PIPING SIZE.

TO D&TR BRANCH THROUGH THE COR.

10. THE CONTRACTOR SHALL PERFORM A GAS LEAKING TEST AND SUBMIT THE GAS LEAKING TEST REPORT

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FACILITY SHARE OF THE EXPENSES.

M-4

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

E

AS SHOWN

DATE:

MECHANICAL

D - 19 - 17

A B C D F G H

GENERAL NOTES AND SCOPE OF WORK

CHANG, TAE HO

NAM, TAE CHIN

WORK CLASS: "K" (REPAIR / MAINTENANCE WORK)

NEEDED LOCATIONS.

13. ENSURE TO INSTALL LABELED ACCESS DOORS FOR ALL THE TEST AND MAINTENANCE

ARE NEW AND ARE TO BE PROVIDED BY THE CONTRACTOR.

6. UNLESS OTHERWISE NOTED AS EXISTING, THE ITEMS SHOWN ON THE DRAWINGS

SPRINKLERS WITH O-RINGS ARE NOT PERMITTED.

SEISMIC BRACING CALCULATION IN ACCORDANCE WITH NFPA 13 REQUIREMENTS:

10. PROVIDE EARTH QUAKE PROTECTION (SWAY BRACING), END OF BRANCH LINE AND

14. FIRE PROTECTION PLANS SHOWN ARE USED FOR COST ESTIMATE PURPOSE ONLY.

SMOKE DETECTORS AND ALL OTHER TRADES.

11. FINAL SPRINKLER HEADS LOCATIONS SHALL BE COORDINATE WITH CEILING FANS,

VERIFICATION.

FAILURE TO DO THIS WILL REQUIRE THE CONTRACTOR TO RE-EXPOSE THE PIPING FOR

PIPE THAT SUPPLIES THE AUTOMATIC FIRE EXTINGUISHING SYSTEM / STANDPIPE SYSTEM.

16. THE FIRE INSPECTOR SHALL PERFORM A VISUAL INSPECTION OF ALL UNDERGROUND

SPRINKLER HEAD IN THE SYSTEM.

RISER WILL RESULT IN FLUSHING THE ABOVEGROUND SPRINKLER SYSTEM THROUGH EVERY

SYSTEM. FAILURE TO FLUSH UNDERGROUND FIRE LINE PRIOR TO "STACKING" THE SPRINKLER

GROUND PIPES WHICH SUPPLY THE AUTOMATIC FIRE-EXTINGUISHING SYSTEM/ STANDPIPE

18. THE FIRE INSPECTOR MUST WITNESS A HYDROSTATIC TEST AND FLUSH OF ALL UNDER-

PREVENTION OFFICE TO COORDINATE INSPECTION OF MATERIAL.

PRIOR TO INSTALLATION TO VERIFY COMPLIANCE WITH STANDARDS. CONTACT FIRE

20. ALL EQUIPMENT AND PIPING MUST BE INSPECTED BY THE FIRE PREVENTION OFFICE

PROJECTS, KOREA (REVISION 1 - 20151030)".

ENGINEERING AS INDICATED ON "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA

BY A REGISTERED PROFESSIONAL ENGINEER LICENSED TO PRACTICE FIRE PROTECTION

AND SEALED BY A U.S. FIRE PROTECTION ENGINEER (NICET), LEVEL III OR IV AND STAMPED

SYSTEM COMPLETE WITH HYDRAULIC CALCULATIONS AND FINAL DESIGN DRAWINGS SIGNED

8. THE FIRE SPRINKLER SYSTEM CONTRACTOR IS TO PROVIDE A COMPLETE ENGINEERED

DRAWINGS AND SPECIFICATIONS.

7. THE FIRE SPRINKLER SYSTEM SHALL BE DESIGNED TO MEET THE INTENT OF THE

ETC. FAILURE TO INSPECTION WILL RESULT IN RESCHEDULING INSPECTION.

SPRINKLER PIPE, NAIL PLATES IF REQUIRED, LOCATION OF FIRE DEPARTMENT CONNECTIONS, CLIPS IF REQUIRED, PLACEMENT & TYPE OF SPRINKLER HEADS, FIRE CAULKING AROUND

19. AT THE TIME OF THE TEST, THE INSPECTOR SHALL CHECK PIPE SIZE, PIPE HANGERS, SURGE

SHOP DRAWINGS.

SYSTEM. THE HYDRANT LOCATIONS, FLOW TESTS AND DATE SHALL BE INDICATED ON THE

BASED ON NFPA 291 REQUIREMENTS AND UTILIZE THIS DATE TO DESIGN THE SPRINKLER

17. THE CONTRACTOR SHALL CONDUCT WATER SUPPLY HYDRANT TEST FOR THIS PROJECT

PANELS AND DOORS.

TO BE VISIBLE AND ACCESSIBLE FROM THE FLOOR WITHOUT HAVING TO REMOTE CEILING

FOR MECH. ROOMS AND OTHER UTILITY ROOMS. SHUT-OFF VALVES SHALL BE INSTALLED

12. ALL SPRINKLER PIPING IN FINISHED AREAS SHALL BE CONCEALED FOR VIEW EXCEPT

TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".

9. ALL EQUIPMENT SHALL BE UL LISTED AND/ OR FM APPROVED AS INDICATED ON "STANDARD

FIRE PREVENTION OFFICE PRIOR TO IMPLEMENTATION.

THE CHANGE SHALL BE APPROVED TO DESIGN & TECHNICAL REVIEW BRANCH AND

15. IF FIELD CONDITIONS NECESSITATE SIGNIFICANT CHANGE FROM APPROVED PLAN,

HS-00554-5J

29 JUL 19

CAMP CARROLL

1. INSTALL NEW WET PIPE FIRE SPRINKLER SYSTEM WITH ALL NECESSARY ACCESSORIES AND PARTS.

CODES AND REGULATIONS TO COMPLETE SUBJECT PROJECT CONSTRUCTION. )

FROM NOT SHOWN OR/AND INDICATED IN THE CONCEPTUAL DRAWINGS TO MEET WITH APPLICABLE

PURPOSE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ALL OTHER ADDITIONAL COST CAUSED

(THE FIRE SPRINKLER SYSTEM ROUTING AND PIPE SIZES SHOWN ARE CONCEPTUAL FOR IGCE

WORK CLASS: "L" (CONSTRUCTION / ALTERATION WORK)

PARTS IN THE MECHANICAL ROOM AND AROUND THE BUILDING.

DAMPER, THERMOSTATS, OARC, SMOKE STACK, INSULATION AND ASSOCIATED ACCESSORIES &

UNITS, CONCRETE PADS, PUMPS, EXPANSION TANK, AIR SEPARATOR, PIPES, GAUGES, VALVES,

1. REMOVE EXISTING HVAC SYSTEM INCLUDING AIR COOLED CHILLER, FAN COIL UNITS, A/C

AND ALL NECESSARY ACCESSORIES AND PARTS

IN-LINE EXHAUST FANS WITH ASSOCIATED DUCTWORK, DAMPERS, WALL CAPS, INSULATION

5. REPLACE EXISTING VENTILATING SYSTEM WITH NEW ONE INCLUDING WALL EXHAUST FANS,

3. PROVIDE NEW FOUR SEASON TYPE A/C UNITS FOR COMM. ROOMS.

4. PROVIDE NEW ELECTRIC UNIT HEATERS AND RADIANT HEATERS AS INDICATED.

NECESSARY ACCESSORIES AND PARTS.

DOMESTIC WATER PIPING, INSULATION, BACKFLOW PREVENTER, VALVES, GAUGES AND ALL

6. REPLACE EXISTING PLUMBING FIXTURES AND PIPES INCLUDING SEWER & VENT PIPING,

ACCESSORIES AND PARTS.

EXPANSION TANK WITH SMOKESTACK, CONC. PAD, VALVES, GAUGES AND ALL NECESSARY

7. PROVIDE NEW DOMESTIC HOT WATER HEATER, HOT WATER RE-CIRCULATING PUMP AND

VALVES AND CABINET AT BLDG. #239.

8. REMOVE EXIST. GAS REGULATOR, GAS METER, GAS FILTER, GAS PIPES, PRESSURE GAUGES, & PARTS.

THERMOSTATS, THERMOSTAT LOCK BOXES, CONCRETE PADS AND ALL NECESSARY ACCESSORIES

ASSOCIATED DUCTWORK, REFRIGERANT PIPES, CONDENSATE PIPES, CENTRAL CONTROLLERS,

2. PROVIDE NEW HEAT PUMP UNITS AND ENERGY RECOVERY VENTILATORS COMPLETE WITH

VALVES, CABINET, GAS LEAK DETECTION SYSTEM AND GAS ALARM GONG AT BLDG. #230.

9. PROVIDE NEW GAS REGULATOR, GAS METER, GAS FILTER, GAS PIPES, PRESSURE GAUGES,

(2-1 ADA, HQ)

REPAIR BUILDING NO. S-230

29 81

350X150

80 CFM

150x150 EAR

250x100

300x150

50 CFM

150x150 EAR

300x150

200x100

250x250 EAR

200 CFM

IN-LINE EXHAUST FAN WALL CAP

P-1

SCALE : 1 / 100M-5

GRAPHIC SCALE

SCALE: 1 : 100

4000mm

NAM, TAE CHIN

CHANG, TAE HO

NEW HVAC DUCT PLAN (1ST FL.)

O A

E A

S A

R A

OA

EA

SA

RA

26 26

T T

VC VC

VC VC VC

VC

(TYP.OF 18 EA))

VENTILATION CONTROLLER

J250 J250

J150

J150

J200

J125

J125

J125

J125

J150

J150

J250

J125

J125

J250

J150

J100

J100

J100

OA

EA

SA

RA

J100

J100

J200

J175 J150

J175

J100

J125

J150

RETURN DIFFUSER

SUPPLY DIFFUSER:

J100

J250

J150J250

J150

J175

J175

J125

J125

J150

J150 J125

J100

J100

J125 J250

J250

J250

J200

J200

J150

J150 J150

J150

J125

J125J125

J125

J250

J250 J125

J125 J150

J200

J200

J150 J125

J125

J175

J200 J100

J150

J100

J250

J250

J250J200

J175

J125 J100

J100

J125J150

J175

J100

J100

J100

J100

J125

J150

J100

J100

J100

OA

EA

SA

RA

J100 J125

J125

O A

E A

S A

R A

MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS.

1. SIZES AND LAYOUTS OF DUCTWORK MAY CHANGE DEPENDING ON

SPECIFIC NOTES

2. ALL DUCTS FOR ENERGY RECOVERY VENTILATORS SHALL BE INSTALLED.

O

A

E A

S A

R A

DOOR (600 X 600)

CEILING ACCESS

M-5

200x100

TAG

150x150

300x150

TAG

250x250

UP UP

UP

HS-00554-5J

29 JUL 19

CAMP CARROLL

NEW HVAC DUCT PLAN (1ST FL.)

DUCT MATERIAL SCHEDULE

FLEXIBLE DUCT W/ INSULATION

GALVANIZED SPIRAL DUCT W/ INSULATIONERV MAIN DUCT

ERV BRANCH DUCT

(2-1 ADA, HQ)

REPAIR BUILDING NO. S-230

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

E

AS SHOWN

DATE:

MECHANICAL

D - 19 - 17

A B C D F G H

30 81

GRAPHIC SCALE

SCALE: 1 : 100

4000mm

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

E

AS SHOWN

DATE:

MECHANICAL

D - 19 - 17

A B C D F G H

NAM, TAE CHIN

CHANG, TAE HO

150x150 EAR

50 CFM

150 CFM

200x200 EAR

WALL CAP

200x100

300x150 IN-LINE EXHAUST FAN

350x200

250x250 EAR

230 CFM

IN-LINE EXHAUST FAN

300x150

250x250 EAR

230 CFM

IN-LINE EXHAUST FAN WALL CAP

150x150 EAR

50 CFM

200x100

300x150

150 CFM

200x200 EAR

IN-LINE EXHAUST FAN

WALL CAP

400x200

300x150

250x250 EAR

230 CFM

200x100

250x250 EAR

230 CFM

150x150 EAR

50 CFM

P-2

SCALE : 1 / 100

P-1

SCALE : 1 / 100

NEW HVAC DUCT PLAN (2ND FL.)

NEW HVAC DUCT PLAN (3RD FL.)

OA

EA

SA

RA

OA

EA

SA

RA

OA

EA

SA

RA

OA

EA

SA

RA

O A

E A

S A

R A

O A

E A

S A

R A

O A

E A

S A

R A

VCVC VC

VC VC VC

VC VC VC

VCVCVC

O A

E A

S A

R A

O A

E A

S A

R A

J250

J250

J250 J250

J100

J100

J100

J150

J150

J100 J175

J175

J150

J150

J150

J150

J100

J100

J100

J100

J250

J250

J100

J100

J200

J150J150

J100

J200

J150 J150

J250

J250

J250

J125 J100

J150 J125

J100 J150

J150

J150

J250

J250 J125

J125

J125

J125

J100

J200

O A

E A

S A

R A

J175

J150

J125

J125

J150

J100

J100

J250

J250

J250

J250

J100

J100

J100 J150

J100

J150

J175

J175

J150

J150

J150

J150

J100

J100 J100

J100

J250

J250

J250

J100

J100

J100

J100

J200J200

J125J100

J125J125

J125

J125

J100

J175

J150J150J125

J250

J250 J250

J100

J100

J175

J150 J150

J150

J175

J150

J100

J100

J250

J250

J250J150

J150

J100

J100

J175

J150

J150

J125J125

J250

J250

J150 J150

J150

J175

J175

J100

J100 J150

J150

J250

J250 J100

J100

J200

J125

J200

J175

J150

J150

J150

J150 J150

J125

J250 J250

J125

J125

J150

J150

J150

J150

J200 J150

J100

J100

J100

J100

J250 J250

J100 J100

J100

J100

J200

J200

J175

J125

J125

J150

J125

J125

J175

J150

WALL CAP

DOOR (600 X 600)

CEILING ACCESS

DOOR (600 X 600)

CEILING ACCESS

M-6

TAG

350x350

350x200

TAG

150x150

200x100

250x150

200x200 TAG

TAG

150x150

200x100

400X200

TAG

400X400200x100

TAG

150x150

250x150

TAG

200x200

UP DN UPDN

DN UP

DN DN

DN

OA

EA

SA

RA

OA

EA

SA

RA

HS-00554-5J

29 JUL 19

CAMP CARROLL

NEW HVAC DUCT PLAN (2ND & 3RD FL.)

M-6

M-6

(2-1 ADA, HQ)

REPAIR BUILDING NO. S-230

31 81

DOOR (600 X 600)

CEILING ACCESS

DOOR (600 X 600)

CEILING ACCESS

GRAPHIC SCALE

SCALE: 1 : 100

4000mm

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

E

AS SHOWN

DATE:

MECHANICAL

D - 19 - 17

A B C D F G H

NAM, TAE CHIN

CHANG, TAE HO

P-1

SCALE : 1 / 100M-7

NEW HVAC PIPING PLAN (1ST FL.)

M-7

HS-00554-5J

29 JUL 19

CAMP CARROLL

NEW HVAC PIPING PLAN (1ST FL.)

(2-1 ADA, HQ)

REPAIR BUILDING NO. S-230

32 81

9 7

13 13

12 15

11 12

14 14

131211

4 -1 4 -2

56 -1 6 -2

4 -3

3 -13 -23 -3

Tch Tch Tch Tch TchTchTch Tch TchTch Tch

Tch TchTch Tch Tch Tch Tch Tch Tch Tch Tch Tch Tch Tch

Tch

Tc

Tch

C C

TO / FROM

REFRIGERANT PIPES

6 -1 TO / FROM

REFRIGERANT PIPES

4 -1

TO / FROM

REFRIGERANT PIPES

5 TO / FROM

REFRIGERANT PIPES

4 -2

TO / FROM

REFRIGERANT PIPES

6 -2 TO / FROM

REFRIGERANT PIPES

4 -3

TO / FROM

REFRIGERANT PIPES

TO / FROM

REFRIGERANT PIPES

TO / FROM

REFRIGERANT PIPES

3 -1

3 -2

3 -3

RS=15.88

RL=9.52

CD=25

RS=19.05

RL=9.52

CD=25

RS=22.2

RL=9.52

CD=32

RS=28.58

RL=12.7

CD=32

RS=28.58

RL=15.88

CD=32

RS=15.88

RL=9.52

CD=25

RS=12.7

RL=6.35

CD=25

RS=28.58

RL=15.88

RS=28.58

RL=15.88

RS=12.7

RL=6.35

RS=15.88

RL=9.52

RS=15.88

RL=9.52

RS=19.05

RL=9.52

RS=22.2

RL=9.52

RS=22.2

RL=9.52

RS=15.88

RL=9.52

CD=25

RS=15.88

RL=9.52

CD=25

RS=15.88

RL=9.52

CD=25

RS=15.88

RL=9.52

CD=25

97 7 9

RS=12.7

RL=6.35

RS=12.7

RL=6.35

CD=25

RS=12.7

RL=6.35

CD=25

RS=12.7

RL=6.35

CD=25

RS=12.7

RL=6.35

CD=25

RS=15.88

RL=9.52

CD=25

RS=12.7

RL=6.35

CD=25

RS=12.7

RL=6.35

CD=25

RS=15.88

RL=9.52

CD=25

RS=15.88

RL=9.52

CD=25

RS=28.58

RL=15.88

(TYP. OF 5 EA)

SPLASH BLOCK

RS=15.88

RL=9.52

CD=25

RS=19.05

RL=9.52

CD=32

RS=22.2

RL=9.52

CD=25

RS=19.05

RL=9.52

CD=32

RS=15.88

RL=9.52

CD=25

RS=15.88

RL=9.52

CD=25

RS=28.58

RL=12.7

RS=15.88

RL=9.52

CD=25

RS=12.7

RL=6.35

RS=15.88

RL=9.52

RS=19.05

RL=9.52

RS=22.2

RL=9.52

RS=12.7

RL=6.35

RS=12.7

RL=6.35

RS=12.7

RL=6.35

RS=12.7

RL=6.35

25 25

40 40

RS=15.88

RL=9.52

RS=12.7

RL=6.35

RS=34.9

RL=19.05

(TYP. OF 85 EA)

THERMOSTAT FOR HPU

(9 EA)

W/ EMERGENCY SHUT-OFF

CENTRAL CONTROLLER

UP UP

UP

SPECIFIC NOTES

OF HVAC SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.

1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS

MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS.

2. SIZES AND LAYOUTS OF REFRIGERANT PIPING MAY CHANGE DEPENDING ON

2. REFRIGERANT & CONDENSATE PIPE SIZES SHALL BE VERIFIED.

ALUMINUM JACKETS.

4. ALL EXPOSED REFRIGERANT & CONDENSATE PIPES SHALL BE COVERED UP WITH

6. ALL THERMOSTATS AND CONTROLLERS SHALL BE INSTALLED WITH LOCK BOXES.

WITH MANUFACTURER’S INSTALLATION INSTRUCTIONS.

5. CLEARANCE DISTANCES FOR OUTDOOR HPU SHALL BE DETERMINED IN ACCORDANCE

PIPE SLEEVES AND SHALL BE PENETRATED THROUGH THE EXISTING WALL OPENINGS.

7. REFRIGERANT & DRAIN PIPES FOR CORRIDORS SHALL BE COVERED UP WITH PVC

WALLS, DRAIN THE CONDENSATE WATER TO THE JANITOR ROOM ON THE 2ND FLOOR.

8. IF CONDENSATE DRAIN PIPES GOING TO CORRIDORS CANNOT PASS THROUGH THE

3. ALL REFRIGERANT & DRAIN PIPING FOR HEAT PUMP UNITS SHALL BE INSTALLED.

PUMP OUTDOOR UNITS.

9. THE CONTRACTOR SHALL INSTALL STAINLESS STEEL WIRE-MESH SCREENS ON HEAT

File details come from the government source that posted it.