GENERAL NOTES
DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.
4. ALL WALL / FLOOR / ROOF OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND
AS DIRECTED BY THE CONTRACTING OFFICER.
EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS
5. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO
CEILING, ROOF, EQUIPMENT, PIPE, DUCT AND ELECTRICAL ITEMS.
PREVENTION SYSTEM WITH NO ADDITIONAL COST TO THE GOVERNMENT SUCH AS WALLS,
ITEMS TO MAKE WAY FOR THE INSTALLATION AND REPLACEMENT OF MECHANICAL AND FIRE
18. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE AND REINSTALL THE OBSTRUCTED
SPECIFICATIONS.
CONTRACT DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT
OF THE ACTUAL PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON
SYSTEM TO SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS
17. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL
9. ANY PIPES THAT PENETRATE FIRE RATED WALLS (EXISTING/ NEW) SHALL BE SEALED PER SPEC.
TO ENSURE PROPER OPERATION, AS ORIGINALLY INTENDED.
EQUIPMENT. THE CONTRACTOR SHALL TEST, ADJUST AND BALANCE EQUIPMENT AS REQUIRED
14. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY START-UP AND TESTING OF THE NEW
AND SHALL BE VERIFIED AT THE JOB SITE.
2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC, ARE APPROXIMATE
PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.
ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR
3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE
CONTRACTING OFFICER’S APPROVAL.
REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR
IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER’S
PRIOR TO COMMENCING ANY CONSTRUCTION OR REPAIR.
EQUIPMENT, DUCTWORK, PIPING, DIMENSIONS AND ETC. UNDER THE SUPERVISION OF C.O.R
1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION,
A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.
10. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING.
THE REQUIREMENTS OF SEAL CLASS C.
TO SMACNA STATIC PRESSURE CONSTRUCTION CLASS 500PA AND DUCTWORK SHALL MEET
7. THE SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED ACCORDING
START OF CONSTRUCTION.
PLAN SHALL BE SUBMITTED TO AND APPROVED BY DPW AND THE USER, PRIOR TO THE
USER TO FULLY UTILIZE THE FACILITY DURING THE CONSTRUCTION PERIOD. THIS PHASING
SHALL PROVIDE A PHASING PLAN FOR CONSTRUCTION COMPLETION ALLOWING FOR THE
FACILITY BE FULLY OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR
19. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, IF IT IS REQUIRED THAT THE
CONTRACTOR.
THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS
THE EXISTING EQUIPMENT, NEW EQUIPMENT, DUCT WORK, PIPING AND ETC. DAMAGES DUE TO
11. CONNECTIONS TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE
FOR APPROVAL.
DESIGN & TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION
12. THE CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE
SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".
15. ALL EQUIPMENT AND MATERIALS SHALL MEET THE REQUIREMENTS OF "STANDARD TECHNICAL
ADDITIONAL COST TO THE PROJECT CONTRACT.
THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE MECHANICAL SCOPE OF WORK AT NO
O & MA PROJECTS, KOREA (NOVEMBER 30, 2015)" FORM AS A PART OF THIS PROJECT.
16. THE MECHANICAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR
REVIEW BRANCH FOR APPROVAL BEFORE COMMENCING THE WORK.
13. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION TO THE DESIGN & TECHNICAL
SUCH AS ANCHORS, HANGERS, SUPPORTS, ETC.
8. ALL PIPES, DRAINS AND DUCTWORK TO BE REMOVED SHALL INCLUDE ALL ITS ACCESSORIES
AS ORIGINALLY INTENDED.
AND INSTALL NEW DUCTWORK AND MAKE ALL NECESSARY DUCT CONNECTION TO FUNCTION
ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION, REMOVE THE EXISTING DUCTWORK
& LOCATION PRIOR TO INSTALL NEW HAVC AND PLUMBING PIPING. IF THE EXISTING DUCT
6. THE CONTRACTOR SHALL COORDINATE WITH THE EXISTING DUCTWORK AND PIPING ELEVATION
CONSTRUCTION.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF CORE DRILLING DURING
M-3
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
E
AS SHOWN
DATE:
MECHANICAL
D - 19 - 17
A B C D F G H
NAM, TAE CHIN
CHANG, TAE HO
DOMESTIC HOT WATER HEATER
(KW)
OUTPUT
GROSS
111.6
(LPH)
RECOVERY
HEAT
ELEC. POWER
FLA: 2, 120 V, 1 PH, 60 HZ
TEMP.
SUPPLY
RISE
TEMP.
60 C 16.7 C
REDUCER AND STANDARD ACCESSORIES, AHRI & CSA CERTIFIED PRODUCT.
CASCADE SYSTEM, MODULE TYPE CONDENSING WATER HEATER WITH SCALE
DOMESTIC WATER EXPANSION TANK
WORKING PRESSURE, EQUIPPED W/ FDA APPROVED FIXED BUTYL BLADDER,
ASME CODE AND PRESSURE VESSEL CODE (ASME BPVC SEC VIII), MAX. 125 PSI
VERTICAL TYPE, PRE-CHARGE STEEL THERMAL TANK, SHELL CONFORMING TO
TANK SIZE: 12" DIA x 20" LG
TANK CAPACITY: 5 GALLONS (ACCEPTANCE VOLUME)
ACROSS-THE-LINE MAGNETIC CONTROLLER IN A NEMA 250 AND NEMA MG 1.
ALL BRONZE CONSTRUCTION. MOTORS SHALL BE EQUIPPED WITH AN
IN-LINE CLOSED COUPLED CENTRIFUGAL TYPE, FLANGE CONNECTION AND
DOMESTIC HOT WATER RE-CIRCULATING PUMP32
MOTOR: 1 HP, 115 V, 1 PH, 60 HZ, 3,250 RPM
CAPACITY: 6 GPM AT 63 FT TDH
THE BUILDING AS SHOWN ON THE DRAWINGS.
5. AUTOMATIC WET PIPE SPRINKLER PROTECTION SYSTEM SHALL BE PROVIDED THROUGHOUT
REQUIREMENTS AND SUBMIT FOR APPROVAL PRIOR TO INSTALLATION.
A COMPLETE FIRE SPRINKLER SHOP DRAWINGS BASED ON NFPA 13 AND SPECIFICATION
MEANS CONCEPTUAL REQUIREMENT ONLY. THE SPRINKLER CONTRACTOR SHALL SUBMIT
2. THE FIRE SPRINKLER SYSTEM SHOWN THESE DRAWING IS PERFORMANCE BASED WHICH
FIRE PROTECTION GENERAL NOTES
SYSTEM THROUGHOUT THE BUILDING TO FULLY PROTECT THIS FACILITY.
1. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC WET PIPE SPRINKLER
AND EQUIPMENT LISTINGS.
ACCORDANCE WITH NEPA 13 & 13R, UFC 3-600-1, MANUFACTURER’S RECOMMENDATIONS
SHOWN IN SUGGESTED LOCATIONS. FINAL QUANTITY AND LAYOUT SHALL BE IN
3. THE EQUIPMENT, VALVES, PIPING, HEADS AND OTHER ACCESSORIES & PARTS ARE
D E S C R I P T I O N
NO.
ITEM
Q’ TY
EQUIPMENT SCHEDULE
HS-00554-5J
29 JUL 19
CAMP CARROLL
EQUIPMENT SCHEDULE AND GENERAL NOTES
LIGHTING AND HVAC OUTLETS FOR THE SPRINKLER’S EXACT LOCATION.
4.THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURAL CEILING PLAN,
(2-1 ADA, HQ)
REPAIR BUILDING NO. S-230
28 81
7. THE CONTRACTOR SHALL PERFORM THE TRAINING ABOUT GAS SUPPLY SYSTEM TO O&M DIVISION.
AND GAS PIPING LINES TO DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.
5. THE CONTRACTOR SHALL SUBMIT THE DETAILED SHOP DRAWING OF GAS DISTRIBUTION SYSTEM
US ORIGIN MATERIALS:
AS INDICATED ON THE DRAWINGS.
INTERNET SITE HTTP:// WWW.CCKBID.COM). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE
DATED FEBRUARY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT
REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS",
ALL GENERIC US ORIGIN MATERIALS SHALL BE AS OFF-SHORE IN THE GENERIC SUBMITTAL
NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION.
TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)" SECTION 33 51 15,
1. GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE AS WELL AS "STANDARD
20151030)" SECTION 33 51 15, PART 2 PRODUCTS.
AS WELL AS "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 -
2. ALL MATERIALS OF GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE
THE DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.
6. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION OF GAS DISTRIBUTION SYSTEM TO
GAS DISTRIBUTION GENERAL NOTES
ADJUSTMENTS, RELOCATIONS AND/ OR REPAIRS WILL BE MADE AT THE CONTRACTOR’S COST.
AS A RESULT OF THE CONTRACTOR’S CONSTRUCTION. ALL DAMAGE TO GAS FACILITIES REQUIRING
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO GAS FACILITIES DURING OR
SCOPE OF WORK
ACCESSORIES.
8. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR THE INSTALLATIONS OF GAS PIPING AND
9. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR GAS PIPING SIZE.
TO D&TR BRANCH THROUGH THE COR.
10. THE CONTRACTOR SHALL PERFORM A GAS LEAKING TEST AND SUBMIT THE GAS LEAKING TEST REPORT
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FACILITY SHARE OF THE EXPENSES.
M-4
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
E
AS SHOWN
DATE:
MECHANICAL
D - 19 - 17
A B C D F G H
GENERAL NOTES AND SCOPE OF WORK
CHANG, TAE HO
NAM, TAE CHIN
WORK CLASS: "K" (REPAIR / MAINTENANCE WORK)
NEEDED LOCATIONS.
13. ENSURE TO INSTALL LABELED ACCESS DOORS FOR ALL THE TEST AND MAINTENANCE
ARE NEW AND ARE TO BE PROVIDED BY THE CONTRACTOR.
6. UNLESS OTHERWISE NOTED AS EXISTING, THE ITEMS SHOWN ON THE DRAWINGS
SPRINKLERS WITH O-RINGS ARE NOT PERMITTED.
SEISMIC BRACING CALCULATION IN ACCORDANCE WITH NFPA 13 REQUIREMENTS:
10. PROVIDE EARTH QUAKE PROTECTION (SWAY BRACING), END OF BRANCH LINE AND
14. FIRE PROTECTION PLANS SHOWN ARE USED FOR COST ESTIMATE PURPOSE ONLY.
SMOKE DETECTORS AND ALL OTHER TRADES.
11. FINAL SPRINKLER HEADS LOCATIONS SHALL BE COORDINATE WITH CEILING FANS,
VERIFICATION.
FAILURE TO DO THIS WILL REQUIRE THE CONTRACTOR TO RE-EXPOSE THE PIPING FOR
PIPE THAT SUPPLIES THE AUTOMATIC FIRE EXTINGUISHING SYSTEM / STANDPIPE SYSTEM.
16. THE FIRE INSPECTOR SHALL PERFORM A VISUAL INSPECTION OF ALL UNDERGROUND
SPRINKLER HEAD IN THE SYSTEM.
RISER WILL RESULT IN FLUSHING THE ABOVEGROUND SPRINKLER SYSTEM THROUGH EVERY
SYSTEM. FAILURE TO FLUSH UNDERGROUND FIRE LINE PRIOR TO "STACKING" THE SPRINKLER
GROUND PIPES WHICH SUPPLY THE AUTOMATIC FIRE-EXTINGUISHING SYSTEM/ STANDPIPE
18. THE FIRE INSPECTOR MUST WITNESS A HYDROSTATIC TEST AND FLUSH OF ALL UNDER-
PREVENTION OFFICE TO COORDINATE INSPECTION OF MATERIAL.
PRIOR TO INSTALLATION TO VERIFY COMPLIANCE WITH STANDARDS. CONTACT FIRE
20. ALL EQUIPMENT AND PIPING MUST BE INSPECTED BY THE FIRE PREVENTION OFFICE
PROJECTS, KOREA (REVISION 1 - 20151030)".
ENGINEERING AS INDICATED ON "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA
BY A REGISTERED PROFESSIONAL ENGINEER LICENSED TO PRACTICE FIRE PROTECTION
AND SEALED BY A U.S. FIRE PROTECTION ENGINEER (NICET), LEVEL III OR IV AND STAMPED
SYSTEM COMPLETE WITH HYDRAULIC CALCULATIONS AND FINAL DESIGN DRAWINGS SIGNED
8. THE FIRE SPRINKLER SYSTEM CONTRACTOR IS TO PROVIDE A COMPLETE ENGINEERED
DRAWINGS AND SPECIFICATIONS.
7. THE FIRE SPRINKLER SYSTEM SHALL BE DESIGNED TO MEET THE INTENT OF THE
ETC. FAILURE TO INSPECTION WILL RESULT IN RESCHEDULING INSPECTION.
SPRINKLER PIPE, NAIL PLATES IF REQUIRED, LOCATION OF FIRE DEPARTMENT CONNECTIONS, CLIPS IF REQUIRED, PLACEMENT & TYPE OF SPRINKLER HEADS, FIRE CAULKING AROUND
19. AT THE TIME OF THE TEST, THE INSPECTOR SHALL CHECK PIPE SIZE, PIPE HANGERS, SURGE
SHOP DRAWINGS.
SYSTEM. THE HYDRANT LOCATIONS, FLOW TESTS AND DATE SHALL BE INDICATED ON THE
BASED ON NFPA 291 REQUIREMENTS AND UTILIZE THIS DATE TO DESIGN THE SPRINKLER
17. THE CONTRACTOR SHALL CONDUCT WATER SUPPLY HYDRANT TEST FOR THIS PROJECT
PANELS AND DOORS.
TO BE VISIBLE AND ACCESSIBLE FROM THE FLOOR WITHOUT HAVING TO REMOTE CEILING
FOR MECH. ROOMS AND OTHER UTILITY ROOMS. SHUT-OFF VALVES SHALL BE INSTALLED
12. ALL SPRINKLER PIPING IN FINISHED AREAS SHALL BE CONCEALED FOR VIEW EXCEPT
TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".
9. ALL EQUIPMENT SHALL BE UL LISTED AND/ OR FM APPROVED AS INDICATED ON "STANDARD
FIRE PREVENTION OFFICE PRIOR TO IMPLEMENTATION.
THE CHANGE SHALL BE APPROVED TO DESIGN & TECHNICAL REVIEW BRANCH AND
15. IF FIELD CONDITIONS NECESSITATE SIGNIFICANT CHANGE FROM APPROVED PLAN,
HS-00554-5J
29 JUL 19
CAMP CARROLL
1. INSTALL NEW WET PIPE FIRE SPRINKLER SYSTEM WITH ALL NECESSARY ACCESSORIES AND PARTS.
CODES AND REGULATIONS TO COMPLETE SUBJECT PROJECT CONSTRUCTION. )
FROM NOT SHOWN OR/AND INDICATED IN THE CONCEPTUAL DRAWINGS TO MEET WITH APPLICABLE
PURPOSE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ALL OTHER ADDITIONAL COST CAUSED
(THE FIRE SPRINKLER SYSTEM ROUTING AND PIPE SIZES SHOWN ARE CONCEPTUAL FOR IGCE
WORK CLASS: "L" (CONSTRUCTION / ALTERATION WORK)
PARTS IN THE MECHANICAL ROOM AND AROUND THE BUILDING.
DAMPER, THERMOSTATS, OARC, SMOKE STACK, INSULATION AND ASSOCIATED ACCESSORIES &
UNITS, CONCRETE PADS, PUMPS, EXPANSION TANK, AIR SEPARATOR, PIPES, GAUGES, VALVES,
1. REMOVE EXISTING HVAC SYSTEM INCLUDING AIR COOLED CHILLER, FAN COIL UNITS, A/C
AND ALL NECESSARY ACCESSORIES AND PARTS
IN-LINE EXHAUST FANS WITH ASSOCIATED DUCTWORK, DAMPERS, WALL CAPS, INSULATION
5. REPLACE EXISTING VENTILATING SYSTEM WITH NEW ONE INCLUDING WALL EXHAUST FANS,
3. PROVIDE NEW FOUR SEASON TYPE A/C UNITS FOR COMM. ROOMS.
4. PROVIDE NEW ELECTRIC UNIT HEATERS AND RADIANT HEATERS AS INDICATED.
NECESSARY ACCESSORIES AND PARTS.
DOMESTIC WATER PIPING, INSULATION, BACKFLOW PREVENTER, VALVES, GAUGES AND ALL
6. REPLACE EXISTING PLUMBING FIXTURES AND PIPES INCLUDING SEWER & VENT PIPING,
ACCESSORIES AND PARTS.
EXPANSION TANK WITH SMOKESTACK, CONC. PAD, VALVES, GAUGES AND ALL NECESSARY
7. PROVIDE NEW DOMESTIC HOT WATER HEATER, HOT WATER RE-CIRCULATING PUMP AND
VALVES AND CABINET AT BLDG. #239.
8. REMOVE EXIST. GAS REGULATOR, GAS METER, GAS FILTER, GAS PIPES, PRESSURE GAUGES, & PARTS.
THERMOSTATS, THERMOSTAT LOCK BOXES, CONCRETE PADS AND ALL NECESSARY ACCESSORIES
ASSOCIATED DUCTWORK, REFRIGERANT PIPES, CONDENSATE PIPES, CENTRAL CONTROLLERS,
2. PROVIDE NEW HEAT PUMP UNITS AND ENERGY RECOVERY VENTILATORS COMPLETE WITH
VALVES, CABINET, GAS LEAK DETECTION SYSTEM AND GAS ALARM GONG AT BLDG. #230.
9. PROVIDE NEW GAS REGULATOR, GAS METER, GAS FILTER, GAS PIPES, PRESSURE GAUGES,
(2-1 ADA, HQ)
REPAIR BUILDING NO. S-230
29 81
350X150
80 CFM
150x150 EAR
250x100
300x150
50 CFM
150x150 EAR
300x150
200x100
250x250 EAR
200 CFM
IN-LINE EXHAUST FAN WALL CAP
P-1
SCALE : 1 / 100M-5
GRAPHIC SCALE
SCALE: 1 : 100
4000mm
NAM, TAE CHIN
CHANG, TAE HO
NEW HVAC DUCT PLAN (1ST FL.)
O A
E A
S A
R A
OA
EA
SA
RA
26 26
T T
VC VC
VC VC VC
VC
(TYP.OF 18 EA))
VENTILATION CONTROLLER
J250 J250
J150
J150
J200
J125
J125
J125
J125
J150
J150
J250
J125
J125
J250
J150
J100
J100
J100
OA
EA
SA
RA
J100
J100
J200
J175 J150
J175
J100
J125
J150
RETURN DIFFUSER
SUPPLY DIFFUSER:
J100
J250
J150J250
J150
J175
J175
J125
J125
J150
J150 J125
J100
J100
J125 J250
J250
J250
J200
J200
J150
J150 J150
J150
J125
J125J125
J125
J250
J250 J125
J125 J150
J200
J200
J150 J125
J125
J175
J200 J100
J150
J100
J250
J250
J250J200
J175
J125 J100
J100
J125J150
J175
J100
J100
J100
J100
J125
J150
J100
J100
J100
OA
EA
SA
RA
J100 J125
J125
O A
E A
S A
R A
MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS.
1. SIZES AND LAYOUTS OF DUCTWORK MAY CHANGE DEPENDING ON
SPECIFIC NOTES
2. ALL DUCTS FOR ENERGY RECOVERY VENTILATORS SHALL BE INSTALLED.
O
A
E A
S A
R A
DOOR (600 X 600)
CEILING ACCESS
M-5
200x100
TAG
150x150
300x150
TAG
250x250
UP UP
UP
HS-00554-5J
29 JUL 19
CAMP CARROLL
NEW HVAC DUCT PLAN (1ST FL.)
DUCT MATERIAL SCHEDULE
FLEXIBLE DUCT W/ INSULATION
GALVANIZED SPIRAL DUCT W/ INSULATIONERV MAIN DUCT
ERV BRANCH DUCT
(2-1 ADA, HQ)
REPAIR BUILDING NO. S-230
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
E
AS SHOWN
DATE:
MECHANICAL
D - 19 - 17
A B C D F G H
30 81
GRAPHIC SCALE
SCALE: 1 : 100
4000mm
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
E
AS SHOWN
DATE:
MECHANICAL
D - 19 - 17
A B C D F G H
NAM, TAE CHIN
CHANG, TAE HO
150x150 EAR
50 CFM
150 CFM
200x200 EAR
WALL CAP
200x100
300x150 IN-LINE EXHAUST FAN
350x200
250x250 EAR
230 CFM
IN-LINE EXHAUST FAN
300x150
250x250 EAR
230 CFM
IN-LINE EXHAUST FAN WALL CAP
150x150 EAR
50 CFM
200x100
300x150
150 CFM
200x200 EAR
IN-LINE EXHAUST FAN
WALL CAP
400x200
300x150
250x250 EAR
230 CFM
200x100
250x250 EAR
230 CFM
150x150 EAR
50 CFM
P-2
SCALE : 1 / 100
P-1
SCALE : 1 / 100
NEW HVAC DUCT PLAN (2ND FL.)
NEW HVAC DUCT PLAN (3RD FL.)
OA
EA
SA
RA
OA
EA
SA
RA
OA
EA
SA
RA
OA
EA
SA
RA
O A
E A
S A
R A
O A
E A
S A
R A
O A
E A
S A
R A
VCVC VC
VC VC VC
VC VC VC
VCVCVC
O A
E A
S A
R A
O A
E A
S A
R A
J250
J250
J250 J250
J100
J100
J100
J150
J150
J100 J175
J175
J150
J150
J150
J150
J100
J100
J100
J100
J250
J250
J100
J100
J200
J150J150
J100
J200
J150 J150
J250
J250
J250
J125 J100
J150 J125
J100 J150
J150
J150
J250
J250 J125
J125
J125
J125
J100
J200
O A
E A
S A
R A
J175
J150
J125
J125
J150
J100
J100
J250
J250
J250
J250
J100
J100
J100 J150
J100
J150
J175
J175
J150
J150
J150
J150
J100
J100 J100
J100
J250
J250
J250
J100
J100
J100
J100
J200J200
J125J100
J125J125
J125
J125
J100
J175
J150J150J125
J250
J250 J250
J100
J100
J175
J150 J150
J150
J175
J150
J100
J100
J250
J250
J250J150
J150
J100
J100
J175
J150
J150
J125J125
J250
J250
J150 J150
J150
J175
J175
J100
J100 J150
J150
J250
J250 J100
J100
J200
J125
J200
J175
J150
J150
J150
J150 J150
J125
J250 J250
J125
J125
J150
J150
J150
J150
J200 J150
J100
J100
J100
J100
J250 J250
J100 J100
J100
J100
J200
J200
J175
J125
J125
J150
J125
J125
J175
J150
WALL CAP
DOOR (600 X 600)
CEILING ACCESS
DOOR (600 X 600)
CEILING ACCESS
M-6
TAG
350x350
350x200
TAG
150x150
200x100
250x150
200x200 TAG
TAG
150x150
200x100
400X200
TAG
400X400200x100
TAG
150x150
250x150
TAG
200x200
UP DN UPDN
DN UP
DN DN
DN
OA
EA
SA
RA
OA
EA
SA
RA
HS-00554-5J
29 JUL 19
CAMP CARROLL
NEW HVAC DUCT PLAN (2ND & 3RD FL.)
M-6
M-6
(2-1 ADA, HQ)
REPAIR BUILDING NO. S-230
31 81
DOOR (600 X 600)
CEILING ACCESS
DOOR (600 X 600)
CEILING ACCESS
GRAPHIC SCALE
SCALE: 1 : 100
4000mm
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
E
AS SHOWN
DATE:
MECHANICAL
D - 19 - 17
A B C D F G H
NAM, TAE CHIN
CHANG, TAE HO
P-1
SCALE : 1 / 100M-7
NEW HVAC PIPING PLAN (1ST FL.)
M-7
HS-00554-5J
29 JUL 19
CAMP CARROLL
NEW HVAC PIPING PLAN (1ST FL.)
(2-1 ADA, HQ)
REPAIR BUILDING NO. S-230
32 81
9 7
13 13
12 15
11 12
14 14
131211
4 -1 4 -2
56 -1 6 -2
4 -3
3 -13 -23 -3
Tch Tch Tch Tch TchTchTch Tch TchTch Tch
Tch TchTch Tch Tch Tch Tch Tch Tch Tch Tch Tch Tch Tch
Tch
Tc
Tch
C C
TO / FROM
REFRIGERANT PIPES
6 -1 TO / FROM
REFRIGERANT PIPES
4 -1
TO / FROM
REFRIGERANT PIPES
5 TO / FROM
REFRIGERANT PIPES
4 -2
TO / FROM
REFRIGERANT PIPES
6 -2 TO / FROM
REFRIGERANT PIPES
4 -3
TO / FROM
REFRIGERANT PIPES
TO / FROM
REFRIGERANT PIPES
TO / FROM
REFRIGERANT PIPES
3 -1
3 -2
3 -3
RS=15.88
RL=9.52
CD=25
RS=19.05
RL=9.52
CD=25
RS=22.2
RL=9.52
CD=32
RS=28.58
RL=12.7
CD=32
RS=28.58
RL=15.88
CD=32
RS=15.88
RL=9.52
CD=25
RS=12.7
RL=6.35
CD=25
RS=28.58
RL=15.88
RS=28.58
RL=15.88
RS=12.7
RL=6.35
RS=15.88
RL=9.52
RS=15.88
RL=9.52
RS=19.05
RL=9.52
RS=22.2
RL=9.52
RS=22.2
RL=9.52
RS=15.88
RL=9.52
CD=25
RS=15.88
RL=9.52
CD=25
RS=15.88
RL=9.52
CD=25
RS=15.88
RL=9.52
CD=25
97 7 9
RS=12.7
RL=6.35
RS=12.7
RL=6.35
CD=25
RS=12.7
RL=6.35
CD=25
RS=12.7
RL=6.35
CD=25
RS=12.7
RL=6.35
CD=25
RS=15.88
RL=9.52
CD=25
RS=12.7
RL=6.35
CD=25
RS=12.7
RL=6.35
CD=25
RS=15.88
RL=9.52
CD=25
RS=15.88
RL=9.52
CD=25
RS=28.58
RL=15.88
(TYP. OF 5 EA)
SPLASH BLOCK
RS=15.88
RL=9.52
CD=25
RS=19.05
RL=9.52
CD=32
RS=22.2
RL=9.52
CD=25
RS=19.05
RL=9.52
CD=32
RS=15.88
RL=9.52
CD=25
RS=15.88
RL=9.52
CD=25
RS=28.58
RL=12.7
RS=15.88
RL=9.52
CD=25
RS=12.7
RL=6.35
RS=15.88
RL=9.52
RS=19.05
RL=9.52
RS=22.2
RL=9.52
RS=12.7
RL=6.35
RS=12.7
RL=6.35
RS=12.7
RL=6.35
RS=12.7
RL=6.35
25 25
40 40
RS=15.88
RL=9.52
RS=12.7
RL=6.35
RS=34.9
RL=19.05
(TYP. OF 85 EA)
THERMOSTAT FOR HPU
(9 EA)
W/ EMERGENCY SHUT-OFF
CENTRAL CONTROLLER
UP UP
UP
SPECIFIC NOTES
OF HVAC SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.
1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS
MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS.
2. SIZES AND LAYOUTS OF REFRIGERANT PIPING MAY CHANGE DEPENDING ON
2. REFRIGERANT & CONDENSATE PIPE SIZES SHALL BE VERIFIED.
ALUMINUM JACKETS.
4. ALL EXPOSED REFRIGERANT & CONDENSATE PIPES SHALL BE COVERED UP WITH
6. ALL THERMOSTATS AND CONTROLLERS SHALL BE INSTALLED WITH LOCK BOXES.
WITH MANUFACTURER’S INSTALLATION INSTRUCTIONS.
5. CLEARANCE DISTANCES FOR OUTDOOR HPU SHALL BE DETERMINED IN ACCORDANCE
PIPE SLEEVES AND SHALL BE PENETRATED THROUGH THE EXISTING WALL OPENINGS.
7. REFRIGERANT & DRAIN PIPES FOR CORRIDORS SHALL BE COVERED UP WITH PVC
WALLS, DRAIN THE CONDENSATE WATER TO THE JANITOR ROOM ON THE 2ND FLOOR.
8. IF CONDENSATE DRAIN PIPES GOING TO CORRIDORS CANNOT PASS THROUGH THE
3. ALL REFRIGERANT & DRAIN PIPING FOR HEAT PUMP UNITS SHALL BE INSTALLED.
PUMP OUTDOOR UNITS.
9. THE CONTRACTOR SHALL INSTALL STAINLESS STEEL WIRE-MESH SCREENS ON HEAT
File details come from the government source that posted it.