Pages_1_from_H01_HS-00554-5J_DRAWING.pdf
PDF 3 MB Posted
- Attached to
- Repair deteriorated Bldg. 230 at Camp Carrol
- Solicitation number
- W91QVN19R0273
About this file
Drawing1
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
R-11SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
O & M
HOUSING DIV.
REVIEWED BY
UNITED STATES ARMY GARRISON DAEGU
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
DIRECTORATE OF PUBLIC WORK
HGFEDCBA
D - 19 - 17
CHON, HYON TAE
DESIGN REVIEW SIGNATURE
ORGANIZATION
USING AGENCY
36TH SIGNAL
MASTER PLN.
ENVIRONMENTAL
NAME SIGNATURE
O&M DIV.
FIRE DEPT.
SAFETY OFFICE
DPTMS(AT/FP)
188TH MP COM.
IND. HYGENIST
HS-00554-5J
UNIT #15746, APO AP 96218-5746
C - 3
DRAWING NO.
CHIEF,
DESIGN & TECH. REVIEW Br.
C - 2
YI, TONG KI
CAMP CARROLL
AS SHOWN
C - 45
DATE: 29 JUL 19
C - 56
C - 7
(2-1 ADA, HQ)
REPAIR BUILDING NO. S-230
(2-1 ADA, HQ)
REPAIR BUILDING NO. S-230
1 1 OF 1R - 1
PROJECT NO. HS-00554-5J, CAMP CARROLL
9 C - 8 8 OF 81
10 C - 9 9 OF 81
C - 6
AE - 10
AE - 11
AE - 12
AE - 13
AE - 14
AE - 15
AE - 16
M - 16
43 M - 17
M - 18
M - 19
M - 20
M - 21
M - 22
M - 24
M - 23
M - 2551
M - 2652
M - 28
55 M - 29
M - 27
E - 1
ELECTRICAL
E - 2
E - 3
E - 4
E - 5
E - 6
E - 7
E - 8
E - 9
E - 10
E - 11
E - 12
E - 13
E - 14
E - 15
E - 16
E - 17
E - 18
E - 19
E - 20
E - 21
E - 22
E - 23
E - 24
E - 25
E - 26
E - 27
DETAIL DRAWINGS - 2
LEGEND, NOTES AND SCOPE OF WORK
T I T L E S H E E T
TITLE SHEET
C - 1 1 OF 812
AE - 1 10 OF 81
ARCHITECTURAL
CIVIL
AE - 2
AE - 3
AE - 4
AE - 5
AE - 6
AE - 7
AE - 8
AE - 9
M - 1
MECHANICAL
27 LEGEND AND ABBREVIATIONS
M - 2
M - 3
M - 4
M - 5
M - 6
M - 7
M - 8
M - 9
M - 10
M - 11
M - 12
M - 1541
M - 1440
M - 1339
LOCATION PLAN
REMOVAL PLAN
SITE LAYOUT PLAN
TYPICAL SECTION
SIDEWALK, CURB AND ASPHALT CONCRETEPAVEMENT DETAILS
PAVEMENT MARKING DETAILS
HANDICAPPED PARKING AND CAR WHEEL STOPS DETAILS
WATER DISTRIBUTION GATE VALVE, AND POST INDICATOR VALVE
WATER SUPPLY DISTRIBUTION-THRUST BLOCK
EXISTING / REMOVAL FLOOR PLAN, #601, REMOVAL WORK, GENERAL NOTES
SCOPE OF WORK
1F FLOOR PLAN, 2F FLOOR PLAN
3F FLOOR PLAN, ROOF FLOOR PLAN
METAL STUD, RUNNER AND INSULATION PLAN
ENLARGED PARTIAL FLOOR PLAN, NOTES , MIRROR DETAILS, SHOWER CURB DETAILS
(TYP), PAPER TOWEL DESPENSER & WASTE RECEPTACLE DETAILS, ROBE HOOK DETAILS (TYP)
TOILET PARTITION PLAN & ELEVATION (TYP), TOILET PARTITION DETAILS (TYP), LAVATORY COUNTER DETAIL
ROOF SLAB(TYP), NOTES , CANOPY DETAIL(TYP)
ENLAGED ENTERANCE CANOPY (STRUCTURAL), SECTION DETAILS (STRUCTURAL), PURLIN CONNECTION ON CONC
ELEVATIONS, SECTIONS, EAVE DETAIL, RAKE DETAIL, RIDGE DETAIL, DROP CEILING DETAIL (TYP)
ROOF PURLIN LAYOUT, SECTION, NOTES
PURLIN DETAIL-1, 2, DOWNSPOUT DETAIL (TYP), FALL PROTECTION SYSTEM, ROOF DETAIL
DETAIL, SLAB DETAIL, STAIR NON-SLIP DETAIL, STAIR HANDRAIL & GUARDRAIL DETAIL
CMU WALL OPENING DETAIL, CMU BLOCK-UP DETAIL, CLJ DETAIL, CEILING ACCESS DOOR DETAIL, CONC STOOP
SIGNAGE SCHEDULE, BUILDING IDENTIFICATION
DOOR SCHEDULE, DOOR TYPES, HARDWARE SCHEDULE, GLASS SCHEDULE, DOOR STOP DETAIL, ASTRAGAL
WINDOW SCHEDULE, WINDOW TYPES, NOTES, STEEL SECURITY GIRLLE DOOR DETAILS
INTERIOR / EXTERIOR FINISH SCHEDULE, ABBREVIATION, MATERIAL & COLOR SCHEDULE, NOTES
EQUIPMENT SCHEDULE
EQUIPMENT SCHEDULE AND GENERAL NOTES
GENERAL NOTES AND SCOPE OF WORK
NEW HVAC DUCT PLAN (1ST FL.)
NEW HVAC DUCT PLAN (2ND & 3RD FL.)
NEW HVAC PIPING PLAN (1ST FL.)
NEW HVAC PIPING PLAN (2ND & 3RD FL.)
HPU FLOW DIAGRAM - 1
HPU FLOW DIAGRAM - 2
HPU & ERV CONTROL SCHEMATIC DIAGRAM - 1
HPU & ERV CONTROL SCHEMATIC DIAGRAM - 2
NEW SEWER AND VENT PIPING PLAN (1ST FL.)
NEW SEWER AND VENT PIPING PLAN (2ND & 3RD FL.)
NEW SEWER AND VENT PIPING ENLARGED PLANS & ISOMETRIC DIAGRAM
NEW DOMESTIC WATER PIPING PLAN (1ST FL.)
NEW DOMESTIC WATER PIPING PLAN (2ND & 3RD FL.)
DOMESTIC WATER PIPING ENLARGED PLANS & ISOMETRIC DIAGRAM
NEW MECH. ROOM PIPING PARTIAL PLAN AND ISOMETRIC DIAGRAM
EXISTING AND NEW GAS PIPING PLAN & ISOMETRIC DIAGRAM
NEW FIRE PROTECTION PIPING PLAN (1ST FL.)
NEW FIRE PROTECTION PIPING PLAN (2ND & 3RD FL.)
VALVE ROOM FIRE PROTECTION PIPING PARTIAL PLAN, ISOMETRIC DIAGRAM
DETAIL DRAWINGS - 1
DETAIL DRAWINGS - 3
DETAIL DRAWINGS - 4
DETAIL DRAWINGS - 5
DETAIL DRAWINGS - 6
LIGHTING PLAN - 1ST AND 2ND FLOOR
LIGHTING PLAN - 3RD FLOOR AND LIGHTING DETAIL
LIGHTING FIXTURE SCHEDULE AND EXTERIOR LTG. CONTROL DIAGRAM
POWER PLAN1 - 1ST FLOOR AND 2ND FLOOR
POWER PLAN1 - 3RD FLOOR AND MECHNICAL ROOM ENLARGED PLAN
HVAC POWER PLAN - 1ST FLOOR
HVAC POWER PLAN - 2ND FLOOR AND 3RD FLOOR
HVAC CONTROL PLAN - 1ST FLOOR
HVAC CONTROL PLAN1 - 2ND FLOOR, 3RD FLOOR
HVAC CONTROL PLAN2 - 1ST FLOOR
HVAC CONTROL PLAN2 - 2ND FLOOR, 3RD FLOOR
COMMUNICATION PLAN - 1ST FLOOR
COMMUNICATION PLAN - 2ND FLOOR, 3RD FLOOR
COMMUNICATION SYSTEM DIAGRAM - 1ST FLOOR AND 2ND FLOOR
COMMUNICATION SYSTEM DIAGRAM - 3RD FLOOR AND OUTLET DETAIL
FIRE ALARM PLAN - 1ST FLOOR
FIRE ALARM PLAN - 2ND FLOOR AND 3RD FLOOR
FIRE ALARM SINGLE LINE DIAGRAM AND NOTES
CCTV, IDS PLAN - 1ST FLOOR AND 2ND FLOOR
CCTV, SIRP NET PLAN - 3RD FLOOR
ELECTRICAL SITE PLAN AND ELECTRICAL POWER SINGLE LINE DIAGRAM
PANEL SCHEDULE "L1A" AND "L1B"
PANEL SCHEDULE "L2A" AND "L2B"
PANEL SCHEDULE "L3A" AND "L3B"
PANEL SCHEDULE "LT1", "LT2", "LT3" AND "MH"
PANEL SCHEDULE "MD" AND "MDP"
S-940 Tennis Court
S-294 Court Tennis
S-296 Court Tennis
S-165 Volleyball Court
S-980
STORY FIELD
LUTHER H.
T-646
S-671
S-672
S-673
S-674
S -644
T-780
T-508
S-86
S -7
S -7
S -7
T -6
T -5
T -7
T -5
S-961
T-533
T -5
S-714
S -8
T-377
T-584
T -3
T-3
S-531
T-417
T-863
T-765
T-368
T-507
T-772
S-967
T-924
T-575
T-696S-603
T-928
T-691
S-102
T-521
T-558
T-989
T-342
T-681
T-343
S-965
T-116
T-504
T-315
T-385
T-617
T-661
T-693
T-766
T-764
T-768
T-769
T-271
T-763
T-160
T-299
T-414
T-413
T-104
S-153
T-120
S-954
S-994
T-653
CEMETERY
S-860 Substation Electrical
S-360 Substation Electrical
S-576 Substation Electrical
S-133 bridge Foot
T-522
Footbridge
S-990 Footbridge
T-849 Footbridge
T-986 Footbridge
GATE 2
GATE 1
GATE 4
GATE 3
Gate Access
Railroad
Gate Access Farmer
Gate Access Farmer
S-118 Electronic Sign
S-952 Electronic Sign
S-781
Flag Pole
S-390
DEAD MEMORIAL
KOREAN WAR
S-741 Land Farm
T re a tm e n t
B e d
T re a tm e n t
B e d
Pond Holding
S-730
RANGE
QUALIFICATION
ZERO AND
25M RIFLE S-725
TESTING POND
BRIDGING BOAT
AMPITHEATRE
CAC
T-729 Storage Yard
Container
S-847
S-865 Bridge
Railroad
S-300 Road Bridge
S-860 Road Bridge
S-900 Road Bridge
S-500 Road Bridge
S-861 Road Bridge
A R
K A
N S
A S
N E
B R
A S
K A A
V E
N U
E
N E
W Y
O R
K A
V E
N U
E
A R
K A
N S
A S A
V E
N U
E
O H
IO
A
V E
N U
E
G E
O R
G
IA
A
V E
N U
E
T E
X A
S A
V E
N U
E
M O
N T A N
A A
V E N
U E
AVENUE
ILLINOIS AVENUE
A R
IZ
O N
A A
V E
N U
E
TENNESSEE AVENUE
N E
B R
A S
K A A
V E
N U
E
A M
E R
IC
A N A
V E N
U E
A R
K A
N S
A S A
V E
N U
E
PENN AVENUE
M
IS
S
IS
S
IP
P I
A V
E N
U E
A V
E N
U E
OHIO AVENUE
A M
E R
IC
A N A
V E N
U E
KENTUCKY AVENUE
G E
O R
G
IA
A
V E
N U
E
FLORIDA AVENUE
MISSISSIPPI
NEVADA
N E
W
N E
B R
A S
K A A
V E
N U
E
A M
E R
IC
A N A
V E N
U E
NEW YORK AVENUE
GEORGIA AVENUE
N E
B R
A S
K A A
V E
N U
E
OREGON
A V E N
U E
A V E N
U E
A V E N
U E
Y O
R K
PENN AVENUE
T-534
T-677
T-659
T-311
T-386
T-700
T-826
T-619
T-376
S-114
T-519
T-625
S-983
S-984
S-387
T-509B
T-509-2
T-578 Vehicle Scales
T-509-1
S-284
T-115
S-401
S-269
Bus Stop 10
S-383 Bus Stop 9
S-933 Bus Stop 6
S-621 Vehicle Scales
S-701
T-369
S-378
T-89
T-513
S-669 Station
Hunter Brake
S-328
S-329
T-509C
T-503 Bus Stop 1
S-622
T-624
S-639
T-416
T-827
S-350
T-415
T-979
S-667
S-705
T-926
T-577
T-720 Bus Stop 5
T-412
T-509D
T-509A
DUMP POINT
INDUSTRIAL WASTE
RECYCLING CENTER AND S-839
S-835
S-665
S-840
S-837
S-836
S-605
S-606
S-607
S-608
S-985
S-955
S-709
S-510
S-326
S-530
S-818
S-817
S-135
S-620
S-151
S-821
S-405
T-645
S-846
T -5
S-327
S -5
S-970
S-117
S-601
S-684
S-138
S-388
S-139
S-668
S-831
S-825
S-917
S-915
S -9
S-612
S -9
S-256
S-111
S-233
S-563
S-110
S-711
T-
S-231
S-396
S-230
S-100 S-235
S-375
S -9
S-136
S-403
T-565
S-253
S-250
S-977
S-676
S-254
S-573
S-946
S-998
S-203
S-841
S-123
S-938
S-657
S-914
T-516
S-341
S-911
S-113
T-520
S-913
S-141 S-143
S-142
S-264
S-731
S-101
S -309
S -2
S -7
S -9
T -9
T -9
S -9
S -9
S -2
S -9
S -6
S-675
S-320
S -8
S -8
S -9
T -5
T -9
S-9
S -9
S -3
T-318
S -4
S -6
S -3
S -8
S-9
S -6
S -8
S -8
T-126
S-121
T-125
T-127
T-207
S -1
T-236
S -9
S -6
T-206
S -3
S -9
T -3
S -3
S-154
S -9
S -8
S-974
S-321
S-
S-910S -4
S-340
S -6
S -7
S-349
S-301
S -611
T -3
S -6
S -7
S -7
S-140
S -6
S-718
S -7
S-137
S -6
S-842
S-351
S-512
S-205
S -5
S-336
S-239
S -9
S -3
S-267
S-509
T-359
S -3
S-532
S -9
S-655
S-208
T -7
S-702
S-163
S-304
T-515
S-733
S-732
S-642
S-627
T-384
S -3
T -5
T -3
S-312
S-666
S-420
S-973
T -3
T-580
S-679
T-996
S-925
T-997
S-931
T-631
T -2
S-131
S-919
T -3
T-521
S-395
S-397
S-918
S-944
T-195
T-196
T-198
T-197
T-194
T-199
S-119
S-739
S-3
S-647
T-261
S-164
S-626
S-58
T-130
S-717
S-402
T-572
T-189
T-406
T-193
T-958
S-88
S-348
T-581
S-265
S-640
S-953
S-411
S-664
S-654
S-344
S-511
S-982
S-968
S-929
T-155
S-972
T-582
S-771
S-95
T-409
S-948
S-916
S-947
S-957
T-192
S-956
S-719
T-762
S-770
S-162
S-161
T-317 Tower Cooling
T-923
S-93
S-922
T-814
T-812
T-569
T-635
S-995
T-810
T-280
T-811
T-633
T-103
T-813
T-637
T-636
S-741
TRAINING
CONFINED SPACE
BURN BUILDING AND
T-724
RESCUE
FIRE FIGHTING
S-845 Washrack
S-693 Washrack
S-404 Washrack
S-976 Washrack
S-939 Washrack
S-987 Washrack
S-316 Washrack
S-927 Washrack
T-6
S-703
PLANT
TREATMENT
SEWAGE
S-820
S-87
S-150
S-144
PLANT
TREATMENT
WATER
WETLAND
CAMP CARROLL
S-978 Substation Electrical
S-870
CLINIC
HEALTH/DENTAL
S
DFAC
TEMF
KU, HUN MO
CHI, K. K.
D - 19 - 07HS-00554-5J
29 JUL 19
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
1 LOCATION PLAN
1 SCALE : 1 / 5000
LOCATION PLAN
C-1
N
THIS PROJECT
GRAPHIC SCALE
(IN METERS)
SCALE: 1 :5000
0 50 100 200
S T O
R A G E
O R
G A N
IZ
A T
IO
N A L
SEE SITE LAYOUT PLAN
CAMP CARROLL
2 3
(2-1 ADA, HQ)
REPAIR BUILDING NO. S-230
1 81
KU, HUN MO
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
CHI, K. K.
LEGEND:
ITEM TO REMOVE
GRAPHIC SCALE
SCALE: 1 : 200
4000 8000
REMOVAL NOTES
CAMP CARROLL
REMOVAL PLAN
HS-00554-5J D - 19 - 17
2 81 C-2
ASBESTOS REMOVAL, CLEAN UP, AND DISPOSAL WORK
5.
4.
3.
2.
1.
SCALE : 1 / 200
REMOVAL PLAN
29 JUL 19
GENERAL NOTES:
IF REQUIRED.
DETOUR ROAD FOR VEHICLES DURING CONSTRUCTION PERIOD
5. CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD AND
ON THE PROJECT.
BY THE CONTRACTING OFFICER PRIOR TO COMMENCING WORK
PORTION OF THE JOB BY THE COR AND SHOULD BE APPROVED
2. THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGS FOR ANY
CONTRACTING OFFICER.
CONTRACTORS EXPENSE TO THE SATISFACTION OF THE
DAMAGED BY DISMANTLING, DEMOLISHING, OR REMOVING AT THE
RESTORATION TO THEIR ORIGINAL CONDITIONS OF THE ITEMS
3. THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR/
AND OTHER UTILITY MARKERS IN THE PROJECT LIMIT.
6. CONTRACTOR SHALL RESTORE/REESTABLISH SURVEY MONUMENTS
FROST DEPTH UNLESS OTHERWISE NOTED.
8. WATER AND SEWER LINE SHOULD HAVE A MINIMUM COVER OF
WITHOUT ANY ADDITIONAL COST.
INCLUDING FALSEWORK SUCH AS FORMWORKS AND SHORING
9. CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES
APPROVAL PRIOR TO COMMENCING THE WORK.
SUBMITTAL TO THE DESIGN AND TECHNICAL REVIEW BRANCH FOR
THE CONTRACTOR SHOULD PREPARE AND SUBMIT MATERIAL
MILLIMETERS AND STATIONS AND ELEVATIONS ARE IN METERS.
UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN
SOLID SODDING WITHIN THE WORK BOUNDARY.
CUT AND FILLED AREA SHALL BE COVERED WITH TOP SOIL AND
14.
13.
10.
11.
12.
15.
16.
SUBMISSION OF CONTRACT PROPOSAL.
AND DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
1. THE CONTRACTOR SHOULD VERIFY ALL EXISTING CONDITIONS
CONSTRUCTION OPERATIONS.
AND OTHER ITEMS WHICH WILL INTERFERE WITH THE
SUCH AS UNDERGROUND ROCK BASE, EXISTING UTILITY LINES,
AND CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS,
4. THE SITE INDICATED ON THE DRAWING SHOULD BE GRADED
WILL BE UTILIZED TO ACCOMPLISH THE CIVIL SCOPE OF WORK.
COMMAND" FORM AS A PART OF THIS PROJECT.THE DETAILS
DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT
O & MA PROJECT, KOREA, REVISION1, 30 OCTOBER 2015,
COMMAND" AND "STANDARD TECHNICAL SPECIFICATIONS FOR
2015, DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT
DETAIL DRAWINGS, FOR O & MA PROJECT, KOREA, 30 NOVEMBER
7. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD
PROVIDED FOR THE CONTRACTOR BY THE GOVERNMENT.
CONSTRUCTION AREA AND NO LAY DOWN AREA SHALL BE
OFFICES AND STORAGE AREAS SHALL BE WITHIN THE
LOCATION APPROVED/INDICATED BY C.O.R. ADMINISTRATIVE FIELD
TEMPORARY FACILITIES ACCORDING TO O&MA SPEC. AT THE
CONTRACTOR SHOULD PROVIDE AND MAINTAIN THE CONTRACTOR’S
THE PUBLIC AND/OR MILITARY TRAFFIC AND OPERATIONS.
NECESSARY PRECAUTIONS FOR THE PROTECTION AND SAFETY OF
AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL
NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES
CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL
LAWS AND REGULATIONS.
GOVERNMENT LEASED PROPERTY IN ACCORDANCE WITH LOCAL
DISPOSAL OF WASTE MATERIALS SHOULD BE OUTSIDE U.S.
DETERMINE PROPER MATERIAL HANDING METHODS.
MATERIALS WITHIN PROJECT LIMIT WITH COR CAREFULLY TO
CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE/RECYCLABLE
1.
2.
3.
4.
5.
6.
ABANDONED IN ACCORDANCE WITH THE GUIDANCE OF COR.
REMOVAL WORK SHALL BE REMOVED OR CUT AND CAPPED OR
REMOVAL OF UNDERGROUND UTILITY LINES FOUND DURING THE
FOR KOREA, USFK PAM 200-1.
APPLICABLE KOREAN ENVIRONMENTAL GOVERNING STANDARDS
ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE
ROADWAY, EXISTING CHAIN-LINK FENCE, ETC.
FOR THE PROJECT LIMITS, I.E. EDGE OF PAVEMENT, EDGE OF
EXISTING GROUND FEATURES SHALL BE USED AS A DEMARCATION
AS INDICATED AND REQUIRED.
THE ITEMS WITHIN THE PROJECT BOUNDARY SHALL BE REMOVED
LIMITS INDICATED, UNLESS OTHERWISE NOTED.
ALL REMOVAL WORKS SHALL BE CONFINED WITHIN THE PROJECT
N
REMOVE EXISTING WATER LINE
REMOVE EXISTING GAS LINE
REMOVE EXISTING WHEEL STOPS
59.
AC
59.
AC58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
59.
AC
59.
AC
59.
AC
58.
AC
58.
AC
58.
AC
58.
AC
57.
AC
56.
AC
56.
AC 56.
AC
57.
AC
56.
AC
56.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC58.
AC
58.
AC56.
AC
58.
AC
58.
AC
58.
AC
56.
AC
56.
AC
56.
AC
58.
AC
56.
AC 56.
AC
AC
AC
56.
AC
56.
56.
AC
56.
AC
56.
AC
57.
EMH
59.
FHT
59.
WV
58.
WV
58.
WV
58.
WV
59.
CMH
58.
SMH
58.
SMH
58.
SMH
58.
SMH
58.
SMH
58.
SMH
58.
SMH
59.
SWALK
58.
SWALK
58.
SWALK
57.
SWALK 57.
SWALK
57.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK58.
SWALK
58.
SWALK 58.
SWALK
56.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK 58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK58.
SWALK
58.
SWALK58.
SWALK
58.
58.
SWALK58.
SWALK
57.
SWALK
57.
SWALK
57.
SWALK
57.
57.
SWALK
57.
SWALK
58.
SWALK58.
SWALK58.
SWALK
58.
SWALK SWALK
58.
SWALK
58.
SWALK58.
SWALK58.
SWALK58.
SWALK58.
SWALK58.
SWALK56.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
PAD
59.
PAD
58.
PAD
58.
PAD
58.
PAD 58.
PAD
58.
PAD
58.
PAD
57.
PAD
57.
PAD
58.
FLAG
58.
DIT
CH
58.
DIT
CH58.
DIT
CH
58.
DIT
CH
58.
DIT
CH
58.
DIT
CH 58.
DIT
CH
58.
DIT
CH58.
DIT
CH 58.
DIT
CH
57.
DIT
CH
57.
DIT
CH
57.
DIT
CH
57.
DIT
CH
58.
DIT
CH
58.
DIT
CH
58.
DIT
CH
58.
DIT
CH
58.
DIT
CH
58.
DIT
CH
56.
DIT
CH
57.
DIT
CH
56.
DIT
CH
55.
DIT
CH
57.
DIT
CH
57.
DIT
CH
57.
DIT
CH55.
DIT
CH
55.
DIT
CH
57.
DIT
CH
57.
DIT
CH57.
DIT
CH
57.
DIT
CH
56.
DIT
CH 57.
DIT
CH
57.
DIT
CH
56.
DIT
CH
57.
DIT
CH
57.
DIT
CH
58.
O-
DIT
CH
58.
O-
DIT
CH
58.
O-
DIT
CH
58.
HWALL
57.
HWALL
56.
HWALL
58.
HWALL
58.
HWALL58.
HWALL
57.
HWALL
57.
HWALL
56.
HWALL
56.
HWALL
56.
HWALL
57.
HWALL
57.
HWALL
58.
DRAIN
58.
DRAIN
58.
DRAIN
56.
DRAIN
56.
DRAIN
56.
DRAIN
56.
DRAIN
57.
BOTTOM
57.
BOTTOM
58.
BOTTOM
57.
BOTTOM
57.
BOTTOM
56.
BOTTOM
57.
PLANTER
58.
PLANTER
58.
PLANTER
58.
PLANTER
57.
PLANTER
58.
PLANTER
57.
PLANTER
59.
EP
59.
EP
57.
GWIR
E
58.
CONTAIN
NER
58.
CONTAIN
NER 58.
CONTAIN
NER
58.
CONTAIN
NER
58.
STOOP
58.
STOOP 58.
STOOP
58.
STOOP
58.
STOOP 58.
STOOP
58.
STOOP
58.
STOOP 58.
STOOP 58.
STOOP
58.
STOOP
58.
STOOP
58.
STOOP
58.
STOOP
58.
STOOP 58.
STOOP
58.
STOOP
58.
STOOP 58.
STOOP
56.
56.
56.
BLDG
58.
BLDG
58.
BLDG 58.
BLDG
58.
BLDG
58.
BLDG
58.
BLDG
56.
BLDG
56.
BLDG
58.
BLDG
58.
BLDG
58.
BLDG
58.
ACON
59.
ACON
58.
ACON
59.
ACON
59.
ACON
59.
ACON
59.
ACON
59.
ACON
59.
ACON
59.
PARKIN
G59.
PARKIN
G
59.
PARKIN
G
58.
PARKIN
G
58.
PARKIN
G58.
PARKIN
G
58.
PARKIN
G58.
PARKIN
G
58.
PARKIN
G58.
PARKIN
G58.
PARKIN
G58.
PARKIN
G
58.
PARKIN
G
58.
PARKIN
G
58.
PARKIN
G58.
PARKIN
G
58.
PARKIN
G
58.
PARKIN
G
58.
PARKIN
G
58.
PARKIN
G 58.
PARKIN
G
58.
PARKIN
G
58.
PARKIN
G
57.
TMH
58.
TMH
58.
TMH
58.
TMH
58.
CANOPY 58.
CANOPY
59.
TREE
59.
TREE58.
TREE
59.
TREE
60.
TREE
57.
TREE
58.
TREE58.
TREE
58.
TREE
58.
TREE
58.
TREE
58.
TREE
58.
TREE
56.
TREE
56.
TREE
56.
TREE
56.
TREE
56.
TREE
55.
TREE
56.
TREE
59.
SB
59.
SB
58.
HANDR
56.
HANDR
58.
HANDR
58.
CROSS
58.
CROSS58.
CROSS
58.
CROSS
57.
GAS
57.
GAS
57.
GAS
56.
GAS
56.
MH
56.
MH
58.
MH
56.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
VALVE
58.
POST
58.
POST
58.
BARREL
58.
BARREL57.
BARREL
57.
BARREL
57.
HRAIL
57.
HRAIL
58.
TREN
56.
TREN 56.
TREN
56.
TREN
TREN
55.
TREN
55.
TREN56.
TREN
58.
TREN
58.
TREN
56.
TREN
57.
TREN
57.
TREN56.
TREN
56.
TREN
57.
TREN
57.
TREN 57.
TREN
56.
TREN
56.
TREN
57.
TR
57.
TR
55.
TR
55.
TR
56.
TR
56.
TR
56.
TR
57.
HANR
57.
HANR
55.
56.
CHIL
L
57.
CHIL
L57.
CHIL
L
58.
SHRUB
58.
SHRUB
58.
SHRUB
58.
SHRUB58.
SHRUB
58.
SHRUB
58.
SHRUB
58.
SHRUB
58.
SHRUB
58.
SHRUB58.
SHRUB58.
SHRUB
57.
SHRUB
57.
SHRUB
58.
SHRUB
58.
SHRUB
58.
SHRUB
58.
SHRUB
58.
SHRUB58.
SHRUB
58.
SHRUB
58.
SHRUB58.
SHRUB
57.
ST-
MH
57.
ST-
MH
57.
ST-
MH
57.
ST-
MH
56.
FENCE
56.
FENCE56.
FENCE
56.
PIP
E
57.
PIP
E
58.
STEP
56.
STEP
56.
STEP
56.
CONTANNER
T
S
C
S
T
DIT
CH
S
FHT
E/P
G
G
E/P
W/V
W/V
W/V
P A
R K
IN
G
N O
BLDG.# S-230
S
S
CONTAINER
W
W
ELEC.
S
S S-239
BLDG.#
PAVEMENT, GRAVAL AND TIMBERS
REMOVE EXISTING ASPHALT CONCRETE
ASSUMED PIPE INSULATION
PIPES, VALES AND ASBESTOS CONTAINING
REMOVE EXISTING DOMESTIC & HVAC WATER
REMOVAL
COR REQUIRED BEFORE TREE/ SHRUB
BUILDING SHRUBS, CONFIRMATION WITH
REMOVE EXISTING TREES, AND AROUND
REMOVE EXISTING CONCRETE STEP
REMOVE EXISTING TREES
REMOVE EXISTING CONCRETE PAD
FOR A.C. UNIT
REMOVE EXISTING CONCRETE PADS
PROJECT WORK LIMITS
TRENCH COVER
REMOVE EXISTING TRENCH, WALL TOP AND
TO BE REPLACED
EXISTING CONCRETE SEWER MANHOLE
EXISTING SEWER LINE TO BE REPLACED
TO BE REPLACED
EXISTING CONCRETE SIDEWALK
TO BE REPLACED
EXISTING CONCRETE CURB
W
TO BE REPLACED
EXISTING STEEL HANDRAILS
TO BE REPLACED
EXISTING STEEL HANDRAILS
SHRUB BRANCHES
CUT AND TRIM TREES &
COVERED CONCRETE DITCH
REMOVE EXISTING STEEL GRATING
CONTAINER
C O
N T
A
IN
E R
REMOVE EXISTING TIMBERS FOR PLANTER
PLANTER
57.
TREE
PROVIDE EARTH FILL IN THE TRENCH
TO BE REPLACED
EXISTING CONCRETE OPEN DITCH
FENCE AND SINGLE SWING GATE
REMOVE EXISTING CHAIN-LINK
CONTAINER
REMOVE AND REINSTALL EXISTING
"https://zotapro.com/asbestos-training/" "http://www.baos.com/training_category.php?aCategoryID=1","https://www.envtlmgmt.org/courses-and-registration/asbestos-training" "https://www.epa.gov/asbestos/state-asbestos-contacts","https://www.zackacademy.com/class/asbestos-certification/asbestos-inspector" SEE OMA SPEC. SECTION 02 82 14.00 10. AND THE BELOW URLs (INTERNET ADDRESSES).
WHO COMPLETED AN EPA-APPROVED TRAINING COURSE WITH EPA-APPROVED MAP PROGRAM.
ASBESTOS REMOVAL WORK SHALL BE SUPERVISED BY THE TRAINED AND ACCREDITED ASBESTOS PROFESSIONAL
THEIR ASBESTOS RELATED DUTIES.
CONTRACTOR SHALL QUALIFY AND BE MAINTAINED US EPA AHERA ACCREDITATION COMMENSURATE WITH
WAS REMOVED.
CONTRACTOR SHALL SUBMIT A REPORT SHOWING THE NATURE, LOCATION, AND QUANTITY OF THE ACM THAT OF ACM, AND THE PROCEDURES OF WORKER PROTECTION, ACM REMOVAL AND DISPOSAL,AND AIR MONITORING.
DETAILED DESCRIPTION OF WORK THAT WILL BE PERFORMED INCLUDING LOCATIONS, TYPES, AND QUANTITIES BY INDIVIDUALS WHO HAVE CURRENT ACCREDITATIONS. THE SITE SPECIFIC WORK PLAN SHALL PROVIDE WORK PLAN THAT WILL BE REVIEWED BEFORE ANY WORK MAY BEGIN. THE WORK PLAN SHALL BE PREPARED
DISPOSED IAW APPLICABLE ROK REGULATIONS.
REMOVAL AND PROTECTION OF WORKERS AND ENVIRONMENT. THE DISPOSAL OF ACM SHALL BE PROPERLY CONTRACTOR SHALL COMPLY WITH ENVIRONMENTAL GOVERNING STANDARDS (EGS) REGARDING HANDLING, -ROK OCCUPATIONAL SAFETY AND HEALTH LAWS, AND ENVIRONMENTAL LAW.
-U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA).
-UNITED STATE FORCES KOREA(USFK) ENVIRONMENTAL GOVERNING STANDARD (EGS, USFK REGULATION 201-1).
REGULATORY REQUIREMENT
(2-1 ADA, HQ)
KU, HUN MO
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
CHI, K. K.
N
C-3
LEGEND:
GRAPHIC SCALE
SCALE: 1 : 200
4000 8000SCALE : 1 / 200
#1 (CONSTRUCTION/ALTERATION)
SCOPE OF WORK
HS-00554-5J
29 JUL 19
SITE LAYOUT PLAN
CAMP CARROLL
D - 19 - 17
3 81
ARE NOT SHOWN
CONTROL LINES AS REQUIRED. THE UTILITY LINES
WATER, IRRIGATION, ELEC, POWER, TELEPHONE,
REROUTE UNDER GROUND UTILITY LINES SUCH AS
59.
AC
59.
AC58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
58.
AC
59.
AC
59.
AC
59.
AC
58.
AC
58.
AC
57.
AC
56.
AC
56.
AC 56.
AC
56.
AC
57.
AC
57.
AC
56.
AC
56.
AC
58.
AC
56.
AC
56.
AC
56.
AC
58.
AC
56.
AC
AC
56.
AC
56.
AC
56.
AC
57.
EMH
59.
FHT
59.
WV
58.
WV
58.
WV
59.
CMH
58.
SMH58.
SMH
58.
SMH
58.
SMH
58.
SMH
58.
SWALK
57.
SWALK 57.
SWALK
57.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK58.
SWALK
58.
SWALK 56.
SWALK
SWALK
58.
SWALK
58.
SWALK
58.
SWALK58.
SWALK
58.
58.
SWALK58.
SWALK
57.
SWALK
57.
SWALK
57.
SWALK
57.
SWALK
57.
SWALK
58.
SWALK58.
SWALK
58.
SWALK SWALK
58.
SWALK
58.
SWALK58.
SWALK58.
SWALK58.
SWALK58.
SWALK58.
SWALK56.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
SWALK
58.
PAD
59.
PAD58.
PAD
58.
PAD
57.
PAD
57.
PAD
58.
FLAG
58.
DIT
CH
58.
DIT
CH
58.
DIT
CH 58.
DIT
CH
57.
DIT
CH
57.
DIT
CH
57.
DIT
CH
58.
DIT
CH
58.
DIT
CH
58.
DIT
CH
58.
DIT
CH
56.
DIT
CH
57.
DIT
CH
55.
DIT
CH
57.
DIT
CH
57.
DIT
CH
55.
DIT
CH
55.
DIT
CH
57.
DIT
CH
57.
DIT
CH
56.
DIT
CH
56.
DIT
CH
57.
DIT
CH
58.
O-
DIT
CH
58.
O-
DIT
CH
58.
HWALL
57.
HWALL
56.
HWALL
58.
HWALL58.
HWALL
57.
HWALL
56.
HWALL
56.
HWALL
57.
HWALL
58.
DRAIN
58.
DRAIN
58.
DRAIN
56.
DRAIN
56.
DRAIN
56.
DRAIN
56.
DRAIN
57.
BOTTOM
57.
BOTTOM
58.
BOTTOM
57.
BOTTOM
56.
BOTTOM
57.
PLANTER
58.
PLANTER
58.
PLANTER
58.
PLANTER
59.
EP
59.
EP
57.
GWIR
E
58.
CONTAIN
NER
58.
CONTAIN
NER 58.
CONTAIN
NER
58.
CONTAIN
NER
58.
STOOP
58.
STOOP 58.
STOOP
58.
STOOP
58.
STOOP 58.
STOOP
58.
STOOP
58.
STOOP 58.
STOOP 58.
STOOP
58.
STOOP
58.
STOOP
58.
STOOP
58.
STOOP
58.
STOOP 58.
STOOP
58.
STOOP
58.
STOOP
56.
56.
BLDG
58.
BLDG
58.
BLDG 58.
BLDG
58.
BLDG
58.
BLDG
58.
BLDG
56.
BLDG
56.
BLDG
58.
BLDG
58.
BLDG
58.
BLDG
58.
ACON
58.
PARKIN
G
58.
TMH
58.
TMH
58.
TMH
60.
TREE
57.
TREE
56.
TREE
56.
TREE
56.
TREE
56.
TREE
55.
TREE
56.
TREE
59.
SB
58.
HANDR
58.
HANDR
58.
CROSS58.
CROSS
58.
CROSS
57.
GAS
57.
GAS
57.
GAS
56.
GAS
56.
MH
56.
MH
58.
MH
56.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
57.
W-
DIT
CH
58.
POST
58.
BARREL
58.
BARREL57.
BARREL
57.
BARREL
57.
TREN
57.
TREN56.
TREN
56.
TREN
56.
TREN
57.
TR
57.
TR
55.
TR
55.
TR
56.
TR
56.
TR
57.
HANR
55.
57.
ST-
MH
57.
ST-
MH
56.
PIP
E
57.
PIP
E
58.
STEP
56.
STEP
56.
STEP
56.
CONTANNER
T
S
C
T
DIT
CH
S
FHT
E/P
G (P
E
D
A S S
U M
E D
(P E
D
A S S
U M
E D
G
E/P
W/V
W/V
W/V
BLDG.# S-230
S
S
CONTAINER
W/V
(D
A S S
U M
E D
(D=150, ASSUMED)
W
W
E
E
ELEC.
S
G
S T
O P
(D
A S S
U M
E D
W
W
(PVC, D=150)
S
S S-239
BLDG.#
SEE DETAIL
INSTALL POST INDICATOR VALVE AND GUARD POSTS
SAME AS EXIST.
REPLACE EXISTING CONCRETE OPEN DITCH
SEE DETAILS
THRUST BLOCKS
BOX, OTHER FITTINGS AND ACCESSORIES,
TAPPING SLEEVE, VALVE, GATE VALVE, VALVE
INSTALL WATER LINES (D=65, PVC) INCLUDING
SEE DETAIL
BASE COURSE
CONSTRUCT CONCRETE SIDEWALK INCLUDING
SEE DETAILS
BLOCKS AND ANCHOR BLOCKS
OTHER FITTINGS AND ACCESSORIES, THRUST
TAPPING SLEEVE, TAPPING VALVE, VALVE BOX,
INSTALL WATER LINES (D=150, PVC) INCLUDING
SEE PAVEMENT DETAIL
INCLUDING BASE COURSE AND SUBBASE COURSE
CONSTRUCT ASPHALT CONCRETE PAVEMENT
SEE DETAIL
REPLACE EXISTING CONCRETE CURB
(PVC, VG1, D=150)
REPLACE EXISTING SEWER LINE,
SEE DETAIL
INSTALL WHEEL STOPS
SEE DETAILS
AND ARROWS
MARKINGS, CENTER LINE, STOP LINE
PAINT PARKING STRIPS, CROSSWALK,
PROJECT WORK LIMITS
SOLID SODDING
SOD WITH TOP SOIL AND
SITE LAYOUT PLAN
INSTALL POST INDICATOR VALVE AND GUARD POSTS.
INSTALL STEEL HANDRAILS.
INSTALL WHEEL STOPS.
COURSE AND SUBBASE COURSE.
CONSTRUCT ASPHALT CONCRETE PAVEMENT INCLUDING BASE
INCLUDING BASE COURSE.
CONSTRUCT CONCRETE SIDEWALK, STEP AND CONCRETE PAVEMENT
MILL AND OVERLAY (50MM THICK) ASPHALT CONCRETE PAVEMENT.
LINE AND ARROWS.
PAINT PARKING STRIPS, CROSSWALK, MARKINGS, CENTER LINE, STOP
9.
8.
7.
6.
5.
4.
3.
2.
1.
#2 (REPAIR/MAINTENANCE)
REMOVE EXISTING TRENCH, WALL TOP AND TRENCH COVER.
ASBESTOS CONTAINING ASSUMED PIPE INSULATION.
REMOVE EXISTING DOMESTIC & HVAC WATER PIPES, VALES AND
TIMBERS.
REMOVE EXISTING ASPHALT CONCRETE PAVEMENT, GRAVAL AND
REMOVE EXISTING CONCRETE PADS.
REMOVE EXISTING CONCRETE STEP.
REMOVE EXISTING CHAIN-LINK FENCE AND SINGLE SWING GATE.
REMOVE EXISTING WHEEL STOPS.
REMOVE EXISTING TREES AND AROUND BUILDING SHRUBS.
REPLACE EXISTING CONCRETE SIDEWALK INCLUDING BASE COURSE.
REPLACE EXISTING CONCRETE SEWER MANHOLE.
REMOVE EXISTING STEEL GRATING COVERED CONCRETE DITCH.
SOD WITH TOP SOIL AND SOLID SODDING.
9.
8.
7.
6.
5.
4.
3.
2.
1.
10.
11.
12.
15.
16.
17.
18.
REMOVE EXISTING WATER LINE.
REMOVE EXISTING GAS LINE.
REPLACE EXISTING CONCRETE CURB.
REPLACE EXISTING SEWER LINE, (PVC, VG1, D=150).
REPLACE EXISTING CONCRETE OPEN DITCH.
PROVIDE EARTH FILL.
REROUTE UNDER GROUND UTILITY LINES.
#3 (GENERAL REQUIREMENTS)
SEE GENERAL NOTES ON DRAWING REF. NO. C-2.
SEE REMOVAL NOTES ON DRAWING REF. NO. C-2.
DRAWING REF. NO. C-2.
SEE ASBESTOS REMOVAL, CLEAN UP, AND DISPOSAL WORK ON
1.
2.
3.
PIV
PIV
POST INDICATOR VALVE
TO BE REPLACED OR CONSTRUCTED
CONC. SIDEWALK AND BASE COURSE
CONCRETE PAVEMENT
MILL AND OVERLAY ASPHALT
,6
,3
,6
2,750
4SEE DETAIL
INSTALL ’STOP’ SIGN AND POST
1SEE TYPICAL SECTIONS
PAVEMENT AND HANDRAILS
CONSTRUCT CONCRETE STEP AND CONCRETE
SEE STANDARD DETAIL DRAWINGS, C-901, C-904
(1,200 X 1,200, MATCH TO AC TOP ELEVATION)
REPLACE EXISTING CONCRETE SEWER MANHOLE
SEE DETAILS
INCLUDING BASE COURSE
REPLACE EXISTING CONCRETE SIDEWALK
AND ACCESSORIES, THRUST BLOCKS AND ANCHOR BLOCKS.
SLEEVES, TAPPING VALVE, GATE VALVE, VALVE BOXES, OTHER FITTINGS
INSTALL WATER LINES (D=150, D=65, PVC) INCLUDING TAPPING53
13.
REPLACE EXISTING STEEL HANDRAILS.
20.
1,800
1, 1,200
1,800
1, 14.
21.
19.CUT AND TRIM TREES & SHRUB BRANCHES.
SEE MECH. DRAWINGS
NATURAL GAS LINE TO BE CONNECTED TO BLDG.#230
SEE STANDARD DETAIL DRAWING, C-307
REPLACE EXISTING STEEL HANDRAILS
SEE STANDARD DETAIL DRAWING, C-307
REPLACE EXISTING STEEL HANDRAILS
SEE STANDARD DETAIL DRAWING, C-307
INSTALL STEEL HANDRAILS
SEE DETAIL
AND GUTTER
CONSTRUCT CONCRETE CURB
SEE STANDARD DETAIL DRAWING, C-1008
INLET, (600 X 600)
CONSTRUCT CONCRETE SURFACE
SEE DETAIL
ASPHALT CONCRETE PAVEMENT
MILL AND OVERLAY (50MM THICK)
CONSTRUCT CONCRETE CURB AND GUTTER.
INSTALL STORM DRAIN LINE, (D=300, PVC).
CONSTRUCT CONCRETE SURFACE INLET.
10.
11.
12.
13.
C O
N T
A
IN
E R
CONTAINER
REMOVE AND REINSTALL EXISTING CONTAINER.
22.
INSTALL SIGNS AND POSTS. (STOP, HANDICAP)
1,200
SEE DETAIL
INSTALL ’HANDICAP’ SIGN AND POST
(PVC, VG1, D=300)
INSTALL STORM DRAIN LINE
SEE ARCH. DRAWINGS
MATCH TO STOOP TOP
1, 1,800
NOTE:
MARKERS
INSTALL NATURAL GAS LINE
INCLUDING NECESSARY ACCESSORIES
INSTALL GAS LINE (PE, D=63)
INSTALL NATURAL GAS LINE MARKERS.
14.
AND SUBMIT THE TEST REPORT TO COR.
1. CONTRACTOR SHALL PERFORM NATURAL GAS LEAKING TEST
SEE PAVEMENT DETAIL
INCLUDING BASE COURSE AND SUBBASE COURSE
CONSTRUCT ASPHALT CONCRETE PAVEMENT
(PE, D=63)
INSTALL GAS LINE (D=63, PE) INCLUDING NECESSARY ACCESSORIES.
(P V C
D
W
(2-1 ADA, HQ)
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
REVIEWED BY
SHEET OFAS SHOWN
FES
KU, HUN MO
CHI, K. K.
CAMP CARROLL
HS-00554-5J
29 JUL 19
C-4
D - 19 - 17
AC ELEVATIONS
MATCH TO EXISTING
MATERIAL PROPERTIES:
ABBREVIATION:
B
TREAD DETAIL
A
TTYPICAL SECTION
300 1,125 2,000 2,000
350250100
WELD ALL CONNECTION
(D=40)
STEEL HANDRAIL
SEE DETAIL ’B’
SEE DETAIL ’A’
D13@250 O.C
D13@150 O.C
CONCRETE PAVEMENT (T=150)
BASE COURSE (T=100)
(12.5MM)
EXPANSION JOINT
350 350 350 350 4,250
SEE DETAIL ’C’
SEE DETAIL ’C’
B
TYPICAL SECTION
NOT TO SCALE3 4
1 TYPICAL SECTION
HANDRAIL POST
MORTAR
FORMED HOLE
HANDRAIL POST
MORTAR
FORMED HOLE
HANDRAIL POST DETAIL -1 HANDRAIL POST DETAIL -2
SURFACE
W/ABRASIVE
SAFETY NOSING
ANCHOR
R
IS
E R
TREAD
O.C: ON CENTER
@MAX 1.5 METER INTERVAL.
3. SEE THE NOTE OF CONCRETE SIDEWALK. PROVIDE CONSTRACTION JOINT
2. REINFORCING STEEL YIELD STRENGTHS, fy=300 Mpa.
1. CONCRETE MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS, f’c=24 Mpa.
#8- 150 X 150
WWF(WIRE WELDED FABRIC)
(2-1 ADA, HQ)
4 81
NOT TO SCALE
COAT
BITUMINOUS TACK
SAW CUT & APPLY
EXST. AC PAVEMENT NEW AC PAVEMENT OVERLAY
(MILLED EXISITNG ASPHALT CONCRETE SURFACE)
TACK COAT
AC PAVEMENT MILLING OVERLAY
HOT-MIXED ASPHALT CONCRETE #78)
ASPHALT WEARING COURSE OVERLAY (T=50,
EXST. AC SURFACE COURSE (T=75, ASSUMED)
EXISTING BASE COUSRE
EXISTING SUBBASE COURSE
CIVIL
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
REVIEWED BY
SHEET OFAS SHOWN
FES
KU, HUN MO
CHI, K. K.
NOT TO SCALE
CONCRETE SIDEWALK
JOINT FILLER JOINT SEALER
3R
AND WHERE WALKS ABUT OTHER CONCRETE STRUCTURES
STRAIGHT SECTIONS AND AT ALL RETURNS OF WALKS,
PROVIDE EXPANSION JOINTS AT MAXIMUM 15m INTERVALS FOR
9.5
EXPANSION JOINT
3R
AGGREGATE USED.
BUT NOT LESS THAN THE MAXIMUM NOMINAL SIZE OF THE
BE AT LEAST ONE - FOURTH OF THE SIDEWALK SLAB THICKNESS.
EXCEED 1.25. THE DEPTH OF THE CONTRACTION JOINT WILL
THAT THE RATIO OF SLAB LENGTH TO WIDTH WILL NOT
TRANSVERSE CONTRACTION JOINTS SHALL BE SPACED SO
CONTRACTION JOINT
%(TYP)2
GRADE
FINISHED
MATERIAL BASE
COMPACTED NON-FROST-SUSCEPTIBLE
CONCRETE 21 MPA
SEE PLAN
WIDTH (VARIES)
SECTION
NOT TO SCALE
CONCRETE CURB
SLOPE
JOINT SEALER
15R
25 150
NFSM
"C
"C"
TACK COAT
SUBBASE COURSE
BASE COURSE
ADJACENT PAVEMENT
PRIME COAT
SLOPE
SUBGRADE
EXPANSION JOINT
12.5mm PREMOLDED
BRICK PAVED OR GRADE
CONCRETE SIDEWALK
CAST-IN-PLACE
CONCRETE CURB
SECTION
FLEXIBLE PAVEMENT
PROVIDE EXPANSION JOINTS AT MAX. 15M INTERVALS.
NOTES:
NOT TO SCALE3
CONCRETE RAMP (TYP)
CONCRETE CURB
EXPANSION JOINT
12.5mm PREMOLDED
CONCRETE RAMP(T=100)
WWF (150 x 150 x 4 DIA)
EXPANSION JOINT
12.5mm PREMOLDED
CONC. SIDEWALK
2%
2-D13 BARS
COMPACTED SUBGRADE
BASE COURSE (T=100)
2-D13 BARS
fy = 440 Mpa fy = 392 Mpa (GRADE 60)
Fnt = 310 Mpa fu = 482 Mpa
1. CONCRETE : (MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS)
ALL CONCRETE UNLESS NOTED OTHERWISE
HOT-ROLLED DEFORMED BAR
2. STEEL
WELDED WIRE FABRIC
4. BOLTS :
ASTM A307,
3. WELDING ELECTRODE:
CONCRETE
CONFORM TO ACI STANDARDS (ACI 318, ACI 301 ETC.)
1. ALL WORK FOR CONCRETE AND REINFORCING STEEL SHALL
CONCRETE FINISH
f’c = 21 MPa
SIDEWALK PATH.
1. APPLY BROOM FINISH PERPENDICULAR TO RAMP AND
MATERIAL STRENGTHS
100% LABORATORY MAX. DENSITY.
COMPACTED TO AT LEAST
(STABILIZED AGGREGATE)
AGGREGATE BASE COURSE (T=225)
100% LABORATORY MAX. DENSITY
COMPACTED TO AT LEAST
SUBBASE COURSE (T=300)
EXST. AC SURFACE
EXST. SUBBASE COURSE
NEW AC PAVED
SECTION
COAT
BITUMINOUS TACK
SAW CUT & APPLY
NEW AC PAVEMENT
EXST. BASE COURSE
EXST. AC PAVEMENT
MIN.
PRIME COAT
NOT TO SCALE
AC PAVEMENT TRANSITION DETAIL
3 5
CAMP CARROLL
PAVEMENT DETAILS
SIDEWALK, CURB AND ASPHALT CONCRETE
HS-00554-5J
29 JUL 19
C-5
D - 19 - 17
(T=75)
ASPHALT CONCRETE PAVEMENT
NOT TO SCALE
CONCRETE CURB & GUTTER
NFSM
R 6.3%
SUBGRADE
SLOPE
CONCRETE SIDEWALK
25150 600
2. "C" DIMENSION CONSTANT EQUALS PAVEMENT’S SECTION MINUS 300mm
1. PROVIDE EXPANSION JOINTS AT MAXIMUM 15m. INTERVALS (MATCH SIDEWALK)
NOTE:
SEE PLAN
PAVING SECTION
FLEXIBLE
CONCRETE CURB & GUTTER
BITUMINOUS JOINT FILLER
12.5mm THICKNESS EXPANSION
(2-1 ADA, HQ)
5 81
NOT TO SCALE
MARKING DETAILS
3,000 (TYP.)
STOP LINE (WHITE)
CENTER SOLID LINE (YELLOW)
CROSSWALK (WHITE)
1,800 (TYP.)
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
UNIT #15746, APO AP 96218-5746
DATE:
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
KU, HUN MO
CHI, K. K.
PAVEMENT MARKING DETAILS
(12")
,8
(9 .5 ft
1, (4 .5 ft
1, (5 .0 ft
(4 .0 ft
1, (3 .0 ft
,4
(8 .0 ft
(12")
1, (5 .0 ft
(3 .0 ft
R 1,0
R
2,438 (8.0 ft)
(1
2,896 (9.5 ft)
(1
TURN LANE- USE ARROW
THROUGH LANE- USE ARROW
NOT TO SCALE
CROSSWALK AND STOP LINE
1,800 MIN.
AS REQUIRED
1,200 MIN.600 600 1,800 MIN.
600 TYP.
GALVANIZED CAP
SIGN BOARD
ALUMINUM
FASTENERS
GALVANIZED
SIGN BOARD
SUPPLEMENTAL
(D50MM)
POST,UNPAINTED
GALVANIZED STEEL
250 MIN.
(CAST-IN-PLACE)
CONCRETE FOOTING1,
,1
W/ WHITE LETTERS
RED BACKGROUND
WHITE BORDER
STOP
NOT TO SCALE
SIGN AND POST DETAILS4
NOT TO SCALE
DIRECTIONAL ARROWS
3 6
3 6
3 6
HS-00554-5J
CAMP CARROLL
29 JUL 19
C-6
D - 19 - 17
(2-1 ADA, HQ)
6 81
File details come from the government source that posted it.