H1_Drawing_files___131420___MECH.PDF
PDF 8 MB Posted
- Attached to
- Repair Bldg# 1974, Area I
- Solicitation number
- W91QVN18R0262
About this file
Drawing_MECH
View the file
Other files
| File | Type | Posted |
|---|---|---|
| H1_Drawing_files___131420___CIVIL.PDF | ||
| H1_Drawing_files___131420___ELEC.PDF | ||
| A22_Submittal_Register___131420.xls | XLS spreadsheet | |
| H1_Drawing_files___131420___Title.pdf | ||
| A21_W91QVN18R0262_RFP.pdf | ||
| H1_Drawing_files___131420___ARCH.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
BELL AND SPIGOT
TRAP, ELECTRIC (INDICATE TYPE)
SOLVENT CEMENT
REDUCER, ECCENTRIC (STRAIGHT, INVERT)
REDUCER, ECCENTRIC (STRAIGHT, DOWN)
FIRE DEPARTMENT CONNECTION
M E C H A N I C A L M A T E R I A L I N D I C A T I O N S & S Y M B O L S
TEE, OUTLET DOWN
ANCHOR, MAIN
BUTTERFLY
AIR LINE
valves : (for selective actuators)
GATE, ANGLE
PLUG VALVE
GATE, GLOBE
THREE WAY
CONTROL
DPT DEWPOINT TEMPERATUREAMERICAN WIRE GAUGEAWG
CENTIGRADE
CAPACITY
BRAKE HORSEPOWER
BAROMETER(-TRIC)
BOILING POINT
PRESSURE, BAROMETRIC
COOLING LOAD
COEFFICIENT
CUBIC METER PER HOUR
COUNTER CLOCKWISE
CLASSIFICATION
CAST IRON PIPE
CHILLED WATER
CIRCUIT
CUBIC METER
COMPRESSOR
CONTINUE
CONNECTIONCONN
CONT
CU M
CPRSR
CLASS
CLG LOAD
COEF
CMH
CKT
CIP
CHW
CCW
C
CAP
BP
BARO PR
BARO
BHP
FA FACE AREA OR FRESH AIR
FHC
FLA
FHY FIRE HYDRANT
FULL LOAD AMPERES
FIRE HOSE CABINET
EFF
EWT
EXPJT
EVAP
EP
EQPT
ESP
ENT
ECON
EDR
EAT
ECC
DX
DPDT
DPV
EFFICIENCY
EXPANSION JOINT
EXTERNAL STATIC PRESSURE
EVAPORAT (-E,-ING,-ED,-OR)
ENTERING WATER TEMP
EXPLOSION PROOF
ENTERING
EQUIPMENT
DRY PIPE VALVE
DOUBLE POLE DOUBLE THROW
ENTERING AIR TEMPERATURE
EQUIVALENT DIRECT RADIATION
DIRECT EXPANSION
ECONOMIZER
ECCENTRIC
air conditioning and refrigeration
AIR COOLED
ALARM CHECK VALVE
AIR CONDITION UNIT (S)
AVERAGE
APPROXIMATE
AMPERE(AMP, AMPS)
AIR HANDLING UNIT
ALTITUDE
AMBIENT
ALUMINUM
APPARATUS DEW POINT
AIR CONDITION (-ING,-ED)
AIR COOLED CONDENSING UNIT
APPROX
AVG
AMP
AMB
AIR COND
ALT
AL
AHU
ACCU
ACLD
ACU
ACV
ADP
C/HWS
C/HWR
CHS
CHR
D
RS
RL
RD
(NAME)
M
CU MM
DIAG
DO
DIV
DIFF
DB
DIA or
DBT
CW
Cv
CWP
DECIBEL OR DRY BULB
DRY BULB TEMPERATURE
DIAGRAM
DIVISION
DIESEL OIL
DIFFERENCE
DIAMETER
DEGREE
o
CUBIC MILLIMETER
COEFFICIENT, VALVE FLOW
CLOCKWISE OR COLD WATER
CIRCULATING WATER PUMP
HOT/CHILLED WATER SUPPLY
HOT CHILLED WATER RETURN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
DRAIN
REFRIGERANT SUCTION
REFRIGERANT LIQUID
CONTROL AIR MAIN
PIPE TO BE REMOVED
REFRIGERANT DISCHARGE
GLOBE
GATE
A
BALL
SQ
PLUMBING
LIQUID LINELL
PLMB
LINEAR METER
LITERS PER DAY
LITERS PER HOUR
LAUNDRY TRAY
LITERS PER SECOND
LEAVING WATER TEMPERATURE
NOT APPLICABLE
NOISE CRITERIA
NORMALLY CLOSED
METERS PER SECOND
METERS PER HOUR
MINIMUM OR MINUTE
NORMALLY OPEN
NATIONAL TAPER PIPE (THREAD)
NOT IN CONTRACTNICKG KILOGRAM
KILOGRAM PER SQ. CENTIMETER (ABSOLUTE)
KILOGRAM PER SQ. CENTIMETER
KILOGRAM PER SQ. CENTIMETER (GAUGE)KG/SQ CM G
KG/SQ CM A
KG/SQ CM
NO
N.O.
NPT
NUMBER
KILOCALORIE PER HOUR
THERMAL CONDUCTIVITY
JOULE
IRON PIPE SIZE
ISOMETRIC
DIAMETER, INSIDE
KCAL/HR
K
J
ISO
ID
IPS
HEAD
HERTZ
HORIZONTAL
HORSEPOWER
HOT WATER
HOT WATER HEATER
HOUR(S)
MERCURY
HORIZ
HZ
HW
HWH
HP
HR
HD
HG
MAX MAXIMUM
NC
N/A
N.C.
MM
MPH
MPS
MIN
MILLIMETER
M
LT
LWT
LM
LPH
LPS
LPD
METERS
SUPPLY AIRSA
SANITARY
SUBMERSIBLE
SCHEDULE
SAN
SCH
SBM
UH
UR
U
QUART
QUANTITY
PERCENT
PETROLEUM, OIL AND LUBRICANTS
POINT OF CONNECTION
PARTS PER MILLION
PRESSURE REDUCING VALVE
RADIATOR
REFRIGERANT (12, 22, ETC)
REVOLUTIONS PER MINUTE
REFRIGERATION TON
THERMAL RESISTANCE
RETURN AIR
RELATIVE HUMIDITY
RT
RH
RPM
R12, R22
R
RA
RDTR
QT
QTY
PPM
PRV
POC
POL
THERM
TONS
TYP
THK
TSTAT
TD
TEMP
SYM
STOR
SUCT
STD
STL
SSU
SSF
SST
ST
FLEXIBLE CONNECTOR
EXPANSION JOINT
EXPANSION LOOP
FLOWMETER, ORIFICE
KILOGRAM PER SQ. METER (GAUGE)
KILOGRAM PER SQ. METER (ABSOLUTE)
KILOGRAM PER SQ. METER
STRAINER, BLOW OFF
PUMP (INDICATE USE)
PRESSURE GAUGE AND COCK
PRESSURE SWITCH
KILOWATT HOUR
LATENT HEAT
LEAVING AIR TEMPERATURE
FLOWMETER, VENTURI
A B B R E V I A T I O N S
FIBERGLASS REINFORCED PLASTIC
FEMALE PIPE THREAD
GRAMS
HOSE BIBB
FACE VELOCITY
FEED WATER PUMP
GAGE OR GAUGE
GALVANIZED STEEL
FIXTURE
GA
GALVS
HB
GR
FXTR
FVEL
FWP
FLUSH VALVE
FREQUENCY
FUEL OILFO
FREQ
FRP
FPT
FV
LAT
LH
LG
LBS
L
LAV
KWH
LENGTH
POUNDS
LITERS
LAVATORY
KG/SM G
KG/SM A
KG/SM
KJ
KW
KILOJOULE
KILOWATT
P
PS
FS
STRAINER
FLOW SWITCH
OFM
VFM
EJ
BALL JOINT
(2-WAY SHOWN)
OUTSIDE AIR
NOT TO SCALE
OUTSIDE AIR INTAKE LOUVER
POLE
OXYGEN
PASCAL
PRESSURE DROP OR DIFFERENCE
PHASE (ELECTRIC)
PRESSURE GAGE
OUTSIDE SCREW & YOKE
DIAMETER, OUTSIDE
PH
PG
Pa
PD
P
OXY
OS&Y
NTS
OA
OD
OAIL
SPR
SP
SPEC
SPDT
SM
SLPD
SLPS
SLPH
SEC
SF
SG
SH
SL
sprinkler
DRY-PIPE VALVE
PRE-ACTION VALVE
SIDEWALL SPRINKLER
ALARM CHECK VALVE
PENDENT SPRINKLER
UNION, SCREWED
UNION, FLANGED
TEE, SINGLE SWEEP
UPRIGHT SPRINKLER
COLD WATER
HOT WATER SUPPLY
HOT WATER RETURN
CONDENSATE DRAIN ABOVE
SANITARY DRAIN
ACID WASTE
CHEMICAL SUPPLY PIPES
FLOOR DRAIN
CONDENSATE DRAIN BELOW
FLOOR OR GRADE
FUNNEL DRAIN, OPEN
SURFACE CLEANOUT
VENT THRU ROOF
FLOOR CLEANOUT
PIPE SLEEVE
HOSE BIBB
BACKFLOW PREVENTER
PIPE SLEEVE WITH FIRE STOPPING
FLOOR SINK (200mm x 200mm)
PITCH OR PIPE, UP(U), DOWN(D)
FLOOR OR GRADE
(NAME)E
VAC
A
HWS
MTWR
HWR
MTWS
CR
CS
FOG
FOR
FOS
FOV
FOD
MU
VPD
PC
BBD
MPC
LPC
LPS
MPS
JWS
JWR
FCO
LOW TEMPERATURE HOT WATER RETURN
LOW TEMPERATURE HOT WATER SUPPLY
MEDIUM TEMPERATURE HOT WATER RETURN
MEDIUM TEMPERATURE HOT WATER SUPPLY
VACUUM (AIR)
COMPRESSED AIR
EXISTING PIPE
FUEL OIL RETURN
FUEL OIL SUPPLY
CONDENSATE WATER RETURN
CONDENSATE WATER SUPPLY
FUEL OIL GAUGE
PLAN ELEV.
BFP
200mm x 200mm
SCO
FUEL OIL TANK VENT
PUMPED CONDENSATE
BOILER BLOW DOWN
VACUUM PUMP DISCHARGE
FUEL OIL DRAIN
MAKE UP WATER
LOW PRESSURE STEAM
JACKET WATER SUPPLY
JACKET WATER RETURN
LOW PRESSURE CONDENSATE
MEDIUM PRESSURE CONDENSATE
MEDIUM PRESSURE STEAM
ACID
(NAME)
FD
CD
G GAS
CD
VENT
PIPING
heating plumbing
MOTOR ELECTRIC
CHECK, NON-SLAM
QUICK CLOSING, FUSIBLE LINK
SQUARE HEAD BALANCING COCK
PRESSURE REDUCING
SQUARE HEAD BALANCING COCK
HOSE END DRAIN
CONTROL, PNEUMATIC-ELECTRIC
CONTROL, ELECTRIC-PNEUMATIC
ALIGNMENT GUIDE
ANCHOR, INTERMEDIATE
AIR VENT, AUTOMATIC
AIR VENT, MANUAL
W/ MEASURING TAP
MV
AVV
S AIR SEPARATOR
S
R
SAFETY
QUICK OPENING
RELIEF
PE
LOCK SHIELD
NEEDLE
valves, special duty :
EP
M
S
CHECK, SWING
SOLENOID
DIAPHRAGM
LATERAL
TEE, OUTLET UP
REDUCER, CONCENTRIC
TEE
CONNECTION, TOP
ELBOW, TURNED UP
CONNECTION, BOTTOM
ELBOW, TURNED DOWN
fitting :
FLANGED
WELDED
R
SOLDERED
CAP
BUSHING
THERMOMETER
SCREWED
THERMOSTAT, ELECTRIC
valve actuators dampers
SQUARE
WATTHOUR OR WATER HEATER
HEAT TRANSFER COEFFICIENT
UNIT HEATER
URINAL
TEMPERATURE DIFFERENCE
TONS OF REFRIGERATION
THERMOMETER
THERMOSTAT
TYPICAL
THICKNESS
TEMPERATURE
SYMBOL
STAINLESS STEEL
SAYBOLT SECONDS FUROL
SAYBOLT SECONDS UNIVERSAL
STORAGE
SUCTION
STANDARD
STEEL
STEAM
WIDTH
WEIGHT
WASHER
WATERPROOF
WATER CLOSET
WATER-COOLED
W/
WT
WTRPRF
WSHR
WITH
WD
WH
WC
WCLD
FIRE DAMPER (PROVIDE ACCESS DOOR)
ELECTRIC MOTOR OPERATED DAMPER
SMOKE DAMPER (PROVIDE ACCESS DOOR)
PRESSURE, DYNAMIC(VELOCITY)
WET BULB TEMPERATURE
STATIC PRESSURE
LPD, STANDARD CONDITIONS
LPS, STANDARD CONDITIONS
LPH, STANDARD CONDITIONS
SINGLE POLE DOUBLE THROW
SPECIFICATION
SPRINKLER
SQUARE METER
SPECIFIC GRAVITY
SECOND
SAFETY FACTOR
SENSIBLE HEAT
SENSIBLE LOAD
VOLUME
VERTICAL
VISCOSITY
WET BULB
VENTILATION
WB
WBT
W
VP
WATT
VOL
VISC
VENT
VERT
VACUUM
VALVE
VARIABLE AIR VOLUME
VELOCITY
VOLTV
VAC
VLV
VAV
VEL
SD
AD
M
VD
AD FD
S
BDD
PNEUMATIC OPERATED DAMPER
SPLITTER DAMPER
BACKDRAFT DAMPER
MANUAL VOLUME DAMPER
DUCT SECTION, POSITIVE PRESS., FIRST
EXHAUST AIR GRILLE OR REGISTER, CEILING
DUCT SECTION, NEGATIVE PRESS., FIRST
ACCESS DOOR, VERTICAL OR HORIZONTAL
CHANGE OF ELEVATION, RISE(R), DOWN(D)
COWL, (GOOSENECK) AND FLASHING
F S
FC
TRANSITION
DETECTORS, FIRE AND/OR SMOKE
TURNING VANES
FLEXIBLE CONNECTION
SOUND ATTENUATOR
FLEXIBLE DUCT
AD
R
810mm x 400mm
810mm x 400mm
810mm x 400mm
FIGURE IS ON TOP
ACOUSTICAL LINING
DIRECTION OF FLOW
FIGURE IS ON TOP
(600mm x 300mmH, 472 LPS)
TG 600/300
NECK DIAMETER)
DIFFUSER, LINEAR
CEILING DIFFUSER, ROUND TYPE (200mm
CEILING DIFFUSER, SQUARE TYPE
EXISTING WORK TO BE REMOVED
200mm NCD
SUPPLY AIR GRILLE OR REGISTER, CEILING
EXHAUST AIR GRILLE OR REGISTER, CEILING
SUPPLY AIR GRILLE OR REGISTER, SIDEWALL
RETURN AIR GRILLE OR REGISTER, CEILING
TRANSFER GRILLE ASSEMBLY
LOUVER, DOOR OR WALL
UNDERCUT DOOR (13mm, 47.2 LPS)
DOOR GRILLE (300mmx150mmH)
(500mmWx300mmH, 94.4 LPS)
500/300L
47.2
UC 13mm
300x150
DG
94.4
SR
RR
RG
SG
EG
ER
SR
SG
DUCT WORK
grilles, registers and diffusers :
RLA
LRA
RATED LOAD AMPS
LOCKED ROTOR AMPS
REMOVE EXIST WORK(R)
(E) EXISTING WORK TO REMAIN.
OR END OF DEMOLITION WORK
POINT OF CONNECTION NEW TO EXISTING
M-1
& SYMBOLS AND ABBREVIATIONS
MECHANICAL MATERIAL INDICATIONS
SYSTEM, S-1974, CP CASEY
REPAIR BUILDING AND INSTALL SPRINKLER
CHONG, ST
131420
M-2
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
GALVANIZED STEEL PIPE WITH CAST IRON DRAINAGE FITTINGS.
ABOVEGROUND VENT PIPING WILL BE HUBLESS CAST IRON PIPE AND FITTINGS OR
LAGGED COPPER PIPING. SOIL, WASTE, AND VENT PIPING WILL BE CAST IRON SOIL PIPE.
WITH TIN-ANTIMONY SOLDERED ENDS. HOT WATER PIPING WILL BE INSULATED AND
TYPE. WATER PIPING SHALL BE COPPER. FITTINGS SHALL BE CAST BRONZE OR COPPER
13. PLUMBING FIXTURES SHALL BE OF COMMERCIAL GRADE AND OF WATER CONSERVING
MAKING ALL NECESSARY DUCT CONNECTIONS FUNCTION AS ORIGINALLY INTENDED.
INSTALLATION, REMOVE THE EXISTING DUCTWORK AND REPLACE WITH NEW DUCTWORK,
EXISTING DUCTWORK ELEVATION AND LOCATION IS IN CONFLICT WITH THE NEW PIPING
MUST COORDINATE WITH THE EXISTING DUCTWORK ELEVATIONS AND LOCATION. IF THE
12. PRIOR TO THE INSTALLATION OF NEW HVAC AND PLUMBING PIPING, THE CONTRACTOR
CONTRACTING OFFICER FOR APPROVAL.
CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE
11. SOME DETAILS SHOWN ON THE CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE
SUCH AS ANCHORS, HANGERS/SUPPORTS, ETC.
10. ALL HVAC PIPING/DUCTWORK TO BE REMOVED SHALL INCLUDE ALL ITS ACCESSORIES,
PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.
9. ANY OPENING RESULT FROM THE REMOVAL WORK THAT IS NOT TO BE REUSED SHALL BE
DUCTWORK SHALL MEET THE REQUIREMENTS OF SEAL CLASS C.
ACCORDING TO SMACNA STATIC PRESSURE CONSTRUCTION CLASS 500PA AND
8. ALL SUPPLY, RETURN, AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED
AREA.
DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR
7. ALL WALL/FLOOR/ROOF OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND
SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.
6. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING. A
5. CONCRETE REMOVAL AND RESTORATION SHALL CONFORM TO SPEC.
4. ANY PIPES THAT PENETRATE FIRE RATED WALLS (EXISTING/NEW) SHALL BE SEALED PER SPEC.
OR REPLACED BY THE CONTRACTOR.
DAMAGES DUE TO THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED
DAMAGE THE EXISTING EQUIPMENT, NEW EQUIPMENT, DUCTWORK, PIPING, ETC.
3. CONNECTIONS TO EXISTING SYSTEMS SHALL BE DONE IN SUCH A MANNER AS NOT TO
APPROXIMATE AND SHALL BE VERIFIED AT THE JOB SITE.
2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
CORRECTIONS FOR THE CONTRACTING OFFICER'S APPROVAL.
CONTRACTING OFFICER'S REPRESENTATIVE WITH RECOMMENDATIONS FOR PROPER
DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE ATTENTION OF THE
EXISTING CONDITIONS, EQUIPMENT, FINISHES, ETC., PRIOR TO START OF WORK. IF ANY
1. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH THE
GENERAL NOTES
PLUMBING WORK
HVAC SYSTEM
SCOPE OF WORK
ALL MECHANICAL SYSTEMS SHALL BE TESTED, ADJUSTED, AND BALANCED BY THE CONTRACTOR IN STRICT ACCORDANCE WITH
APPLICABLE SECTIONS OF DIVISION 15 - MECHANICAL O&MA STANDARD TECHNICAL SPECIFICATIONS FOR MISCELLANEOUS PROJECTS, KOREA.
THE HVAC TESTING, ADJUSTING, AND BALANCING (TAB) REPORT SHALL BE SUBMITTED TO THE PROJECT COR FOR GOVERNMENT REVIEW AND
APPROVAL.
1.
2.
3.
4.
8.
8.
1.
2.
3.
4.
WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED BATHROOM EXHAUST FANS AND DUCTS WITH NEW.
FIRE PROTECTION
1.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED EXHAUST FANS, WIND DRIVEN ROTARY TURBINE VENTILATOR AND CONTROL WITH NEW.
WORK CLASS "K" (REPAIR / MAINTENANCE WORK)
WORK CLASS "L" (CONSTRUCTION WORK)
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED FAN COIL UNITS, OUTSIDE AIR INTAKE BOXES, CONTROL AND ASSOCIATED PIPING
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED SEWER PIPING, VENT PIPING, FLOOR DRAIN AND CLEANOUT WITH NEW.
INSTALL NEW SPRINKLER SYSTEM.
GENERAL NOTES, NOTE & SCOPE OF WORK
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED HOT/CHILLED WATER PIPING WITH INSULATIONS, DRAIN PIPING AND ASSOCIATED ACCESSORIES WITH NEW.
SCHEDULE AND ASSOCIATED ACCESSORIES WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED DOMESTIC HOT AND COLD WATER PIPING WITH INSULATIONS INCLUDING WATER HAMMER ARRESTER
5. REPAIR BY REPLACEMENT OF EXISTING FINNED TUBE RADIATORS AND RANGE HOODS INCLUDING DUCT WITH NEW.
6. REPAIR BY REPLACEMENT OF EXISTINGDETERIORATED AIR SEPERATOR, EXPANSION TANK AND ELECTRIC UNIT HEATER WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED PLUMBING FIXTURES, WATER METER AND ASSOCIATED PIPING WITH NEW.
5.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED SINK AND VALVE BOX WITHIN THE LAUNDRY ROOM WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING DETERIORATED DOMESTIC HOT WATER STORAGE TANK, DOMESTIC HOT WATER CIRCULATION PUMP, DOMESTIC HOT WATER RE-CIRCULATION PUMP, CONTROL AND ASSOCIATED ACCESSORIES WITH NEW.
7. REPAIR BY REPLACEMENT OF EXISTING SPLIT AIR CONDITIONING UNIT, CHILLED & HOT WATER CIRCULATION PUMPS AND CONTROL WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING OUTSIDE AIR INTAKE LOUVER W/MOTORIZED O.A. DAMPER AND CO DETECTION SYSTEM FOR MECH ROOM WITH NEW.
SYSTEM, S-1974, CP CASEY
REPAIR BUILDING AND INSTALL SPRINKLER
CHONG, ST
M-3
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
M E C H A N I C A L E Q U I P M E N T S C H E D U L E
MECHANICAL EQUIPMENT SCHEDULE
CHILLED/HOT WATER COIL
FAN COIL UNIT
FCU
ITEM NO
FCU
QTY SERVICE TYPE
CAPACITY
(CFM)
AIR
5,987
(BTU/HR)
16.9
WB
EAT
COOLING
DB
1.2
GPM
EWT
FLOOR MOUNTED TYPE
FLOOR MOUNTED TYPE
VERTICAL CABINET
VERTICAL CABINET
TOTAL
SUPPLY FAN
115/ 1/ 60
VOLT/ PH/ HZ
EAT
HEATING
9,313
(BTU/HR)(INCH)
- 76.7
EWT
NOTE
HEAT CAPMAX
WPD
OUTSIDE AIR
CFM
300 7,603 1.6 - 12,893 115/ 1/ 60
ITEM NO
WATTS
Q'TY
RH
RANGE HOOD
TV, LOUNGE AND
GAME ROOM
SERVICE TYPE
CONTROL WITH EXHAUST DUCT
VENTED TYPE, 2-SPEED FAN
HOOD SIZE
"EEPX30"WX6"HEIGHT2
FAN CAP.
190 CFM
MOTOR POWER
2.5 AMPS, 120V, 1PH, 60HZ.
TANK SIZE
(INCH x INCH)
CHILLED/HOT WATER SYSTEM
ITEM NO
ET
SERVICEQ'TY
EXPANSION TANK
TYPE
(GAL)
TANK VOLUME
(PSI)PRESSURE
CHARGING
(PSI)PRESSURE
WORKING
BLADDER VERTICAL TYPE 110 24"DIA x 67" HIGHT
ITEM NO Q'TY REMARKS
WIND DRIVEN ROTARY TURBINE VENTILATOR
WIND-DRIVEN ROTARY TURBINE VENTILATOR CREATE A
VACUUM WHICE AUTOMATICALLY DRAWS OUT STALE IMPURE
AIR FROM VENTILATING SYSTEM
AIR CAPACITY
284 CFM
OVERRALL SIZE
" HIGHT2
1" DIA x 14 2
WV
EAT
FINNED TUBE RADIATOR
SERVICEQ'TYITEM NO
FTR
FTR
(BTU/HR)
HEATING CAPACITY EWT
R E M A R K SROW LENGTH
(INCH)
ELEMENT
FTR
687,680 180
5,670
2,880
4'-0"
3'-0"
1'-6"
4 1/4" x 4 1/4" x 40FINS/LF
4 1/4" x 4 1/4" x 40FINS/LF
4 1/4" x 4 1/4" x 40FINS/LF
1 1/4"DIA COPPER TUBE,
1 1/4"DIA COPPER TUBE,
1 1/4"DIA COPPER TUBE,
ITEM NO
Q'TY SERVICE TYPE CAPACITY REMARKS
DOMESTIC HOT WATER STORAGE TANK
DT
ENTIRE BUILDING
HORIZONTAL
STL. ROUND
STORAGE
TANK SIZE
GALLONS
(FT DIA X FT LONG)
2,380 6' - 0" X 15' - 0"
TYPE
REMARKS
ALL BRONZE CONSTRUCTION
ALL BRONZE CONSTRUCTION
BASE MOUNTED END SUCTION
CENTRIFUGAL TYPE
CENTRIFUGAL TYPE
PIPE MOUNTED IN-LINE
PIPE MOUNTED IN-LINE
CENTRIFUGAL TYPE
CIRC. PUMP
DOMESTIC HOT WATER
DOMESTIC HOT WATER
P
P
P
ITEM NO
PUMPS
Q'TY SERVICE
(FT)(GPM)
TYPE
CAPACITY HEAD
VOLT/PH/HZ
1,750
1,750
1,750200/3/60
200/3/60
115/1/60
MOTOR
HP
RPM
P
BASE MOUNTED END SUCTION
CENTRIFUGAL TYPE
HOT WATER CIRC. PUMP 1,750200/3/60
CHILLED WATER CIRC. PUMP
5 ALL BRONZE CONSTRUCTION
ALL BRONZE CONSTRUCTION
10.583
22 76
1/2
154.7
79.2
4 RE-CIRC. PUMP
INLET
AIR SEPARATOR
CHILLED/HOT WATER SYSTEM
Q'TYITEM NO
SERVICE
PIPE MOUNTED 3"
TYPE REMARKS
WITH STRAINER
PIPE SIZE(INCH)
3"
OUTLET
WATER FLOW RATE
190 GPMAS
( C)
23.9
( C)
20.0
( C) ( C)
45.0
45.0
QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIRMENTS.
GENERAL NOTE
ITEM NO
Q'TY
WFM
MECH. ROOM
SERVICE TYPE
WATER FLOW METER
2" DIA.
WORKING PRESSURE
150PSI MAX.
METER SIZEFLOW RATE
150GPM
POSITIVE DISPLACEMENT TYPE. IN LINE MOUNTED, FLOW METER CONSIST OF BRONZE BODY,
GRAPHITE IMPREGNATED AND SELF LUBRICATING CHAMBER AND POSTION, OVERSIZE FINE MESH
STRAINER, HERMETICALLY SEALED 3" DIAMETER TOTALIZING REGISTER AND STANDARD ACCESSORIES.
NO
ITEM
EUH
Q'TY SERVICE TYPE
1 MECH ROOM
HORIZONTAL
DISCHARGE
TYPE
HEATING ELEMENT CAP
POWER(KW) VOLT/PH/HZ
3 208/1/60
FAN CAPACITY
AIR CAP(LPS) RPM HP VOLT/PH/HZ
165.2 1,600 1/100 208/1/60
REMARKS
PROVIDE UNIT MOUNTED DISCONNECT SWITCH
AND UNIT MTD. THERMOSTAT.
ELECTRIC UNIT HEATER
R-410a
TYPE
REFRIGERANT
PER MANUFACTURER RECOMMENDATIONS.
ALL AC UNITS REFRIGERANT PIPING SHALL BE INSTALLED 1 CAPACITY SHALL BE BASED ON 35 DEG CN O T E S :
SPLIT AIR CONDITIONING UNIT
QTY. REMARKS
CONDENSER FAN
VOLT/PH/HZ
POWERPOWER QTY
OUTDOOR UNIT
POWER VOLT/PH/HZ
QTY
(KW)
COOLING CAP
(LPS)
INDOOR EVAPORATOR UNIT
COMPRESSORSERVICEITEM NO T Y P E
AIR CAP.
SHALL BE PROVIDED WITH LOW AMBIENT KIT.3
EFFICIENCY
MIN.
(SEER)
PACKAGED SPLIT AIR COOLED TYPECOMM ROOM
ACU
1 152.8
2.7
(0.8 TON)
1.1 FLA 115/1/60 1
7.5 RLA
40.0 LRA
1 115/1/600.6 FLA 10.0
HIGH WALL DUCT FREE SPLIT COOLING SYSTEM
WITH REMOTE ELECTRONIC CONTROLLER.
21 43
W/DISCONNECT SWITCH
W/BACKDRAFT DAMPER
NOTE
FOR BATH ROOM & TOILET(104)
EF
CEILING GRILLE
BIRD SCREEN
CENTRIFUGAL FANCEILING RECESS,
WATTS
0.25 115/1/60 1
FOR MECH ROOM
Q'TY
EF
ITEM NO
FANS
SERVICE
AIR CAP
(CFM)
TYPE
HP
ESP
(INCH)
RPM
115/1/60
VOLT/PH/HZ
FAN MOTOR
REMARKS
2 3
FOR LAUNDRY ROOM(2ND FLOOR)1 115/1/60 21 3
WALL MTD, DIRECT DRIVEN, CENTRIFUGAL FAN
WALL MTD, DIRECT DRIVEN, CENTRIFUGAL FAN
1,750
1,750
1,750
0.25
0.25
1,600 1/3
240 1/20
2 115/1/60 21 3WALL MTD, DIRECT DRIVEN, CENTRIFUGAL FAN 1,7500.25300 1/25
EF
EF
FOR M(125) & W(124) TOILET
SUPPLY ROOM(122) & STORAGE(110)
M(125) & W(124) TOILET
TOILET(104)
FCU
FCU
BED ROOMS 400 10,984 2.0
FLOOR MOUNTED TYPE
FLOOR MOUNTED TYPE
VERTICAL CABINET
VERTICAL CABINET
115/ 1/ 6018,222-
600 14,920 2.6 - 23,809 115/ 1/ 60
45.0
45.0
14,400
FTR
268180 8'-0"1
4 1/4" x 4 1/4" x 40FINS/LF
1 1/4"DIA COPPER TUBE,
LAUNDRY (234)
DAY ROOM & LOBBY
OFFICES (1ST FLOOR)
OFFICES (1ST FLOOR)
23.9
16.9
23.9
16.9
23.9
16.9
6.7
6.7
6.7
6.7
20.0 76.7
20.0 76.7
20.0 76.7
MODEL NO. CAF, CENTURY ACE OR APPROVED EQUAL.
UNIONS, 2-EA. GATE VALVES, AUTOMATIC SUMMER-CHANGEOBER SWITCH, BALANCING VALVE , AND ALL NECESSARY SAFETIES & OPERATING ACCESSORIES.
AIR GRILLE, MOTORIZED OUTSIDE AIR DAMPER W/OUTSIDE AIR WALL BOX & INSECT SCREEN, MANUAL AIR VENT, ELASTOMERIC FLEXIBLE CELLULAR INSULATION, ALUMINUM FIN, CENTRIFUGAL FAN, DRAIN PAN, WASHABLE FILTER, UL LISTED 3-SPEED FAN MOTOR & CONTROL, ADJUSTABLE SUPPLY AIR GRILLE, RETURN
VERTICAL CABINET UNIT, FLOOR MOUNTED, TOP AIR DISCHARGE, COMPLETE WITH COMBINATION COOLING AND HEATING UNIT WATER COIL, W/COPPER TUBE &
CHONG, ST
SYSTEM, S-1974, CP CASEY
REPAIR BUILDING AND INSTALL SPRINKLER
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
M-4
SCALE : 1 / 100-
1 1ST FLOOR HVAC PLAN
M4
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
OF HVAC PIPING SYSTEM IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HVAC PIPING SYSTEM
IN FIELD(TYP)
UP
STAIR-2
VEST-2
VEST-1
UP
VEST-3
STAIR-3
WALL VENTILATOR
EF
CHWS
CHWR
CHWR
CHWS CHWS
CHWR
T T T
T
T
T
T T
T
T
T
TTTTTT
T
R S
R L
ACU
DRAIN
OACU
CONC. PAD
24"x16" OUTSIDE AIR
INTAKE LOUVER
UP
UP
FEC
107108
STORAGE
111112
115 116
STAIR-2
STAIR-1
139138
MECH ROOM
VEST-2
VEST-1
OFFICE
SUPPLY ROOM
TEL/COMM ROOM
LOBBY
CORRIDOR-1 CORRIDOR-2
BALCONY
BALCONY
JANITOR
FEC
CONFERENCE EOC
SEC VAULT
COMM/
OFFICE
OFFICE
WAR ROOM
ROKA-2
S-3 OFFICES-6 OFFICE
OFFICE
CHAPLAIN
ASST OFFICE
CHAPLAIN
S-4 OFFICE
S-2 OFFICE
ROKA-1
UP
FEC
129127
OFFICE
COMMANDING
VEST-3
VAULT
CRYPTO
STAIR-3
SGT MAJ
COMMANDING
OFFICE
XO OFFICE
OFFICE OFFICE
S-1 OFFICE
STORAGE
ROOM
WAITING
TOILET
T
FD
EF
WALL VENTILATOR
EF
THERMOSTAT
VENTILATION
FTR
FTR
FTR
FTR
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
SEE ENLARGED PLAN
FOR MECHANICAL ROOM
M7
32 2032
32 1001003250 8050 80
8065 8065 8065 8080 8080 658080
25 25 20
20 32 32
W. TOILET
124 125
M. TOILET
658080FTR
508080
4010032100
AND ASSOCIATED FUEL PIPING.
REMOVE EXISTING SUMP, CONTROL
32 100
REMAIN EXISTING WATER CHILLER
100100
WALL PIPING
UNDERGROUND DOUBLE
CHS/CHR PREFABRICATED
POC
AND ASSOCIATED GAS PIPING.
REMAIN EXISTING ALL GAS SYSTEM
REMAIN EXISTING WATER CHILLER.
REPLACE EXISTING CHS & CHR PIPING WITH NEW.
M
1ST FLOOR HVAC PLAN AND NOTES
CHONG, ST
SYSTEM, S-1974, CP CASEY
REPAIR BUILDING AND INSTALL SPRINKLER
131420
WITH MOTORIZED DAMPER
600 x 400 O.A. INTAKE LOUVER
T T
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
SCALE : 1 / 100-
1 2ND FLOOR HVAC PLAN
M5
M-5
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
OF HVAC PIPING SYSTEM IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HVAC PIPING SYSTEM
IN FIELD(TYP)
2ND FLOOR HVAC PLAN AND NOTES
UPUP
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
LAUNDRY
STAIR-1
STAIR-3
STAIR-2
BALCONY
TV/LOUNGE ROOM
STORAGE
BULK
SINK
W
W
W
W
W
UP.
(GFGI)
OVEN
(GFGI)
MACHINE
ICE MAKE
(GFGI)
REF
RH
ALUMIUM FLEX. DUCT
WALL VENT CAP & 7"O
WALL VENTILATOR
EF
RADIATOR
FINNED TUBE
FTR
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
D
D
D
D
D
D
D
T T T T T T T T T T T T T T T T
TTTTTTTTTTTTTTTT
FD
EF
EF
FD FD
EF
FD
EF
EF
FD
(TYP)
200 x 100
(TYP)
300 x 100
EF
EF
FDFD
FD
EF
4 EF
EF
FD FD
FD FD FD
EF
EF
FD FD
EF
FD
EF
T
FCU
THERMOSTAT FOR FCU (TYP)
FCU
FCU
D, CHWS, CHWR, CHWR
(TYP OF 32)
20 20 25 32
D, CHWS, CHWR, CHWR
20 25 32 32 20 25 25
EF
(TYP)
300x50 O.A INTAKE WALL BOX
(TYP)
FAN COIL UNIT
(TYP)
CEILING EXHAUST FAN
12" x 12" GRAVITY DAMPER
(TYP)
680x50 O.A INTAKE WALL BOX
DRYER VENT
(TYP)
W
W
EF
RANGE HOOD
CHONG, ST
SYSTEM, S-1974, CP CASEY
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
SCALE : 1 / 100-
1 3RD FLOOR HVAC PLAN
M6
M-6
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
OF HVAC PIPING SYSTEM IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HVAC PIPING SYSTEM
IN FIELD(TYP)
3RD FLOOR HVAC PLAN AND NOTES
UPUP
FEC
STAIR-2
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
STAIR-3
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
STAIR-1
STORAGE
BULK
GAME ROOM
BALCONY
STORAGE
BULK
(GFGI)
OVEN
(GFGI)
MACHINE
ICE MAKE
(GFGI)
REF
D N
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
T T T T T T T T T T T T T T T T
T
TT TT TT TT TT TT TT TT
FD
EF
EF
FD FD
EF
4 (TYP OF 16)
CEILING EXHAUST FAN
FD
EF
EF
FD
EF
EF
FDFD
FD
EF
4 EF
EF
FD FD
FD FD FD
EF
EF
FD FD
EF
(TYP)
250 x 100
(TYP)
300 x 150
EF
FD
EF
EF
ALUMIUM FLEX. DUCT
WALL VENT CAP & 7"O
(TYP OF 32)
20 32 32
CHWS, CHWR, CHWR
25 32 32 25 25
(TYP)
300x50 O.A INTAKE WALL BOX
VENTILATOR(TYP)
WIND DRIVEN ROTARY TURBINE
RH
(TYP)
680x50 O.A INTAKE WALL BOX
(TYP)
WITH SHUT OFF VALVE
1/2O AUTOMATIC AIR VENT
WV
RANGE HOOD
CHONG, ST
SYSTEM, S-1974, CP CASEY
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
SCALE : 1 / 100-
M7
M-7
MECHANICAL ROOM ENLARGED PLAN
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HVAC PIPING SYSTEM
T SW
ON-OFF SWITCH
UNIT MOUNTED
THERMOSTAT &
M
GENERAL:
TO 29.4 DEC. C.
SETPOINT. SET THE THERMOSTAT AT 12.7 DEG.C.
THE THERMOSTAT SHALL CYCLE WALL HEATER TO MAINTAIN THERMOSTAT
SEQUENCE OF OPERATION
MANUFACTURER SHALL FURNISH THE CONTROL SYSTEM TO
INCLUDE UNIT MOUNTED THERMOSTAT AND ON-OFF SWITCH.
THE THERMOSTAT SHALL HAVE A TEMPERATURE RANGE OF 12.7 DEC. C
ELECTRIC UNIT HEATER
- M7
2 ELEC. UNIT HEATER CONTROL
NOT TO SCALE
MECHANICAL ROOM ENLARGED PLAN,
U P
C H
W S
C H
W R
U P
PRV
AIR SEPARATOR
REDUCED PRESSURE
PRINCIPLE BACKFLOW
PREVENTER
TM
EXPANSION TANK
CHWS
CHWR
CHWR
PG PG
PG PG
U P
1"
HOT WATER CIRCULATING PUMP
CHILLED WATER CIRCULATING PUMP
TRV
U P
WALL VENTILATOR
DOMESTIC HOT WATER
RE-CIRC. PUMP
DOMESTIC HOT WATER
CIRC. PUMP
DOMESTIC HOT WATER
STOR. TANK
50 65
50 50
100100
25100
32 3220
32 3220 32 3220
4" CHWS, CHWR PIPING
FOR CONTINUATION
(PIPE RUN UNDERGROUND)
W
WATER FLOW METER
80 COLD WATER PIPING
OA INTAKE LOUVER
M
MOTORIZED O.A. DAMPER
CONC. PAD
CONC. PAD
CONC. PAD
CONC. PAD
P
ET
P
DT
EF
AS
P
P
WFM
EA
ELEC. UNIT HEATER
EUH
OF HVAC PIPING SYSTEM AND GAS PIPING IN FIELD(TYP)
AND GAS PIPING IN MECH. ROOM.
GAS LEAK DETECTOR
GAS LEAK DETECTION
MOUNTED ON CEILING(E)
CONTROL PANEL(E)
GAS ALARM GONG(E)
REMAIN EXISTING GAS SYSTEM
POC
ELEC. UNIT HEATER CONTROL AND
NOTES
CHONG, ST
SYSTEM, S-1974, CP CASEY
REPAIR BUILDING AND INSTALL SPRINKLER
131420
CONC. PAD
ASSOCIATED ACCESSORIES.
DOMESTIC HOT WATER HEATER
REMOVE & REINSTALL EXISTING
ASSOCIATED ACCESSORIES.
HOT WATER HEATING BOILER
REMOVE & REINSTALL EXISTING
ALARM HORN
CO DETECTOR
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
FAN COIL UNIT CONTROL DIAGRAM,
NOT TO SCALE
FAN COIL UNIT CONTROL DIAGRAM
FACTORY PROVIDED WALL MOUNTED
SPACE THERMOSTAT
SWITCH(OFF-HIGH-MEDIUM-LOW)
UNIT MOUNTED 3-SPEED
MAINTAIN ROOM TEMPERATURE AT 23.9 DEG.C
IN WINTER OPERATION :
PIPE MOUNTED CHANGEOVER SWITCH
SWITCH WALL MOUNTED. WHEN FCU IS OPERATED OPEN MOTORIZED OA INTAKE DAMPER.
IN SUMMER OPERATION :
MAINTAIN ROOM TEMPERATURE AT 20 DEG.C
SPACE COOLING THERMOSTAT SHALL CYCLE FCU FAN "ON"OR"OFF" TO
FAN OPERATION IS CONTROLLED BY OCCUPANT VIA 3-SPEED FAN
THE OPERATING MODE (HEATING OR COOLING) SHALL BE DETERMINED BY
SPACE HEATING THERMOSTAT SHALL CYCLE FCU FAN "ON"OR"OFF" TO
T
FCU:
CH
C
SA
MOTORIZED OA
INTAKE DAMPER
OA
(ONLY FOR FCU-1)
SEQUENCE OF OPERATION
CAPACITOR
W
BK
R
BL
BR
BR
FAN
MOTOR
(COMMOM)
(LOW)
(MEDUIM)
(HIGH)
FCU
UNIT MOUNTED
51 2 6
4 8
1 2
TEMPRERATURE CONTROLLER
(110V)
POWER
LN Centry-Ace
F
COOLING
RUN
HEATING
UP DOWN H-C ON/OFF
CAT-100A
Y : YELLOW
* WIRING COLOR *
R : RED
BK : BLACK W : WHITE
BL : BLUE
BR : BROWN
: FIELD WIRING
3 4
DAMPER
MOTOR
TEMP.SENSOR
3-SPEED SWITCH
M8
NOT TO SCALE-
MECH RM WALL FAN CONTROL DIAGRAM
T
EF
E .A
T
T-1
M
M
N
OL'S
G
C
DM
DM
120VAC, 1PH, 60HZ
(SEE ELECT. DWG)
O.A.
FOR MECH.RM.
LOUVER W/BIRDSCREEN
OUTSIDE AIR INTAKE
MOTORIZED O.A.
DAMPER
H
OFF
SEQUENCE OF OPERATION
VENT THERMOSTAT
AUTO
HAND
SET AT 35.0 DEG. C.
VENTILATION THERMOSTAT(T-1)
WHEN SPACE TEMP. RISES ABOVE 35 DEG.C, ROOF EXHAUST FAN
SHALL OPERATE AND OPEN O.A. INTAKE DAMPER AND MOTORIZED
BACKDRAFT DAMPER VENTILATION TO MAINTAIN T-1 SETPOINT.
MOTORIZED BACKDRAFT DAMPER
W/A.O.H. SEL. SW
MAGNETIC MOTOR STARTER
O.A.
MOTORIZED
BACKDRAFT DAMPER
DAMPER MOTOR
IN MECH.RM. (EF-0)
ROOF EXH. FAN
NOT TO SCALE-
MECH RM
CO DETECTOR
RELAY(S)
MODULE BOX
ALARM HORN
FL
TO FACP
CARBON MONOXIDE DETECTION SYSTEM
WHEN ANY CARBON MONOXIDE (CO) DETECTORS DETECTS
OPERATION SEQUENCE
100 PPM OR GREATER, DETECTORS SHALL ENERGIES REQUIRED NUMBER OF
B. RELAY MODULE :
RELAY MODULE SHALL BE KIDDE CO12OX.
EQUIPMENT SHALL BE INSTALLED PER MFG INSTRUCTIONS AND IN
ACCORDANCE WITH NFPA 720.
C.
CARBON MONOXIDE DETECTOR SPECIFICATION
CO DETECTOR KIDDE MODEL # i12010SCO OR APPROVED EQUAL
POWER SOURCE: 120VAC, 60HZ 45MA
SALED LITHIUM BATTERY BACKUP
SMOKE SENSOR: IONIZATION
CO SENSOR: ELECTROCHEMICAL
AUDIO ALARM: 85DB AT 10FT
TEMPERATURE RANGE: 40˚F (4.4˚C) TO 100˚F (37.8˚C)
HUMIDITY RANGE: 10%-95% RELATIVE HUMIDITY, NON-CONDENSING
WIRING: QUICK CONNECT PLUG WITH 6" PIGTAILS
INTERCONNECTS: UP TO 24 DEVICES OF WHICH 18 CAN BE INITIATING
STROBE LIGHT: KIDDE MODEL SL177I,
RELAY MODULES TO ACTIVATE FACP AND ACTIVATE ALARM HORN.
CO DETECTION SYSTEM
M8
M8
M-8
MECH RM WALL FAN CONTROL DIAGRAM,
AND CO DETECTION SYSTEM
CHONG, ST
SYSTEM, S-1974, CP CASEY
APPROPRIATE SWITCHOVER VALVES SHALL BE MANUALLY OPEN/CLOSED
1.1
1.
3.
SET VOILER B-1 "HAND-AUTO" SWITCH TO AUTO POSITION, BOILER
WINTER SEASON
STARTS AND RUNS CONTINOUSLY WHEN O.A. THERMOSTAT DROPS BELOW
SET PUMP P-1 "HAND-OFF-AUTO" SWITCH TO "AUTO" POSITION, PUMP
IT'S SETPOINT OF 15.6 DEG.C.
STARTS WHEN P-1 IS ENERGIZED. BOILER PACKAGE CONTROL SHALL
SUMMER-WINTER SWITCHOVER
ACCORDINGLY AS PER SEASON REQUIREMENTS.
MAINTAIN BOILER HOT WATER SUPPLY TEMPERATURE AT 82.2 DEG. C.
SEQUENCE OF OPERATION
1.2
2. CHILLED WATER SYSTEM:
2.1
STARTS AND RUNS CONTINOUSLY WHEN O.A. THERMOSTAT RISES ABOVE
SET PUMP P-2 "HAND-OFF-AUTO" SWITCH TO "AUTO" POSITION, PUMP
IT'S SETPOINT OF 21.1 DEG.C.
2.2
CLOSES IT'S CONTACT UPON SENSING FLOW AND P-2 IS ENERGIZED.
CHILLER CONTROL SYSTEM IS ENERGIZED WHEN PIPELINE FLOW SWITCH
CHILLER BUILT-IN CONTROL MAINTAIN CHILLED WATER SUPPLY TEMP.
AT -6.7 DEG.C.
CHILLED/HOT WATER PIPING SYSTEM DIAGRAM
- NOT TO SCALE
FS
STARTER
OT
COLD WATER
PIPING LINE
1 EXPANSION TANK
HOT WATERET
C/HWS
C/HWR
AIR SEPARATOR
WC
AS
C H
S
1H W
R
C H
R
CHR
CHS
WATER CHILLER
AIR COOLED
SUNSHIELD
W/REMOTE BULB
OUTDOOR AIR THERMOSTAT
H W
S
PRESSURE REDUCING VALVE
SET AT 0.84KG/CM
BACK FLOW PREVENTER
ASSEMBLY
MAKE UP
POSITION
V - 1
V - 2
VALVE
OPEN
WINTERSUMMER
CLOSED
OPEN CLOSED
TO
V-2 V-2
V-1
V-1
HWS
HWR
CHEMICAL FEEDER
W/REMOVABLE FUNNEL
PCHILLED WATER
CIRC.PUMP
OUTDOOR AIR THERMOSTAT
W/REMOTE BULB
HOT WATERP
1 CIRC.PUMP
FLOW SWITCH
(FACTORY SUPPLIED)
FLEXIBLE
CONNECTOR
SUNSHIELD
VALVE SCHEDULE
CHS
CHR
HOT WATER BOILER
GAS FIRED CONDENSING
TO BE REMAINED
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
AS
AIR SEPARATOR
M9
M-9
CHILLED/HOT WATER PIPING SYSTEM
DIAGRAM AND SEQUENCE OF OPERATION
CHONG, ST
SYSTEM, S-1974, CP CASEY
REPAIR BUILDING AND INSTALL SPRINKLER
131420
O
SENSER (PT1000)
T
O.A. TEMP.
EXISTING SUNSHIELD
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
UPUP
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
LAUNDRY
STAIR-1
STAIR-3
STAIR-2
BALCONY
TV/LOUNGE ROOM
STORAGE
BULK
W
W
W
W
W
UP.
(GFGI)
OVEN
(GFGI)
MACHINE
ICE MAKE
(GFGI)
REF
D
D
D
D
D
D
D
SEE ENLARGE PLAN
FOR TYPE "A"
- - SEE ENLARGE PLAN
FOR TYPE "A"
SEE ENLARGE PLAN
FOR TYPE "B"
-SEE ENLARGE PLAN
FOR TYPE "B"
- SEE ENLARGE PLAN
U P
U P
U P
U P
U P
U P
U P
U P
U P
U P
U P
U P
U P
P-1P-1P-1P-1P-1P-1P-1P-1
P-1P-1P-1P-1P-1P-1P-1P-1
P-5P-5P-5P-5
P-5 P-5 P-5 P-5
P-5 P-5 P-5
P-5 P-5 P-5 P-5
P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7
P-9
P-10P-10P-10P-10P-10P-10P-10P-10
P-10 P-10 P-10P-10
P-10
P-10 P-10 P-10
P-7
M11
M11
M11
M11
M11
W
W
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING SYSTEM
OF HW,CW,SEWER AND VENT PIPING IN FIELD(TYP)
(1ST & 2ND FLOOR) AND NOTES
COLD AND HOT WATER PIPING PLAN
UP
FEC
UP
FEC
137107108110
STORAGE
111112
115 116
125124
STAIR-2
STAIR-1
139138
MECH ROOM
VEST-2
VEST-1
OFFICE
SUPPLY ROOM
TEL/COMM ROOM
LOBBY
CORRIDOR-1 CORRIDOR-2
W. TOILET M. TOILET
BALCONY
BALCONY
JANITOR
FEC
CONFERENCE EOC
SEC VAULT
COMM/
OFFICE
OFFICE
WAR ROOM
ROKA-2
S-3 OFFICES-6 OFFICE
OFFICE
CHAPLAIN
ASST OFFICE
CHAPLAIN
S-4 OFFICE
S-2 OFFICE
ROKA-1
UP
FEC
129127
OFFICE
COMMANDING
VEST-3
VAULT
CRYPTO
STAIR-3
SGT MAJ
COMMANDING
OFFICE
XO OFFICE
OFFICE OFFICE
S-1 OFFICE
STORAGE
ROOM
WAITING
TOILET
403240324032403240324032403240324032403240324032
SEE ENLARGED PLAN
FOR MECHANICAL ROOM
M7
U P
50 65
D N
P-1
P-1 P-1
P-1
P-1
P-1
P-7
P-7
P-7 P-7
P-7
P-7
P-7
P-6
A
B
AA
SCALE : 1 / 100-
M10
COLD AND HOT WATER PIPING PLAN(1ST FLOOR)
SCALE : 1 / 100-
M10
COLD AND HOT WATER PIPING PLAN(2ND FLOOR)
M-10
CHONG, ST
SYSTEM, S-1974, CP CASEY
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
UPUP
FEC
STAIR-2
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
STAIR-3
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
STAIR-1
STORAGE
BULK
GAME ROOM
BALCONY
STORAGE
BULK
(GFGI)
OVEN
(GFGI)
MACHINE
ICE MAKE
(GFGI)
REF
D N
T
SEE ENLARGE PLAN
FOR TYPE "A"
- SEE ENLARGE PLAN
FOR TYPE "A"
SEE ENLARGE PLAN
FOR TYPE "B"
-SEE ENLARGE PLAN
FOR TYPE "B"
U P
D N
D N
D N
D N
D N
D N
D N
D N
D N
D N
D N
D N
3240 32403240 3240 3240 3240 3240 3240 3240 3240 3240
4032 5032 5040 5040 5040 5040 5040
D N
5040 5040 5040 5032 4032
P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1
P-5 P-5 P-5 P-5
P-5 P-5 P-5P-5 P-5 P-5 P-5
P-5
P-5
P-5 P-5 P-5
P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7
P-10 P-10 P-10 P-10 P-10 P-10 P-10
P-10 P-10 P-10 P-10 P-10 P-10 P-10 P-10
P-7
WALL HANG TYPE
W/ AERATOR SHALL BE KOSDO INC
MODEL KSAJ-515-24 OR APPROVED EQUAL.
MODEL KSAJ-100 OR APPROVED EQUAL.
SHALL BE KOSDO INC
5015 40 DOUBLE BOWLP-9 LAUNDRY SINK1 15
20 40WASHER7 20
15SHOWER32P-10 15 40 50
WASTE
15 40
PIPE CONNECTION
H.W. VENT
BACK
STAINLESS STEEL TYPE
R E M A R K S
RESPONSIBLE FOR VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENTS
QUANTITIES ARE SHOWN FOR ESTIMATION PURPOSE ONLY, THE CONTRACTOR SHALL BE
PLUMBING FIXTURE SCHEDULE
C.W.
NOTES :
REQUIREMENTS.
QTY.
P-7
P-1
P-5
SYMBOL
KITCHEN SINK
SINGLE BOWL
F I X T U R E
LAVATORY
WATER CLOSET38
7540151 15SERVICE SINK
TANK TYPE
Q' TY
WATER HAMMER ARRESTER SCHEDULE
FIXTURE
UNIT RATING
CONN.
SIZE
P.D.I
SYMBOL
REMARK
1 - 11A
( TYPICAL )
12 - 32B
15 mm
20 mm COMPRESSION CHAMBER WITH EXPANSION
STAINLESS STEEL CONSTRUCTION PRESSURIZED
AND NOTES
SCHEDULE, WATER HAMMER ARREST
(3RD FLOOR), PLUMBING FIXTURE
COLD AND HOT WATER PIPING PLAN
M11
M11
M11
M11
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING SYSTEM
OF HW,CW,SEWER AND VENT PIPING IN FIELD(TYP)
P-6
SCALE : 1 / 100-
M11
COLD AND HOT WATER PIPING PLAN(3RD FLOOR)
M-11
CHONG, ST
SYSTEM, S-1974, CP CASEY
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
P-1 P-5 P-5
P-7
P-10
A
B
A
A
20 20
20 32
25 32
A B
A B
P-1 P-1
P-10
P-10
P-7
P-7
P-5 P-5 P-1
P-10
P-7
15 15
32 20
32 20
20 20
A
A
A
B
32 20
SCALE : 1 / 50-
1 ENLARGED PLAN FOR TYPE "A"
SCALE : 1 / 50-
ENLARGED PLAN FOR TYPE "B"
P-1 P-1 P-1 P-1
P-10
P-10
P-10
P-10
P-5 P-5 P-5 P-5
P-7
P-7
P-7
P-7
A
B
A
A
32 20
32 25
B
A
AB
32 20
32 20
32 20
A
A
A
B
SCALE : 1 / 50-
ENLARGED PLAN FOR TYPE "C"
P-7 P-7
P-7
P-5
P-5 P-5P-1 P-1 P-1
P-10
P-10
P-10
SSP-6
A
A
A
A
20 20
20 20
A A
AA A
A
AB
20 20
SCALE : 1 / 50-
ENLARGED PLAN
AND ENLARGED PLAN
ENLARGED PLAN FOR TYPE "A","B","C"
LAUNDRY
W
W
W
W
W
D
D
D
D
D
D
D
P-9A A
B
SEE DETAIL (TYP)
32 3220 20
M25
W
W
B
M-12
M12 M12
M12
M12
CHONG, ST
SYSTEM, S-1974, CP CASEY
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
M-13
UPUP
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
LAUNDRY
STAIR-1
STAIR-3
STAIR-2
BALCONY
TV/LOUNGE ROOM
STORAGE
BULK
W
W
W
W
W
UP.
(GFGI)
OVEN
(GFGI)
MACHINE
ICE MAKE
(GFGI)
REF
D
D
D
D
D
D
D
P-1P-1P-1P-1P-1P-1P-1P-1 P-1P-1P-1P-1P-1P-1P-1P-1
P-5P-5P-5P-5
P-5 P-5 P-5 P-5
P-5 P-5 P-5
P-5 P-5 P-5 P-5
P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7
P-9
P-10P-10P-10P-10P-10P-10P-10P-10
P-10 P-10 P-10P-10
P-10
P-10 P-10 P-10
P-7
SCALE : 1 / 100-
1 SEWER PIPING PLAN(1ST FLOOR)
SEE ENLARGE PLAN
ICE MACHINE
50 I.D FOR
SCALE : 1 / 100-
SEWER PIPING PLAN(2ND FLOOR)2
SEWER PIPING PLAN(1ST & 2ND FLOOR)
M13
M13
M14
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING SYSTEM
OF HW,CW,SEWER AND VENT PIPING IN FIELD(TYP)
AND NOTES
UP
FEC
UP
FEC
137107
STORAGE
111112
115 116
119 120
125124
STAIR-2
STAIR-1
139138
MECH ROOM
VEST-2
VEST-1
OFFICE
SUPPLY ROOM
TEL/COMM ROOM
LOBBY
CORRIDOR-1 CORRIDOR-2
W. TOILET M. TOILET
BALCONY
BALCONY
FEC
CONFERENCE EOC
SEC VAULT
COMM/
OFFICE
OFFICE
WAR ROOM
ROKA-2
S-3 OFFICE
S-6 OFFICE
OFFICE
CHAPLAIN
ASST OFFICE
CHAPLAIN
S-4 OFFICE
S-2 OFFICE
ROKA-1
UP
FEC
129127
OFFICE
COMMANDING
VEST-3
VAULT
CRYPTO
STAIR-3
SGT MAJ
COMMANDING
OFFICE
XO OFFICE
OFFICE OFFICE
S-1 OFFICE
STORAGE
ROOM
WAITING
TOILET
- M15
SEE ENLARGE PLAN - M15 - M15 - M15 - M15 - M15
12 13 14 12 15
- M15
SEE ENLARGE PLAN - M15 - M15 - M15 - M15 - M15
17 18 19 17 201611
2ND & 3RD FLOOR
150 SEWER LINE FROM
CONNECT EXIST SEWER LINE
150 SEWER MAIN LINE
FCO
2ND & 3RD FLOOR
150 SEWER LINE FROM
FCO
CONNECT EXIST SEWER LINE
150 SEWER MAIN LINE
CONNECT EXIST SEWER LINE
KITCHEN SINK
2ND & 3RD FLOOR
50 SEWER LINE FROM
50 SEWER MAIN LINE
2ND FLOOR LAUNDRY RM
50 SEWER LINE FROM
100FCO
CONNECT EXIST SEWER LINE
150 SEWER MAIN LINE
80FD
80FCO
4"FCO
150FCO
JANITOR
50FCO
CHONG, ST
SYSTEM, S-1974, CP CASEY
REPAIR BUILDING AND INSTALL SPRINKLER
131420
W
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
M-14
UPUP
FEC
STAIR-2
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
STAIR-3
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
BED ROOM
STAIR-1
STORAGE
BULK
GAME ROOM
BALCONY
STORAGE
BULK
(GFGI)
OVEN
(GFGI)
MACHINE
ICE MAKE
(GFGI)
REF
D N
T
P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1
P-5 P-5 P-5 P-5
P-5 P-5 P-5P-5 P-5 P-5 P-5
P-5
P-5
P-5 P-5 P-5
P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7P-7 P-7 P-7 P-7
P-7 P-7 P-7 P-7
P-10 P-10 P-10 P-10 P-10 P-10 P-10
P-10 P-10 P-10 P-10 P-10 P-10 P-10 P-10
P-7
ICE MACHINE
50 I.D FOR
3" VTR
2" x 3" INCREASER
SCALE : 1 / 50-
ENLARGED PLAN
SCALE : 1 / 100-
SEWER PIPING PLAN(3RD FLOOR)
M14
M14
- M15
LAUNDRY
W
W
W
W
W
D
D
D
D
D
D
D
P-9
PLUGGED
50 FCO
50 FCO
50 FD
50ID(TYP)
W
W
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING SYSTEM
OF HW,CW,SEWER AND VENT PIPING IN FIELD(TYP)
,ENLARGED PLAN AND NOTES
SEWER PIPING PLAN(3RD FLOOR)
SEE ENLARGE PLAN - M15 - M15 - M15 - M15 - M15
2 3 4 2 5
- M15
SEE ENLARGE PLAN - M15 - M15 - M15 - M15 - M15
7 8 9 7 106
CHONG, ST
SYSTEM, S-1974, CP CASEY
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
SH2
KS2 KS4
L10
P - 13
2"
2"
L17
L18
4" VTR 4"x3" REDUCER
3"
3"
3"
11/ 2"
11/ 4"
2"
2" 11/ 4"
2"SD
2"FCO
2"
4" 2"
2"
2"
D N
2",4"
D N2",4"
2"FCO
3"3"
2"FCO
2" 3"
3"
2"
4"
2"
4"
2"
2"SD
2"SD
4" 4"
2"
11/ 2"
11/ 2"
D N2",4"
3" 11/ 4"
3"
2"
11/ 4" 2"
11/ 2"
2"
2" 4"
2"SD
2"2"
4"
2"
2"FCO
2"FCO
2",4" D N
3"
3" 2"
11/ 4"
11/ 2" 11/ 4"
2"
2"SD
2"
2" 4"
4"2"
3"
4" VTR 4"x3" REDUCER
D N2",4"
3" 3"
2"
2" 11/ 4"
11/ 2"
11/ 2"
11/ 4"
2" 4"
2"FCO
2"SD
2"4" 2" 2"
4" VTR 4"x3" REDUCER
D N
2"FCO
2"SD
4",2"
4"x3" REDUCER 4" VTR
3"
11/ 2"
3"
3"
3" 2"
2"
11/ 4"
11/ 4"
2"
2"4"2"
4"
2"
3" 3"
3" 3" 2"
11/ 2"
11/ 2"
2"
2"FCO
2"SD
2"FCO
2"SD
2"
4" 4" 4"
4"
2"
D N
2",4"
2"
3"
2" 3"
11/ 2"
4"2"
11/ 4"
11/ 2"
2"
2"SD
2"FCO
4"
2"
2"
D N 4",2"
D N 4",2"
2"SD
2"FCO
2"
4"
3"
11/ 4"
4"
2"
3"
2"
3"
2"
11/ 4"
11/ 2"
2"4"
2"2"
3"
3"
3"
11/ 2"
11/ 4"
11/ 4"
2"
D N 4",2"
2"FCO
2"SD
11/ 2"
2"
4"
2"
2"
D N
U P
4",2"
2"
4"
2"SD
4"
2"
4",2"
11/ 4"
11/ 2"
2"
2"
11/ 4"
11/ 2"
D N
U P
2"FCO
11/ 2"
4",2"
2",4"
2"FCO
2"SD
2"SD
4"
2"
4" 2"
2"
11/ 2"11/ 2"
4" 2"
2"FCO
U P
D N
2"SD
2"FCO
4",2"
4",2" 4" 2"
2"
2"
11/ 4" 2"
11/ 2"
4"
11/ 4"
U P
D N
2"
11/ 4"
11/ 4" 11/ 2"11/ 2"
2"FCO
2"SD
2"
4" 2"
4"
4",2"
4",2"
11/ 4"
2"
11/ 2"
11/ 2"
11/ 4"
4" 2"
4" 2"
2"SD
2"FCO
U P
D N
4",2"
4",2"
2"
2"
4"
2"FCO
D N
U P
11/ 2"
2"SD
2"
11/ 2"11/ 4"
11/ 4"
2",4"
2",4"
2"
4"2"
4"
2"FCO
2"FCO
2"SD
2"SD
2"
11/ 2"
4"
2"
4"2"4"
2"
4"
4"
11/ 2"
D N
U P
4",2"
4",2"
2"FCO
U P
D N
2"SD
11/ 2"
11/ 4"
11/ 2"
4",2"
4",2"
2" 11/ 4"
4"
2"
2"
4"
2"FCO
2"SD
D N
11/ 4"
11/ 2"
2"
11/ 2" 11/ 4"
2" 2"
2" 4"
4"
U P
2",4"
2",4"
2"FCO
2"SD
11/ 2"
4"
2"
11/ 4"
U P
D N
11/ 4" 2"
11/ 2"
4" 2"
2",4" 2"
4",2"
1 SEWER AND VENT PIPING ENLARGED PARTIAL PLAN
NOT TO SCALE
2 3 4 5
6 7 8 9 10
11 12 13 14 15
16 17 18 19 20
P-5
P-5
P-5
P-5
P-5
P-5 P-5
P-5
P-1
P-1 P-1
P-1
P-1
P-10
P-10
P-10
P-10
P-10
P-7 P-7
P-7 P-7
P-7
P-7
P-1 P-1
P-1 P-1
P-1
P-1
P-1
P-1
P-1
P-1P-1 P-1
P-1
P-1
P-1
P-1
P-1
P-5
P-5
P-5
P-5
P-5
P-5 P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-10
P-10
P-10
P-10
P-10
P-10
P-10
P-10
P-10
P-10
P-10P-10
P-10
P-10
P-10
P-10
P-10P-10
P-7 P-7
P-7 P-7
P-7
P-7
P-7
P-7
P-7P-7
P-7
P-7
P-7 P-7
P-7 P-7 P-7
P-7
P-5P-5
M-15
M15
M15 M15 M15 M15 M15
M15M15M15M15M15
M15 M15 M15 M15 M15
M15M15M15M15M15
PARTIAL PLAN
SEWER AND VENT PIPING ENLARGED
CHONG, ST
SYSTEM, S-1974, CP CASEY
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
M-16
CONTROL DIAGRAM
NOT TO SCALE- M16
SET AT 82.7Kpa
H W
S
AUTOMATIC
HWS
HWR
ET
P
E
HWS
HWR
P.G.
AIR VENT
AS
MOTOR STARTER
W/REMOVABLE FUNNEL
CHEMICAL FEEDER
HEATING SYSTEM
FROM/TO BLDG.
W/REMOTE BULB
OUTDOOR AIR THERMOSTAT
OT
SUNSHIELD
TYPE)
ASSEMBLY (REDUCED PRESSURE PRINCIPAL
BACK FLOW PREVENTER
AUTOMATIC
AIR VENT PRESSURE REDUCING VALVE
MAKE UP COLD WATER
P
CONTROL PANEL
HOT WATER BOILER PACKAGE
HOT WATER HEATING SYSTEM CONTROL DIAGRAM
DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM
NOT TO SCALE
NH
1PH 120VAC
L4080
(BUILT IN CONTROL)
DOM H.W. HEATER
RELAY
STORAGE TANK
DOMETIC HOT WATER
H.W. SENSOR
THEMOSTATIC
MIXING VALVE
COPPER WELL
PLUMBING SYSTEM
THERMOMETER
AQUASTAT
DT
SET AT 43.3 DEG. C
WELL
THERMOSTAT 26.7 DEG C. TO 82.2 DEG C . RANGE,
T-# SHALL BE A REMOTE BULB
CONTROL
TRANSFORMER
O/L
120V
FOR P-2
G
C
MOTOR STARTER
HOLDING COIL
FUSE
SEE ELECTRICAL
DRAWING
O
A
P
N O T E ;
H
TYPICAL
T-1
1.66 DEG C. DIFFERENTIAL, WIRE TO MAKE ON FALL.
MOUNT ON DOMESTIC HOT WATER
MOUNT IN HWR PIPING (P-3)
8 FL AMPS AT 120VOLTS.
STORAGE TEMP(P-2).
T-2 AQUASTAT
SET AT 37.8 DEG. C.
RECIRC. PUMP
DOMESTIC H.W.
T-1COPPER WELL
P
ET
P
P DOMESTIC H.W.
CIRC. PUMP
P
GROUNDLIGHT
P
TO MAINTAIN ITS SET POINT,
P
2 CONTROL
SEQUENCE OF OPERATION
SHALL BE SIMILAR.
T-1
T-2
AS FOLLOWS ;
PUMP
AQUASTAT SHALL CONTROL PUMP
140 DEG F FOR PUMP P-2
100 DEG F FOR PUMP P-3
GREEN PILOT
43.3 DEG.C ENTIRE BLDG
SEQUENCE OF OPERATION
REMOTE BULB THERMOSTAT T-1 SHALL CONTROL PUMP P-2 TO MAINTAIN ITS SETPOINT.
T-1 SHALL BE PROVIDED WITH A COPPER CAPILLARY. T-1 SHALL HAVE A RANGE OF APPROX.
FOR 8 FLA AT 120 VAC. T-2 & P-3 BE SIMILAR.
80 DEG F, 180 DEG F 3 DEG F ADJUSTABLE DIFFERENITAL AND SUITABLE
M16
CHONG, ST
SYSTEM, S-1974, CP CASEY
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
M-17
FIRE PROTECTION LEGEND & ABBREVIATION
AUTOMATIC FIRE SUPPRESSION GENERAL
NOTES AND SPRINKLER Q'TY LIST
CHONG, ST
SYSTEM, S-1974, CP CASEY
REPAIR BUILDING AND INSTALL SPRINKLER
131420
SP
D
FIRE PROTECTION LEGEND & ABBREVIATION
SPRINKLER
MAIN SUPPLY SPRINKLER
PENDENT SPRINKLER(K=5.6)
CUTTING POINT
CAP
FIRE DEPARTMENT CONNECTION
(2-WAY SHOWN)
VALVES
CHECK VALVE
FITTING
WALL MOUNTED TEST HEADER
CONNECTION, TOP
ELBOW, 90
ELBOW, TURNED UP
ELBOW, TURNED DOWN
TEE
TEE, OUTLET UP
TEE, OUTLET DOWN
CONNECTION, BOTTOM
RISER
TEST VALVE
DRAIN VALVE
TYPICALTYP.
NO
EXST EXISTING
ABBREVIATIONS
MAX MAXIMUM
MIN MINIMUM
DRAIN PIPE
NUMBER
DRAWINGDWG
CONN
CONT CONTINUE/CONTINUATION
CONNECTION
RM ROOM
W/ WITH
W/O WITHOUT
SCH SCHEDULE
RESIDENTIAL PENDENT SPRINKLER(K=4.9)
UPRIGHT SPRINKLER(K=8.0)
9. ELEVATOR FIRE SPRINKLER SHALL BE IN ACCORDANCE WITH UFC 3-600-01, PAR 6-30.
AUTOMATIC FIRE SUPPRESSION(S) GENERAL NOTES:
1. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC WET PIPE SPRINKLER SYSTEM
TO FULLY PROTECT THIS FACILITY. THE FIRE SPRINKLER SYSTEM SHOWN THESE DRAWING IS
PERFORMANCE BASED WHICH MEANS CONCEPTUAL REQUIREMENT ONLY. THE SPRINKLER
CONTRACTOR SHALL SUBMIT A COMPLETE FIRE SPRINKLER SYSTEM SHOPDRAWINGS BASED ON
NFPA 13 AND SPECIFICATION REQUIREMENTS AND SUBMIT FOR APPROVAL PRIOR TO
INSTALLATION. THE EQUIPMENT SHOWN ARE SUGGESTED LOCATIONS HOWEVER FINAL LAYOUT
SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND
EQUIPMENT LISTINGS. CONTRACTOR SHALL COORDINATE SPRINKLER HEADS LOCATIONS WITH,
CEILING PANELS, LIGHTING FIXTURES, AND HVAC AIR DEVICES. ALL EQUIPMENT SHALL BE UL
LISTED AND FM APPROVED IN ACCORDANCE WITH NFPA 13 AND THE PROJECT SPECIFICATION.
2. THE CONTRACTOR SHALL CONDUCT WATER SUPPLY HYDRANT TEST FOR THIS PROJECT BASED
ON NFPA 291 REQUIREMENTS AND UTILIZE THIS DATA TO DESIGN THE SPRINKLER SYSTEM.
THE HYDRANT LOCATIONS, FLOW TESTS, AND DATE SHALL BE INDICATED ON THE
SHOPDRAWINGS. AUTOMATIC SPRINKLER PROTECTION SYSTEM IS REQUIRED TO PROTECT THIS
ENTIRE FACILITY. A MINIMUM 10% SAFETY FACTOR IS REQUIRED BETWEEN THE AVAILABLE
WATER SUPPLY AND THE SPRINKLER SYSTEM DEMAND.
INSTALLED IN THE HORIZONTAL POSITION.
7. ALL AUTOMATIC SPRINKLER DRAIN VALVES FOR FIRE DEPARTMENT CONNECTIONS SHALL BE
BE INSTALLED ON THE EXTERIOR.
DRAINS, BUT MUST TERMINATE TO THE BUILDING EXTERIOR. SPRINKLER RISERS SHALL NOT
AND MAINTENANCE. TEST DRAINS ARE NOT TO BE TERMINATED AT WALL SINKS OR FLOOR
6. PROVIDE MINIMUM 1M X 2M SPACE FOR EACH FIRE SPRINKLER RISER FOR INSTALLATION
AS-BUILT DRAWINGS FOR THIS PROJECT.
CONTRACTOR SHALL CONFORM TO THE SYMBOLS INDICATED IN NFPA 170 TO DEVELOP THE
22-"PLANS AND CALCULATIONS" PRIOR TO SPRINKLER PIPING INSTALLATION. THE
5. CONTRACTOR SHALL SUBMIT HYDRAULIC CALCULATIONS AS REQUIRED BY NFPA 13 CHAPTER
4. FIRE PROTECTION PLANS SHOWN ARE USED FOR COST ESTIMATE PURPOSE ONLY.
WITH O-RINGS ARE NOT PERMITTED.
BRACING CALCULATION IN ACCORDANCE WITH NFPA 13 REQUIREMENTS; SPRINKLERS
3. PROVIDE EARTHQUAKE PROTECTION (SWAY BRACING), END OF BRANCH LINE AND SEISMIC
8. FLEXIBLE COUPLINGS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 13, PAR 9.3.2.
10. ALL PIPING, SANITARY, VENT, WASTE, PLUMBING, OTHER PIPING, POWER OR CONTROL CIRCUTS, OR DUCT SHALL PENETRATE ANY STAIR OR EXIT PASSAGEWAY ENCLOSURE UNLESS IT SERVES
AN APPLIANCE WITHIN THE ENCLOSURE AND DEAD ENDS IN THE ENCLOSURE.
DRY SIDEWALL SPRINKLER(K=5.6)
OS&Y GATE VALVE(N.O.)
W/TAMPER SWITCH
OS&Y GATE VALVE(N.C.)
W/TAMPER SWITCH
PENDENT SPRINKLER(K=8.0)
SPRINKLER Q'TY LIST
SPRINKLER HEAD TYPE
US/(METRIC)
"K" FACTOR
SIZE
A R E ASYMBOL
BED ROOM
TH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.