SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO. DESCRIPTION OF DRAWINGS
TITLE SHEET
DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
TITLE SHEET
T-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A - 1
ARCHITECTURAL
E - 1
ELECTRICAL
CIVIL
C - 1
FEWR NO. 109375, CAMP RED CLOUD
REPAIR BUNKERS, BLDG S-294, S-50 & S-55
CAMP RED CLOUDYI, SC
109375
BLDG S-294, CRC
C - 2
BLDG S-50, CRC
A - 2
GROUND FLOOR PLAN, GENERAL NOTES AND SCOPE OF WORKS
DOOR / WINDOW SCHEDULE, ELEVATIONS, HARDWARE SCHEDULE & PICTURES
LOWER LEVEL FLOOR PLAN, SECTION AND SCOPE OF WORK
DETAILS
A - 1
ARCHITECTURAL
E - 1
E - 2
ELECTRICAL
LEGEND, GENERAL NOTES AND SCOPE OF WORKS
BLDG S-55, CRC
A - 2
L - 1 PROJECT LOCATION PLAN2
A - 3
GROUND FLOOR PLANS, PICTURES AND GENERAL NOTES
DETAILS, PICTURES AND SCOPE OF WORK
AND WINDOW SCHEDULE.
INTERIOR, EXTERIOR FINISH SCHEDULE, MATERIAL/COLOR SCHEDULE, DOOR
CIVIL
C - 1
C - 2
REPAIR BUNKERS, BLDG S-249,S-50 &S-55
SITE LAYOUT PLAN AND SCOPE OF WORK
AC PAVEMENT DETAIL
E - 3
E - 4
EXIST/NEW EXTERIOR POWER DISTRIBUTION PLAN
NEW GENERATOR & ATS LAYOUT PLAN & POWER SINGLE LINE DIAGRAM
PLAN
LEGEND, GENERAL NOTES AND SCOPE OF WORK, EXIST/NEW TELEPHONE SYSTEM
E - 1
E - 2
ELECTRICAL
6 EXISTING GENERATOR CONTROL SYSTEM AND ELECTRICAL COMPONENTS
GENERAL NOTES AND SCOPE OF WORK, MECHNICAL ROOM ENLARGE PLAN
SCHEDULE, LIGHTING FIXTURE DETAILS & SCHEDULE
NEW GROUND FLOOR ELECTRICAL PLAN, NEW PANELBOARD "P" LOAD
GREEN
SAND
S A
N D
FNSH. EL. EL. 68.20
O U
T D
O O
R
D E C
K
BIK
E R
ACK
FL
EL:
67.
N
POHANG
UIJONGBU
MAIN GATE
FIRE STATION
GATE #2
NOT TO SCALE
L O C A T I O N M A P
CAMP RED CLOUD
WONJU
MOKPO
TONGYOUNG
SEOUL
TONGDUCHON
CHUNCHON
OSAN
TAEJON
E A S T S E A
BUSAN
WAEGWAN
CHINHAE
TAEGU
MUNSAN
W E S T
S E A
INCHON
KWANGJU
KUNSAN
PYONGTAEK
L-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
PROJECT LOCATION PLAN
SCALE:
PROJECT LOCATION PLAN
N/A
N
S-55
S-294
CP RED CLOUD, KOREA
REPAIR BUNKERS, BLDG S-294, S-50 AND S-55,
FEWR NO. 109375,
THIS PROJECT
S-50
(S-55)
REPAIR BUNKERS, BLDG S-294, S-50 & S-55
CAMP RED CLOUD
109375
KWON, CH