Drawing_files___109375___Title.pdf

PDF 1 MB Posted

Attached to
Repair bunkers, CRC
Solicitation number
W91QVN-18-R-0048
Issued by

About this file

Drawing - Title

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.

T - 1

RING NO. DESCRIPTION OF DRAWINGS

TITLE SHEET

DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

TITLE SHEET

T-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A - 1

ARCHITECTURAL

E - 1

ELECTRICAL

CIVIL

C - 1

FEWR NO. 109375, CAMP RED CLOUD

REPAIR BUNKERS, BLDG S-294, S-50 & S-55

CAMP RED CLOUDYI, SC

109375

BLDG S-294, CRC

C - 2

BLDG S-50, CRC

A - 2

GROUND FLOOR PLAN, GENERAL NOTES AND SCOPE OF WORKS

DOOR / WINDOW SCHEDULE, ELEVATIONS, HARDWARE SCHEDULE & PICTURES

LOWER LEVEL FLOOR PLAN, SECTION AND SCOPE OF WORK

DETAILS

A - 1

ARCHITECTURAL

E - 1

E - 2

ELECTRICAL

LEGEND, GENERAL NOTES AND SCOPE OF WORKS

BLDG S-55, CRC

A - 2

L - 1 PROJECT LOCATION PLAN2

A - 3

GROUND FLOOR PLANS, PICTURES AND GENERAL NOTES

DETAILS, PICTURES AND SCOPE OF WORK

AND WINDOW SCHEDULE.

INTERIOR, EXTERIOR FINISH SCHEDULE, MATERIAL/COLOR SCHEDULE, DOOR

CIVIL

C - 1

C - 2

REPAIR BUNKERS, BLDG S-249,S-50 &S-55

SITE LAYOUT PLAN AND SCOPE OF WORK

AC PAVEMENT DETAIL

E - 3

E - 4

EXIST/NEW EXTERIOR POWER DISTRIBUTION PLAN

NEW GENERATOR & ATS LAYOUT PLAN & POWER SINGLE LINE DIAGRAM

PLAN

LEGEND, GENERAL NOTES AND SCOPE OF WORK, EXIST/NEW TELEPHONE SYSTEM

E - 1

E - 2

ELECTRICAL

6 EXISTING GENERATOR CONTROL SYSTEM AND ELECTRICAL COMPONENTS

GENERAL NOTES AND SCOPE OF WORK, MECHNICAL ROOM ENLARGE PLAN

SCHEDULE, LIGHTING FIXTURE DETAILS & SCHEDULE

NEW GROUND FLOOR ELECTRICAL PLAN, NEW PANELBOARD "P" LOAD

GREEN

SAND

S A

N D

FNSH. EL. EL. 68.20

O U

T D

O O

R

D E C

K

BIK

E R

ACK

FL

EL:

67.

N

POHANG

UIJONGBU

MAIN GATE

FIRE STATION

GATE #2

NOT TO SCALE

L O C A T I O N M A P

CAMP RED CLOUD

WONJU

MOKPO

TONGYOUNG

SEOUL

TONGDUCHON

CHUNCHON

OSAN

TAEJON

E A S T S E A

BUSAN

WAEGWAN

CHINHAE

TAEGU

MUNSAN

W E S T

S E A

INCHON

KWANGJU

KUNSAN

PYONGTAEK

L-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

CIVIL

PROJECT LOCATION PLAN

SCALE:

PROJECT LOCATION PLAN

N/A

N

S-55

S-294

CP RED CLOUD, KOREA

REPAIR BUNKERS, BLDG S-294, S-50 AND S-55,

FEWR NO. 109375,

THIS PROJECT

S-50

(S-55)

REPAIR BUNKERS, BLDG S-294, S-50 & S-55

CAMP RED CLOUD

109375

KWON, CH

File details come from the government source that posted it.