Drawing_files___109375___Bldg50___ELEC.PDF
PDF 135 KB Posted
- Attached to
- Repair bunkers, CRC
- Solicitation number
- W91QVN-18-R-0048
About this file
bldg. #50 Elec
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ELECTRICAL
"MP"
SCALE : 1/100
EXIST PANELBOARD "MP"
TO TTC (TYPCIAL)
8-PIN (RJ45 TYPE) OUTLET
W/COVER PLATE & LUG FOR "TEL"
(TYPICAL)
TO BE TERMINATED AT
(TYPICAL)
110 TERMINAL BLOCK IN TTC
T T
TT
T
T
T
T T
T
T
TT
T
T
TT
T
T
T
T
T
T
T
T T
T
W/110 TYPE PROTECTED ENTRANCE TERMINAL BLOCK (1-25PAIR),
110 TYPE TERMINAL BLOCK (4-100PAIR) & PATCH CORD AS REQ'D,
TELECOMMUNICATION MAIN GROUNDING BUSBAR (TMGB),
TO BE TERMINATED AT
NEMA 1 ENCL.
RECEPTACLE (2P-3W-20A-125V, GROUNDING TYPE)
PROTECTED TERMINAL BLOCK IN TTC
762mmWx610mmHx152mmD, SURFACE MOUNTED, T T
C
NEW 54mm CONDUIT
REMOVE EXIST POWER LINE BUT RE-USE 54mm CONDUIT
REMOVE EXIST POWER LINE AND CONDUIT
NEW POWER SERVICE LINE
FROM EXIST TELEPHONE PEDESTAL
FROM BUILDING S-55
MP-21
SCOPE OF WORK
A. REPAIR/MAINTENANCE ( K )
1.
CATV BEFORE CONSTRUCTION.
CONTRACTOR SHALL COORDINATE WITH AREA MP, DO IMO, SIGNAL BRIGADE,
DESCRIPTIONSYMBOL
T TELEPHONE LINE
FIRE CODE AND SPECIFICATIONS.
OF THE NATIONAL ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE,
ALL ELECTRICAL WORK SHALL CONFORM TO THE CURRENT REQUIREMENTS 1.
OR RENOVATION.
CONDITION AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFING ALL EXISTING 3.
THE GRADING LINE OF NEW DUCTS WILL BE LIMITED TO THE
WIDTH OF DUCT EXCAVATION.
AND AFTER INSTALLATION OF ELECTRICAL SYSTEM.
TO THEIR ORIGINAL CONDITION AND OPERATION DURING
ALL DAMAGED AREA INCLUDING SODDING, UTILITIES, STRUCTURES
THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING
NEW SEALING FITTING
OUTLETS, SEALING FITTING, CABLE AND CONDUIT WITH NEW.
RESTORE EXISTING TELEPHONE TERMINAL CABINET SET, TELEPHONE
NEW TELEPHONE CALBE ,1-25PAIR, #24AWG
NEW TELEPHONE TERMINAL CABINET "TTC"
NEW 1-4PAIR, CAT-6, #24AWG IN 16C
NEW SINGLE CAT-6 MODULAR JACK,
NEW 2-AWG#12 &1-#12(G) IN 16C.
TTC
HOMERUN CIRCUIT TO PANELBOARD OR TTC
GENERAL NOTESLEGEND
SINGLE TELEPHONE OUTLET
TELEPHONE TERMINAL CABINET
PANELBOARD
TYPE
DUPLEX RECEPTACLE, 2P-3W-20A-125V, GROUNDING
2.
4.
2. REMOVE EXIST SECONDARY POWER LINE
EXIST/NEW TELEPHONE SYSTEM PLAN
SYSTEM PLAN
SCOPE OF WORK, EXIST/NEW TELEPHONE
LEGEND, GENERAL NOTES AND
CAMP RED CLOUD
(BLDG S-50)
REPAIR BUILDING S-294, S-50 & S-55
TAK, YS
109375
4-AWG#1/0 & 1-4(G) IN 54 CONDUIT
File details come from the government source that posted it.