A-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

SCALE:

GROUND FLOOR PLAN

GENERATOR RM

L1 D1

1/50

3003,600300

4,200

SCALE: N/A

TEXTURE COAT (TYP)

REMOVE ACST & APPLY

(TYP)

PAINT EXTERIOR WALL & CANOPY

MANUFACTURES INDICATED.

PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.

ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).

CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS

FOR APPROVAL.

CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITED TO COR

CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE

SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD

8.

FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR

2.

3.

4.

5.

6.

7.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL

AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION

OF THE LOAD BEARING WALLS TO PREVENT COLLAPSE OF THE STRUCTURE

APPROPRIATE TEMPORARY SUPPORTS SHOULD BE CONSTRUCTED PRIOR TO DEMOLITION

GENERAL NOTES

OFFICE, DPW. PER DIRECTION FROM THE INSPECTOR IN CHARGE OR COR

SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY OR STORAGE

9.

10.

11.

12.

13.

BE AS A PART OF THE CONTRACT DOCUMENT OF THIS PROJECT.

STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED OCTOBER 1, 2003 SHALL

NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD NO. 595b, COLORS.

COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY AND COLOR

ADDITIONAL COST TO THE GOVERNMENT.

EQUIPMENT, ETC), ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM WITHOUT

THE INSTALLATION AND/OR REPLACEMENT OF MECHANICAL (PLUMBING, HEATING,

ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS AND CEILING WHERE REQUIRED FOR

THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVE/REINSTALL ANY OBSTRUCTED

COMMENCEMENT OF EPOXY COATING WORK.

ALL CONCRETE FLOOR SURFACES SHALL BE LEVELED AND SMOOTHED PRIOR TO

FREE FROM RUST, DUST, OILS, GREASE, DIRT, CRACKS, DAMAGES AND MOLD / MILDEW.

MINOR DAMAGES PRIOR TO THE PAINTING WORK. ALL SURFACES TO BE PAINTED SHALL BE

CLEAN ALL SURFACES TO BE PAINTED IAW THE TECHNICAL SPECIFICATIONS AND REPAIR ALL

14. TRASH REMOVAL AND DISPOSAL SHOULD MEET KOREA ENVIRONMENTAL LOW.

,3

EPOXY COATING (TYP)

REMOVE VCT/WB & APPLY

,6

WALL (TYP)

ALL AROUND CONCRETE

REMOVE BUSHES ON

EXTERIOR SIGNAGE

L2

REPLACE CONC STOOP

AL LOUVER COVER

REMOVE GALVANIZED

INTERIOR AND EXTERIOR PICTURES-1

PICTURES AND GENERAL NOTES

GROUND FLOOR PLANS,

(S-55)

REPAIR BUNKERS, BLDG S-294, S-50 & S-55

CAMP RED CLOUD

109375

KWON, CH

1,400

,4

ACM REMOVAL NOTES

1.

2.

3.

REGION OFFICE.

THE ARMY, INSTALLATION MANAGEMENT AGENCY, KOREA

DATED 14 JANUARY 2014, ISSUED BY THE DEPARTMENT OF

TECHNICAL SPECFICATIONS FOR OMA PROJECTS, KOREA",

02 82 14/ASBESTOS HAZARD CONTROL ACTIVITIES, STANDARD

THE ASBESTOS REMOVAL WORKS SHALL CONFIRM TO "SECTION

ACM AT THE WORK SITE.

ENVIRONMENTAL OFFICE THRU COR TO COMPLETE REMOVAL

THE CONTRACTOR SHALL CONTACT AND VERIFY TO

WORK SITE.

LOAD ASBESTOS CONTAINING MATERIAL REMOVED FROM THE

EPA (ENVIRONMENTAL PROTECTION AGENCY) TO COR FOR EVERY

THE CONTRACTOR SHALL SUBMIT A CERTIFICATION OF DISPOSAL,

1B

DOOR STOP & HOLDER DETAILS

(2 EA)

DOOR

STEEL TUBE

CONC STOOP

WELDED TO

STEEL PLATE

50 x 50 x 6THK

FOUNDATION

STEEL PLATE

STEEL TUBE

CONCRETE

170 x 170 x 6THK

WELDED TO

HOOK & EYEBOLT

CONC)

GALV STEEL

80x80x3.2 THK

WALL TYPE BUMPER L02101

YELLOW STRIPS

BLACK BACKGROUND

TUBE (FILLED W/

250X250

BUILDING IDENTIFICATION

NOTE

COLOR IS TO

MATCH ROOF

COLOR

LETTER COLOR

IS TO MATCH

EXT FIELD WALL

COLOR

1. BUILDING IDENTIFICATION

NUMBER

; CONTRACTOR SHALL VERIFY

NUMBER & SIZE

2. NUMBER ARE TWO PLACES

BUILDING

IDENTIFICATION

NUMBER

PER BUILDING.

V E

R

IF

Y B

Y

S-55

S-55

3. LOCATION FOR SEE PICTURE.

1C

GL

SCOPE OF WORKS (ARCHITECTURAL WORKS)

REPAIR / MAINTENANCE (K) WORKS

1.

2.

3.

A-2

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

AS SHOWN ON NEW FLOOR PLAN AND DOOR SCHEDULE.

REPLACE DETERIORATED EXISTING DOOR AND DOOR FRAME WITH NEW INCLUDING NEW HARDWARE SET

REPLACE EXISTING ALUMINUM LOUVERS WITH NEW AS SHOWN ON FLOOR PLANS AND LOUVER SCHEDULD.

6. REMOVE BUSHES ON ALL AROUND CONCRETE WALL AS SHOWN ON PICTURE.

4.

5.

7.

(TYP)

REPLACE AL LOUVER

REPLACE METAL DOOR

8.

AS SHOWN ON FLOOR PLAN, DOOR SCHEDULE AND PICTURE.

REPLACE DETERIORATED EXTERIOR CONC STOOP WITH NEW INCLUDING NEW DOOR STOP AND HOLDER

WALL (TYP)

ALL AROUND CONCRETE

REMOVE BUSHES ON

EXTERIOR SIGNAGE

SCALE: N/A

INTERIOR AND EXTERIOR PICTURES-2

10MM THK PEJ

150MM CWB

D13

1% SLOPE

150200

NFSM

EXISTING CONC SLABW/BROOM FINISH

W.W.F & 150MM CWB

ON GRADE W/150X150-#8

150MM THK. CONC STOOP

1A

DOOR STOP & HOLDER DETAILS

SCALE: N/A

DETAILS

SCOPE OF WORK

DETAILS, PICTURES AND

(TYP)

PAINT EXTERIOR WALL

(S-55)

REPAIR BUNKERS, BLDG S-294, S-50 & S-55

CAMP RED CLOUD

109375

KWON, CH

HIGH SPOTS, PAINTING, AND UNEVEN SURFACE SHALL HAVE BEEN CORRECTED FOR NEW FLOORING.

SMOOTH, TRUE, LEVEL PLANE WITH ALL DEFECTS SUCH AS ROUGH OR SCALING CONCRETE, LOW SPOTS, ON GROUND FLOOR PLAN & INTERIOR FINISH SCHEDULE. THE EXISTING CONCRETE FLOORING SHALL BE

REMOVE DETERIORATED EXISTING FLOOR TILE AND WB AND APPLY NEW EPOXY COATING AS SHOWN

WALL AS SHOWN ON FLOOR PLAN AND INTERIOR FINISH SCHEDULE.

SURFACE PREPARATION/APPLY TEXTURE COATING ON ALL INTERIOR SURFACES INCLUDING CEILING &

REMOVE DETERIORATED EXISTING ACOUSTIC TILES OF CEILINGS AND WALLS INCLUDING CLEANING AND

PAINT EXISTING EXTERIOR EXPOSED CONCRETE WALL AND METAL SURFACES AS SHOWN ON PICTURE.

REPLACE DETEROPRATED EXISTING EXTERIOR SIGNAGES WITH NEW AS SHOWN ON PICTURE.

9.

- FLOOR TILES AND ADHESIVES IN GENERATOR ROOM, 22.68 SM

REMOVE EXISTING ASBESTOS CONTAINING MATERIALS AS ACM REMOVAL NOTES.

A-3

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

ROOM NAMESROOM NOS

INTERIOR FINISH SCHEDULE

FLOOR BASE WALLS CEILING

REMARKS

FINISH COLOR FINISH COLOR FINISH COLOR FINISH COLOR HEIGHT

SURFACE

ROOFING

FLASHING

FASCIA

SOFFIT

DOOR & FRAME

HANDRAIL

MATERIAL

ROOF LINER

STEEL

STEEL PIPE

COLOR

CHOCOLATE

COLOR NO.

20095

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

20095

20095

20095

20095

20095

REMARKS

WALL EIFS

WALL CMU

BEAM/COL CONC

STAIR CONC

SAND-STONE

SAND-STONE

SAND-STONE

SAND-STONE

23617

23617

23617

23617

PROTECTED METAL

PROTECTED METAL

PROTECTED METAL

EXTERIOR COLOR SCHEDULE-1

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

MATERIAL & COLOR SCHEDULE

FLOOR MATERIAL/COLOR BASE MATERIAL/COLOR WALL MATERIAL/COLOR CEILING MATERIAL/COLOR

MAT'L

EXST

MAT'L

NEW

MAT'L

EXST

MAT'L

NEW

MAT'L

EXST

MAT'L

NEW

MAT'L

NEW

MAT'L

EXST

2700VCT PAINT TC-1AWP101 GENERATOR RM

REMARKS

DOOR DIMENSION

WIDTH

MATERIAL

D1

DOOR

TYPE

DOOR

NOS.

ROUGH OPENING

WIDTH HEIGHT

HDW

SET

THICKHEIGHT NO (HR)

RATED

FIRE

LOUVERGLAZING CUT

UNDER

FRAMEDOOR

DOOR / WINDOW / LOUVER SCHEDULE DOOR / WINDOW / LOUVER ELEVATION

B AL 800 500 - -

A 1950 1 - -

L1

1000 -

(MM)

A

1 KICK PLATE J102, SST

HARDWARE SCHEDULE

METAL METAL 1100 2000 44.5

FINISH SCHEDULE NOTES :

MANUFACTURERS STANDARD MUST APPROACH.

COLOR IS NOT REQUIRED. THE SELECTIONS SERVE ONLY TO INDICATE THE COLOR WHICH THE

INTENDED TO LIMIT SELECTIONS OF PRODUCTS. AN EXACT MATCH OF THE MANUFACTURERS

MANUFACTURERS' COLORS LISTED ARE FOR IDENTIFICATION PURPOSES ONLY AND ARE NOT

USER AGENCY.

SELECTION OF INTERIOR PAINT AND FACTORY APPLIED COLORS SHALL BE APPROVED BY

SHALL BE WATERPROOF TYPE GWB.GWB FOR TOILETS, AND OTHER WET AREAS

- CEMENT BOND COAT FOR TILE NEEDS ANSI A118 OR ISO 13007 C2 S1 OR ABOVE QUALIFICATION.

AS REQUIRED.

WATERPROOFING MEMBRANE NEEDS 2MM THK OR ABOVE INCLUDING PLASTIC MESH AT CORNER

OR APPROVED EQUAL

NONSLIP GRIT

CLEANPOXY 3100

NOROO PAINT & COAT

EPOXY EP-1

EPOXY EP-1 - TC PAINT TC-1AWP TCCOATING WB PAINT PT-1

FOR TEXTURED COATING

WITH MANUFACTURE'S STANDARD PUTTY

ALL CMU & VOIDS SHALL BE FILLED FLUSH

PRIOR TO APPLICATION OF TEXTURED COATING

OR APPROVED EQUAL FOR INTERIOR.

BON TILE BY MFG BY KUNSUL ENTERPRISE

TEXTURED COATINGTC-1

FOR TEXTURED COATING

WITH MANUFACTURE'S STANDARD PUTTY

ALL CMU & VOIDS SHALL BE FILLED FLUSH

PRIOR TO APPLICATION OF TEXTURED COATING

OR APPROVED EQUAL FOR INTERIOR.

BON TILE BY MFG BY KUNSUL ENTERPRISE

TEXTURED COATINGTC-1PT-1

OR APPROVED EQUAL

LATEX/SEMIGLOSS

NOROO NR9058

PAINT COLOR

W/ BIRD SCREEN

AL LOUVER

B

& INSECT SCREEN

AL -

THERMAL INSULATED

METAL DOOR

W/ METAL FRAME

HDW-1

HINGES A5112 114x114, NRP

LOCKSET 1000-1, F07

1 THRESHOLD J32100

1 1DOOR STOP & HOLDER

B AL 1600 500 - -L2 AL -

DOOR AND WINDOW SCHEDULE.

MATERIAL/COLOR SCHEDULE,

INTERIOR, EXTERIOR FINISH SCHEDULE,

(S-55)

REPAIR BUNKERS, BLDG S-294, S-50 & S-55

CAMP RED CLOUD

109375

KWON, CH

WEATHER STRIP AND SEAL