SEE ADDENDUM
(No Collect Calls)
W91QVN-17-R-0083 24-Apr-2017
b. TELEPHONE NUMBER
724-6546
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 24 May 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. PAK, HYON CHON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCC YONGSAN, UNIT #15289
APO AP 96205-5289
UNITED STATES OF AMERICA (THE)
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
238220
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN-17-R-0083
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 11 Months Preventive Maintenance Heating System
FFP
(Firm-Fixed Price Portion) Preventive Maintenance, Inspection and Operation of Heating Systems in accordance with the paragraphs 5.2 & 5.4 of PWS and Attachments (1,3,5 & 7)/Technical Exhibit Listed.
(4,010,125 SF X 11 Months = 44,111,375 SF) Base Year: 1 August 2017 – 30 June 2018 FOB: Destination
NET AMT
0002 6 Months PM for HVAC & Heat Pump System
FFP
(Firm-Fixed Price Portion) Preventive Maintenance and Inspection of HVAC & Heat Pump System in accordance with the paragraphs 5.3 & 5.4 of PWS and Attachments (2,4,5 & 8)/Technical Exhibit Listed.
(258,746 SF X 6 Months = 1,552,476 SF)
0003 11 Months Work Call Center Operation
FFP
Work Call Center Operation in accordance with the paragraph 5.4.4 (24hours and 7 days a week). Attachment (7 & 8)//Technical Exhibit Listed.
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
Installation & Removal Services
FFP
(Requirements Portion) The contractor shall replace/repair of major equipment provided by the Government as needed basis IAW the paragraph 5.5 of PWS.
ESTIMATED
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AA 15 Job Removal of Space Heating/Domestic
FFP
Removal of Space Heating/Domestic Hot Water Boiler Under 380GPH
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AB 15 Job Installation of Space Heating/Domestic
FFP
Installation of Space Heating/Domestic Hot Water Boiler Under 380GPH
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AC 6 Job Removal of Space Heating/Domestic
FFP
Removal of Space Heating/Domestic Hot Water Boiler between 381 and 645 GPH
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AD 6 Job Installation of Space Heating/Domestic
FFP
Installation of Space Heating/Domestic Hot water Boiler between 381 and 645
GPH
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AE 8 Job Removal of Space Heating/Domestic
FFP
Removal of Space Heating/Domestic Hot Water Boiler above 646 GPH
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AF 8 Job Installation of Space Heating/Domestic
FFP
Installation of Space Heating/Domestic Hot Water Boiler above 646 GPH
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AG 200 Each Retubing boiler (One tube = one each)
FFP
Retubing boiler (One tube = one each)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AH 16 Job Removal of Warm Air Furnace
FFP
Removal of Warm Air Furnace under 250,000 BTU
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AJ 16 Job Installation of Warm Air Furnace
FFP
Installation of Warm Air Furnace under 250,000 BTU
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AK 3 Job Removal of Warm Air Furnace
FFP
Removal of Warm Air Furnace between 250,001 and 450,000 BTU
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AL 3 Job Installation of Warm Air Furnace
FFP
Installation of Warm Air Furnace between 250,001 and 450,000 BTU
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AM 4 Job Removal of Warm Air Furnace
FFP
Removal of Warm Air Furnace above 450,001 BTU
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AN 4 Job Installation of Warm Air Furnace
FFP
Installation of Warm Air Furnace above 450,001 BTU
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AP 6 Job Removal of Hot Water Storage Tank
FFP
Removal of Hot Water Storage Tank under 300 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AQ 6 Job Installation of Hot Water Storage Tank
FFP
Installation of Hot Water Storage Tank under 300 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AR 2 Job Removal of Hot Water Storage Tank
FFP
Removal of Hot Water Storage Tank between 301 and 600 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AS 2 Job Installation of Hot Water Storage Tank
FFP
Installation of Hot Water Storage Tank between 301 and 600 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AT 2 Job Removal of Hot Water Storage Tank
FFP
Removal of Hot Water Storage Tank above 601 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AU 2 Job Installation of Hot Water Storage Tank
FFP
Installation of Hot Water Storage Tank above 601 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AV 3 Job Removal of Aboveground Fuel Oil Storage
FFP
Removal of Aboveground Fuel Oil Storage Tank under 300 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AW 3 Job Installation of Aboveground Fuel Oil Sto
FFP
Installation of Aboveground Fuel Oil Storage Tank under 300 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AX 2 Job Removal of Aboveground Fuel Oil Storage
FFP
Removal of Aboveground Fuel Oil Storage Tank between 301 and 600 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AY 2 Job Installation of Aboveground Fuel Oi
FFP
Installation of Aboveground Fuel Oil Storage Tank between 301 and 600 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AZ 4 Job Removal of Aboveground Fuel Oil Storage
FFP
Removal of Aboveground Fuel Oil Storage Tank between 601 and 1,200 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BA 4 Job Installation of Aboveground Fuel Oil
FFP
Installation of Aboveground Fuel Oil Storage Tank between 601 and 1,200 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BB 2 Job Removal of Aboveground Fuel Oil Storage
FFP
Removal of Aboveground Fuel Oil Storage Tank above 1,201 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BC 2 Job Installation of Aboveground Fuel Oil
FFP
Installation of Aboveground Fuel Oil Storage Tank above 1,201 GAL
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BD 13 Job Painting of Aboveground Fuel Oil Storage
FFP
Painting of Aboveground Fuel Oil Storage Tank, 600 GAL or under (including removal of rust and prevention of rust)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BE 8 Job Painting of Aboveground Fuel Oil Storage
FFP
Painting of Aboveground Fuel Oil Storage Tank over 600 GAL (including removal of rust and prevention of rust)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BF 21 Job Lettering (Caution, Fuel Type, Tank#
FFP
Lettering (Caution, Fuel Type, Tank#, etc.) of Aboveground Fuel Oil Storage Tank
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BG 1 Job Removal of Heat Exchanger (Bundler)
FFP
Removal of Heat Exchanger (Bundler)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BH 1 Job Installation of Heat Exchanger (Bundler)
FFP
Installation of Heat Exchanger (Bundler)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BJ 4 Job Removal of Radiator, Convector or Fan
FFP
Removal of Radiator, Convector or Fan Coil Unit
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BK 4 Job Installation of Radiator, Convector
FFP
Installation of Radiator, Convector or Fan Coil Unit
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BL 1 Job Removal of Air Handler or Unit Heater
FFP
Removal of Air Handler or Unit Heater
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BM 1 Job Installation of Air Handler or Unit Heat
FFP
Installation of Air Handler or Unit Heater
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BN 20 Job Removal of Humidifier
FFP
Removal of Humidifier
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BP 20 Job Installation of Humidifier
FFP
Installation of Humidifier
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BQ 13 Job Removal of Circulation Pump or Feeder
FFP
Removal of Circulation Pump or Feeder Pump
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BR 13 Job Installation of Circulation Pump
FFP
Installation of Circulation Pump or Feeder Pump
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BS 420 Cubic Feet
Replacement of Supply or Return Duct
FFP
Replacement of Supply or Return Duct including insulation within Mechanical Room
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BT 1,631 Each Interior Pipe (2 inch or under) for Spac
FFP
Interior Pipe (2 inch or under) for Space Heating, Domestic Hot Water and Heating Fuel including Valve, Fitting and Insulation (1 each = 1 feet)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BU 30 Each Exterior Pipe (2 inch or under) for Spac
FFP
Exterior Pipe (2 inch or under) for Space Heating, Domestic Hot Water and Heating Fuel including Valve, Fitting and insulation (1 each = 1 feet)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BV 964 Each Underground Pipe (2 inch or under)for Sp
FFP
Underground Pipe (2 inch or under)for Space Heating, Domestic Hot Water and
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BW 7 Job Replacement of Compressor
FFP
Replacement of Compressor (0.75 Ton-Model#COM07074, 208-230/60/1; 1.25 Ton-Model#COM07079, Tecumseh RK157ET, 208-230/60/1; 1.5 Ton- Model#COM08938, Tecumseh RK233ET, 208-230/60/1; 1.8 Ton-Model# COM04485, Copeland CR22K6-PFV, 208-230/60/1; 1.8 Ton- Model#COM04540, Copeland ZR22K3-PFV, 208-230/60/1; 2.0 Ton- Model#COM04482, Copeland CR24K6-PFV, 208-230/60/1; 2.5 Ton- Model#COM04551, Copeland ZR30K3-PFV, 208-230/60/1; 2.9 Ton- Model#COM04498, Copeland CR35K6-PFV, 208-230/60/1; 3.0 Ton- Model#COM04560, Copeland ZR36K3-PFV, 208-230/60/1; 3.5 Ton-Model# COM04513, Copeland CR42K6-PFV, 208-230/60/1; 4.5 Ton- Model#COM04580, Copeland ZR54K3-PFV, 208-230/60/1; 5.1 Ton- Model#COM04588, Copeland ZR61K3-PFV, 208-230/60/1; 9.3 Ton- Model#COM07060, Trane, 460/60/3; 10 Ton, Model#COM06238, Trane, 460/60/3)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BX 7 Job Replacement of Capacitor
FFP
Replacement of Capacitor, Low Pressure Switch or High Pressure Switch.
(*Capacitor - Model#CPTX0036, 35 MFD, 440V; Model#00120, 7.5 MFD, 370V;
Model#CPT00235, 35 MFD, 440V; Model#00240, 40 MFD, 370V;
Model#CPT00464, 20 MFD, 370V; Model#00467, 25 MFD, 440V;
Model#CPT00483, 15 MFD, 440V; Model#00651, 45 MFD, 370V;
Model#CPT00904, 80 MFD, 370V; Model#CPT00904, Round, W/O Resistor.
*Low Pressure Switch - Model#SWT02282, Open 17-23, Close 35-45. *High Pressure Switch - Model#SWT02327, Open 395, Close 295; Model#SWT02327, Open 395, Close 295)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BY 3 Job Replacement of Solenoid Coil or Valve
FFP
Replacement of Solenoid Coil or Valve (*Solenoid Coil - Model#COL05944, 24V, 50/60Hz. *Solenoid Valve - Model#VAL08356, 24V, 50/60Hz)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004BZ 1 Job Replacement of Fan Motor
FFP
Replacement of Fan Motor (1/12 HP - Model#MOT09820, 208-230/60/1, 1080 RPM, 39 FRAME,Sleeve BRG. 1/8 HP - Model#MOT11826, AC, 208-230/60/1, 1080 RPM, 3-SPD; Model#MOT09818, 208-230/60/1, 1080 RPM, 39 FRAME, Sleeve BRG. 1/3 HP - Model#MOT09817, 208-230/60/1, 1080 RPM, 39 FRAME Sleeve BRG. 1/2 HP - Model# MOT09819, 208-230/60/1, 1080 RPM, 39 FRAME, Sleeve BRG; Model#MOT11823, AC, 208-230/60/1, 1075 RPM, 3-SPD.
1 HP - Model#MOT09204, 208-230/60/1, Programmable,48 FRAME, Ball Bearing; Model#MOT09205, 208-230/60/1, Programmable, 48 FRAME, Ball Bearing,Model#MOT09816, 208-230/60/1, 1080 RPM, 39 FRAME, Sleeve BRG)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004CA 4 Job Replacement of Reversing Valve
FFP
Replacement of Reversing Valve or Expansion Valve. (*Reversing Valve - 1.5 Ton: Model#VAL06971, 2 Ton: Model#VAL08212 (R22), 2.6 Ton, 3 Ton:
Model#VAL08214 (R22), 4 Ton: Model#VAL06385 (R22); Model#VAL06972 (R22), 5 Ton: Model#VAL08216 (R22); Model#VAL06385 (R22), 9.5 Ton:
Model#VAL08217 (R22). *Expansion Valve - 1 Ton: Model#VAL07604 (R22);
Model#VAL07605 (R22), 2 Ton: Model#VAL06383 (R22); Model#VAL07606, 3 Ton: Model#VAL06384 (R22); Model#VAL07607 (R22), 5 Ton:
Model#VAL06385 (R22); Model#VAL07625 (R22), 9.5 Ton: Model#VAL07522 (R22))
UNIT UNIT PRICE ESTIMATED AMOUNT
0004CB 7 Job Replacement of Module, Transformer
FFP
Replacement of Module, Transformer or Thermistor Senor. (*Module - Model#MOD01221, Control, 24V; Model#MOD01577, Control, (ZN524);
Model#MOD01404, DYNAVIEW, Programmable Required. *Transformer - Model#TRR00743, 50VA, 208/240V PRI, 24V SEC; Model#TRR00780, 75VA, 208/230V PRI,24V SEC, w/Circuit Breaker; Model#TRR01552, 208-240V Primary, 24V Secondary, 50/60Hz; Model#TRR01803, 100VA, 460/575V PRI, 24V SEC; Model#TRR00185, 460V PRI, 115V; Model#TRR00401, 120V PRI, 24V. *Thermistor Sensor - Model#SEN00339, -40 C to 65 C Temp. Range1.)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004CC 6 Job Replacement of Blower Relay
FFP
Replacement of Blower Relay, Thermostat or Control. (*Blower Relay - Model#SWT02326, 10 Watts. *Thermostat - Model#THT00931, Manual Changeover; Model#THT01412, 50-90 F Position, Fan Switch, w/ EXT ADJ Setpoint/Degree F. *Control - Model#CNT03600, ICM FAN, PWB, 16 PIN.)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004CD 1 Job Replacement of Pump (Model#PMP00681
FFP
Replacement of Pump (Model#PMP00681, Desuperheater)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004CE 1 Job Replacement of Drier Filter
FFP
Replacement of Drier Filter (Model#DHY00335, DHYX0091 and DHY00335)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004CF 4 Job Replacement of Contactor, Relay
FFP
Replacement of Contactor, Relay, Temperature Sensor or Fan Motor Module.
(*Contactor - Model#CTR00818, 3 POLE, 40 AMP, 24V; Model#CTR01197, 3 POLE, 30 AMP, 24V; Model#CTR01757, 40 FLA, 575V, 3 POLE. *Relay - Model#RLY01781, 24VAC 50/60 HETONZ. *Temperature Sensor - Model#SEN00981, -40 C to 65 C Temp. Range. *Fan Motor Module - Model#MOD00976, 1HP, 200-230V, 60Hz.)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004CG 5 Job Replacement of Pressure Transducer
FFP
Replacement of Pressure Transducer or Inverter. (*Pressure Transducer - Model#TDR00327, 0-475 PSI. *Inverter - Model#SV008iC5-1, LS Industrial System, 200-230V, 1HP 50/60Hz.)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004CH 1 Job Replacement of Humidifier
FFP
Replacement of Humidifier (Model#: APRILAIRE 600)
0005 1 Job Replacement/Repair Parts
FFP
(Requirements Portion) The Contractor shall provide replacement/repair parts and materials in accordance with the paragraph 5.6 of PWS. All items listed in the Attachment 8 shall be Brand Name or Equal. The contractor shall provide the prices for the listed items in Attachment 6 with the price proposal. This CLIN has a Not To Exceed amount of KW85,000,000.
Base year: 1 August 2017 – 30 June 2018
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 400,000 Square Foot
HVAC duct/Exhaust Fan Duct cleaning serv
HVAC duct/Exhaust Fan Duct cleaning service (Requirements Portion) in accordance with the paragraph 5.7 of PWS.
(SF : Whole Building Area) Base year: 1 August 2017 – 30 June 2018
0007 1 Job Accounting for Contract Services
FFP
(CMR Requirement) must be reported by 31 October of each calendar year in accordance with Paragraph 5.9 of the PWS.
Estimated Cost for War Hazard Losses is
FFP
Zero (0)
0009 1 Months Phase-In Period (1 Jul 17 - 31 Jul 17)
FFP
(Firm-Fixed Price Portion) The Contractor shall provide all phase-in personnel, management, resources, transportation and other services for transition from existing contract to new contract in accordance with the paragraph 1.15.1 of PWS.
1001 12 Months OPTION Preventive Maintenance Heating System
FFP
(Firm-Fixed Price Portion) Preventive Maintenance, Inspection and Operation of Heating Systems in accordance with the paragraphs 5.2 & 5.4 of PWS and Attachments (1,3,5 & 7)/Technical Exhibit Listed.
(4,010,125 SF X 12 Months = 48,121,500 SF) 1st Option Year: 1 July 2018 – 30 June 2019
1002 6 Months OPTION PM for HVAC & Heat Pump System
FFP
(Firm-Fixed Price Portion) Preventive Maintenance and Inspection of HVAC & Heat Pump System in accordance with the paragraphs 5.3 & 5.4 of PWS and Attachments (2,4,5 & 8)/Technical Exhibit Listed.
(258,746 SF X 6 Months = 1,552,476 SF)
1003 12 Months OPTION Work Call Center Operation
FFP
Work Call Center Operation in accordance with the paragraph 5.4.4 (24hours and 7 days a week). Attachment (7 & 8)//Technical Exhibit Listed.
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Installation & Removal Services
FFP
(Requirements Portion) The contractor shall replace/repair of major equipment provided by the Government as needed basis IAW the paragraph 5.5 of PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AA 15 Job OPTION Removal of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AB 15 Job OPTION Installation of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AC 6 Job OPTION Removal of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AD 6 Job OPTION Installation of Space Heating/Domestic
FFP
Installation of Space Heating/Domestic Hot water Boiler between 381 and 645
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AE 8 Job OPTION Removal of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AF 8 Job OPTION Installation of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AG 200 Each OPTION Retubing boiler (One tube = one each)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AH 16 Job OPTION Removal of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AJ 16 Job OPTION Installation of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AK 3 Job OPTION Removal of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AL 3 Job OPTION Installation of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AM 4 Job OPTION Removal of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AN 4 Job OPTION Installation of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AP 6 Job OPTION Removal of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AQ 6 Job OPTION Installation of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AR 2 Job OPTION Removal of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AS 2 Job OPTION Installation of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AT 2 Job OPTION Removal of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AU 2 Job OPTION Installation of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AV 3 Job OPTION Removal of Aboveground Fuel Oil Storage
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AW 3 Job OPTION Installation of Aboveground Fuel Oil Sto
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AX 2 Job OPTION Removal of Aboveground Fuel Oil Storage
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AY 2 Job OPTION Installation of Aboveground Fuel Oi
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AZ 4 Job OPTION Removal of Aboveground Fuel Oil Storage
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BA 4 Job OPTION Installation of Aboveground Fuel Oil
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BB 2 Job OPTION Removal of Aboveground Fuel Oil Storage
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BC 2 Job OPTION Installation of Aboveground Fuel Oil
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BD 13 Job OPTION Painting of Aboveground Fuel Oil Storage
FFP
Painting of Aboveground Fuel Oil Storage Tank, 600 GAL or under (including
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BE 8 Job OPTION Painting of Aboveground Fuel Oil Storage
FFP
Painting of Aboveground Fuel Oil Storage Tank over 600 GAL (including removal
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BF 21 Job OPTION Lettering (Caution, Fuel Type, Tank#
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BG 1 Job OPTION Removal of Heat Exchanger (Bundler)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BH 1 Job OPTION Installation of Heat Exchanger (Bundler)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BJ 4 Job OPTION Removal of Radiator, Convector or Fan
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BK 4 Job OPTION Installation of Radiator, Convector
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BL 1 Job OPTION Removal of Air Handler or Unit Heater
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BM 1 Job OPTION Installation of Air Handler or Unit Heat
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BN 20 Job OPTION Removal of Humidifier
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BP 20 Job OPTION Installation of Humidifier
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BQ 13 Job OPTION Removal of Circulation Pump or Feeder
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BR 13 Job OPTION Installation of Circulation Pump
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BS 420 Cubic
OPTION Replacement of Supply or Return Duct
Replacement of Supply or Return Duct including insulation within Mechanical
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BT 1,631 Each OPTION Interior Pipe (2 inch or under) for Spac
FFP
Interior Pipe (2 inch or under) for Space Heating, Domestic Hot Water and Heating
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BU 30 Each OPTION Exterior Pipe (2 inch or under) for Spac
FFP
Exterior Pipe (2 inch or under) for Space Heating, Domestic Hot Water and
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BV 964 Each OPTION Underground Pipe (2 inch or under)for Sp
FFP
Underground Pipe (2 inch or under)for Space Heating, Domestic Hot Water and
UNIT UNIT PRICE ESTIMATED AMOUNT
1004BW 7 Job OPTION Replacement of Compressor
FFP
Replacement of Compressor (0.75 Ton-Model#COM07074, 208-230/60/1; 1.25 Ton-Model#COM07079, Tecumseh RK157ET, 208-230/60/1; 1.5 Ton- Model#COM08938, Tecumseh RK233ET, 208-230/60/1; 1.8 Ton-Model# COM04485, Copeland CR22K6-PFV, 208-230/60/1; 1.8 Ton- Model#COM04540, Copeland ZR22K3-PFV, 208-230/60/1; 2.0 Ton- Model#COM04482, Copeland CR24K6-PFV, 208-230/60/1; 2.5 Ton- Model#COM04551, Copeland ZR30K3-PFV, 208-230/60/1; 2.9 Ton- Model#COM04498, Copeland CR35K6-PFV, 208-230/60/1; 3.0 Ton- Model#COM04560, Copeland ZR36K3-PFV, 208-230/60/1; 3.5 Ton-Model# COM04513, Copeland CR42K6-PFV, 208-230/60/1; 4.5 Ton- Model#COM04580, Copeland ZR54K3-PFV, 208-230/60/1; 5.1 Ton- Model#COM04588, Copeland ZR61K3-PFV, 208-230/60/1; 9.3 Ton- Model#COM07060, Trane, 460/60/3; 10 Ton, Model#COM06238, Trane, UNIT UNIT PRICE ESTIMATED AMOUNT
1004BX 7 Job OPTION Replacement of Capacitor
FFP
Replacement of Capacitor, Low Pressure Switch or High Pressure Switch.
(*Capacitor - Model#CPTX0036, 35 MFD, 440V; Model#00120, 7.5 MFD, 370V;
Model#CPT00235, 35 MFD, 440V; Model#00240, 40 MFD, 370V;
Model#CPT00464, 20 MFD, 370V; Model#00467, 25 MFD, 440V;
Model#CPT00483, 15 MFD, 440V; Model#00651, 45 MFD, 370V;
Model#CPT00904, 80 MFD, 370V; Model#CPT00904, Round, W/O Resistor.
*Low Pressure Switch - Model#SWT02282, Open 17-23, Close 35-45. *High Pressure Switch - Model#SWT02327, Open 395, Close 295; Model#SWT02327, UNIT UNIT PRICE ESTIMATED AMOUNT
1004BY 3 Job OPTION Replacement of Solenoid Coil or Valve
FFP
Replacement of Solenoid Coil or Valve (*Solenoid Coil - Model#COL05944, UNIT UNIT PRICE ESTIMATED AMOUNT
1004BZ 1 Job OPTION Replacement of Fan Motor
FFP
Replacement of Fan Motor (1/12 HP - Model#MOT09820, 208-230/60/1, 1080 RPM, 39 FRAME,Sleeve BRG. 1/8 HP - Model#MOT11826, AC, 208-230/60/1, 1080 RPM, 3-SPD; Model#MOT09818, 208-230/60/1, 1080 RPM, 39 FRAME, Sleeve BRG. 1/3 HP - Model#MOT09817, 208-230/60/1, 1080 RPM, 39 FRAME Sleeve BRG. 1/2 HP - Model# MOT09819, 208-230/60/1, 1080 RPM, 39 FRAME, Sleeve BRG; Model#MOT11823, AC, 208-230/60/1, 1075 RPM, 3-SPD.
1 HP - Model#MOT09204, 208-230/60/1, Programmable,48 FRAME, Ball Bearing; Model#MOT09205, 208-230/60/1, Programmable, 48 FRAME, Ball
UNIT UNIT PRICE ESTIMATED AMOUNT
1004CA 4 Job OPTION Replacement of Reversing Valve
FFP
Replacement of Reversing Valve or Expansion Valve. (*Reversing Valve - 1.5 Ton: Model#VAL06971, 2 Ton: Model#VAL08212 (R22), 2.6 Ton, 3 Ton:
Model#VAL08214 (R22), 4 Ton: Model#VAL06385 (R22); Model#VAL06972 (R22), 5 Ton: Model#VAL08216 (R22); Model#VAL06385 (R22), 9.5 Ton:
Model#VAL08217 (R22). *Expansion Valve - 1 Ton: Model#VAL07604 (R22);
Model#VAL07605 (R22), 2 Ton: Model#VAL06383 (R22); Model#VAL07606, 3 Ton: Model#VAL06384 (R22); Model#VAL07607 (R22), 5 Ton:
Model#VAL06385 (R22); Model#VAL07625 (R22), 9.5 Ton: Model#VAL07522
UNIT UNIT PRICE ESTIMATED AMOUNT
1004CB 7 Job OPTION Replacement of Module, Transformer
FFP
Replacement of Module, Transformer or Thermistor Senor. (*Module - Model#MOD01221, Control, 24V; Model#MOD01577, Control, (ZN524);
Model#MOD01404, DYNAVIEW, Programmable Required. *Transformer - Model#TRR00743, 50VA, 208/240V PRI, 24V SEC; Model#TRR00780, 75VA, 208/230V PRI,24V SEC, w/Circuit Breaker; Model#TRR01552, 208-240V Primary, 24V Secondary, 50/60Hz; Model#TRR01803, 100VA, 460/575V PRI, 24V SEC; Model#TRR00185, 460V PRI, 115V; Model#TRR00401, 120V PRI, UNIT UNIT PRICE ESTIMATED AMOUNT
1004CC 6 Job OPTION Replacement of Blower Relay
FFP
Replacement of Blower Relay, Thermostat or Control. (*Blower Relay - Model#SWT02326, 10 Watts. *Thermostat - Model#THT00931, Manual Changeover; Model#THT01412, 50-90 F Position, Fan Switch, w/ EXT ADJ
UNIT UNIT PRICE ESTIMATED AMOUNT
1004CD 1 Job OPTION Replacement of Pump (Model#PMP00681
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004CE 1 Job OPTION Replacement of Drier Filter
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004CF 4 Job OPTION Replacement of Contactor, Relay
FFP
Replacement of Contactor, Relay, Temperature Sensor or Fan Motor Module.
(*Contactor - Model#CTR00818, 3 POLE, 40 AMP, 24V; Model#CTR01197, 3 POLE, 30 AMP, 24V; Model#CTR01757, 40 FLA, 575V, 3 POLE. *Relay - Model#RLY01781, 24VAC 50/60 HETONZ. *Temperature Sensor - Model#SEN00981, -40 C to 65 C Temp. Range. *Fan Motor Module -
UNIT UNIT PRICE ESTIMATED AMOUNT
1004CG 5 Job OPTION Replacement of Pressure Transducer
FFP
Replacement of Pressure Transducer or Inverter. (*Pressure Transducer - Model#TDR00327, 0-475 PSI. *Inverter - Model#SV008iC5-1, LS Industrial
UNIT UNIT PRICE ESTIMATED AMOUNT
1004CH 1 Job OPTION Replacement of Humidifier
FFP
1005 1 Job OPTION Replacement/Repair Parts
FFP
(Requirements Portion) The Contractor shall provide replacement/repair parts and materials in accordance with the paragraph 5.6 of PWS. All items listed in the Attachment 8 shall be Brand Name or Equal. The contractor shall provide the prices for the listed items in Attachment 6 with the price proposal. This CLIN has a Not To Exceed amount of KW85,000,000.
Base year: 1 August 2017 thru 31 July 2018
UNIT UNIT PRICE ESTIMATED AMOUNT
1006 400,000 Square
OPTION HVAC duct/Exhaust Fan Duct cleaning serv
HVAC duct/Exhaust Fan Duct cleaning service (Requirements Portion) in accordance with the paragraph 5.7 of PWS.
(SF : Whole Building Area)
1007 1 Job OPTION Accounting for Contract Services
FFP
(CMR Requirement) must be reported by 31 October of each calendar year in accordance with Paragraph 5.9 of the PWS.
OPTION Estimated Cost for War Hazard Losses is
FFP
2001 12 Months OPTION Preventive Maintenance Heating System
FFP
(Firm-Fixed Price Portion) Preventive Maintenance, Inspection and Operation of Heating Systems in accordance with the paragraphs 5.2 & 5.4 of PWS and Attachments (1,3,5 & 7)/Technical Exhibit Listed.
(4,010,125 SF X 12 Months = 48,121,500 SF) 2nd Option Year: 1 July 2019 – 30 June 2020
2002 6 Months OPTION PM for HVAC & Heat Pump System
FFP
(Firm-Fixed Price Portion) Preventive Maintenance and Inspection of HVAC & Heat Pump System in accordance with the paragraphs 5.3 & 5.4 of PWS and Attachments (2,4,5 & 8)/Technical Exhibit Listed.
(258,746 SF X 6 Months = 1,552,476 SF)
2003 12 Months OPTION Work Call Center Operation
FFP
Work Call Center Operation in accordance with the paragraph 5.4.4 (24hours and 7 days a week). Attachment (7 & 8)//Technical Exhibit Listed.
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Installation & Removal Services
FFP
(Requirements Portion) The contractor shall replace/repair of major equipment provided by the Government as needed basis IAW the paragraph 5.5 of PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AA 15 Job OPTION Removal of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AB 15 Job OPTION Installation of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AC 6 Job OPTION Removal of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AD 6 Job OPTION Installation of Space Heating/Domestic
FFP
Installation of Space Heating/Domestic Hot water Boiler between 381 and 645
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AE 8 Job OPTION Removal of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AF 8 Job OPTION Installation of Space Heating/Domestic
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AG 200 Each OPTION Retubing boiler (One tube = one each)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AH 16 Job OPTION Removal of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AJ 16 Job OPTION Installation of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AK 3 Job OPTION Removal of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AL 3 Job OPTION Installation of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AM 4 Job OPTION Removal of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AN 4 Job OPTION Installation of Warm Air Furnace
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AP 6 Job OPTION Removal of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AQ 6 Job OPTION Installation of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AR 2 Job OPTION Removal of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AS 2 Job OPTION Installation of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AT 2 Job OPTION Removal of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AU 2 Job OPTION Installation of Hot Water Storage Tank
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AV 3 Job OPTION Removal of Aboveground Fuel Oil Storage
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AW 3 Job OPTION Installation of Aboveground Fuel Oil Sto
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AX 2 Job OPTION Removal of Aboveground Fuel Oil Storage
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AY 2 Job OPTION Installation of Aboveground Fuel Oi
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AZ 4 Job OPTION Removal of Aboveground Fuel Oil Storage
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BA 4 Job OPTION Installation of Aboveground Fuel Oil
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BB 2 Job OPTION Removal of Aboveground Fuel Oil Storage
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BC 2 Job OPTION Installation of Aboveground Fuel Oil
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BD 13 Job OPTION Painting of Aboveground Fuel Oil Storage
FFP
Painting of Aboveground Fuel Oil Storage Tank, 600 GAL or under (including
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BE 8 Job OPTION Painting of Aboveground Fuel Oil Storage
FFP
Painting of Aboveground Fuel Oil Storage Tank over 600 GAL (including removal
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BF 21 Job OPTION Lettering (Caution, Fuel Type, Tank#
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BG 1 Job OPTION Removal of Heat Exchanger (Bundler)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BH 1 Job OPTION Installation of Heat Exchanger (Bundler)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BJ 4 Job OPTION Removal of Radiator, Convector or Fan
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BK 4 Job OPTION Installation of Radiator, Convector
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BL 1 Job OPTION Removal of Air Handler or Unit Heater
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BM 1 Job OPTION Installation of Air Handler or Unit Heat
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BN 20 Job OPTION Removal of Humidifier
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BP 20 Job OPTION Installation of Humidifier
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BQ 13 Job OPTION Removal of Circulation Pump or Feeder
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BR 13 Job OPTION Installation of Circulation Pump
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BS 420 Cubic
OPTION Replacement of Supply or Return Duct
Replacement of Supply or Return Duct including insulation within Mechanical
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BT 1,631 Each OPTION Interior Pipe (2 inch or under) for Spac
FFP
Interior Pipe (2 inch or under) for Space Heating, Domestic Hot Water and Heating
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BU 30 Each OPTION Exterior Pipe (2 inch or under) for Spac
FFP
Exterior Pipe (2 inch or under) for Space Heating, Domestic Hot Water and
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BV 964 Each OPTION Underground Pipe (2 inch or under)for Sp
FFP
Underground Pipe (2 inch or under)for Space Heating, Domestic Hot Water and
UNIT UNIT PRICE ESTIMATED AMOUNT
2004BW 7 Job OPTION Replacement of Compressor
FFP
Replacement of Compressor (0.75 Ton-Model#COM07074, 208-230/60/1; 1.25 Ton-Model#COM07079, Tecumseh RK157ET, 208-230/60/1; 1.5 Ton- Model#COM08938, Tecumseh RK233ET, 208-230/60/1; 1.8 Ton-Model# COM04485, Copeland CR22K6-PFV, 208-230/60/1; 1.8 Ton- Model#COM04540, Copeland ZR22K3-PFV, 208-230/60/1; 2.0 Ton- Model#COM04482, Copeland CR24K6-PFV, 208-230/60/1; 2.5 Ton- Model#COM04551, Copeland ZR30K3-PFV, 208-230/60/1; 2.9 Ton- Model#COM04498, Copeland CR35K6-PFV, 208-230/60/1; 3.0 Ton- Model#COM04560, Copeland ZR36K3-PFV, 208-230/60/1; 3.5 Ton-Model# COM04513, Copeland CR42K6-PFV, 208-230/60/1; 4.5 Ton- Model#COM04580, Copeland ZR54K3-PFV, 208-230/60/1; 5.1 Ton- Model#COM04588, Copeland ZR61K3-PFV, 208-230/60/1; 9.3 Ton- Model#COM07060, Trane, 460/60/3; 10 Ton, Model#COM06238, Trane, UNIT UNIT PRICE ESTIMATED AMOUNT
2004BX 7 Job OPTION Replacement of Capacitor
FFP
Replacement of Capacitor, Low Pressure Switch or High Pressure Switch.
(*Capacitor - Model#CPTX0036, 35 MFD, 440V; Model#00120, 7.5 MFD, 370V;
Model#CPT00235, 35 MFD, 440V; Model#00240, 40 MFD, 370V;
Model#CPT00464, 20 MFD, 370V; Model#00467, 25 MFD, 440V;
Model#CPT00483, 15 MFD, 440V; Model#00651, 45 MFD, 370V;
Model#CPT00904, 80 MFD, 370V; Model#CPT00904, Round, W/O Resistor.
*Low Pressure Switch - Model#SWT02282, Open 17-23, Close 35-45. *High Pressure Switch - Model#SWT02327, Open 395, Close 295; Model#SWT02327, UNIT UNIT PRICE ESTIMATED AMOUNT
2004BY 3 Job OPTION Replacement of Solenoid Coil or Valve
FFP
Replacement of Solenoid Coil or Valve (*Solenoid Coil - Model#COL05944, UNIT UNIT PRICE ESTIMATED AMOUNT
2004BZ 1 Job OPTION Replacement of Fan Motor
FFP
Replacement of Fan Motor (1/12 HP - Model#MOT09820, 208-230/60/1, 1080 RPM, 39 FRAME,Sleeve BRG. 1/8 HP - Model#MOT11826, AC, 208-230/60/1, 1080 RPM, 3-SPD; Model#MOT09818, 208-230/60/1, 1080 RPM, 39 FRAME, Sleeve BRG. 1/3 HP - Model#MOT09817, 208-230/60/1, 1080 RPM, 39 FRAME Sleeve BRG. 1/2 HP - Model# MOT09819, 208-230/60/1, 1080 RPM, 39 FRAME, Sleeve BRG; Model#MOT11823, AC, 208-230/60/1, 1075 RPM, 3-SPD.
1 HP - Model#MOT09204, 208-230/60/1, Programmable,48 FRAME, Ball Bearing; Model#MOT09205, 208-230/60/1, Programmable, 48 FRAME, Ball
UNIT UNIT PRICE ESTIMATED AMOUNT
2004CA 4 Job OPTION Replacement of Reversing Valve
FFP
Replacement of Reversing Valve or Expansion Valve. (*Reversing Valve - 1.5 Ton: Model#VAL06971, 2 Ton: Model#VAL08212 (R22), 2.6 Ton, 3 Ton:
Model#VAL08214 (R22), 4 Ton: Model#VAL06385 (R22); Model#VAL06972 (R22), 5 Ton: Model#VAL08216 (R22); Model#VAL06385 (R22), 9.5 Ton:
Model#VAL08217 (R22). *Expansion Valve - 1 Ton: Model#VAL07604 (R22);
Model#VAL07605 (R22), 2 Ton: Model#VAL06383 (R22); Model#VAL07606, 3 Ton: Model#VAL06384 (R22); Model#VAL07607 (R22), 5 Ton:
Model#VAL06385 (R22); Model#VAL07625 (R22), 9.5 Ton: Model#VAL07522
UNIT UNIT PRICE ESTIMATED AMOUNT
2004CB 7 Job OPTION Replacement of Module, Transformer
FFP
Replacement of Module, Transformer or Thermistor Senor. (*Module - Model#MOD01221, Control, 24V; Model#MOD01577, Control, (ZN524);
Model#MOD01404, DYNAVIEW, Programmable Required. *Transformer - Model#TRR00743, 50VA, 208/240V PRI, 24V SEC; Model#TRR00780, 75VA, 208/230V PRI,24V SEC, w/Circuit Breaker; Model#TRR01552, 208-240V Primary, 24V Secondary, 50/60Hz; Model#TRR01803, 100VA, 460/575V PRI, 24V SEC; Model#TRR00185, 460V PRI, 115V; Model#TRR00401, 120V PRI, UNIT UNIT PRICE ESTIMATED AMOUNT
2004CC 6 Job OPTION Replacement of Blower Relay
FFP
Replacement of Blower Relay, Thermostat or Control. (*Blower Relay - Model#SWT02326, 10 Watts. *Thermostat - Model#THT00931, Manual Changeover; Model#THT01412, 50-90 F Position, Fan Switch, w/ EXT ADJ
UNIT UNIT PRICE ESTIMATED AMOUNT
2004CD 1 Job OPTION Replacement of Pump (Model#PMP00681
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004CE 1 Job OPTION Replacement of Drier Filter
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004CF 4 Job OPTION Replacement of Contactor, Relay
FFP
Replacement of Contactor, Relay, Temperature Sensor or Fan Motor Module.
(*Contactor - Model#CTR00818, 3 POLE, 40 AMP, 24V; Model#CTR01197, 3 POLE, 30 AMP, 24V; Model#CTR01757, 40 FLA, 575V, 3 POLE. *Relay - Model#RLY01781, 24VAC 50/60 HETONZ. *Temperature Sensor - Model#SEN00981, -40 C to 65 C Temp. Range. *Fan Motor Module -
UNIT UNIT PRICE ESTIMATED AMOUNT
2004CG 5 Job OPTION Replacement of Pressure Transducer
FFP
Replacement of Pressure Transducer or Inverter. (*Pressure Transducer - Model#TDR00327, 0-475 PSI. *Inverter - Model#SV008iC5-1, LS Industrial
UNIT UNIT PRICE ESTIMATED AMOUNT
2004CH 1 Job OPTION Replacement of Humidifier
FFP
2005 1 Job OPTION Replacement/Repair Parts
FFP
(Requirements Portion) The Contractor shall provide replacement/repair parts and materials in accordance with the paragraph 5.6 of PWS. All items listed in the Attachment 8 shall be Brand Name or Equal. The contractor shall provide the prices for the listed items in Attachment 6 with the price proposal. This CLIN has a Not To Exceed amount of KW85,000,000.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006 400,000 Square
OPTION HVAC duct/Exhaust Fan Duct cleaning serv
HVAC duct/Exhaust Fan Duct cleaning service (Requirements Portion) in accordance with the paragraph 5.7 of PWS.
(SF : Whole Building Area)
2007 1 Job OPTION Accounting for Contract Services
FFP
(CMR Requirement) must be reported by 31 October of each calendar year in accordance with Paragraph 5.9 of the PWS.
OPTION Estimated Cost for War Hazard Losses is
FFP
PWS
NOTICE TO OFFERORS
All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement, and to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies shall be determined by the Contracting Officer. All offeror(s) interested in competing for this requirement are required to submit their price proposal, as applicable, in Korean won only. A proposal submitted in currency other than Korean won will not be considered for award.
Note: Due to planned redeployment of U.S. Forces from Yongsan (Seoul) to the Camp Humphreys (Pyongtaek) starting 2018 year, the life of this contract some or all contract requirements may be reduced or adjustable.
PERFORMANCE WORK STATEMENT
Preventive Maintenance & Repair of Heating and Ventilation Systems for
USAG-Yongsan
Part 1
General Information
1. GENERAL: This is a non-personal services contract to provide Heating and Ventilation Maintenance and Repair services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform operation, maintenance, repair and overhaul of integrated heating, ventilation and heat pump systems as defined in this Performance Work Statement (PWS), section 5 except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: There are multiple heating systems located throughout USAG Yongsan, FED Compound, Camp Morse, and CP Tango to be serviced under this contract. The Contractor shall maintain the heating and ventilation systems thru a Preventive Maintenance program to ensure reliable heating during the heating season.
1.2.1 The Contractor shall refer to Attachments 1 thru 4 to validate the types and location of the heating, ventilation systems.
1.3 Objectives: The objective of this contract is to provide complete and full Preventive Maintenance and repair on all heating systems at USAG Yongsan, FED Compound, Camp Morse, and CP Tango. Preventive Maintenance includes all inspections, testing, routine service (0800-1700 hours), and maintenance in accordance with prescribed manufacturer guidelines and intervals. Contractor shall perform, coordinate and complete the requirements of the contract in cooperation with any other contractors or trades performing work at USAG Yongsan, FED Compound, Camp Morse, and CP Tango as required by the standards of this contract.
1.4 Scope: The Contractor shall provide preventive maintenance and repair services for a variety of heating systems and their components. This work includes the maintenance, repair, and installation of all components, devices, equipment, and associated systems, including but not limited to compressors, blowers, motors, drive assemblies, fans, service valves, dampers, condensers, cooling coils, piping, pumps, purge units, control systems and wiring, duct work, burner assemblies, combustion chambers, thermostats and temperature controls, registers, condensate and drip pans and drains, grills, evaporators, air filters, heat/air conditioning units, and all other items of equipment essential to the proper operation of the heating systems in accordance with the manufacturer’s manuals.
1.4.1 Preventive Maintenance: Contractor shall perform Preventive Maintenance (PM) inspections on the equipment and systems listed in Attachments 1 thru 4 in accordance with the tasks specified in Part 5. PM consists primarily of inspection, cleaning, lubrication, adjustment, calibration, on-call repair services and component replacement (e.g. filters, belts, hoses, fluids, oil and grease, and refrigerant) for minor repair as required minimizing malfunction, breakdown, and deterioration of equipment; and the identification of and/or performance of any repairs required to bring the equipment up to the manufacturer’s operating standards. PMs shall be performed as specified in Attachments 10 and shall include all of the applicable check points. The Contractor shall complete all repair requirements identified during the performance of a PM inspection. The Contractor shall submit a detailed PM schedule to the COR for approval 30 calendar days prior to the start date of each Contract year. The schedule shall cover the entire term of the contract year and shall include each specific piece of equipment, PM, location, work to be performed (i.e. weekly, monthly or quarterly PM). Semi-annual PM inspections for heating equipment shall be scheduled immediately prior to the heating and cooling seasons.
1.4.1.1 Routine Calls: Service Calls that do not meet the requirement in paragraph 1.4.1.2. will be classified as routine calls. The Contractor shall respond, begin work on routine service calls within 24 hours after receipt of the call, and complete all repairs within 7 calendar days. Routine service call work will normally be performed during the government’s regular working hours.
1.4.1.2 Emergency Calls: Service calls will be classified as an emergency when system failures constitute a danger to personnel, threaten to damage property, or threaten to disrupt activity operations or mission. Examples include loss of heating service in areas with no concentrated heat producing equipment. The Contractor shall respond within 2 hours and work until the emergency condition is fixed. Once contractor eliminates the emergency condition additional repairs shall be completed within 5 days.
1.4.2 Performance: All work shall be accomplished in conformance with approved and accepted standards of the industry; equipment manufacturers; all applicable local, state, and federal standards; and all applicable building and safety. When the Contractor completes work on a system, that system shall be free of missing components or defects which would prevent it from functioning as originally intended and/or designed. Corrective or repair/replacement work shall be carried to completion including operational checks and cleanup of the job site.
Except where otherwise noted, replacements shall match existing in dimensions, finish, color, and design. The
Contractor shall schedule and arrange work to cause the least interference with normal operations and mission. In those cases where some interference may be essentially unavoidable, the Contractor shall make every effort to minimize the impact of the interference, inconvenience, equipment downtime, interrupted service, and customer discomfort.
1.5 Period of Performance
Phase-In Period: 1 July 2017 – 31 July 2017 (CLIN 0009) Base Period: 1 August 2017 – 30 June 2018 (CLIN 0001 thru CLIN 0008) 1st Option Period: 1 July 2018 – 30 June 2019 (CLIN 1001 thru CLIN 1008) 2nd Option Period: 1 July 2019 – 30 June 2020 (CLIN 2001 thru CLIN 2008)
1.6 General Information
1.6.1 Hours of Operation: The Contractor is responsible for conducting business, 0800(08:00 a.m.) to 1700 (05:00 p.m.) Monday through Friday except Korean legal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. However, operations at the installations continue twenty four (24) hours seven (7) days per week, therefore the Contractor must maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.2 Place of Performance: The work to be performed under this contract will be performed at USAG Yongsan, FED Compound, Camp Morse, and CP Tango, Attachment 1 list heating equipment and location of service.
1.6.3 Quality Control- The offeror shall submit a Quality Control Plan (QCP) that demonstrates the offeror’s approach to conducting comprehensive quality control. The plan shall clearly describe the offeror’s quality control methods and practices such as standardized procedures to monitor performance, identify discrepancies, and take corrective action to prevent re-occurrences. As part of the QC Plan, the Offeror shall identify what items the Offeror will inspect under its comprehensive QC for each task listed in the PRS table. The QCP shall be used throughout the life of this contract and shall be updated by the Contractor when the changes impact the QCP. Offer shall submit QCP with contract proposal.
The plan shall include followings at minimum, but not limited to:
a. A description of the preventive maintenance system to cover all services. The description shall specify the areas to be inspected on both a scheduled and unscheduled basis, frequency of inspection, and the title and organizational placement of the inspectors.
b. A description of the methods to be used to identify and prevent defects in the quality of service performed.
c. A description of the records to maintain the inspection and testing documents and corrective or preventive actions taken.
d. The records of inspections shall be kept and made available to the Government throughout the contract…