Attachment-10, Inspection Checklist, 1 of 1

Worksheet for AST and Dike Tank No:

Work Description Yes No Remark /Take Action

1. Inspeciton & Clean-up

a. Does the tank have any visible leaks or sign of leak?

b. Is the dike drain free of debris drained?

c. Does the dike have a drain valve?

d. Is the dike drain valve closed?

e. Is the tank grounded?

f. Are there "No Smoking" signs on the tank?

g. Does the tank have visible corrosion damaged?

h. Does the container dike have visible damaged?

i. Does the tank required re-painting?

j. Contractor should maintain cleanliness in the dike

k. Contractor must close the drain valve after work.

- Diagram

2. Please, describe below any abnormalities found under inspection and required corrections.

3. If there is any leaking in tank and dike, contractor have to report to COR wihtout delay.

Date :

Inspector/Signature :

Worksheet