ATTACHMENT 0006 Bldg_C_Furn-Combined (seating chart).pdf

PDF 1 MB Posted

Attached to
ANC SE Expansion Moving Services
Solicitation number
W91QV126RA060
Issued by

About this file

This document is a furniture and equipment plan for Building C, presented at a scale of 1/8" = 1'-0". The plan depicts the spatial layout and allocation of furniture and equipment across multiple rooms and functional areas within the facility, with dimensions indicating the building measures 116 feet in length, 86 feet 8 inches in width, and 49 feet 4 inches in height.

The furniture schedule identifies task chairs (CH-1), guest chairs (CH-3), medium office desks (D-5), workstations (D-18 and D-19), and stainless steel work tables (T-7), all to be furnished and installed by the contractor (CF/CI). The equipment schedule specifies a paint booth with make-up air unit (SE.03) measuring 14 feet wide by 27 feet long, also to be furnished and installed by the contractor. The plan includes a functional area color-coding system designating spaces for Facility Maintenance (yellow), Interment Operations (pink), G4 Supply/Logistics (green), Fleet Maintenance (blue), and Planning & Resources (cyan). Specific room designations include office spaces (C101-C103), warehouse areas (C100A-C100C), laundry (C108), mechanical/janitorial (C105), car wash (C118), paint shop (C115), vehicle storage (C116), and various storage areas. The source documentation references existing service complex content survey data from 2022-2023.

View the file

Other files

File Type Posted
Solicitation Amendment - W91QV126RA0600003.pdf PDF
ATTACHMENT 0003 RFI from Move Vendors ANMC responses 13 OCT 2026.xlsx XLSX spreadsheet
ATTACHMENT 0002 MICC PWS AUG 2025_Southern Expansion_ V5 2026 10-14 FINAL.pdf PDF
ATTACHMENT 0016 Move Routes-Access-Size.pptx PPTX presentation
Solicitation Amendment W91QV126RA0600003 SF 30.pdf PDF
Solicitation Amendment - W91QV126RA0600002 (1).pdf PDF
Solicitation Amendment W91QV126RA0600002 SF 30 (1).pdf PDF
ATTACHMENT 0009 Fac Maint Move Inventory.pdf PDF
ATTACHMENT 0015 Storage options at Warehouse Bldg C.pdf PDF
ATTACHMENT 0017 Move Schedule Matrix NSC Move 2027.xlsx XLSX spreadsheet
ATTACHMENT 0003 RFI from Move Vendors ANMC responses 13 OCT 2026.xlsx XLSX spreadsheet
ATTACHMENT 0008 ENG Move Inventory v2.pdf PDF
Solicitation Amendment W91QV126RA0600002 SF 30.pdf PDF
ATTACHMENT 0018 Service_Complex_Area V2 match.pdf PDF
ATTACHNENT 0007 Bldg_D_Furn-Combined (seating chart).pdf PDF
ATTACHMENT 0005 Bldg_B_Furn-Combined (seating chart).pdf PDF
ATTACHMENT 0013 Operations G3 Move Inventory.pdf PDF
ATTACHMENT 0004 Bldg_A_Furn_V2(seating chart).pdf PDF
Solicitation Amendment - W91QV126RA0600002.pdf PDF
ATTACHMENT 0011 G4 Bays Move inventory.pdf PDF
ATTACHMENT 0002 ANC PWS SE Expansion v5 FINAL.pdf PDF
ATTACHMENT 0010 Fleet Move Invenotry.pdf PDF
ATTACHMENT 0014 Safet yMove inventory.pdf PDF
ATTACHMENT 0012 Internment Ops Move Invenotry.pdf PDF
Solicitation Amendment W91QV126RA0600001 SF 30 (1).pdf PDF
Solicitation Amendment - W91QV126RA0600001 (1).pdf PDF
Solicitation - W91QV126RA060 FINAL.pdf PDF
ATTACHMENT 0002 ANC Access Roster Request for SE Expansion Moving Services Contract Recompete.xlsx XLSX spreadsheet
ATTACHMENT 0001 WAGE DETERMINATION.pdf PDF
MICC PWS AUG 2025_Southern Expansion_ v4 2026 08-11 FINAL.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

C.2

C.A C.B C.C C.D C.E C.F

C.1

C.3

C.4

LOADING DOCK

C109

OPEN OFFICE

C101

TLT

C104

OFFICE

C102

OFFICE

C103

WAREHOUSE -

DRIVE

C100B

A1 / A-103

COMM

C107

LAUNDRY

C108

TLT

C106

MECH/ JAN.

C105

WAREHOUSE -

NORTH STORAGE

C100A

WAREHOUSE -

SOUTH STORAGE

C100C

UNIFORM

STORAGE

C110

WE.01

WE.01

WE.01

WE.01

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

WE.02

CH-1

CH-1

CH-1 CH-3

CH-3

WE.05 WE.04 T-7

C.E.5

WE.01

WE.01

WE.01

WE.01WE.01

WE.01

WE.01

WE.01 WE.01WE.01

WE.01WE.01

WE.01WE.01

WE.01WE.01 WE.01WE.01

WE.01WE.01

WE.01WE.01

WE.01WE.01 WE.01

WE.01

WE.01

WE.01

D-19 D-18

D-5

D-5CH-3

CH-1 CH-1CH-3

WE.02

FURNITURE SCHEDULE

MARK DESCRIPTION

FURNISHED /

INSTALLED BY

CH-1 TASK CHAIR CF/CI

CH-3 GUEST CHAIR CF/CI

D-5 MEDIUM OFFICE DESK CF/CI

D-18 WORKSTATION (1) CF/CI

D-19 WORSTATION GROUP (2) CF/CI

T-7 STAINLESS STEEL WORK TABLE CF/CI

EQUIPMENT SCHEDULE - EXISTING

MARK NAME DESCRIPTION MANUFACTURER MODEL

FURNISHED /

INSTALLED BY

EE-015 Existing Equipment: STORAGE SHELF #015 GF/GI EE-191 Existing Equipment: PAINT SHAKER #191 FLUID MANAGEMENT HARBIL 5G-HD GF/GI EE-192 Existing Equipment: WORKBENCH #192 GF/GI EE-193 Existing Equipment: FLAMMABLE CABINET #193 GF/GI EE-194 Existing Equipment: FLAMMABLE CABINET #194 GF/GI EE-195 Existing Equipment: FLAMMABLE CABINET #195 GF/GI EE-203 Existing Equipment: STORAGE CABINET #203 TENNSCO GF/GI EE-204 Existing Equipment: STORAGE SHELF #204 GF/GI EE-205 Existing Equipment: STORAGE SHELF #205 GF/GI EE-206 Existing Equipment: STORAGE SHELF #206 GF/GI EE-207 Existing Equipment: STORAGE SHELF #207 GF/GI EE-208 Existing Equipment: WORKBENCH #208 GF/GI

EQUIPMENT SCHEDULE - WAREHOUSE EQUIPMENT

MARK NAME DESCRIPTION DIMENSION

FURNISHED /

INSTALLED BY COMMENTS

WE.01 PALLET

RACKS

PALLET RACK SYSTEM CF/CI SEE SPECIFICATION 11 10 00 MISCELLANEOUS

EQUIPMENT FOR ADDITIONAL DETAILS

WE.02 BULK RACK

SHELVING

HEAVY DUTY BULK RACK SHELVING96"w x 24"d x 96"h CF/CI SEE SPECIFICATION 11 10 00 MISCELLANEOUS

EQUIPMENT FOR ADDITIONAL DETAILS

WE.03 UTILITY

SHELVING

HEAVY DUTY OPEN SHELVING 36"w x 12"d x 84"h CF/CI SEE SPECIFICATION 11 10 00 MISCELLANEOUS

EQUIPMENT FOR ADDITIONAL DETAILS

WE.04 LAUNDRY

WASHER

COMMERCIAL WASHER, 65lb

CAPACITY

38"w x 44"d x 56"h CF/CI SEE SPECIFICATION 11 10 00 MISCELLANEOUS

EQUIPMENT FOR ADDITIONAL DETAILS

WE.05 LAUNDRY

DRYER

COMMERCIAL DRYER, 75lb

CAPACITY

46"w x 36"d x 85"h CF/CI SEE SPECIFICATION 11 10 00 MISCELLANEOUS

EQUIPMENT FOR ADDITIONAL DETAILS

EQUIPMENT SCHEDULE - SHOP EQUIPMENT

MARK NAME DESCRIPTION DIMENSION

FURNISHED /

INSTALLED BY Notes

SE.03 PAINT BOOTHPAINT BOOTH AND MAKE-UP AIR

UNIT

14' W x 27'L CF/CI SEE SPECIFICATION 11 10 00 MISCELLANEOUS

EQUIPMENT FOR ADDITIONAL DETAILS

DN

44"44"

DN

C.2

C.3

C.4

C.G C.H

VEHICLE

STORAGE

C116

LOADING DOCK

C109

CAR WASH

C118

EQUIP.

C117

A1 / A-102

PROPERTY

STORAGE

C112

OFFICE STORAGE

C111

ELEC

C113

FIRE RISER

C114

PAINT SHOP

C115

UNIFORM

STORAGE

C110

116' - 0"

86' - 8" 29' - 4"

EE-015

EE-192 EE-208

EE-204 EE-205

EE-206

EE-207

EE-191

EE-203

EE-195

EE-194

EE-193

SE.03

WE.03 WE.03 WE.03

WE.03

WE.03

WE.03

WE.03

CAR WASH EQUIPMENT

C.3.8

C.3.6

C.2.2

C.F.5 xx-000

1i

EXISTING EQUIPMENT -SEE SCHEDULE

NEW FURNITURE OR EQUIPMENT -SEE SCHEDULE

FURNITURE AND EQUIPMENT PLAN LEGEND

C1 SCALE: 1/8" = 1'-0"

BUILDING C FURNITURE AND EQUIPMENT

0 8'4' 16'

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Text Box

FACILITY MAINTENANCE

DvorakCC Text Box

INTERMENT OPERATIONS

DvorakCC Text Box

G4 - SUPPLY/LOGISTICS

DvorakCC Text Box

FLEET MAINTENANCE

DvorakCC Text Box

PLANNING & RESOURCES

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

DvorakCC Rectangle

Interment OPS Assets (Existing Bldg 1290, 1300, 1310)

Concrete liners small, concrete liners medium, concrete liners large, tomb covers, liners, wheelbarrow, niche covers (pallets), green canopy, blue canopy, tamper, black drum, green tarp, poles, folding chairs, black tarp, black basins, pallets of tarps, ladders.

Source: Existing Service Complex Content Survey 2022-2023

G4/Logistics Assets (Existing Bldg 127)

Office Supplies, misc.

Source: Existing Service Complex Content Survey 2022-2023

Facility Care Assets (Existing Building 1330, 1340, 1350)

Shelves, generator, generator, palette of bagged concrete, construction material, scaffold, toilets, temp eternal flame lumber, ladders, tables masonry materials misc., bollards - spare

Source: Existing Service Complex Content Survey 2022-2023

G3-Operations Assets (Exiting Bldg 1350)

Flag crates, chair covers, stands for events, chair racks, signs and flags, stanchions and signs, electric sign, pallets of flags

File details come from the government source that posted it. Updated .