Attachment 30 FWS-I Q and A Tracker Revd (17 Feb 2021)v2.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Family of Weapon Sight – Individual (FWS-I) Full Rate Production
Solicitation number
W91CRB-21-R-0012
Issued by

About this file

This document contains a question and answer tracker from a pre-solicitation engagement with industry for the Family of Weapon Sight - Individual (FWS-I) full rate production contract. The Army Contracting Command - Aberdeen Proving Ground plans to issue solicitation number W91CRB-21-R-0012 for the production of the FWS-I, associated spare parts, maintenance support, and technical assistance. Key details include clarification that the Total Evaluated Price matrix and past performance questionnaires will be provided with the final RFP, confirmation of the maintenance approach utilizing Regional Support Centers, and an extended proposal due date of March 4th, 2021.

View the file

Other files

File Type Posted
W91CRB21R0012 Amendment 7.pdf PDF
Attachment 30 FWS-I Q and A Tracker - 23 Feb 2021.xlsx XLSX spreadsheet
W91CRB21R0012 Amendment 6.pdf PDF
W91CRB21R0012 Amendment 5.pdf PDF
W91CRB-21-R-0012 Solicitation Amendment 4.pdf PDF
Attachment 30 FWS-I Q and A Tracker 5 FEB 2021.xlsx XLSX spreadsheet
Exhibit A FWS-I CDRL (2 FEB 2021).pdf PDF
Attachment 28 COMPASS.pdf PDF
W91CRB-21-R-0012 Solicitation Amendment 3 (8 FEB 2021).pdf PDF
Attachment 01 FWS-I Performance Specification FRP-PRF-FWSI (2 FEB 2021).docx DOCX document
Attachment 23 FWS-I TEP (29 JAN 2021).XLSX XLSX spreadsheet
W91CRB21R0012 AMENDMENT 0002.pdf PDF
Solicitation W91CRB-21-R-0012 FWS-I.pdf PDF
Exhibit A FWS-I CDRLs.pdf PDF
Attachment 28 COMPASS Request Instruction.docx DOCX document
Attachment 27 ASSET and eHTS Request Instruction.docx DOCX document
Solicitation W91CRB-21-R-0012 FWS-I (Amendment 1).pdf PDF
Attachment 26 Small Arms Tool Kit LIN W51910.pdf PDF
Attachment 29 FWS-I QASP.docx DOCX document
Attachment 21 Requisitioned Government Furnished Property-VERSION1.3_distributed_0005.pdf PDF
Attachment 01 FWS-I Performance Specification FRP-PRF-FWSI 09 Nov 2020.docx DOCX document
Attachment 20 DD1494_PreparationGuide.pdf PDF
Attachment 24 TM 11-5855-343-10-Operator_2020-7-01.pdf PDF
Attachment 09 ISW_SolNet_Protocol_FinalDraft.pdf PDF
Attachment 13 FWS-I Failure Definition and Scoring Criteria (FDSC) 24 May 2013.docx DOCX document
Attachment 19 LSAR MIL-STD-1388-2B.PDF PDF
Attachment 15 draft M_TMDE Technical Manual (1).docx DOCX document
Attachment 05 Manworn HALO Assembly Drawing 184100 Rev C.pdf PDF
Attachment 17 NVImageJ Instructions.pdf PDF
Attachment 18 Request Instruction.docx DOCX document
Attachment 14 FWS-I TK105AG COMPONENT LIST.PDF PDF
Attachment 04 I- MILES IWS 2 Performance Specification PRF-PT-00543 Rev B.pdf PDF
Attachment 06 Mount Asssembly Drawing A3301511 Rev B.pdf PDF
Attachment 07 M16A1 A2 M4 Bracket Assembly Drawing A3170580 Rev B.pdf PDF
Attachment 22 Scheduled Government Furnished Property-VERSION1.4_distributed_.pdf PDF
Attachment 25 Past Performance Questionaire from SSP.docx DOCX document
Attachment 16 NVThemIP Modeling Guidance.pdf PDF
Exhibit B DID DOCUMENT.PDF PDF
Attachment 23 FWS-I TEP.xlsx XLSX spreadsheet
Attachment 10 FWS-I SCG 25 APRIL 2018.pdf PDF
Attachment 30 FWS-I Q and A Tracker.XLSX XLSX spreadsheet
Attachment 11 DD Form 254.pdf PDF
Attachment 08 ISW_SolNet_PropertyDescriptorSpecification_FinalDraft.pdf PDF
Attachment 18 Request Instruction.docx DOCX document
Attachment 26 Small Arms Tool Kit LIN W51910.pdf PDF
Solicitation W91CRB-21-R-0012 FWS-I.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

Solicitation W91CRB21R0012Question & Answers
This will be posted to beta.SAM.gov
No.RFP DocumentSection / Paragraph #RFP WordingQuestion /Comment for GovernmentGovernment ResponseSolicitation Action
1TEP WorksheetSpares Pricing TabsCurrent formulas are not completeThere appears to be errors in the following Cell formulas:

Eyepiece Spares Pricing Cells J18, L18, N18, P18, and R18 only add the cells J24 and J31 but they should add J24,J31,J38, J45, J52, J59, J66, and J73 (and then L, N, P, and R respectively) Housing Spares Pricing Cells J18, L18, N18, P18, and R18 only add the cells J24 through J66 but it should also add J73. J80, J87, J94, J101, J108, J115, J122, J129, and J136 (and then L, N, P, and R respectively) Optics Sensor Spares Pricing Cells J19, L19, N19, P19, and R19 only add the cells J25 through J67 but it should also add J74, J81, J88, J95, J102, J109, J116, J123, J130, J137, J144, and J151 (and then L, N, P, and R respectively) Weapon Sight Wireless Spares Pricing Cells J19, L19, N19, P19, and R19 only add cell J25 but it should also add J32, J39, J46, J53, and J60 (and then L, N, P, and R respectively) Ancillary Spares seems to be OK Can the Government please modify or clarify? The formulas correctly reflect the Government intent. These cells are not included in the TEP sum because the Government does not want to double count the cost of any individual spare part in the TEP. The rows that are not included in the TEP give the offeror a chance to offer pricing for parts that are included in larger modules that are also spared.

For example, suppose the eyepiece is connected to the housing using screws and an o-ring. If the screws and o-ring are not included with the eyepiece when it is purchased as a spare part, then the screw and o-ring prices should be entered on the Ancillary Spares Pricing tab. If they are included with the eyepiece when it is purchased as a spare part (and if the vendor is willing to sell them separately as well), then the screw and o-ring prices should be entered in rows 33-73 on the Eyepiece Spares Pricing tab.No Action Required
2Solicitation W91CRB-21-R-0012 FWS-I.pdfClauses Incorporated by Full Text 52.211-11Where:

EXAMPLE (values are arbitrary): CLIN awarded for 150 systems at a unit cost of $10,000/system to be

delivered over a three (3) month period at 50 system/month.In the last round of Q and A it was stated that the wording in this section was going to be revised to "Actual Delivery Schedule" and the total on row #3 corrected to 150. Will we see the revised version of this clause in an amended solicitation?Both these changes were included in Amendment 3. (see page 39 of 66 in amendment 3)No Action Required
3SolicitationSection L Para 1.1.1.1, 1.1.1.1.1, and 1.1.2.11.1.1.1 Table 1 - Proposal Volumes: Volume 1: Offer 30 Pages. 1.1.1.1.1 The number of pages specified in the above table is the firm page limit for that volume.

1.1.2.1 Volume 1 Offer Offerors shall include the following:

- Standard Form 33, "Solicitation, Offer and Award," with blocks 12 through 18 completed and signed by the Offeror;

- RFP Section B, "Supplies or Services and Prices/Costs," with the Offeror’s proposed line item prices inserted in the appropriate spaces;

- RFP Section G, "Contract Administrative Data", completed by the Offeror;

- RFP Section I, "52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)," completed by the Offeror.The inclusion of the Government supplied RFP Section B, Section G, and Section I, as well as other statements and requirements identified in Para. 1.1.2.1 exceed 30 pages.
Will the Government please remove or change the 30 page limit on Volume 1?Volume 1 page limitation is changed to not to exceed 45 pages.Modify Table 1
4Performance Spec3.3.8.3The FWS-I shall exhibit neither damage, nor degradation of performance after exposure to immediate (within (1) minute) temperature changes from +71 °C to -46 °C and from -46 °C to +71 °C after stabilization at each extreme, for a minimum of three cycles. Air velocity shall not exceed 1.7 m/s (335 ft/min). Temperature Shock testing shall be performed in accordance with MIL-STD-810G, Method 503.5, Procedure I-C.A standard thermal shock chamber that utilizes an “elevator” style setup has a higher air flow velocity that exceeds 1.7 m/s which is standard for most commercial off the shelf chambers. This requirement will add additional NRE for the chamber manufacturer to ensure they can meet this requirement which will ultimately increase the overall price of a thermal shock chamber that is specific to this program.
Will the Government please consider removing the air velocity requirement of not to exceed 1.7 m/s (335 ft/min)?The Government will not remove the air flow velocity requirement. This requirement comes from MIL-STD-810: "...air velocity that does not exceed 1.7 m/s (335 ft/min) in the vicinity of the test item." The requirement can be met with appropriate test setup.No Action Required
5Solicitation, beta.samDue DateAmendment 2 Date Offers Due: Feb 25, 2021 12:00 pm ESTThe current severe winter weather, combined with the COVID-19 pandemic, has severely limited communication, interaction, and general productivity for many of our proposal team members. Many who are already working remotely due to COVID policies and not on major city power grids have lost internet connectivity and power for extended periods of time. Offerors with employees who authorized to commute to the office are likewise adversely affected by transportation conditions. Additionally, offerors with employees in the northeast, midwest, and south central regions are experiencing greater impacts in their proposal efforts than offerors with employees and operations in less-affected areas. Could the government take into consideration the above factors by extending the proposal due date by one week to March 5, 2021 at 12:00PM EST?
The due date for proposals is revised to 4 March 2021 12:00 PM Eastern Time.
6Amendment 3L.2.1.2.2.1, bullet 4Element 4 - FWS-I Frequency Allocation Application
The Offeror shall submit for informational purposes a preliminary stage two DD1494 application for equipment frequency allocation for spectrum certification for the FWS-I as part of the Offeror’s proposal. The Offeror’s FWS-I preliminary stage two DD1494 shall be submitted as Annex D and will not be counted against the page count for the Technical Integration Volume.The RFP calls for the submission of a preliminary stage two DD1494 application. If our RF chipset already has an approved spectrum certification for use with FWS-I, is this application still required?If the proposed RF chipset and antenna already have approved spectrum certification, the vendor shall include the model and part number for both the ISW module and antenna. If there is a discrepancy in Part Number/model compared to PdM SMS records, the Government will require the vendor to submit a DD-1494 for clarification. Section L will be revised accordingly.Revise Section L, paragraph 2.1.2.2.1, Element 4 to read:

"FWS-I Frequency Allocation Application The Offeror shall submit for informational purposes a preliminary stage two DD1494 application for equipment frequency allocation for spectrum certification for the FWS-I as part of the Offeror’s proposal. If the offeror's proposed wireless chipset and antenna already have approved spectrum certification, the vendor shall include the model and part number for both the ISW module and antenna in lieu of a new DD1494. If there is a discrepancy in Part Number/model compared to PdM SMS records, the Government will require the vendor to submit a DD1494 for clarification. If required, the Offeror’s FWS-I preliminary stage two DD1494 shall be submitted as Annex D and will not be counted against the page count for the Technical Integration Volume."

7Amendment 3Section C, Appendix ASummary: The FWS-I shall be supported by the Standard Army Maintenance and Supply System to the maximum extent deemed practical. A Modular TMDE station shall be provided by the Government which includes a base hardware and software interface (NVLabCap-based) to support all measurements required to sustain the FWS-I.
1. The TMDE software, special tools, fixtures, and interface equipment are being developed for Maintainer-level maintenance.Please confirm that it is the Government's intent to deploy the "Modular TMDE station" at the maintainer level and that all the TMDE employed on it will be available for Field Maintenance support in the Two Level Maintenance Concept.Yes, the Government intends to deploy the Modular TMDE at Regional Support Center(s) for maintainer level maintenance. The Modular TMDE will be available for Field Maintenance above the operator and crew level.No Actions Required
8Amendment 3C.3.5.5
L.2.1.2.2.2, para #2(C) Utilizing the U.S. Army Communications-Electronics Command (CECOM) Regional Support Centers (RSCs) is an acceptable maintenance approach for the FWS-I at the Maintainer-level. Maintainer-level support shall consist primarily of fault isolation, removal and replacement of modules and individual parts, and system exchange during the warranty period as needed.
(L) The narrative shall describe the Offeror’s approach and methodology for organic field and sustainment-level maintenance which may include the use of the CECOM Regional Support Centers.Please confirm that the CECOM RSCs are employed for both Maintainer Field Maintenance Support and also Sustainment (Depot) Maintenance Support?The CECOM RSCs are not equipped for depot-level repairs. Offerors are not required to include sustainment level repairs in the FWS-I sustainment strategy. If the offeror's maintenance strategy includes sustainment (Depot) level tasks, they will be performed at Army deopt(s).No Action Required
9Amendment 3C.3.5.7.2
M.2.2.3.1.2(C) Spare Parts. Throughout this Statement of Work, the term “spares” or “spare parts” refers to all Line Replaceable Units (LRUs) and Shop Replaceable Units (SRUs).
(M) The Offeror’s maintenance concept may result in a "Strength" IAW Table 8 - Maintenance Concept Discriminators. // Total number of spare-able parts ≤ 25Based on the definition of a spare part as a LRU or SRU, please confirm that items such as the Technical Manual, Quick Reference Guide, and cleaning pen are not considered "spare parts" for purposes of the spare part count in section M.2.2.3.1.2?Correct, Technical Manual, Quick Reference Guide, and cleaning pen are not considered "spare parts" for purposes of the spare part count in section M.2.2.3.1.2.
10SolicitationSection L, table 1Volume 4, past performance indicates a 30 page limit with an asterick that points to excluding annexesThere are no references to allowable annexes in the past performance volume - please clarifyCPARS data, Cure Notices, and Show-cause Notices should are not included in the Volume 4 page count. This will be clarified in Table1/Section L, adding paragraph 2.1.2.4.Under paragraph 2.1.1.1, Table 1, the refernce to paragraph 2.1.2.2.4 for Past performance has been added to the asterisk paragraphs for excluding annexes.
11RFP Section I Contract Clauses52.211-11 Liquidated DamagesExisting Clasue for Liquidated DamagesCurrently the Liquidated Damages clause is un-capped. In extreme cases, that means the liquidated damages could end up being more than any fees being charged and put an un-capped financial burden on the contractor. Un-capped Liquidated damages will likely cause the contractor to increase their unit price significantly and put un-realistically conservative delivery times on their production lots potentially increasing the actual cost to the Army and delaying PdM-SMS's fielding schedule. Research on other Army contracts with liquidated damages for production systems shows the clause almost always includes a cap.
Will the Government add a cap to the current formula of 1.5% of the order value?The Government will not add a cap for liquidated damages. Liquidated damages are for missed deliveries. The Government desires vendors to communicate production issues and negotiate a rebaselined delivery schedule in advance of missed deliveries. In the event of last minute delays, the Government expects vendors to negoatiate a rebaselined schedule as quickly as possible.No Action Required

Industry Day Q&A Priority Question(s) for Government Proprietary Y/N

1How many Bid samples will be required with the proposal submission?N
1Will ballistics/shock information on NGSW be available with the RFP? Without specific information it will be difficult to assess the impact on the design.N
2Will the USG be requesting feedback on the draft Section L & M that was posted? If so, what is the timeline?N
3Will you be formally responding to the feedback that industry provided on the draft RFP?N
1Section L & M Past performance - please clarify how a Company with relevant experience but no US Governmental prime contract track record can meet the Past Performance criteria and score a Strength
Is this covered by 1.2.3.3.2Y
2Section L & M Past performance - please clarify whether wireless capability is a relevancy criteria (1.2..3.3.1) as it is not stated as relevant in 1.1.2.4
3Section L & M Past performance (1..1.2.4) - please explain what is a new Corporate Entity and how this might apply to a company that wants to be a supplier to PEO Soldier
4Section L & M Logistics - there is a requirement (1.2.3.1.2) to provide a replacement unit within 48 hrs upon receipt of a warranty failure. Please advise the geographical location to which the replacement must be delivered ?
5Timescale for Awards - the RFP will be in Q1 - when is the bid due and what else happens before award in Q4
6Quantity of Awards -are we correct that there could be one follow on Contract Award and up to 2 awards via the PDR/CRD route making a total of 3 vendors
7Cost - is the cost submitted for a CLIN for just the CLIN activity or can it also include the cost of the work required to generate the data presented in the CLIN reportY
9Section L & M Section 1.1.2.2.1 , Element 5 . The requirement to provide contractor test results is a "may" , would providing the results be considered a strength ?Y
1Can Gov't provide additional detail to the Schedule presented, for example, seqencing to identify qualification and PRR timeline?N
2What is expected RFP response time?N
3Will questions previously submitted to the Govt be addressed in an update to BETA.Sam?N
4Is there a ceiling value on IDIQ?N
5Will documents identified in Section 2.2.2 of Specification be released with the Final RFP?N
1Can the Army clarify the requirements for the Integrated Program Master Schedule mentioned in Section L?. While requirements for an Integrated Master Schedule are included in the draft SOW, there is no mention of an Integrated Program Master Schedule and the term “IPMS” appears only once in the SOW (within 3.5.16 Provisioning Technical Documentation) so the requirements are not clearly understood.N
2Can the Army provide a draft of Attachment #23 "Total Evaluated Price (TEP) Matrix"?N
3Can the Army provide a draft of the Past Performance Questionnaire, Attachment #25 of the RFP?N
4Can the Army clarify what is the potential CPFF requirement mentioned in Section L?N
5Can the Army provide a draft of NVThermIP Modeling Guidance, Attachment #16 mentioned in Section L?N
1What is the performance of the inertial sensors used in the ENVG and IVAS, and is there a government-selected or recommended module for RTA?
2Would the government consider a 5-year factory warranty desirable for this program?
1You mentioned a potential future requirement for the “Powered Rail” or “Intelligent Rail.” Do you anticipate including the Picatinny Smart Rail ICD in the Final RFP for industry to plan for future Power/Intelligent Rail integration?
2For the same Powered Rail/Intelligent rail potential future requirement, do you have an anticipated initial timeline for when that requirement could be inserted in the FWS-I program in the future?

One question per line, in priority order. Please send only one spreadsheet per company.

File details come from the government source that posted it. Updated .