This audit report summarizes a production readiness review of a company manufacturing modular scalable vests under a federal contract. Key details include: the audit covered the company's process flows, assembly methods, work instructions, templates and non-conforming product processes. The review evaluated whether the vest design met requirements, production plans were sufficient, quality processes were implemented, and suppliers were qualified. The report lists audit findings and requires the company to address non-conformances within a specified period.
The related federal contract opportunity solicits bids to manufacture modular scalable vests as part of a soldier protection equipment system. The Army plans to award five fixed-price IDIQ contracts for vest production, with subsequent delivery orders competed under fair opportunity procedures. Bids are due by [date redacted] and awards will be made to vendors that can provide vests meeting requirements for weight, modularity and protection. The opportunity is designated for small business with a NAICS code of 315990 and subject to the Buy American Act. Questions should be submitted to the email address listed by the deadline.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTROLLED//CTI//DL ONLY
FOUO – CONTROLLED UNCLASSIFIED INFORMATION
PRODUCT MANAGER SOLDIER PROTECTIVE EQUIPMENT
AUDIT REPORT
| Auditor(s): |
| (insert a name) |
Contract:
| Auditing Organization: |
| PEO Soldier/PM SPIE/PM SPE |
| Company: |
Audit Date:
MM/DD/YYYY
8/21-23/2017 Audit Location:
Auditee(s): (insert a name)
Audit Criteria:
ISO 9001:2015
Widget Design Widget-X PPP, and referenced documentation for Contract Y
Audit Type, Objectives and Scope:
Conduct an audit of Widget production processes. Audit ISO 9001:2015 compliance, adherence to Widget design Widget-x Production Process Package (PPP), and Contract Number.
Summary of Audit Findings:
[Summarize the number of audit findings in this area and identify the paragraph in the audit criteria. Note that this is a brief summary of the audit. Details of the audit finding will be inserted on the last page Summary of Findings]
| Prepared By: |
| Quality Assurance Specialist |
Product Manager Soldier Protective Equipment
Product Engineer
| Approved By: |
| Chief Quality Assurance |
Table 1: Audit Findings
Summary of Findings
| Company: Insert the name of the Company being audited |
| Audit Date: Click here to enter a date. |
Definitions:
A nonconformance (NC) is a noncompliance to a requirement in ISO 9001:2015, a contractual requirement, or an internal requirement.
An opportunity for improvement (OFI) is not a nonconformance but something identified by an Auditor that is worthy of bringing to the attention of management primarily for the purpose of improvement or safety.
An observation (OBS) is neither a nonconformance nor an opportunity for improvement, but merely serves as documentation of something covered during the audit.
| Type |
| ISO 9001 |
Reference Internal Reference Description
Note: Include this table if it is a QMS Audit, Product Audit etc.; ensure that audit evidence or artifacts are included in an Appendix to this report.
Table 1: Audit Findings (continued)
Summary of Findings
| Company: Insert the name of the Company being audited |
| Audit Date: Click here to enter a date. |
Definitions:
A nonconformance (NC) is a noncompliance to a requirement in ISO 9001:2015, a contractual requirement, or an internal requirement.
An opportunity for improvement (OFI) is not a nonconformance but something identified by an Auditor that is worthy of bringing to the attention of management primarily for the purpose of improvement or safety.
An observation (OBS) is neither a nonconformance nor an opportunity for improvement, but merely serves as documentation of something covered during the audit.
| Type |
| ISO 9001 |
Reference Internal Reference Description
Note: Include this table if it is a QMS Audit, Product Audit etc.; ensure that audit evidence or artifacts are included in an Appendix to this report.
Table 2: PRR Audit Report Summary Matrix
| PRR Criteria |
| Results |
| PRR Criteria Met/Not Met |
| The design is appropriately certified. Evidence based Contractor verification and validation data. |
| Reference Contractor documentation that was used to support each element. |
Safety Assessment/User Health Hazard Assessment/ Hazardous Dispositional Assessment and Disclosure NOTE: Contractor Format can be used; The contractor shall provide an assessment with supporting data that the system design has been analyzed for it life cycle, is safety to use and does not pose a hazard to the Solider during use through the product disposal life cycle. Further that the Government will not incur additional cost for disposal because of hazardous disposal classification for individual nor volume disposal because of EPA or Federal Law for associated processing methods, raw materials or integration techniques used in the design of the end item.
The system requirements are fully met in the final production configuration. All design variants have been tested against the Personal Protective Equipment specification requirements and the design meets all requirements. All design variants have been identified in the Production Process Package.
Adequate measures are in place to support production: Personnel, equipment, infrastructure, raw materials, subcontractor relationships/actual Procure Orders.
Design-for-manufacturing considerations ensure ease and efficiency of production and assembly.
Risks have been identified, credibly assessed, and characterized; and mitigation efforts have been defined.
The bill of materials has been reviewed and critical parts identified.
Delivery schedules have been verified;
Alternative sources for resources have been identified, as appropriate.
Adequate raw materials, spares have been planned and budgeted.
Required facilities and tools are sufficient for end item production.
Specified special tools and test equipment are available in proper quantities.
Note: Include this table only for a PRR Audit; ensure that audit evidence or artifacts are included in an Appendix to this report.
Table 2: PRR Audit Report Summary Matrix (continued)
| PRR Criteria |
| Results |
| PRR Criteria Met/Not Met |
Production and support staff are trained and qualified.
Drawings or Patterns created, reviewed and are certified.
Production engineering and planning are sufficiently mature for production.
Production processes and methods are consistent with quality requirements, First Article Test Samples, contract requirements.
Qualified suppliers are identified, audited, and available with materials that are to be procured.
Purchase Orders are reviewed and validated (i.e. Berry Compliance is verified); as appropriate, evidence that the subcontractors have all necessary drawings or patterns, product samples were received and deemed acceptable.
Qualified suppliers are available for materials that are to be procured: Subcontractor facility and resources are verification and validated by the Prime Contractor; subcontractor production readiness verification letter and evidence that all purchase orders have been awarded.
Note: Include this table only for a PRR Audit; ensure that audit evidence or artifacts are included in an Appendix to this report.
Summary of Findings
| Company: (insert a name) |
| Audit Date: 8/21-23/2017 |
Audit Areas of Coverage:
Process Flow (Include if appropriate to the type of audit you conducted; ensure that all process and their place of performance are properly identified based on the contract language) Assembly (Include if appropriate to the type of audit you conducted) Work Instructions (Include if appropriate to the type of audit you conducted the templates reviewed and fines of compliance) Templates (Include if appropriate to the type of audit you conducted the templates reviewed and fines of compliance) Non-Conforming Product Process (Include if appropriate to the type of audit you conducted the templates reviewed and fines of compliance, number each finding and state period for correction, follow-up and closure) DCMA participation (Include if appropriate to the type of audit you conducted DCMA’s participation)
Summary: (Provide a concise summary of event of your audit findings; include follow-up and closure instructions to the contractor. If follow-up is required the audit should add the event on their Outlook calendar to ensure the event is tracked.)
Disclosure: The Lead Auditor will add to the dissemination list and provide the audit information and reports to whomever the Contractor deems appropriate as long as that dissemination follow the procedure below:
· Audit Reports shall retain the dissemination list and labeled with Distribution Statement F.
· The markings on Audit Reports shall comply with 32 CFR 2002.20(b);
· The top and bottom of each page shall contain the following marking centered on the page: FOUO – CONTROLLED UNCLASSIFIED INFORMATION.
· The contractor shall not exact any portion of the Audit Report to solicit new business nor to allege endorsement by Government.
Reference: (Include objective evidence materials reviewed and inspected during the audit)
CC:
Contracting Officer (insert a name) APM: (insert a name) COR (insert a name) Systems Engineer (insert a name) Contractor: (insert a name) DCMA (if appropriate insert name)
PM SPE Form 4, 30 August 2017 1 - 6 | Page Revision 3.2
FOUO – CONTROLLED UNCLASSIFIED INFORMATION
Distribution Statement F: Further dissemination only as directed by Product Manager - Soldier Protective Equipment, ATTN: SFAE-SDR-SPE (Chief, Quality Assurance), 10170 Beach Road, Building 328T, Fort Belvoir, VA 22060-5800 or higher Program Executive Office Soldier authority.
PM SPE Form 4, 30 August 2017 6 - 6| Page Revision 3.2
CONTROLLED//CTI//DL ONLY