B08_J.5_SoW_Exhibit 1 PM SPE Form 1 Engineering Change Request.pdf

PDF 541 KB Posted

Attached to
Modular Scalable Vest Federal contract opportunity
Solicitation number
W91CRB-20-R-0001
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document contains an Engineering Change Request (ECR) form template and information regarding a federal contract opportunity for Modular Scalable Vests. The Army Contracting Command-Aberdeen Proving Ground is seeking approximately five firm fixed price Indefinite Delivery/Indefinite Quantity contracts for Modular Scalable Vests, which provide soldiers with lightweight, modular, scalable protective equipment that maximizes protection and mobility. The scope of work includes all procurement and production activities necessary to manufacture carriers, soft armor ballistic packages, and other materials that constitute the Soldier Protection System Tactical Equipment Program Modular Scalable Vest. The solicitation number is W91CRB-20-R-0001 and responses are to be submitted through the beta.SAM website. The North American Industry Classification code for this requirement is 315990. All items are subject to the Buy American Act.

View the file

Other files for this federal contract opportunity

Other files attached to Modular Scalable Vest, newest first.
File Type Posted
B08_Amendment 0010_W91CRB-20-R-0001_20200316.pdf PDF
B08_Conformed Solicitation thru Amend0009_W91CRB-20-R-0001.pdf PDF
B08_Solicitation-Amendment 0009_W91CRB-20-R-0001.pdf PDF
B08_QA Set 6_W91CRB-20-R-0001-0009_2020306.pdf PDF
B08_Amendment 0008_W91CRB-20-R-0001_20200305.pdf PDF
B08_QA Set 5_W91CRB-20-R-0001-0008_20200305.pdf PDF
B08_J.3_Past Performance Questionnaire_03-05-2020.docx DOCX document
B08_Solicitation-Amendment 0007_W91CRB-20-R-0001.pdf PDF
B08_MSV_ Q&A Set #4_02-27-2020.pdf PDF
B08_Solicitation-Amendment 0005_W91CRB-20-R-0001.pdf PDF
B08_J.4_MSV_ Carrier-Spare Parts_Price Matrix_02-26-2020.xlsx XLSX spreadsheet
B08_Solicitation-Amendment 0004_W91CRB-20-R-0001.pdf PDF
B08_MSV_ QA Set#3_02-21-2020.pdf PDF
B08_J.4_MSV_ Carrier-Spare Parts_Price Matrix_02-20-2020.xlsx XLSX spreadsheet
B08_Solicitation-Amendment 03_W91CRB-20R0001.pdf PDF
B08_MSV_ QA Questions 44-63_Set#2.pdf PDF
B08_Solicitation-Amendment 02_W91CRB-20R0001.pdf PDF
B08_J.10_PeckGenVendShipInstr Rev 12 March 31, 2019.pdf PDF
B08_MSV_ QA Questions 1-43_Set #1.pdf PDF
B08_J.4_MSV_ Carrier-Spare Parts_Price Matrix_01-30-2020.xlsx XLSX spreadsheet
B08_Solicitation-Conformed through Amend 1_W91CRB20R0001.pdf PDF
B08_Solicitation-Amendment 1_W91CRB20R0001.pdf PDF
B08_J.9_SoW_Exhibit 5 PM SPE Form 15 Process Control Plan Template.doc DOC document
B08_MSV Solicitation_dated 01-08-2020.pdf PDF
B08_J.3_Past Performance Questionnaire.docx DOCX document
Request for Access_Limited Distribution Materials.pdf PDF
Notice of Limited Distribution Materials.pdf PDF
B08_J.8_SoW_Exhibit 4 PM SPE Corrective Action Request Response Instructions.docx DOCX document
B08_J.4_MSV- MSV Spares_Price List_01-08-2020.xlsx XLSX spreadsheet
B08_J.6_SoW_Exhibit 2 Production Readiness Review Audit.docx DOCX document
B08_J.7_SoW_Exhibit 3 PM SPE Form 11 ISO 9001 - 2015 Crosswalk.docx DOCX document
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM SPE ENGINEERING CHANGE REQUEST (ECR)

(Vendors – Complete Blocks 2 – 19 and Submit to PM SPE)

1. PM SPE CONTROL NUMBER

2. ORIGINATOR 3. ECR TYPE

a. TYPED NAME (First, Middle Initial, Last)

b. ADDRESS (Street, City, State, Zip Code)

□ ECP □ RFD

□ RFW

4. CLASSIFICATION

□ Critical □ Minor

□ Major

5. TITLE OF ECR

6. ITEM DESIGNATION 7. PROCUREMENT ACTIVITY

8. BASELINE AFFECTED

a. MCN / NSN b. MODEL / DESIGN CODE □ Functional □ Product

□ Allocated

9. END ITEM NOMENCLATURE 10. CONTRACT NUMBER AND LINE ITEM

11. LOTS / MATERIAL AFFECTED

12. REOCCURING DEVIATION (if Yes, Provide CAR# in Block 12 & Status in Block 18)

13. EFFECT ON COST / PRICE

14. EFFECT ON DELIVERY SCHEDULE

15. OTHER SYSTEMS / CONFIGURATION ITEMS / INTERFACES AFFECTED

16. DESCRIPTION OF ECR

17. NEED FOR ECR

18. CORRECTIVE ACTION TAKEN

19. SUBMITTING ACTIVITY

a. TYPED NAME (FIRST, MIDDLE INITIAL, LAST)

c. SIGNATURE

b. TITLE / ORGANIZATION

d. DATE (YYYYMMDD)

PM SPE FORM 1 (ECR), JULY 15 Page 1

PM SPE CONTROL NUMBER

TITLE OF ECR

20. PM SPE JUSTIFICATION

21. ATTACHMENTS

22. COR (APPROVAL AUTHORITY FOR MINOR ECRS) / PM SPE TECHNICAL STAFF APPROVAL / DISAPPROVAL FOR MAJOR OR CRITICAL ECRS)

a. APPROVAL

□ Approved

□ Disapproved

b. SIGNATURE

c. DATE SIGNED

(YYYYMMDD)

23. APM APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR MAJOR ECRs)

□ Approved

24. PM SPE APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR CRITICAL ECRs)

□ Approved

PM SPE FORM 1 (ECR), JULY 15 Page 2

PM SPE CONTROL NUMBER

TITLE OF ECR

PM SPE FORM 1 (ECR), JULY 15 Page 3

ORIGINATOR NAME:
ORIGINATOR ADDRESS:
ECP Checkbox: Off
RFD Checkbox: Off
RFW Checkbox: Off
Critical Checkbox: Off
Major Checkbox: Off
Minor Checkbox: Off
MCN NSN:
MODEL DESIGN CODE:
PROCUREMENT ACTIVITY:
Functional Checkbox: Off
Allocated Checkbox: Off
Product Checkbox: Off
END ITEM NOMENCLATURE:
CONTRACT NUMBER AND LINE ITEM:
LOTS MATERIAL AFFECTED:
REOCCURING DEVIATION:
EFFECT ON COST PRICE:
EFFECT ON DELIVERY SCHEDULE:
OTHER SYSTEMS CONFUGRATION ITEMS INTERFACES AFFECTED:
DESCRIPTION OF ECR:
NEED FOR ECR:
CORRECTIVE ACTION TAKEN:
SUBMITTING ACTIVITY NAME:
SUBMITTING ACTIVITY TITLE:
SUBMISSION DATE:
PM SPE Control Number:
TITLE:
PM SPE JUSTIFICATION:
ATTACHMENTS:
COR APPROVAL: Off
COR DISAPPROVAL: Off
APM APPROVAL: Off
APM DISAPPROVAL: Off
PM APPROVAL: Off
PM DISAPPROVAL: Off
COR DATE:
APM DATE:
PM DATE:
ADDITIONAL INFO:

File details come from the government source that posted it. Updated .