Attachment_3_PRICE_PROPOSAL_WORKSHEET_-_ATC_RANGE_MAINTENANCE.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Range Maintenance Support Services
Solicitation number
W91CRB-16-R-0020
Issued by

About this file

Attachment 3 PRICE PROPOSAL WORKSHEET-ATC RANGE MAINTENANCE

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASIS CLIN 0001 & 0002 ESTIMATE

ATC RANGE SUPPORT CONTRACT (Three Year Award)
IDIQ FFP
CLINFFPENTER OCCUPATION CODE FROM APPLICABLE DoL WD 05-2247 REV 18LABOR CATEGORYESTIMATED HOURSU/IPROPOSED BASE DIRECT LABOR $ RATE FOR THE LABOR CATEGORYPROPOSED HEALTH & WELFARE $ RATE FOR THE LABOR CATEGORYPROPOSED FULLY LOADED LABOR RATE (INCLUDES DIRECT LABOR , HEALTH & WELFARE, OTHER FRINGE BENEFITS INCLUDING VACATIONS & HOLIDAYS, WORKMAN'S COMPENSATION, FICA, FUTA, SUTA, OVERHEAD, G&A, AND PROFIT)AMOUNT
0001AAN/ASite Supervisor Exempt6,000HR$ - 0$ - 0$ - 0$ - 0
0001ABN/ASITE Supv Expmt OT600HR$ - 0$ - 0$ - 0$ - 0
0001ACHeavy Equipment Oper12,000HR$ - 0$ - 0$ - 0$ - 0
0001ADHeavy Equip Oper OT12,000HR$ - 0$ - 0$ - 0$ - 0
0001AESurveyor2,400HR$ - 0$ - 0$ - 0$ - 0
0001AFSurveyor OT240HR$ - 0$ - 0$ - 0$ - 0
0001AGElectrician6,000HR$ - 0$ - 0$ - 0$ - 0
0001AHElectrician OT600HR$ - 0$ - 0$ - 0$ - 0
0001AJWelder2,400HR$ - 0$ - 0$ - 0$ - 0
0001AKWelder OT240HR$ - 0$ - 0$ - 0$ - 0
0001ALLaborer24,000HR$ - 0$ - 0$ - 0$ - 0
0001AMLaborer OT2,400HR$ - 0$ - 0$ - 0$ - 0
0001ANPlumber1,500HR$ - 0$ - 0$ - 0$ - 0
0001APPlumber OT150HR$ - 0$ - 0$ - 0$ - 0
0001AQCarpenter6,000HR$ - 0$ - 0$ - 0$ - 0
0001ARCarpenter OT600HR$ - 0$ - 0$ - 0$ - 0
0001ASTractor Trlr Dvr6,000HR$ - 0$ - 0$ - 0$ - 0
0001ATTractor Trlr Dvr OT600HR$ - 0$ - 0$ - 0$ - 0
0001AUPainter3,000HR$ - 0$ - 0$ - 0$ - 0
0001AVPainter OT300HR$ - 0$ - 0$ - 0$ - 0
0001AWHvy Equip Mechanic4,500HR$ - 0$ - 0$ - 0$ - 0
0001AXHvy Equip Mechanic OT450HR$ - 0$ - 0$ - 0$ - 0
0001AYCement Finisher6,000HR$ - 0$ - 0$ - 0$ - 0
0001AZCement Finisher OT600HR$ - 0$ - 0$ - 0$ - 0
0001BAEnvironmental Tech2,400HR$ - 0$ - 0$ - 0$ - 0
0001BBEnvironmental Tech OT240HR$ - 0$ - 0$ - 0$ - 0
0001BCUXO Tech-III4,500HR$ - 0$ - 0$ - 0$ - 0
0001BDUXO Tech-III-OT450HR$ - 0$ - 0$ - 0$ - 0
0001BGEngineer (PE)6,000HR$ - 0$ - 0$ - 0$ - 0
0001BHTug Captain2,400HR$ - 0$ - 0$ - 0$ - 0
0001BJTug Captain OT240HR$ - 0$ - 0$ - 0$ - 0
0001BKBoat Captain2,400HR$ - 0$ - 0$ - 0$ - 0
0001BLBoat Captain OT240HR$ - 0$ - 0$ - 0$ - 0
0001BMCrane Operator2,400HR$ - 0$ - 0$ - 0$ - 0
0001BNCrane Opertor OT240HR$ - 0$ - 0$ - 0$ - 0
120,090TOTAL CLIN 0001 FFP PRICE$ - 0
INSTRUCTIONS: EACH OFFEROR SHALL COMPLETE ONLY THE BLUE SHADED CELLS.
NOTES: OFFERORS ARE NOT TO CHANGE THE HOURS IN COLUMN E.
OFFERORS SHALL INCLUDE AT LEAST THE MINIMUM HEALTH & WELFARE SPECIFIED IN THE DOL WAGE DETERMINATION IN COLUMN H.
OFFERORS SHALL INCLUDE AT LEAST THE MINIMUM REQUIRED VACATIONS AND HOLIDAYS SPECIFIED IN THE DOL WAGE DETERMINATION IN THE PROPOSED
LOADED RATE IN COLUMN I.
OFFERORS SHALL INCLUDE A COPY OF THEIR PAID LEAVE POLICY COVERED UNDER EMPLOYEE FRINGE BENEFITS (AND INCLUDED IN THE FULLY-BURDENED LABOR RATE), IN THEIR PROPOSAL.
IDIQ TIME & MATERIALAMOUNT
0002Normalized Estimated Material -LT
(e.g., Soil, Engineered Soil, Sand Concrete, Gravel and Stone(various sizes))PROPOSED RATE
Proposed material handling and/or G&A(INCLUDE NO PROFIT)0.00%$ 468,750.00
CLIN 0002 ESTIMATED MATERIAL$468,750.00
0002Normalized Estimated Armored Mobile Equipment -LT
(e.g. Backhoes, Bulldozers. Pile Drivers
Remote Operated Backhoe)PROPOSED RATE
Proposed material handling and/or G&A(INCLUDE NO PROFIT)0.00%$76,250.00
CLIN 0002 ESTIMATED ARMORED EQUIP$76,250.00
0002Normalized Estimated Standard Mobile EquipmentLT
(e.g. Backhoes, Bulldozers. Pile Drivers, Boring equipment)PROPOSED RATE
Proposed material handling and/or G&A(INCLUDE NO PROFIT)0.00%$101,250.00
CLIN 0002 ESTIMATED STANDARD EQUIP$101,250.00
0002Normalized Estimated Fixed EquipmentLT
(e.g. Generators, Air Compressors,
Light Sets, Enclosures/Trailers, Pre-engineered Bldg, Cable, Pre-cast,etc.)PROPOSED RATE
Proposed material handling and/or G&A(INCLUDE NO PROFIT)0.00%$177,500.00
CLIN 0002 ESTIMATED FIXED EQUIP$177,500.00
0002Estimated Labor -
CLINT&MENTER OCCUPATION CODE FROM APPLICABLE DoL WD 05-2247 REV 18LABOR CATEGORYESTIMATED HOURSU/IPROPOSED BASE DIRECT LABOR $ RATE FOR THE LABOR CATEGORYPROPOSED HEALTH & WELFARE $ RATE FOR THE LABOR CATEGORYPROPOSED FULLY LOADED LABOR RATE (INCLUDES DIRECT LABOR , HEALTH & WELFARE, OTHER FRINGE BENEFITS INCLUDING VACATIONS & HOLIDAYS, WORKMAN'S COMPENSATION, FICA, FUTA, SUTA, OVERHEAD, G&A, AND PROFIT)AMOUNT
0002AAHeavy Equipment Operator9,500HR$ - 0$ - 0$ - 0$ - 0
0002ABLaborer5,000HR$ - 0$ - 0$ - 0$ - 0
0002ACTruck Driver9,500HR$ - 0$ - 0$ - 0$ - 0
24,000Total$ - 0

TOTAL CLIN 0002 T&M PRICE $823,750.00

NOTES: OFFERORS ARE NOT TO CHANGE THE HOURS IN COLUMN E
OFFERORS SHALL INCLUDE AT LEAST THE MINIMUM REQUIRED VACATIONS AND HOLIDAYS SPECIFIED IN THE DOL WAGE DETERMINATION IN THE PROPOSED
LOADED RATE IN COLUMN I
OFFEROR SHALL INCLUDE THEIR PAID LEAVE POLICY COVERED UNDER EMPLOYEE FRINGE BENEFITS (THAT ARE INCLUDED IN THE FULLY-BURDENED LABOR RATE), IN THEIR PROPOSAL.
INSTRUCTIONS: EACH OFFEROR SHALL COMPLETE ONLY THE BLUE SHADED CELLS.

TOTAL PROPOSED PRICE $823,750.00

NOTE: CONTRACT MINIMUM/MAXIMUM:
MINIMUM - $1,000.00
MAXIMUM - $9,999,999.00
During the contract period of performance, the Government shall place a minimum order of $1,000.00 under this contract, which will meet the contract minimum of $1,000.00.
The cumulative amount of all task orders shall not exceed $9,999,999.00.

File details come from the government source that posted it. Updated .