The file's text, extracted by GovTribe without its formatting.
BASIS CLIN 0001 & 0002 ESTIMATE
| ATC RANGE SUPPORT CONTRACT (Three Year Award) | | | | | | | | | |
| | | IDIQ FFP | | | | | | |
| CLIN | FFP | ENTER OCCUPATION CODE FROM APPLICABLE DoL WD 05-2247 REV 18 | LABOR CATEGORY | ESTIMATED HOURS | U/I | PROPOSED BASE DIRECT LABOR $ RATE FOR THE LABOR CATEGORY | PROPOSED HEALTH & WELFARE $ RATE FOR THE LABOR CATEGORY | PROPOSED FULLY LOADED LABOR RATE (INCLUDES DIRECT LABOR , HEALTH & WELFARE, OTHER FRINGE BENEFITS INCLUDING VACATIONS & HOLIDAYS, WORKMAN'S COMPENSATION, FICA, FUTA, SUTA, OVERHEAD, G&A, AND PROFIT) | AMOUNT |
| 0001 | AA | N/A | Site Supervisor Exempt | 6,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AB | N/A | SITE Supv Expmt OT | 600 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AC | | Heavy Equipment Oper | 12,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AD | | Heavy Equip Oper OT | 12,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AE | | Surveyor | 2,400 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AF | | Surveyor OT | 240 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AG | | Electrician | 6,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AH | | Electrician OT | 600 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AJ | | Welder | 2,400 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AK | | Welder OT | 240 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AL | | Laborer | 24,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AM | | Laborer OT | 2,400 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AN | | Plumber | 1,500 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AP | | Plumber OT | 150 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AQ | | Carpenter | 6,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AR | | Carpenter OT | 600 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AS | | Tractor Trlr Dvr | 6,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AT | | Tractor Trlr Dvr OT | 600 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AU | | Painter | 3,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AV | | Painter OT | 300 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AW | | Hvy Equip Mechanic | 4,500 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AX | | Hvy Equip Mechanic OT | 450 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AY | | Cement Finisher | 6,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | AZ | | Cement Finisher OT | 600 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BA | | Environmental Tech | 2,400 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BB | | Environmental Tech OT | 240 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BC | | UXO Tech-III | 4,500 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BD | | UXO Tech-III-OT | 450 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BG | | Engineer (PE) | 6,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BH | | Tug Captain | 2,400 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BJ | | Tug Captain OT | 240 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BK | | Boat Captain | 2,400 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BL | | Boat Captain OT | 240 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BM | | Crane Operator | 2,400 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001 | BN | | Crane Opertor OT | 240 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | 120,090 | | TOTAL CLIN 0001 FFP PRICE | | | $ - 0 |
| INSTRUCTIONS: EACH OFFEROR SHALL COMPLETE ONLY THE BLUE SHADED CELLS. | | | | | | | | | |
| NOTES: OFFERORS ARE NOT TO CHANGE THE HOURS IN COLUMN E. | | | | | | | | | |
| OFFERORS SHALL INCLUDE AT LEAST THE MINIMUM HEALTH & WELFARE SPECIFIED IN THE DOL WAGE DETERMINATION IN COLUMN H. | | | | | | | | | |
| OFFERORS SHALL INCLUDE AT LEAST THE MINIMUM REQUIRED VACATIONS AND HOLIDAYS SPECIFIED IN THE DOL WAGE DETERMINATION IN THE PROPOSED | | | | | | | | | |
| LOADED RATE IN COLUMN I. | | | | | | | | | |
| OFFERORS SHALL INCLUDE A COPY OF THEIR PAID LEAVE POLICY COVERED UNDER EMPLOYEE FRINGE BENEFITS (AND INCLUDED IN THE FULLY-BURDENED LABOR RATE), IN THEIR PROPOSAL. | | | | | | | | | |
| IDIQ TIME & MATERIAL | | | | AMOUNT |
| 0002 | Normalized Estimated Material - | | LT | | |
| (e.g., Soil, Engineered Soil, Sand Concrete, Gravel and Stone(various sizes)) | | | PROPOSED RATE | |
| Proposed material handling and/or G&A | (INCLUDE NO PROFIT) | | 0.00% | $ 468,750.00 |
| CLIN 0002 ESTIMATED MATERIAL | | | | $468,750.00 |
| 0002 | Normalized Estimated Armored Mobile Equipment - | | LT | | |
| (e.g. Backhoes, Bulldozers. Pile Drivers | | | | |
| Remote Operated Backhoe) | | | PROPOSED RATE | |
| Proposed material handling and/or G&A | (INCLUDE NO PROFIT) | | 0.00% | $76,250.00 |
| CLIN 0002 ESTIMATED ARMORED EQUIP | | | | $76,250.00 |
| 0002 | Normalized Estimated Standard Mobile Equipment | | LT | | |
| (e.g. Backhoes, Bulldozers. Pile Drivers, Boring equipment) | | | PROPOSED RATE | |
| Proposed material handling and/or G&A | (INCLUDE NO PROFIT) | | 0.00% | $101,250.00 |
| CLIN 0002 ESTIMATED STANDARD EQUIP | | | | $101,250.00 |
| 0002 | Normalized Estimated Fixed Equipment | | LT | | |
| (e.g. Generators, Air Compressors, | | | | |
| Light Sets, Enclosures/Trailers, Pre-engineered Bldg, Cable, Pre-cast,etc.) | | | PROPOSED RATE | |
| Proposed material handling and/or G&A | (INCLUDE NO PROFIT) | | 0.00% | $177,500.00 |
| CLIN 0002 ESTIMATED FIXED EQUIP | | | | $177,500.00 |
| 0002 | | | Estimated Labor - | | | | | | |
| CLIN | T&M | ENTER OCCUPATION CODE FROM APPLICABLE DoL WD 05-2247 REV 18 | LABOR CATEGORY | ESTIMATED HOURS | U/I | PROPOSED BASE DIRECT LABOR $ RATE FOR THE LABOR CATEGORY | PROPOSED HEALTH & WELFARE $ RATE FOR THE LABOR CATEGORY | PROPOSED FULLY LOADED LABOR RATE (INCLUDES DIRECT LABOR , HEALTH & WELFARE, OTHER FRINGE BENEFITS INCLUDING VACATIONS & HOLIDAYS, WORKMAN'S COMPENSATION, FICA, FUTA, SUTA, OVERHEAD, G&A, AND PROFIT) | AMOUNT |
| 0002 | AA | | Heavy Equipment Operator | 9,500 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002 | AB | | Laborer | 5,000 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002 | AC | | Truck Driver | 9,500 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | 24,000 | | | | Total | $ - 0 |
TOTAL CLIN 0002 T&M PRICE $823,750.00
| NOTES: OFFERORS ARE NOT TO CHANGE THE HOURS IN COLUMN E |
| OFFERORS SHALL INCLUDE AT LEAST THE MINIMUM REQUIRED VACATIONS AND HOLIDAYS SPECIFIED IN THE DOL WAGE DETERMINATION IN THE PROPOSED |
| LOADED RATE IN COLUMN I |
| OFFEROR SHALL INCLUDE THEIR PAID LEAVE POLICY COVERED UNDER EMPLOYEE FRINGE BENEFITS (THAT ARE INCLUDED IN THE FULLY-BURDENED LABOR RATE), IN THEIR PROPOSAL. |
| INSTRUCTIONS: EACH OFFEROR SHALL COMPLETE ONLY THE BLUE SHADED CELLS. |
TOTAL PROPOSED PRICE $823,750.00
| NOTE: CONTRACT MINIMUM/MAXIMUM: | |
| MINIMUM - $1,000.00 |
| MAXIMUM - $9,999,999.00 |
| During the contract period of performance, the Government shall place a minimum order of $1,000.00 under this contract, which will meet the contract minimum of $1,000.00. | |
| The cumulative amount of all task orders shall not exceed $9,999,999.00. | |