W91CRB16R0007_Attachment_4_Sample_Ph_II_TO_MOCK__Proc_Instal_PWS.pdf
PDF 709 KB Posted
- Attached to
- Furniture and Ancillary Services REF-A
- Solicitation number
- W91CRB-16-R-0007
About this file
Attachment 4 Phase II PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91CRB16R0007_Amendment_0001.pdf | ||
| W91CRB16R0007_Questions_and_Answers.docx | DOCX document | |
| W91CRB16R0007_Attachment_2_CDRL_3.pdf | ||
| W91CRB16R0007_Attachment_2_CDRL_1.pdf | ||
| W91CRB16R0007_Attachment_1_Questionnaire.docx | DOCX document | |
| W91CRB16R0007_Attachment_5_Sample_Phase_I_Task_Order_MOCK_Design_Pricing_Template.xlsx | XLSX spreadsheet | |
| W91CRB16R0007_Attachment_2_CDRL_2.pdf | ||
| W91CRB16R0007_Attachment_3_QASP.docx | DOCX document | |
| W91CRB16R0007_Attachment_4_Sample_Phase_I_Task_Order_MOCK_Design_PWS.doc | DOC document | |
| W91CRB-16-R-0007_REF-A.pdf | ||
| W91CRB16R0007_Attachment_5_Sample_Phase_II_Task_Order_MOCK_Procurment_and_Installation.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement – New Sample Phase II Procurement/Installation Task Order
CONTRACT INFORMATION: PROJECT IDENTIFICATION:
Contract#: TBD Type of Contract: IDIQ Contractor: TBD
Project Title: Taylor 3050 Procurement/Installation Project Location: Taylor Building, 3rd Floor, Rm 3050 Project Start Date: TBD
GENERAL INFORMATION:
The Contractor shall comply with the project deadlines set by REF-A. The Contractor shall have 12 weeks from the award date to complete the project.
The Contractor shall report directly to REF-A as the primary point of contact, all other representatives are secondary. REF-A shall be informed of and approve individual requests made by other sources before proceeding.
The contractor shall ensure the services are performed by experienced staff and installers.
The contractor shall provide all labor, material and resources required in accordance with the PWS.
The Contractor shall display the building permits as directed on the permits.
PROJECT INFORMATION:
Taylor Building, Room 3050: The Contractor shall provide all labor, material and resources required IAW this Performance Work Statement (PWS), and the attached, Design and Bill of Materials to procure, deliver, and install the new furniture systems components that includes, but not limited to, the following:
Task 1: The Contractor shall procure the furniture components IAW the attached BOM.
Task 2: The Contractor shall deliver and install the new furniture components IAW the attached drawings.
Task 3: The Contractor shall remove all trash and debris from the site upon project completion.
Task 4: The Contractor shall provide any other documentation needed to provide guidance in the execution of the furniture installation.
Project: Taylor Building, Room 3050
File details come from the government source that posted it. Updated .