W91CRB16R0007_Attachment_3_QASP.docx

DOCX document 36 KB Posted

Attached to
Furniture and Ancillary Services REF-A
Solicitation number
W91CRB-16-R-0007
Issued by

About this file

Attachment 3 QASP

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

Furniture and Ancillary Services

1. Purpose. This Quality Assurance Surveillance Plan (QASP) provides a basis for assessing performance quality for this contract.

The Contractor’s performance will be monitored to determine compliance with established performance objectives. This QASP establishes benchmarks that ensure a quantifiable basis for measuring performance and explains the methodology for surveillance, including who will conduct monitoring and what monitoring will take place.

This QASP does not detail how the Contractor accomplishes the work. Rather, this QASP is created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, this QASP recognizes that unforeseen and uncontrollable situations may occur.

2. Government Roles and Responsibilities. The following personnel shall oversee and coordinate surveillance activities.

Contracting Officer (KO). The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the Contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative (COR). The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the Contractor’s performance. When requested by the KO, the COR shall provide quality assurance documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The Contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.

Assigned COR:Karen Whetstone
Telephone:703-545-0604
Email:Karen.j.whetstone.civ@mail.mil

3. Surveillance. Surveillance of Contractor performance is the method used by the Government to evaluate the Contractor’s compliance with all terms and conditions of the contract. This QASP is designed to limit surveillance to that which is necessary to verify that the Contractor is performing satisfactorily with respect to the Statement of Work. The following surveillance methods will be used in the administration of this QASP, at the discretion of the COR:

· Analysis of Contractor’s monthly reports

· Progress or status meetings (including voice teleconferences)

· Communications through email and telephone

· Delivery/removal of furniture

· Completion of assembly of furniture Surveillance results may be used as the basis for actions against the Contractor. In such cases, the Inspection of Services clause in the contract becomes the basis for the KO’s actions.

4. Ratings. A rating scale will be used to describe whether performance exceeds, meets, or does not meet a given standard or acceptable quality level. The following adjectival ratings will be used:

· Excellent—Performance exceeds contract requirements to the Government’s benefit

· Acceptable—Performance meets contractual requirements

· Unacceptable—Performance does not meet contractual requirements The performance ratings implemented via this QASP may be used as past-performance relevant information for future contract awards.

5. Communication. The COR will conduct informal interim counseling sessions with the Contractor’s Project Manager to identify any active contract performance that is not meeting acceptable quality levels. These sessions will be conducted at least on a quarterly basis in order to provide the Contractor a fair opportunity to improve its performance level.

In the event of unacceptable performance, the Contractor will be notified, in writing, of the Government’s determination of the performance levels for all instances where the Contractor failed to meet acceptable quality levels. The Contractor shall acknowledge, in writing, receipt of this determination and shall prepare and submit a corrective action plan to document how the unacceptable performance will be corrected. The COR will review the plan to determine acceptability. All communication may become part of supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.

6. Performance Objectives. This contract has the following tasks/deliverables:

· Design Code Compliance

· Attend Meetings

· Provide Design Services

· Provide Renovation Services

· Procurement/Installation/Reconfiguration Services The Government’s assessment of the Contractor’s performance in achieving these objectives will utilize the standards, acceptable quality levels, and surveillance methods described below.

PERFORMANCE REQUIREMENT
PERFORMANCE STANDARD
PREVENTATIVE MEASURES
PERFORMANCE EXPECTATION

PRS #1 The Contractor shall perform work using experience and qualified personnel (Task 1.6.19.3)

The Contractor shall provide personnel experienced in the appropriate fields of project management, design, and furniture installation
The Contractor representative shall have at least 2 years experience in their field and proper training/education to perform the tasks effectively
COR issues nonconformance report to the Contractor, if nonconformance continues, KO mandates ($) consideration from the Contractor. The Contractor shall be responsible for all costs associated with all required rework
PRS #2 The Contractor shall coordinate with REF-A project lead within the established timeline (Task 5.3.1.1)
Contractor shall coordinate with REF-A project lead on an ongoing basis providing project schedules, floor plans, and status updates
The Contractor shall meet at a minimum three times during the project
COR issues nonconformance report to the Contractor, if nonconformance continues, KO mandates ($) consideration from the Contractor. The Contractor shall be responsible for all costs associated with all required rework

PRS #3 The Contractor shall prepare and attend project meetings (Task 5.3.1.2)

The Contractor shall draft meeting agendas with details required to obtain customers requirements. The Contractor representative shall attend meetings on time
The Contractor shall send documentation to REF-A project at least 24 working hours in advance of the meeting.

The Contractor representative shall arrive 5 minutes prior to meeting COR issues nonconformance report to the Contractor, if nonconformance continues, KO mandates ($) consideration from the Contractor. The Contractor shall be responsible for all costs associated with all required rework.

PRS #4 The Contractor shall assure a very high degree of customer satisfaction with all projects (Task 5.3.1.3)

The Contractor shall ensure that REF-A project lead and the end user receive unparalleled customer service
98% satisfaction rating from the customer. The Contractor shall provide resolution within 24 working hours of notification from the customer. The Contractor shall provide a log to include the issue, date received, resolution, and date resolved
COR issues nonconformance report to the Contractor, if nonconformance continues, KO mandates ($) consideration from the Contractor. The Contractor shall be responsible for all costs associated with all required rework

PRS #5 The Contractor shall provide timely resolution for all problems identified regarding purchasing and/or furniture installation (Task 5.3.1.4)

The Contractor shall immediately notify REF-A project lead of any issues that arise either during the ordering of merchandise and/or furniture installation
The Contractor shall provide resolution within 16 working hours of notification from the customer. The Contractor shall provide a log which includes the issue, date received, resolution, and date resolved
COR issues nonconformance report to the Contractor, if nonconformance continues, KO mandates ($) consideration from the Contractor. The Contractor shall be responsible for all costs associated with all required rework

PRS #6 The Contractor shall provide furniture selections that are the best value to the Government (Task 5.2)

The Contractor shall select furniture that is the best value based on quality, delivery time and availability, compatibility with existing conditions, warranty considerations, past performance and flexibility
First, the Contractor shall utilize existing furniture that resides at the Army warehouse(s), and secondly, purchase new furniture if required
COR issues nonconformance report to the Contractor, if nonconformance continues, KO mandates ($) consideration from the Contractor. The Contractor shall be responsible for all costs associated with all required rework

PRS #7 The Contractor shall follow proper protocol when moving furniture in/out of facilities (Task 5.4.1)

The Contractor shall follow the moving guidelines set forth by the facility listing hours, protection and documentation (certificate of insurance, loading dock clearance form, etc.)
The Contractor shall provide documentation to REF-A representative and/or property management office, as appropriate, at least 72 working hours in advance

The Contractor shall bring all necessary Protection materials on the move date

COR issues nonconformance report to the Contractor, if nonconformance continues, KO mandates ($) consideration from the Contractor. The Contractor shall be responsible for all costs associated with all required rework

PRS # 8 The Contractor shall ensure that all work meets Design Code Compliance (Task 5.7)

The Contractor shall ensure that all designs services performed comply with ADA Code – ANSIA11.7, International Building Code, International Fire Code, NFPA 101 Life Safety Code, NFPA National Electrical Code, and all other applicable building, accessibility or life safety requirements
100%, No deviation from standard
COR issues nonconformance report to the Contractor, if nonconformance continues, KO mandates ($) consideration from the Contractor. The Contractor shall be responsible for all costs associated with all required rework

File details come from the government source that posted it. Updated .