W91364-23-B-0003 RFI 2 - Fence and Truck Access.pdf
PDF 70 KB Posted
- Attached to
- Perimeter Road Restoration and Fence Replacement
- Solicitation number
- W91364-23-B-0003
About this file
This document is a request for information (RFI) related to federal contract opportunity number W91364-23-B-0003 from the Department of the Army Ohio Army National Guard. The RFI concerns perimeter fencing and road restoration work for the project number 3923019. Specifically, the RFI asks whether the existing fence will be removed or left in place set back 20 feet as in the previous section, and requests information on truck access and turnaround given there is no turnaround currently planned. The response clarifies that the new fence will be set back 20 feet leaving the old fence, and that the contractor will be responsible for phasing road improvements with fencing work and any necessary truck access or turnarounds, repairing any road damage before or after perimeter road repairs.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
REQUEST FOR INFORMATION
RFI NUMBER:
PROJECT NUMBER / CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
| CONTRACT NUMBER: W91364-23-B-0003 |
| RFI NUMBER: 2 |
| PROJECT NUMBER CONTRACT TITLE: 3923019 / FY23 Perimeter Road Restoration and Fence Replacement |
| PRIME CONTRACTOR: |
| SUBCONTRACTORSUPPLIER: |
| SUBJECTTITLE OF RFI: Fence Line & Turn Around |
| DRAWINGS: NA |
| DETAILS: NA |
| SPECIFICATION: SOW Base Bid |
| CPM ACTIVITY: |
| PHONE: |
| FAX: |
| COST IMPACT: Off |
| DATE SUBMITTED: |
| RESPOND BY: |
| INFORMATION REQUESTED: Is the fence in the base bid going to be removed or to be left 20' out to continue the way the last section is done (leaving the old fence there)? |
Is there a plan for trucks in the area. There is no turn around, can one be built?
| By: |
| Date: |
| RESPONSE: The new fence will be set back approximately 20' and the old fence left in place. |
Contractor will be responsible for truck access by phasing the road improvements with the fence. Any damage to the road before or after the installation of the perimeter road repairs will be the responsibility of the contractor to repair. This includes any turn around(s) placed by the contractor.
| By_2: Hugh Holley |
| Date_2: |
| COR Concurrence: |
| Date_3: |
| CO Concurrence: Brad Wahl |
| Date_4: 09AUG23 |