Full_size_drawings_2a.pdf

PDF 4 MB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This document package includes architectural drawings and photographs related to a federal solicitation for repair and renovation work at an Air National Guard facility in Mansfield, Ohio. The solicitation seeks bids for demolition of existing structures, as well as fire protection, mechanical, plumbing and electrical systems work. Exterior work includes renovating brick veneer and metal siding, replacing windows and doors. Drawings show demolition plans, building elevations and existing site photographs. The opportunity is set aside for small businesses with a revenue size standard of $36.5 million. Bids are due August 23, 2019 following a pre-bid site visit on July 30. The Department of the Army Ohio Army National Guard is the contracting agency. The 577-day project duration and inclusion of demolition indicate the scope and scale of repair and renovation required at the facility.

Full size 2a

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_14.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
RFI_02.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Full_size_drawings_10.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Pre-Bid_sign_in_sheet.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FILENAME: PLOT DATE: PLOT TIME:

C H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_AD110$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

L

A

B

C

D

E

F

G

H

J

K

1 122 113 4 5 6 7 8 9 10

1 12

A

L

KEY PLAN

D

A B

C

0 16 32 48

1/16"=1'-0"

NN

BLDG TRUE

D E

M O

L

IT

IO

N

A R

C H

IT

E C

T U

R A

L

F

IR

S T F

L O

O R P

L A

N

J B

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

AD110

AS SHOWN

D R P

E A

R S

O

669816_AD110.dwg

669816

GENERAL NOTES

FIRST FLOOR DEMOLITION PLAN

1/16"=1'-0"

A. SEE SHEET A-001 FOR GENERAL NOTES,

LEGENDS AND SYMBOLS, SEE SHEET A-002 FOR

ABBREVIATIONS.

B. WHERE DEMOLITION OR REMOVAL IS

INDICATED REMOVE ALL CONSTRUCTION DOWN

TO SUITABLE SUBSTRATE AND LEAVE

SUBSTRATE READY TO RECEIVE NEW

CONSTRUCTION.

C. COORDINATE DEMOLITION WORK WITH WORK

SHOWN ON CIVIL, STRUCTURAL, MECHANICAL

PLUMBING, FIRE PROTECTION AND COMM.

DRAWINGS.

D. WHERE UNITS OF CONSTRUCTION ARE

INDICATED TO BE REMOVED OR DEMOLISHED,

REMOVE CONNECTORS, ANCHORS, BRACES,

WIRES, CONDUIT, PIPE, BRACKETS, PLATES

AND OTHER ACCESSORIES.

E. REMOVE MATERIALS THAT ARE SCHEDULED TO

BE REMOVED AND ARE ADJACENT TO AND/OR

IN CONTACT WITH ROOF SYSTEM BY METHODS

THAT MINIMIZE DAMAGE TO ROOF.

STRUCTURAL DRAWINGS.

DEMO SLAB FOR NEW FOOTINGS. SEE D3.

HANGAR DOOR (NIC). D2.

ADJACENT BUILDING FOR BURIAL.

REMOVE OVERHEAD CONNECTION TO D1.

GENERALD

DISCIPLINE DEMOLITION DRAWINGS.

SYSTEMS AS DESCRIBED IN INDIVIDUAL

PLUMBING, ELECTRIC, COMM., AND FIRE

REMOVE SITE COMPONENTS, MECHANICAL, C1.

ENGINEERINGC

TRENCH DRAINS. SEE STRUCTURAL DRAWINGS.

SAW CUT HANGAR SLAB FOR INSTALLATION OF B6.

ELECTRICAL, FIRE PROTECTION AND COMM.

INCLUDING FOUNDATIONS, PLUMBING,

REQUIRED FOR NEW CONSTRUCTION

SAW CUT AND REMOVE CONCRETE SLAB AS B5.

SUPPORTED THEREBY.

ATTACHED THERETO AND ELEMENTS

THE ENTIRE CEILING AND APPURTENANCES

SALVAGE AND STORE FOR REINSTALLATION

CEILING. AT CONTRACTOR OPTION, REMOVE,

ATTACHED TO THE REMOVED PORTION OF THE

ABOVE CEILING AND ALL APPURTENANCES

INSTALLATION OF SYSTEMS TO BE INSTALLED

HANGAR CEILING REQUIRED FOR

REMOVE, SALVAGE AND STORE PORTIONS OF B4.

APPURTENANCES MOUNTED THERETO.

AND DOOR FRAMES THEREIN AND ALL

PARTITIONS AS INDICATED INCLUDING DOORS

REMOVE INTERIOR CMU AND METAL STUD B3.

SLAB.

INCLUDING STAIRS DOWN TO FIRST FLOOR

REMOVE MEZZANINE LEVEL IN ENTIRETY B2.

CEILINGS.

REMOVE ALL SUSPENDED ACOUSTIC B1.

INTERIORSB

DOWNSPOUTS.

SYSTEM AS REQUIRED TO TIE-IN NEW

EXCAVATE EXISTING DOWNSPOUT LEADER A4.

REMOVE GUTTER AND DOWNSPOUTS.A3.

DOWN TO FLOOR SLAB.

REMOVE DRYING TOWER CONSTRUCTION A2.

WINDOWS, DOWNSPOUTS, SIGNAGE.

INCLUDING, BUT NOT LIMITED TO DOORS,

CONSTRUCTION ATTACHED THERETO,

BUILDING PERIMETER 4 SIDES - AND ALL

REMOVE BRICK VENEER AND 4" CMU BACKUP - A1.

EXTERIOR WALLA

KEYNOTES

DEMOLITION

LEGEND

D2

A1

A1

A3

B2

TYP

TYP

A1

B4

ABOVE

A1

TYP

A3

TYP

B3

TYP

B6

B6

TYP

B3

TYP

B6

A2

A1

TYP

A3

TYP

B5

B5

B3

TYP

BE REMOVED

EXISTING ELEMENTS TO

REMAIN

EXISTING ELEMENTS TO

D1

A4

TYP

A4

TYP

A4

TYP

B1B1

B1

B1

D3

TYP

D3

TYPD3

TYP

B D

E S

IG

N S

U B

M

IT

T A

L

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

P

05 FEBRUARY 2019

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_AD201$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

Ohio Air National Guard

179th Airlift Wing

D E

M O

L

IT

IO

N

A R

C H

IT

E C

T U

R A

L

B U

IL

D

IN

G E

L E

V A

T

IO

S

J B

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

AD201

9 B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O N

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

669816_AD201.dwg

ABCDEFGHJKL A B C D E F G H J K L

12 11 10 9 8 7 6 5 4 3 2 1

121110987654321

NORTH ELEVATION

SOUTH ELEVATION

WEST ELEVATION

EAST ELEVATION

GENERAL NOTES

A. SEE SHEET A-001 FOR GENERAL NOTES,

LEGENDS AND SYMBOLS, SEE SHEET A-002 FOR

ABBREVIATIONS.

B. WHERE DEMOLITION OR REMOVAL IS

INDICATED REMOVE ALL CONSTRUCTION DOWN

TO SUITABLE SUBSTRATE AND LEAVE

SUBSTRATE READY TO RECEIVE NEW

CONSTRUCTION.

C. COORDINATE DEMOLITION WORK WITH WORK

SHOWN ON CIVIL, STRUCTURAL, MECHANICAL

PLUMBING, FIRE PROTECTION AND COMMS.

DRAWINGS.

D. WHERE UNITS OF CONSTRUCTION ARE

INDICATED TO BE REMOVED OR DEMOLISHED,

REMOVE CONNECTORS, ANCHORS, BRACES,

WIRES, CONDUIT, PIPE, BRACKETS, PLATES

AND OTHER ACCESSORIES.

E. REMOVE MATERIALS THAT ARE SCHEDULED TO

BE REMOVED AND ARE ADJACENT TO AND/OR

IN CONTACT WITH ROOF SYSTEM BY METHODS

THAT MINIMIZE DAMAGE TO ROOF.

1. CLEAN DIRT, GRIME, SOOT FROM SIDING.

2. REMOVE BRICK VENEER AND 4" CMU BACKUP -

BUILDING PERIMETER 4 SIDES - AND ALL

CONSTRUCTION ATTACHED THERETO,

INCLUDING, BUT NOT LIMITED TO DOORS,

WINDOWS, DOWNSPOUTS, SIGNAGE.

3. REMOVE (2) STEEL FRAMES.

4. REMOVE DRYING TOWER CONSTRUCTION

DOWN TO FLOOR SLAB.

5. HANGAR DOOR (NIC).

6. EXISTING ROOF (N.I.C.).

7. CLEAN AND REPAIR LOUVERS AND OTHER

WALL PENETRATIONS.

KEYNOTES

DEMOLITION

TYP

DEMOLITION LEGND

REMOVE LOUVERS

REMOVE DOWNSPOUTS

REMOVE SILL BLOCK

REMOVE DOOR

REMOVE WINDOW

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_AD901$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

L

A

1 12

B

C

D

E

F

G

H

J

K

2 11

1 122 113 4 5 6 7 8 9 10 1 12

A

L

KEY PLAN

D

A B

C

0 16 32 48

1/16"=1'-0"

NN

BLDG TRUE

D E

M O

L

IT

IO

N

A R

C H

IT

E C

T U

R A

L

P H

O T

O G

R A

P H

S O

F

E X

IS

T

IN

G F

A C

IL

IT

IE

S J B

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

AD901

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O

669816_AD901.dwg

PHOTO KEY PLAN

1/16"=1'-0"

1R

AD901

ROOF PHOTO

NTS

72E

3E

4E 5E

2 3 4

1E

7E

6E

8E

9E

2R 1R

GENERAL NOTES

1. PHOTO NAMING CONVENTION

1R - ROOF LOCATION FOR PHOTOGRAPH

1E - EXTERIOR LOCATION FOR PHOTOGRAPH

1 - INTERIOR LOCATION FOR PHOTOGRAPH

2. SEE DRAWINGS AD902 AND AD903 FOR

PHOTOGRAPHS

1. LADDER AND CAGE, CLEAN AND PAINT.

2. STEEL EQUIPMENT

3. HVAC EQUIPMENT

4. PREFINISHED METAL WALLPANELS, CLEAN

5. LOW SLOPE ROOF MEMBRANE, PATCH AND

REPAIR AREAS IMPACTED BY CONSTRUCTION,

SEE SHEET A-130

6. ROOF EDGE. SEE SHEET A-130

7. DRYING TOWER. SEE KEYNOTE A2/AD110

KEYNOTES

DEMOLITION

2R

AD901

ROOF PHOTO

NTS

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_AD902$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

D E

M O

L

IT

IO

N

A R

C H

IT

E C

T U

R A

L

P H

O T

O G

R A

P H

S O

F

E X

IS

T

IN

G F

A C

IL

IT

IE

S J B

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

AD902

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O

669816_AD902.dwg

1E

AD901

EXTERIOR PHOTO

NTS

2E

AD901

EXTERIOR PHOTO

NTS

3E

AD901

EXTERIOR PHOTO

NTS

4E

AD901

EXTERIOR PHOTO

NTS

5E

AD901

EXTERIOR PHOTO

NTS

6E

AD901

EXTERIOR PHOTO

NTS

7E

AD901

EXTERIOR PHOTO

NTS

8E

AD901

EXTERIOR PHOTO

NTS

9E

AD901

EXTERIOR PHOTO

NTS

GENERAL NOTES

A. PHOTOGRAPHS ARE TO REPRESENT EXISTING

CONDITIONS AS OF DATE PHOTO WAS TAKEN.

CONDITIONS MAY HAVE CHANGED DURING THE

TIME OF PREPARATION OF THE DOCUMENTS.

1. CLEAN DIRT, GRIME, SOOT FROM SIDING.

2. WALL PENETRATION, CLEAN AND RESEAL.

3. LADDER AND CAGE, CLEAN AND PAINT

4. BRICK VENEER, SEE SHEET AD110

5. OVERHEAD CABLE SUPPORT, SEE KEYNOTE D1,

SHEET AD110

6. GUTTERS AND DOWNSPOUTS, SEE KEYNOTE

A3/AD110

7. WINDOW, SEE KEYNOTE A1/AD110

8. PRESERVE SIDEWALK

9. GAS METER, SEE MECHANICAL DRAWINGS

10. SPRINKLER CONNECTION, SEE FIRE

PROTECTION DRAWINGS

11. ANTENNA, SEE COMMS. DRAWINGS

12. DEMO LOUVER

13. PRESERVE BOLLARDS IN PLACE

14. TRANSFORMERS, SEE CIVIL AND ELECTRICAL

DRAWINGS

15. ITEMS SEEN IN 3E

16. ASSORTED WALL SUPPORTED DEVICES.

DEMOLISH BRICK VENEER AND CMU BACKUP.

SEE ENGINEERING DRAWINGS FOR SPECIFIC

ACTION

17. DOWNSPOUT AND CONNECTION TO

UNDERGROUND COLLECTION SYSTEM, SEE

KEYNOTE A4/AD110

18. MECHANICAL UNITS, SEE MECHANICAL

DRAWINGS

19. FLIGHT LINE SECURITY CHAIN LINK FENCE

KEYNOTES

DEMOLITION

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

File details come from the government source that posted it. Updated .