SPECIFICATIONS

View the file

Other files

File Type Posted
3280-20-E-1-301 Layout1 —
3280-20-E-1-601 Layout1 —
3280-20-E-2-203 Layout1 —
3280-20-A-1-108R.pdf PDF
3280-20-A-1-601R.pdf PDF
AMENDMENT 5SEP08.pdf PDF
Response to pre bid questions and amendment items .pdf PDF
3280-20-E-2-401 Layout1 —
3280-20-E-1-302 Layout1 —
3280-20-E-1-202 Layout1 —
3280-20-A-3-101R.pdf PDF
3280-20-E-2-601 Layout1 —
3280-20-E-1-603 Layout1 —
Revised 01810 GENERAL COMMISSIONING REQUIREMENTS.pdf PDF
3280-20-C-1-200 C-200 —
3280-20-E-1-801 Layout1 —
3280-20-M-1-101R Layout1 —
3280-20-A-1-302R.pdf PDF
3280-20-E-1-103 Layout1 —
08380_DOUBLE SWING DOORS.pdf PDF
15856 Gravity Ventilators.pdf PDF
3280-20-A-1-107R.pdf PDF
3280-20-E-2-301 Layout1 —
3280-20-E-1-602 Layout1 —
3280-20-C-1-400R.pdf PDF
3280-20-E-1-304 Layout1 —
3280-20-E-0-101 Layout1 —
3280-20-C-1-300 C-300 —
3280-20-E-2-602 Layout1 —
3280-20-E-1-401 Layout1 —
3280-20-F-1-501R Layout1 —
3280-20-E-2-402 Layout1 —
3280-20-E-1-201 Layout1 —
3280-20-E-1-303 Layout1 —
100 Construction Documents Specifications.pdf PDF
3280-20-E-1-101.pdf PDF
3280-20-E-0-102.pdf PDF
amendment one 21aug08.pdf PDF
h5s45400.PDF PDF
3280-20-E-1-701.pdf PDF
3280-20-C-1-401.pdf PDF
3280-20-A-1-502.pdf PDF
3280-20-F-1-101.pdf PDF
3280-20-A-1-503.pdf PDF
3280-20-A-2-503.pdf PDF
3280-20-M-1-601.pdf PDF
3280-20-S-2-101.pdf PDF
3280-20-A-2-303.pdf PDF
3280-20-A-1-501.pdf PDF
3280-20-Q-1-101.pdf PDF
Show 40 more

Latest 50 of 206 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Documents

Ohio Army National Guard Springfield, OH

AFRC, PN 390169

FMS, PN 390170

A/E Consultant:

GRW Project No. 3280-20

(859) 223-3999

Contract No.

W9133L-05-D-0005

29 July 2008

Ohio Army National Guard Armed Forces Reserve Center/Field Maintenance Shop Springfield, Ohio ARNG Project #390169 / 390170

TC-1

TABLE OF CONTENTS

DIVISION 1

GENERAL REQUIREMENTS

Section 01000 – General Requirements ................................................................................................... 1-5 Section 01100 – Summary ...................................................................................................................... 1-6 Section 01290 – Payment Procedures ....................................................................................................... 1-5 Section 01310 – Project Management and Coordination ....................................................................... 1-10 Section 01320 – Construction Progress Documentation ......................................................................... 1-13 Section 01322 – Photographic Documentation ......................................................................................... 1-5 Section 01330 – Submittal Procedures.................................................................................................... 1-14 Section 01351 – Construction Waste Management Plan......................................................................... 1-10 Section 01352 – Sustainable Design Requirements .................................................................................. 1-8 Section 01354 – Indoor Air Quality (IAQ) Management.......................................................................... 1-7 Section 01360 – Green Power Requirements............................................................................................ 1-2 Section 01400 – Quality Requirements.................................................................................................. 1-10 Section 01420 – References ................................................................................................................... 1-19 Section 01500 – Temporary Facilities and Controls .............................................................................. 1-10 Section 01600 – Product Requirements ................................................................................................... 1-6 Section 01700 – Execution Requirements................................................................................................. 1-8 Section 01731 – Cutting and Patching ...................................................................................................... 1-5 Section 01770 – Closeout Procedures ...................................................................................................... 1-5 Section 01781 – Project Record Documents ............................................................................................. 1-4 Section 01782 – Operation and Maintenance............................................................................................ 1-8 Section 01810 – General Commissioning Requirements ......................................................................... 1-3 Section 01815 – Commissioning of HVAC ............................................................................................. 1-6 Section 01820 – Demonstration and Training .......................................................................................... 1-6

DIVISION 2

SITE WORK

Section 02230 – Site Clearing ................................................................................................................... 1-4 Section 02240 – Dewatering .................................................................................................................... 1-2 Section 02260 – Excavation Support and Protection ................................................................................ 1-4 Section 02300 – Earthwork ....................................................................................................................... 1-6 Section 02371 – Erosion and Sedimentation Control- Ohio ..................................................................... 1-9 Section 02400 – Boring and Jacking......................................................................................................... 1-5 Section 02510 – Water Distribution Piping............................................................................................. 1-12 Section 02514 – Concrete Curb & Gutter ................................................................................................. 1-3 Section 02530 – Gravity Sewer Piping ................................................................................................... 1-16 Section 02532 – Sanitary Sewer Manholes, Frames and Covers .............................................................. 1-9 Section 02552 – Geothermal Piping.......................................................................................................... 1-4 Section 02580 – Radio Tower ................................................................................................................... 1-3 Section 02620 – Subdrainage .................................................................................................................... 1-8 Section 02630 – Storm Sewage Systems................................................................................................... 1-7 Section 02700 – Asphaltic Concrete Paving ............................................................................................. 1-3 Section 02720 – Aggregate Base Course .................................................................................................. 1-3

TC-2

Section 02721 – Stormwater Treatment System ....................................................................................... 1-8 Section 02751 – Concrete Paving ............................................................................................................. 1-6 Section 02775 – Sidewalks ....................................................................................................................... 1-3 Section 02820 – Chain Link Security Fences and Gates........................................................................... 1-5 Section 02870 – Site Furnishings - Bicycles............................................................................................. 1-4 Section 02900 – Landscape Plantings ..................................................................................................... 1-11 Section 02950 – Seeding and Sodding ...................................................................................................... 1-7

DIVISION 3

CONCRETE

Section 03300 – Cast-In-Place Concrete................................................................................................ 1-26 Section 03311 – Shrinkage-Compensating Concrete ................................................................................ 1-6

DIVISION 4

MASONRY

Section 04810 – Unit Masonry Assemblies ............................................................................................ 1-23

DIVISION 5

METALS

Section 05120 – Structural Steel ............................................................................................................ 1-11 Section 05210 – Steel Joists ...................................................................................................................... 1-7 Section 05310 – Steel Deck....................................................................................................................... 1-7 Section 05500 – Metal Fabrications....................................................................................................... 1-17 Section 05521 – Pipe and Tube Railings................................................................................................... 1-6

DIVISION 6

WOOD & PLASTIC

Section 06100 – Rough Carpentry ............................................................................................................ 1-7 Section 06202 – Interior Finish Carpentry ................................................................................................ 1-7 Section 06402 – Interior Architectural Woodwork ................................................................................ 1-11

DIVISION 7

THERMAL & MOISTURE PROTECTION

Section 07115 – Bituminous Dampproofing............................................................................................ 1-4 Section 07210 – Building Insulation ......................................................................................................... 1-7 Section 07412 – Metal Wall Panels........................................................................................................ 1-14 Section 07543 - Thermoplastic Polyolefin (TPO) Roofing..................................................................... 1-16

TC-3

Section 07552 – SBS Modified Bituminous Membrane Roofing .......................................................... 1-17 Section 07610 – Sheet Metal Roofing..................................................................................................... 1-16 Section 07620 – Sheet Metal Flashing and Trim ..................................................................................... 1-6 Section 07720 – Roof Hatch ..................................................................................................................... 1-7 Section 07920 – Joint Sealants ................................................................................................................. 1-7

DIVISION 8

DOORS & WINDOWS

Section 08110 – Standard Steel Doors and Frames.................................................................................. 1-6 Section 08211 – Flush Wood Doors......................................................................................................... 1-5 Section 08331 – Overhead Coiling Doors.............................................................................................. 1-10 Section 08361 – Sectional Overhead Doors .......................................................................................... 1-11 Section 08411 – Aluminum-Framed Entrances and Storefronts ............................................................ 1-12 Section 08710 – Door Hardware ............................................................................................................ 1-17 Section 08800 – Glass and Glazing........................................................................................................... 1-4 Section 08801 – Security Glazing ........................................................................................................... 1-11

DIVISION 9

FINISHES

Section 09111 – Non-Load-Bearing Steel Framing .................................................................................. 1-6 Section 09216 – Non-Structural Metal Framing ....................................................................................... 1-5 Section 09250 – Gypsum Board............................................................................................................... 1-7 Section 09310 – Ceramic - Tile.............................................................................................................. 1-12 Section 09511 – Acoustical Panel Ceilings.............................................................................................. 1-7 Section 09622 – Resilient Floor Sports-Floor Covering .......................................................................... 1-6 Section 09651 – Resilient Flooring ......................................................................................................... 1-6 Section 09681 – Carpet Tile ..................................................................................................................... 1-5 Section 09720 – Presentation Dry Erase Wallcovering............................................................................. 1-6 Section 09900 – Painting........................................................................................................................ 1-11

DIVISION 10

SPECIALTIES

Section 10125 – Display Cases ................................................................................................................. 1-6 Section 10155 – Toilet Compartments ..................................................................................................... 1-5 Section 10200 – Louvers and Vents.......................................................................................................... 1-7 Section 10350 – Flagpoles ...................................................................................................................... 1-4 Section 10410 – Directories ...................................................................................................................... 1-5 Section 10431 – Signage ....................................................................................................................... 1-11 Section 10505 – Metal Lockers................................................................................................................ 1-8 Section 10522 – Fire Extinguisher Cabinet.............................................................................................. 1-4 Section 10605 – Wire Mesh Partitions................................................................................................... 1-11 Section 10651 – Operable Panel Partitions .............................................................................................. 1-9 Section 10801 – Toilet and Bath Accessories .......................................................................................... 1-8

TC-4

DIVISION 11

EQUIPMENT

Section 11020 – Vault Doors .................................................................................................................... 1-9 Section 11400 – Food Service Equipment ............................................................................................. 1-40

DIVISION 12

FURNISHINGS

Section 12485 – Walk-off Mats ................................................................................................................ 1-6 Section 12491 – Horizontal Louvers and Blinds....................................................................................... 1-5

DIVISION 13

SPECIAL CONSTRUCTION

Section 13100 – Lightning Protection Systems (Air Terminals) ............................................................. 1-3 Section 13125 – Metal Building Systems ............................................................................................... 1-27 Section 13700 – Security Access and Intrusion Detection....................................................................... 1-1 Section 13850 – Fire Alarm System....................................................................................................... 1-16

DIVISION 14

CONVEYING SYSTEMS

Section 14600 – Hoists and Cranes ........................................................................................................ 1-10

DIVISION 15

MECHANICAL

Section 15010 - General Mechanical Provisions.................................................................................... 1-26 Section 15011 - Scope of Work ............................................................................................................... 1-3 Section 15015 - Sleeves and Penetrations ................................................................................................. 1-3 Section 15018 - Access Panels ................................................................................................................. 1-2 Section 15022 - Lubrication and Packing ................................................................................................. 1-2 Section 15025 - Electrical Coordination ................................................................................................... 1-4 Section 15060 - Pipe and Pipe Fittings - General.................................................................................... 1-11 Section 15080 - Piping Specialties ............................................................................................................ 1-4 Section 15090 - Hangers, Supports and Anchors...................................................................................... 1-8 Section 15095 - Expansion Compensation and Vibration Elimination..................................................... 1-5 Section 15099 - Painting of Mechanical Systems ................................................................................... 1-13 Section 15100 - Valves and Cocks............................................................................................................ 1-8 Section 15152 - Air Compressors and Accessories................................................................................... 1-8 Section 15170 - Motors ........................................................................................................................... 1-21 Section 15180 - Thermal Insulation ........................................................................................................ 1-11 Section 15190 - Mechanical Identification............................................................................................... 1-6 Section 15210 - Mechanical Exterior Piping............................................................................................ 1-6 Section 15305 - Firestopping ................................................................................................................... 1-5 Section 15310 - Fire Protection Piping .................................................................................................. 1-11

TC-5

Section 15330 - Fire Sprinkler Systems ................................................................................................. 1-10 Section 15410 - Plumbing Piping............................................................................................................. 1-6 Section 15412 - Emergency Plumbing Fixtures........................................................................................ 1-6 Section 15430 - Plumbing Specialties.................................................................................................... 1-16 Section 15435 – Above Ground Containment Tanks................................................................................ 1-3 Section 15440 - Plumbing Fixtures ........................................................................................................ 1-13 Section 15450 - Plumbing Equipment...................................................................................................... 1-8 Section 15510 - Hydronic Piping ............................................................................................................. 1-5 Section 15512 - Geothermal Heat Pump Piping........................................................................................ 1-4 Section 15515 - Hydronic Specialties ....................................................................................................... 1-8 Section 15535 - Refrigeration Piping and Specialties ............................................................................ 1-10 Section 15540 - Mechanical Pumps and Accessories ............................................................................... 1-6 Section 15545 - Chemical Water Treatment ............................................................................................. 1-5 Section 15546 - HVAC Water Systems Cleanup ...................................................................................... 1-5 Section 15590 - Chimneys Breechings, and Flues ................................................................................... 1-4 Section 15620 - Electric Unit Heaters ...................................................................................................... 1-5 Section 15624 - Direct and Indirect Gas-Fired Furnaces .......................................................................... 1-6 Section 15625 - Fuel Fired Unit Heaters................................................................................................... 1-4 Section 15782 - Unitary Air Conditioners and Heat Pumps .................................................................. 1-12 Section 15784 - Packaged Water-Source Heat Pumps.............................................................................. 1-5 Section 15810 - Ductwork ........................................................................................................................ 1-6 Section 15815 - Ductwork Accessories..................................................................................................... 1-5 Section 15830 - Air Outlets and Inlets ...................................................................................................... 1-6 Section 15845 - Air Cleaning................................................................................................................... 1-3 Section 15856 – Gravity Ventilators ......................................................................................................... 1-6 Section 15882 - Fans ................................................................................................................................. 1-9 Section 15887 - Carbon Monoxide Exhaust Systems ............................................................................... 1-5 Section 15890 - Air Terminal Units .......................................................................................................... 1-9 Section 15950 – Energy Management System........................................................................................ 1-69 Section 15955 - Mechanical System Testing, Start-Up and Commissioning ........................................... 1-6 Section 15960 - Testing, Adjusting, and Balancing .................................................................................. 1-7

DIVISION 16

ELECTRICAL

Section 16050 – Basic Electrical Materials and Methods ........................................................................ 1-9 Section 16055 – Electrical Studies and Calculations ............................................................................... 1-2 Section 16060 – Secondary Grounding and Bonding .............................................................................. 1-1 Section 16070 – Supporting Devices ........................................................................................................ 1-1 Section 16075 – Electrical Identification .................................................................................................. 1-1 Section 16119 – Underground Ducts ....................................................................................................... 1-3 Section 16120 – Conductors and Cables ................................................................................................... 1-4 Section 16130 – Raceways........................................................................................................................ 1-6 Section 16131 – Boxes .............................................................................................................................. 1-3 Section 16140 – Wirin g Devices............................................................................................................. 1-3 Section 16230 – Standby Power Generator Systems-Fixed ................................................................... 1-19 Section 16280 – Surge Protective Devices............................................................................................... 1-6 Section 16410 – Enclosed Safety Switches and Circuit Breakers............................................................ 1-2 Section 16430 – Low Voltage Switchboards (Switchgear)....................................................................... 1-9 Section 16442 – Panelboards .................................................................................................................... 1-4

TC-6

Section 16455 – Cable Tray ..................................................................................................................... 1-4 Section 16460 – Small Power & Miscellaneous Transformers................................................................ 1-4 Section 16500 – Lighting ......................................................................................................................... 1-7 Section 16710 – Communication Systems ............................................................................................... 1-9 Section 16720 – Intercommunications Equipment................................................................................... 1-6

APPENDIX

Geotechnical Investigations Report........................................................................................................ 1-66 Geothermal Test Repot............................................................................................................................. 1-9

***End of Table of Contents***

3280-20 GENERAL REQUIREMENTS 01000 - 1

SECTION 01000 - GENERAL REQUIREMENTS

PART 1 - GENERAL

1.01 GENERAL

A. The Drawings and all Supplementary Documents are essential parts of the Contract and a requirement occurring in one is as binding as though occurring in all. They are intended to be complimentary, descriptive, and provide for a complete Work.

B. All parts of this Contract are intended to complement each other. However in cases of conflict then the order of precedence is as follows: Specifications, Technical Drawings, and General Conditions.

C. The Owner will be represented by the USP&FO, Contracting Office or by a representative to insure performance by the Contractor.

D. On projects where no architectural or engineering firm has been employed by the Ohio National Guard, then any references to "Architect" or "Engineer" in any of these contract documents will specifically refer to the Contracting Officer.

1.02 PERFORMANCE

A. Submittal of a Bid by a Contractor shall be accepted as prima facie evidence that he has examined the Drawing and has satisfied himself as to the nature and location of the work and all matters which can in any way affect the work or cost thereof, under the Contract. Any failure of the Contractor to acquaint himself with all available information including the physical survey of the site of the proposed work will not relieve him from successfully performing all work to be done for a complete and acceptable job.

B. The above brief outline of principle features of the work in no way limits the responsibility of the Contractor from performing all work and furnishes all labor and materials, required by the Contract Documents, referred to herein. Any omission from the Contract Documents, or mis-descriptions thereof, shall not relieve the Contractor from performing all work required, and furnishing the materials required to completely fulfill the intent of the Contract.

C. All Contractors submitting proposals for this work shall first examine the site and shall take into consideration all such conditions as may affect the work under this Contract. All work completed is to tie into or blend into the existing land or structures in a natural, professional and workmanlike manner.

D. All measurements, dimensions and distance listed in the or Drawings are to be verified in the field prior to bidding by the Contractor. Any discrepancies between the Drawing and the actual conditions shall be reported immediately to the Contracting Officer.

3280-20 GENERAL REQUIREMENTS 01000 - 2

E. Should any requirement in the Drawings for the project as a whole appear to the bidder to be in disagreement with those for the part of the work on which he proposes to bid, a request for classification or clarification in writing should be addressed to the Contracting Officer. The Contracting Officer will reply to all such inquiries in case a correction of the Drawings is required, by means of an Addendum to be sent to all firms and persons to who complete bidding documents have been issued. Any discrepancy in quality of materials called for in the Drawings, not clarified by the Contracting Officer shall be resolved by using the higher quality materials.

F. Submit sufficient information for all materials to be used for the project to the Contracting Officer on the proposed items, at least 14 days after Notice to Proceed.

1. List the proposed items by name on the submittal form to be provided by the Contracting Officer. Submit sufficient information with the submittal to clearly demonstrate that the item(s) meet or exceed industry standards in quality.

G. The Contractor shall guarantee workmanship and materials for a period of one year from the date of acceptance by the Adjutant General's Department and shall leave the work in perfect order at completion. Should defects develop within the guarantee period, the Contractor shall, upon written notice of same, remedy the defects and reimburse the State for all damage to the other work, whether caused by the defects or the work of correcting same.

Guarantees, if any, extending beyond said one-year period shall be specifically provided for in the Contract and may be fulfilled by assignment of a bond or written warranty of the manufacturer.

1.03 EXECUTION

A. In general, the Contractor shall coordinate all construction activities with the Office of Installations Management, including delivery of material.

B. The Contractor shall place orders for materials and equipment to be employed in the work as soon as possible after the award of the Contract. The Contractor shall keep the Contracting Officer informed as to the availability of all specified materials and equipment and of such materials and equipment as may not be obtainable for purpose of the limiting and governing factors. Verification of lack of availability of any materials and equipment must be on the manufacturer's order or letter, a copy of which must be furnished to the Contracting Officer.

C. In order to perform a complete Work, the Contractor must employ adequate numbers of skilled workman who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of all work in these Specifications. The Contractor must be prepared to submit evidence of the experience and equipment necessary for proper completion of this project if requested by the Owner. Such evidence may include a list of previous jobs similar in nature, a list of personnel with years of experience to be used on this project, or certification as an approved installer from the materials manufacturer.

3280-20 GENERAL REQUIREMENTS 01000 - 3

D. The Contractor shall confine operations at the site to areas permitted by the Contracting Officer. He shall not unreasonably encumber the site with materials or equipment and shall assume full responsibility for the protection and safekeeping of products stored on the premises. The Contractor shall move any stored products that interfere with the operations of the facility and, if necessary, obtain and pay for additional storage areas.

The Contracting Officer will determine Coordination of the areas of work.

E. Where existing adjacent properties, structures, streets, curbs, etc., have been damaged or destroyed as the result of work operations, it is the responsibility of the responsible Contractor to see that he restores the foregoing items to their original state at his own expense, as part of the work of the project.

F. Any unusual existing conditions, other than as those indicated, specified and/or shown on the Drawing, shall be brought to the attention of the Contracting Officer prior to any removal and/or changing. Any changes must be directed by the Contracting Officer. All other changes are considered unauthorized and if performed will be at the contractor's cost. Acting upon the direction of any other parties will not relieve the Contractor of the terms and conditions of the Contract.

1.04 PROTECTION OF MATERIAL

A. Any materials delivered to the job in finished condition, installed in finished Condition, or installed and finished before completion of the work, shall be protected from damage until acceptance of the work. Prefinished materials, which are damaged either before or after installation, shall be replaced with new and perfect material. Refinished or replaced and refinished as the Contracting Officer may direct. No additional charge will be honored for replacement or repair of finished materials.

B. Materials and Tool Storage:

1. Each Contractor may provide tool storage containers at the project site as required for his own use. Each Contractor shall coordinate location of these storage facilities and shall supervise their location and removal as the project progress requires.

2. Construction materials may be stored at the project site. The Contractor shall be responsible for the protection of all materials. Where directed by the Contracting Officer.

1.05 SALVAGE

A. Owner has first claim to all salvageable items. All items intended for salvage will be marked or tagged by the Owner. Where specially mentioned in these Specifications, shown on the Drawing or referred to during the construction stage, the Contractor will remove and set aside the salvageable items.

1.06 CLEANLINESS

A. Each Contractor shall be responsible for continuous removal of all debris created by any construction throughout tenure of the Work. Any Subcontractors shall deposit their

3280-20 GENERAL REQUIREMENTS 01000 - 4

debris at a location designated by the Contractor. Each Contractor shall be responsible for the daily removal of its crates, cartons and packaging in which materials, equipment or fixtures are received, and all other identifiable debris. Debris removed from the work site will be transported to an acceptable disposal site. Any debris, mud or deleterious material from the construction site which encroach upon a street will be removed from said street by the Contractor at the end of each working day, or before, if directed by the local authority.

B. Debris shall not be stockpiled at the site. The Contractor shall dispose of debris so that the site shall present a neat, orderly and work oriented appearance.

C. At the completion of construction, each Contractor, as related to their actual project work, shall:

clean all horizontal and vertical surfaces of dust, debris in walls and ceilings or any enclosed cavity, clean all glass, clean windows on both sides, replace any broken glass, remove paint, remove stains, spots and marks from finish work and hardware, etc. The grounds within the Contract limit lines shall be left rake clean. Hard floors of the building shall be damp mopped clean.

D. All Contractors, at the completion of their branch of work, shall remove all surplus material, false work, temporary structures, including foundations thereof and debris of every nature resulting from their operations and put the site in a neat and orderly condition.

1.07 SAFETY

A. Each Contractor shall comply with the Department of Labor's Occupational Safety and Health Act (OSHA). "Act" means the William-Stiger Occupational Safety and Health Act of 1970 (84-State 1590):

1. The Contractor shall take all necessary precautions for the safety of employees on the work and shall comply with all applicable provisions of Federal Safety laws to prevent accidents or injury to persons on, about, or adjacent to the premises where the work is being performed. The Contractor's Job Superintendent shall be responsible for the prevention of accidents during construction. The Contractor shall comply with all applicable provisions of the "Manual of Accident Prevention in Construction" of the Associated General Contractors of America, Inc., and IC-3 of the Industrial Commission of Ohio.

2. In an emergency affecting the safety of life or of the work on adjoining property, the Contractor, without special instruction or authorization from the Owner is hereby permitted to act at his discretion to prevent such threatened loss or injury and he shall so act, without appeal.

3. Each Contractor shall provide properly stocked first aid kits, maintained in readily accessible locations.

B. Each Contractor as it relates to his work shall provide safety cables or railings as required by law or necessity.

C. Each Contractor as it relates to his work, shall provide and maintain guard lights at all barricades, railings, obstructions in the streets or sidewalks and at all trenches or pits adjacent to public walks or roads.

3280-20 GENERAL REQUIREMENTS 01000 - 5

D. All work in project area shall be considered "A Hard Hat Area".

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 01000

3280-20 SUMMARY 01100 - 1

SECTION 01100 - SUMMARY

PART 1 - GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.02 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Type of the Contract.

3. Owner-furnished products.

4. Use of premises.

5. Owner's occupancy requirements.

6. Work restrictions.

7. Specification formats and conventions.

B. Related Sections include the following:

1. Division 1 Section 01010 General Requirements.

2. Division 1 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.03 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: Armed Forces Reserve Center, Project No. 390169 /Field Maintenance Shop, Project No. 390170

1. Project Location: 1120 W. Blee Rd., Springfield, OH 45502/ 1100 W. Blee Rd., Springfield, OH 45502

B. Owner: Ohio Army National Guard

1. Contracting Officer (KO): Elaine Farabee, Contract Specialist, US Property and Fiscal Office for Ohio, Purchasing and Contracting Division, 2811 West Dublin Granville Road, Columbus, OH 43235-2789, (614) 336-7430.

2. Contracting Officer’s Representative (COR): LTC Michael Wright, AGOH – Facilities Management Office, 2825 West Dublin Granville Road, Columbus, OH 43235-2789,

(614) 336-7418.

3280-20 SUMMARY 01100 - 2

C. Architect, A/E: GRW Engineers, Inc. 801 Corporate Drive, Lexington, KY 40503

D. Contractor: TBA.

E. Technical Inspector (TI): George McCann AGOH - Facilities Management Office, 2825 West Dublin Granville Road, Columbus, OH 43235-2789, has been appointed by Owner to serve as

TI.

F. Statement of Work:

1. This statement is a summary to give a general scope of the project. The work includes site work for a 29 acre ± site off of SR 794 adjacent to Springfield-Beckley Municipal Airport in Springfield, Ohio. Site development includes access roads, paved parking, site utilities, and other infrastructure. Buildings include an Armed Forces Readiness Center (AFRC), Field maintenance Shop (FMS), an Unheated Storage Building. The AFRC and FMS are one story slab on grade, masonry bearing wall, steel roof structure, with a combination of standing seam metal roofs and built up low slope roofs. The building exteriors are a combination of brick veneer and metal panel, the colors of which are in keeping with the adjacent air base standards. The Unheated Storage Building is a pre-engineered building.

1.04 TYPE OF CONTRACT

A. Project will be constructed under a single prime contract.

1. Use Contracts and project management Forms included and/or issued by the Contracting Officer.

2. Federal Acquisition Regulations (FAR) shall apply where applicable.

1.05 OWNER-FURNISHED PRODUCTS

A. Retain first paragraph below if Owner furnishes products for a project. Delete option and insert text to suit Project. Revise second sentence as appropriate, or delete entirely if not required.

See Evaluations for model text.

B. Owner will furnish products indicated. The Work includes providing support systems to receive Owner's equipment.

1. Owner will arrange for and deliver Shop Drawings, Product Data, and Samples to Contractor.

2. Owner will arrange and pay for delivery of Owner-furnished items according to Contractor's Construction Schedule.

3. After delivery, Owner will inspect delivered items for damage. Contractor shall be present for and assist in Owner's inspection.

4. Items shown in the Construction documents noted not in contract.

5. If Owner-furnished items are damaged, defective, or missing, Owner will arrange for replacement.

6. Owner will arrange for manufacturer's field services and for delivery of manufacturer's warranties to Contractor.

3280-20 SUMMARY 01100 - 3

7. Owner will furnish Contractor the earliest possible delivery date for Owner-furnished products. Using Owner-furnished earliest possible delivery dates, Contractor shall designate delivery dates of Owner-furnished items in Contractor's Construction Schedule.

8. Contractor shall review Shop Drawings, Product Data, and Samples and return them to Contracting Officer noting discrepancies or anticipated problems in use of product.

9. Contractor is responsible for receiving, unloading, and handling Owner-furnished items at Project site.

10. Contractor is responsible for protecting Owner-furnished items from damage during storage and handling, including damage from exposure to the elements.

11. If Owner-furnished items are damaged as a result of Contractor's operations, Contractor shall repair or replace them.

12. Contractor shall install and otherwise incorporate Owner-furnished items into the Work.

C. Owner-Furnished Products:

1. Beverage Dispenser by Cecilware HT20/4

2. Proofer/heater cabinet-mobile by Lockwood Ca71PFIN-CDD

3. Hot food service counter by Servolift 501-5

4. Electric Brazing pan by South Bend BECT30

5. Self-contained refrigerated dispenser by True Food GDM-5-PT-S

1.06 USE OF PREMISES

A. General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by Owner's right to perform work or to retain other contractors on portions of Project.

1. Owner Occupancy: Allow for Owner occupancy of Project site.

1.07 OWNER'S OCCUPANCY REQUIREMENTS

A. Owner Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed areas of building, before Final Acceptance, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the total Work.

1. Contracting Officer will prepare a Letter of Beneficial Occupancy for each specific portion of the Work to be occupied before Owner occupancy.

2. Before partial Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of building.

3. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of building.

3280-20 SUMMARY 01100 - 4

1.08 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed inside the existing building during normal business working hours of TBD a.m. to TBD p.m., Monday through Friday, except otherwise indicated.

4. Weekend Hours: With coordination, may be permitted.

B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Owner not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Owner's written permission.

C. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.

1.09 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the 16-division format and CSI/CSC's "MasterFormat" numbering system.

1. Section Identification: The Specifications use Section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete because all available Section numbers are not used. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of Sections in the Contract Documents.

2. Division 1: Sections in Division 1 govern the execution of the Work of all Sections in the Specifications.

B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate.

Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications.

Requirements expressed in the imperative mood are to be performed by Contractor.

Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

3280-20 SUMMARY 01100 - 5

1.10 GOVERNMENT INSPECTION

A. The Contractor shall notify the COR:

3. At least 72 hours before work is to start;

4. When a work stoppage of more than 48 hours duration is anticipated;

5. At least 24 hours in advance of returning to work after a work stoppage;

6. At least 72 hours in advance of desired time for final inspection.

7. At least 48 hours in advance for special inspections.

B. Failure to make the arrangements specified in paragraph 1.7.1 above may result in non-acceptance of work.

C. The Contractor shall be aware that the Government will perform a Construction Compliance Inspection (CCI) to assess construction progress and to identify problem areas when construction is approximately 50% complete.

1.11 OMISSIONS

A. Omissions from the drawings and specifications or the mis-description of the work which is manifestly necessary to carry out the intent of the drawings and specifications, or which is customarily performed, shall not relieve the Contractor from performing such omitted or mis-described details of the work as if fully and completely set forth and described in the drawings and specifications.

1.12 MISCELLANEOUS REPAIR

A. Where the drawings and specifications indicate that repairs are to be made, but do not show in detail the materials or methods to be used, the Contractor shall make the repairs in accordance with industry standards and common practices of the trades involved. The owner reserves the right to review and approve any and all methods and procedures for repair prior to the Contractor making the repair. Submittals shall be provided in accordance with Division 1 Section 01330, "Submittal Procedures."

1.13 CONTRACTOR STORAGE AREA AND PERSONNEL

A. The Contracting Officer’s Representative will designate an area that the Contractor may use as a storage area. The Contractor shall contact the Contracting Officer’s Representative for information regarding parking areas to be used for contractor's equipment and by Contractor personnel and any restrictions that will be placed on contractor personnel while on the job site.

3280-20 SUMMARY 01100 - 6

1.14 SITE SECURITY

A. Security of site, materials and storage areas is the responsibility of the Contractor. The area shall be kept clean and free of debris.

1.15 PERMITS

A. Contractor shall be responsible for obtaining and paying for any required permits. Evidence of application will be submitted to the Contracting Officer within the first thirty days after commencement of work.

1.16 TESTING

A. Contractor shall pay for all testing required on the project. Testing agencies shall be approved in advance of work by the Contracting Officer.

1.17 MATERIAL APPROVAL SUBMITTALS

A. Any Submittal approval requiring an excess of two Government reviews (original and one re-submission) will be charged at an hourly rate.

1.18 BIDDERS INSTRUCTIONS

A. Insurance, bonding, bid schedule, pay application and other similar requirements may be found in the bid package with the instructions to bidders.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01100

3280-20 PAYMENT PROCEDURES 01290 - 1

SECTION 01290 - PAYMENT PROCEDURES

PART 1 - GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.02 SUMMARY

A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment.

B. Related Sections include the following:

1. Division 1 Section "Contract Modification Procedures" for administrative procedures for handling changes to the Contract.

2. Division 1 Section "Construction Progress Documentation" for administrative requirements governing preparation and submittal of Contractor's Construction Schedule…