Response to pre bid questions and amendment items .pdf

PDF 109 KB Posted

Attached to
CONSTRUCT ARMED FORCES READINESS CENTER AND FIELD MAINTENANCE SHOP, SPRINGFIELD, OHIO
Solicitation number
W91364-08-B-0001
Issued by

About this file

Response to pre bid questions and amendment items.pdf

View the file

Other files

File Type Posted
3280-20-E-1-301 Layout1 —
3280-20-E-1-601 Layout1 —
3280-20-E-2-203 Layout1 —
3280-20-A-1-108R.pdf PDF
3280-20-A-1-601R.pdf PDF
AMENDMENT 5SEP08.pdf PDF
3280-20-E-2-401 Layout1 —
3280-20-E-1-302 Layout1 —
3280-20-E-1-202 Layout1 —
3280-20-A-3-101R.pdf PDF
3280-20-E-2-601 Layout1 —
3280-20-E-1-603 Layout1 —
Revised 01810 GENERAL COMMISSIONING REQUIREMENTS.pdf PDF
3280-20-C-1-200 C-200 —
3280-20-E-1-801 Layout1 —
3280-20-M-1-101R Layout1 —
3280-20-A-1-302R.pdf PDF
3280-20-E-1-103 Layout1 —
08380_DOUBLE SWING DOORS.pdf PDF
15856 Gravity Ventilators.pdf PDF
3280-20-A-1-107R.pdf PDF
3280-20-E-2-301 Layout1 —
3280-20-E-1-602 Layout1 —
3280-20-C-1-400R.pdf PDF
3280-20-E-1-304 Layout1 —
3280-20-E-0-101 Layout1 —
3280-20-C-1-300 C-300 —
3280-20-E-2-602 Layout1 —
3280-20-E-1-401 Layout1 —
3280-20-F-1-501R Layout1 —
3280-20-E-2-402 Layout1 —
3280-20-E-1-201 Layout1 —
3280-20-E-1-303 Layout1 —
100 Construction Documents Specifications.pdf PDF
3280-20-E-1-101.pdf PDF
3280-20-E-0-102.pdf PDF
amendment one 21aug08.pdf PDF
h5s45400.PDF PDF
3280-20-E-1-701.pdf PDF
3280-20-C-1-401.pdf PDF
3280-20-A-1-502.pdf PDF
3280-20-F-1-101.pdf PDF
3280-20-A-1-503.pdf PDF
3280-20-A-2-503.pdf PDF
3280-20-M-1-601.pdf PDF
3280-20-S-2-101.pdf PDF
3280-20-A-2-303.pdf PDF
3280-20-A-1-501.pdf PDF
3280-20-Q-1-101.pdf PDF
3280-20-A-1-313.pdf PDF
Show 40 more

Latest 50 of 206 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ohio Army National Guard Armed Forces Reserve Center/Field Maintenance Shop Springfield, Ohio ARNG Project #390169 / 390170

GRW Project No 3280-20 page 1 of 25

Responses to Bidder Questions and A/E Amendment Items GRW Engineers / Architects / Planners

DATE

2 September 2008

Contact

Contracting: Elaine Farabee, USPFO Ohio (614) 336-7430 elaine.farabee@us.army.mil

Submitted by / date

Question / Document

Response / Revision

Jon Schlosser –

CENTRIA

8/18/08

Could metal wall panel specifications be modified for interest of other manufacturers?

See attached clarification item concerning the panel specification.

JTC – 8/21/08

E-1-302 Area B

Voice / Data locations at SW corner are outside of 90 meter radius if installed in cable tray as shown. Could additional cable tray be installed to accommodate?

A cable tray will be installed from the main telecommunications room south above the Assembly Room storage rooms to the administrative area. The additional cable tray will be in an addendum.

01 Note 9, E-1-302 Note 10, E-1-303 Note 10, and E-2-301

Keynotes on the prints mentioned above call out different copper feed cables from Reserve Center to FMS. They state the following: E-1-301 states a 50 pair, E-1-302 states 50 pair, E-1-303 states 200 pair, and E-2-301 states 100 pair. The Spec Pg. 16710-2 I. states 50 pair. Please advise on the proper amount of copper pairs from the Reserve Center to the Field Maintenance Shop.

There will be a 50 pair copper cable from the AFRC to the FMS. There will also be two 12 strand optic fiber cables from the AFRC to the FMS.

One optic fiber cable will be dedicated for military use. The second optic fiber cable will be used for fire alarm networking and other uses.

GRW Project No 3280-20 page 2 of 25

E-1-304, E-2-302

Communication Rack layout shows Multi-Mode Fiber Optic Cable installed in the Equipment Rack. Will this cable be install and where does it originate and terminate?

The only optic fiber cable will be from the AFRC to the FMS (two 12 strand cables).

E-1-304, E-2-302

Communication Room’s layout show voice tie cables from patch panel mounted in rack to 110 wiring block mounted on wall. Will this require (1) cable per voice/data outlet or a percentage of the voice/data outlets? Please advise on the proper amount of cables that will need to be installed to facilitate the voice cross cuts.

Each telecommunications outlet will have three RJ-45 jacks mounted in a modular face plate. There will be one CAT 6 UTP cable to each jack (three cables per outlet). All jacks will be orange. The jacks can be used for voice or data. The military may use VoIP. The incoming copper cables will be terminated on 110 blocks. The electrical contractor shall terminate and test all cables (optic fiber and copper). The electrical contractor shall furnish and install all passive equipment and the military will furnish and install all active equipment.

E-2-302 and Specification Pg. 16710-6 N

Pg. 16710-6 N states the Modular Terminal Racks will be 19”w x 30” d freestanding rack. Print E-2-302 General Note 14 states a 19” communications rack. Please clarify the difference between the two items. Will the telecommunications equipment be installed in a closed cabinet or an open equipment rack?

The equipment racks will be open, free standing, 19 inches wide and 30 inches deep.

E-1-302 Keynote 6

Keynote states that there will be a 12 Strand Single Mode Fiber Optic cable installed to (6) locations in Area B (symbol is for Telephone Floor Outlet). Is this a miss print? Does that note refer to the 12 Strand Single Mode cable that will be installed from the Reserve Center to the FMS?

Key notes on sheet E-1-302 will be revised.

Scott Alie – Alutiiq,LLC 8/21/08

Spec section 03300 Cast-in-Place Concrete, paragraph 2.06 "Admixtures" refers to both accelerating and non-accelerating corrosion inhibitors. Please provide indication of which of these types are to be used and where this admixture will be used.

Please also provide the specific dosages for all admixtures required.

In response to question No. 4 from Scott Alie; Sections 2.06.C. and 2.06.D regarding Corrosion-Inhibiting Admixtures should be deleted from the 03300 specification. The remaining admixtures are to be dosed per the manufacturer’s recommendations.

Scott Alie – Alutiiq,LLC 8/21/08

For CLIN items 0007 and 0009, please indicate which portions of the slabs will receive the Type K concrete.

The areas to receive shrinkage-compensating concrete (or Type K concrete as the bidder refers to it), are clearly stated in Section 03311, Paragraph 1.01, Sub-paragraph A.

GRW Project No 3280-20 page 3 of 25

Andrew Bartlowe – LaForce Inc. 8/21/08

Discrepancies exist between hardware set assignments that appear on the door schedule and those that appear in hardware specification 08710. Which are to take precedence?

Please clarify. If we are to refer to set assignments that appear in specification 08710; swinging door hardware has been indicated for over-head doors (openings 19, 50, 51, and 54). No hardware has been indicated for openings 82, 83, and

84. Also, hardware is indicated for openings that occur in the "Unheated Storage Building". This building does not appear on plans. If we are to refer to set assignments that appear on the door schedule; then some openings have not been assigned to hardware sets (openings 23, 57, 59, and 67).

Door Hardware section 08710 and Door Schedules will be revised and resubmitted as part of an amendment.

“Unheated Storage Building” is located on drawings:

C sheets, S-3-101, A-3-101, and E-3-101.

A door schedule will be added to the Unheated Storage Building as an amendment.

Ed Buerger – Ohio CAT 8/26/08

Can you tell us what the kW rating id for the generator set?

Drawing E-1-205 indicates 750 kW, drawing E-1-801 indicates 1000kW and the specifications indicate 800 kW – Please advise.

The emergency standby generator shall be 750 KW.

Can you tell us the ATS ampere rating? Drawing E-1-205 indicates 1000 amps and the specification indicates 1200 amps

– Please advise.

The ATS will be 1,000 amps.

Specification section 16230 page 10 indicates two (2) output breakers are to be provided on the generator set, and refers us to the drawings for their ampere rating. In looking at the riser drawing E-1-205 it indicates one (1) output breaker at 1000 amps. Can you tell us how many output breakers are to be provided, and provide their ampere rating?

The emergency standby generator will have one 1,000 amp, 480 volt, output breaker.

GRW Project No 3280-20 page 4 of 25

Bruce Duerstine – Triec

Discrepancy

16050-7 1.19A of the Specifications calls for (1) 5” Schedule 80 PVC Conduit for Ohio Edison’s Primary Cable.

Sheet E-0-101 Detail Drawing #4 illustrates (1) 5” Schedule 40 PVC Conduit for Ohio Edison’s Primary Cable.

Sheet E-1-201 illustrates (2) 5” Schedule 80 PVC Conduits all the way back to the riser pole at Peacock Road.

Which is Correct?

The primary (medium voltage) cable will be directly buried. The primary cable will be furnished and installed by the Ohio Edison/First Energy (OE/FE). The electrical contactor shall coordinate with OE/FE on the primary cable installation and assist as necessary. The electrical contractor shall open the trench, install a Schedule 80 PVC conduit sleeve under all paved areas, and close the trench. The Schedule 80 PVC conduit only occurs under pavement. Only one conduit is required.

OE/FE requires Schedule 80 PVC for the sleeve. Limits of the sleeve are clearly marked on Sheet E-0-101 with Site Keynote #9. The PVC sleeve does not extend to the riser pole. The Primary Trench Detail-Under Pavement clearly shows only one PVC sleeve. The detail will be revised to show Schedule 80 PVC instead of Schedule 40 PVC. All backfill material under pavement shall be clean, well compacted, crushed stone.

The primary cable on Sheet E-1-201 will be extended under the generator pad to the padmounted transformer (a line was omitted from the drawing). THE CONTRACTOR IS DIRECTED TO CONTACT OHIO

EDISON/FIRST ENERGY TO COORDINATE THE ELECTRICAL

SERVICE. The electrical contractor is required to meet all OE/FE requirements and include them in the base bid.

Bruce Duerstine – Triec

8/26/08

According to the Drawing Index on Sheet G-100 it appears you are missing (2) Electrical Drawings on your website E-0-102 and E-1-101.

Does one of the two drawings mentioned above have a fixture schedule on it?

Sheets E-0-102 and E-1-101 are included in the set but not posted to the website. Those drawings will be posted to the website. Sheet E-0-102 includes the Site Luminaire Schedule.

Bruce Duerstine – Triec

8/26/08

Is there a Fixture Schedule? If so which drawing does it appear?

The Luminaire Schedule appears on Sheet E-1-101.

Bruce Duerstine – Triec

8/26/08

Sheet E-1-102 in Assembly Room 101 there is a Keynote (3) shown in the room, where is the Occupancy Sensor in this room to be located?

Keynote #3 will be removed from Assembly Room 101. Wall mounted motion sensors are to be used in offices and breakrooms. Luminaires in Assembly Room 101 are to be switched as shown.

Bruce Duerstine – Triec

8/26/08

Sheet E-1-103 in the Arms Vault there is an infrared motion detector shown, what does it control?

The luminaires in the Arms Vault are to be switched as shown. The motion sensor will be removed.

GRW Project No 3280-20 page 5 of 25

Bruce Duerstine – Triec

16500-6 B. 1. States: “Use of flexible conduit for connection to fixtures is prohibited, except where concealed above a suspended ceiling”

Is this the actual intent, or can a short piece of flex (3’ or less) be installed between the fixture and a junction box directly adjacent to each fixture? Otherwise this type of installation becomes very labor intensive and extremely difficult to change locations or replace damaged fixtures in the future.

No flexible conduit is to be used in exposed areas. Typically, surface mounted luminaires are mounted to a junction box. Pendant mounted luminaires are to be mounted at a uniform height above finished floor (requiring pendants of varying lengths). If the height is not specified, consult with the engineer. The intent is to have a clean neat appearance resulting from professional workmanship providing a durable installation.

Unistrut used for mounting is to be cut squarely and filed for a finished appearance.

Scott Alie – Alutiiq,LLC

Please confirm that this project is not tax exempt. Project is tax exempt - Owner will provide the forms after award.

Scott Alie – Alutiiq,LLC

Can you please define the scope of work, if any, GRW Inc.

will be responsible for regarding CLIN options 0008 and 0010 for LEED registration, management, certification, etc?

GRW will receive the Contractors documentation and submit it to the USGBC for certification. See revised Solicitation Contract Form and descriptions for scope of work for each item. See each specification division for specific LEED requirements of each division for management and documentation requirements. Contractor is responsible for submission fees, review fees, costs, etc. as outlined on the USGBC website usgbc.org concerning project certification. See the revised Specification Section 01810 included with this amendment.

Scott Alie – Alutiiq,LLC 8/26/08

If GRW, Inc. will be eligible and interested in providing this service, will their quotes for this proposed work made available to bidders?

GRW will provide a commissioning coordinator to represent the design team to work with the Contractor’s assigned commissioning coordinator and the Third Party contractor procured Commissioning Agent (CxA).

GRW will not be the commissioning agent and will therefore not be providing a quote. See http://www.bcxa.org/certification/ccps.htm for possible Commissioning Agents.

Scott Alie – Alutiiq,LLC

8/26/08 Please provide sheet A-2-601 Window Schedule as referenced in Symbol Key on sheet A-2-101, etc.

The window and door schedules are on sheet A-2-501.

(The Symbol Key on sheet A-2-101 referencing sheet A-2-601 shall be revised to A-2-501.)

Scott Alie – Alutiiq,LLC

Spec Section 02580 Radio Tower. For structural load calculations, please provide list of anticipated GFGI

Assume cable, two dishes, two antennas

GRW Project No 3280-20 page 6 of 25 accessories (antennas, dishes, lights, equipment, etc) to be mounted on the tower.

Mark Ericson – Mid America Door Co.

8/27/08

On the door schedule on Sheet A-1-601, the door material for door type "P" is listed as "insulated steel" and "galvanized steel". My assumption is to provide galvanized insulated slats for door numbers 49 and 50 and galvanized non-insulated slats for door numbers 51 and 54.

Provide galvanized steel insulated slats for doors (49 and 50) and galvanized steel non-insulated slats for doors (51 and 54).

The jamb tracks (FRAME MATERIAL) are also galvanized steel.

Mark Ericson – Mid America Door Co.

8/27/08

If the thought process in question No. 1 is correct, do the coiling doors (door numbers 11, 35, 36, and 44) listed in the door schedule on Sheet A-2-501, which are marked "galvanized steel" non-insulated or insulated?

Doors (11, 35, 36, and 44) are insulated galvanized steel.

Mark Ericson – Mid America Door Co.

8/27/08

In Specification Section 08331, Item 2.08.D, the required material is specified as "aluminum", which would require the finish specified in Item 2.08.L.1. However, on the door schedules on Sheets A-1-601 and A-2-501, the coiling door types have "galvanized steel" listed as the door material.

Which is correct?

See attached specification section 08331 for revisions.

Mark Ericson – Mid America Door Co.

8/27/08

In the door schedule on Sheet A-1-601, the coiling doors are listed as having a "pre-finished" finish. If these doors are made with galvanized steel, does this finish need to be baked-on enamel paint or powder-coated?

Door Schedule (DOOR FINISH) shall be revised to “PAINT” for all overhead coiling doors

Mark Ericson – Mid America Door Co.

8/27/08

In specification Section 08331, Item 2.09 refers to a fire-rated door assembly. Is it correct to assume that this applies to the counter shutter, which is door number 85 on Sheet A-1-601?

Door number 85 is fire-rated. See attached Revised Door Schedule.

Jill Strawser – Best Equipment & Design 8/27/08

Drawings state that GC is responsible for all gas hoses for cooking equipment. Hoses are specified with equipment.

Which is correct?

As specified, hoses shall be provided with kitchen equipment.

Jill Strawser – Best Equipment & Design

Cooler floor detail drawings for door section and panel section do not match in who is responsible for what along with the

The General Contractor as shown by division schedule will be responsible for work shown in detailed drawings for both the door and

GRW Project No 3280-20 page 7 of 25

8/27/08 written. Which is correct? panel sections. General Contractor is responsible for division of work.

Jill Strawser – Best Equipment & Design 8/27/08

Where is the condenser being placed? What would the line run be for the hard copper lines?

The condensing unit will be placed on the roof of building directly above the walk-in cooler. The deck of the building roof is 18'-0" above finished floor.

Jill Strawser – Best Equipment & Design 8/27/08

You have a Hatco sink heater specified for the 3 comp sink section of the clean dishtable. The dishtable is listed as NIC.

How is this going to work? You are also showing the Hatco booster heater side brackets on this unit as well.

Include item #50; DISH TABLE - CLEAN W/POT & PAN SINK -- ONE

(1) REQUIRED as part of this contract.

Les Heckman – Staffco Construction, Inc.

8/27/2008

In Regard to Structural Steel 05120:

Paragraph 1.06 Quality Insurance A. Installer Qualifications:

A qualified installer who participates in the AISC Quality Certification Program and is designated an AISC-Certified Erector, Category CSE. This requirement seriously limits the area contractors.

QUESTION: Can the required work be certified after completion by a qualified licensed inspector?

In Specification 5120, Section 1.06, Paragraph A., the AISC Erector Certification requirement may be waived, but the erected steel must be qualified by a licensed inspector.

John C. Meyer

Q.B.S., Inc

8/28/08

Section 5120, paragraph 1.06, subparagraph A, notes the requirement to be AISC qualified. Is this necessary for steel erection as well?

In Specification 5120, Section 1.06, Paragraph A., the AISC Erector qualified by a licensed inspector.

Steve Hurst

Chapel Electric

8/28/08

Spec. section 16230 2.01 A 2 states that the Gen Set shall be 800kw. Drawing E-1-205 shows the generator at 750kw.

Please clarify which is correct?

The emergency standby generator shall be 750 KW.

Steve Hurst

Chapel Electric

8/28/08

Spec. section 16050 1.02 I 8 states that the generator is to be an alternate bid item and the transfer switch is to be part of the base bid. The Solicitation Contract Form Item 0002 Option states that Emergency Power is to be 1000kw as an alternate price. How are we to price Option 0002? If it is to be priced as 1000kw we will have to increase feeder and breaker sizes for the service entrance. Is this the intent or is the intent to be

The Solicitation Contract Form should read 750 KW generator. The emergency standby generator shall be an alternate bid item and the 1,000 amp automatic transfer switch shall be in the base bid. Do not resize service, feeders, or branch circuits.

GRW Project No 3280-20 page 8 of 25 pricing only the generator as the option? What KW rating is the generator to be in the option price?

Steve Hurst

Chapel Electric

8/28/08

Ref: Sheet E-2-203: Based on equipment and feeder sizes, should the transformer feeding Panel CC be 75kva instead of 45kva as shown?

The transformer feeding Panel CC, FMS, shall be 45 KVA. The riser diagram shall be revised to show a 150 amp main breaker in Panel CC.

All panelboard schedules (both AFRC & FMS) will be revised.

David Davenport

Clark Construction Co.

8/28/08

Have you reference to a Drawing Elevation of the Overhead Cranes?

The elevation of the overhead crane is referenced in building sections A and B on sheet A-2-301.

The plan for the crane and support structures is referenced on sheet A-2-102 of the Construction Documents.

David Davenport

Clark Construction Co.

8/28/08

Also the spec (14600) says, “…multiple five (15)-ton hoists and bridge cranes…”

Revise specification section 14600 1.01 A.1 as follows:

“Scope: The following specification covers the furnishing and installation of one (15) – ton hoist and bridge crane on multiple support structures.

The hoist, bridge and bridge structure shall be designed and constructed to CMAA 70/74 Class C, moderate service requirements, for operation in an industrial environment. All items provided shall be in the English language”

While only one (15) ton hoist and bridge crane is being supplied under this scope of work the multiple support structures shall be designed to accommodate two (15) ton hoist and bridge crane in the future.

Rylee Miller

Kalkreuth Roofing and Sheet Metal

8/29/08

On this project there are two roof types in the specs. One is a TPO system and the other is a SBS build up system. The plans only refer to the SBS system is the system that is preferred or is the TPO system. Please let me know.

The project is designed around the SBS system. Provide cost for SBS system in the building bid. Provide bid option for eliminating SBS and providing TPO system.

Kenneth Meyers

E Tek Systems, LLC

8/29/2008

The Energy Management System (EMS) specification Section 15950, Page 69, titled Natural gas Radiant Heaters are to be controlled via the manufacturers provided controls and the drawing schedule M2 602 indicates that a standard thermostat is being provided. The paragraph “Run Conditions- On/Off states that the thermostat, during the

EMS interfaces should be provided to interface the radiant heaters with the EMS system.

Night setback is allowable on the garages (suggest down to 55° F).

However, the presence of water lines in the bays precludes the temperature from dropping below freezing.

GRW Project No 3280-20 page 9 of 25 occupied mode”, maintains the space temperature at 65 degrees. During the Unoccupied Mode, night setback is non applicable. But under the “Emergency Shutdown” operation, when the emergency shutdown button is initiated the burner fans are to stop and the gas valve is closed.

The EMS system is not connected to the stand-a-lone thermostats that control the radiant heater.

Therefore the emergency shutdown sequence cannot be performed without an EMS interface to the radiant heaters. There is also additional energy savings by reducing the space temperature in the garage bay area during unoccupied times. The other mechanical systems in this area are connected to the EMS system designed to reduce the night time temperatures.

Should the radiant heater be interfaced into the EMS system along with the other equipment?

Kenneth Meyers

E Tek Systems, LLC

8/29/2008

The mechanical specifications, Section 1588, titled Carbon Monoxide Exhaust System, Paragraph 2.05-A, Carbon Monoxide Detectors.

The vehicle exhaust manufacturer provides the sensor/detectors. The sensor/detectors are standa-lone and are not interfaced into the EMS system.

Typically the concentration levels are monitored through the EMS system, alarms and setpoint are adjustable to comply with any new regulation that would require changing the environmental concentration (PPM) levels Sequence would be generated to control exhaust fan on a 24 hour basis to protect the work environment. Warning light and strobe lights can easily be added to give ample time to take some sort of measure to protect against bodily injury.

We are requesting the Quatrosense Environments sensor be added to the manufacturers list and

There is no requirement for the vehicle exhaust system manufacturer to provide the carbon monoxide sensor/detectors. Text will be added in the controls specification to reference Section 15887 for the CO sensor description, but that the system is required as part of the building controls. The preferred sensor manufacturer will be added to the specification.

GRW Project No 3280-20 page 10 of 25 be interfaced to the EMS system. In order to maintain consistency with other Ohio Nation Guard projects, have the carbon monoxide sensor provided by the BMS contractor. We also notice that the garage bay is not provided with Nitrogen Dioxide detector

(NO2).

The NO2 sensors are used to monitor diesel fuel byproducts that are listed as a hazardous or volatile mixture?

John C. Meyer

Q.B.S., Inc.

8/29/2008

Please clarify masonry wall heights. In numerous places on the Readiness Center Building and the Field Maintenance Building the wall heights conflict in the wall sections, building sections and the Fire Protection Plan.

See the attached revised reflected ceiling plan clarifying this and other See revised ceiling plan A-1- issued with this amendment

Nicholas D. Bechtel

Harold J. Becker Co., Inc.

9/2/08

The project drawings indicate a Modified membrane roof system for which there is a specification. But there is also a specification for a TPO membrane roof system. Are we to quote the TPO roof system as an alternate to the Modified Bitumen roof system?

TPO is a bid option. See revised bid form and answers to other similar questions herein.

Louie Poole

Butt Construction Company, Inc.

9/2/08

Sec. 05120 (Structural Steel), para. 1.06 A & B calls for AISC certifications for the installer and fabricator. Can these requirements be waived for this project?

In Specification 5120, Section 1.06, Paragraph A., the AISC Erector qualified by a licensed inspector. Fabricator must be certified.

Louie Poole

Butt Construction Company, Inc.

9/2/08

Sec. 02700 (Asphaltic Concrete Paving), para. 2.01 A & B lists items from Standard Specifications. These do not appear to be ODOT specifications.

Please confirm the source of these items.

The pavement items are in OhDot Standard Spec. Section 442. Please revise binders as follows:

For surface course use PG70-22M

For base and intermediate courses use PG 64-28

Dan Boykin Midwest Sales

9/2/08

Can you tell me how many squares the waterproofing and roofing is so I know how to quote the job and the warranty?

Please review the bid documents to determine.

GRW Project No 3280-20 page 11 of 25

Greg Bonner

HD Supply Waterworks

9/2/08

The storm structure inlets shown on the plans are 21.5"x28".

This is not a standard in this area. Can 24"x24" and 36"x36" catch basins be used with an East Jordan Iron Works 5250 frame and grate?

Alternative structure sizes will be considered in the shop drawing review process as long as the intent of the design is met.

Steve Bowman

Wenco, Inc.

9/3/08

We need 30,000 cy of import dirt for this project.

Can a borrow pit be used on site or do we have to import?

Provide earthwork as the construction documents indicate.

David Davenport

Clark Construction Co.

In attempting to estimate the communications package, I’ve yet to find an indication of existing patch-points or tie-in points on the grounds, on the existing poles.

Can you identify and gauge any existing tie-in points? Or lead me to such in the spec or drawings?

See revised E-0-101 included with this amendment.

Butt Construction Company, Inc.

9/3/08

After reviewing the plans & specs, we need clarification for the following:

The following hardware sets In the specs do not match the hardware sets as listed on the Door Schedule:

Door Schedule (Page # A-1-601) Door # 19, 20, 21, 22, 25, 26, 27, 28, 29, 30, 31, 32, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 58, 62, 63, 64, 65, 68, 69, 70, 71, 72, 73, 74, 75, 78 & 80.

See revised Door Schedule sheet A-1-601R included with this amendment. Use set numbers indicated in the door schedule.

Louie Poole

Butt Construction Company, Inc.

9/3/08

Door Schedule (Page # A-1-601) The following Doors call out for Door Elevation “E”, which shows a wood door, but the door material calls for H. M.

Doors:

Door # 05, 06, 08, 09, 10, 27, 28,29, 78, 79, 80, 81, 82, 83 & 84

The following Door calls out for Door Elevation “C”, which shows a wood door, GRW Project No 3280-20 page 12 of 25 but the door material calls for H. M.

Doors:

Door # 11

Company, Inc.

9/3/08

Door Schedule (Page # A-2-501) The following Doors call out for Door Elevation “E”, which shows a wood door, but the door material calls for H. M.

Door # 27, 37 & 40

Revise the door material to Flush Solid Core w/ Glass.

Company, Inc.

9/3/08

The following Doors call out for Door Elevation “D”, which shows a wood door, but the door material calls for H. M.

Door # 38 & 39

Revise the door material to Flush Solid Core.

Company, Inc.

9/3/08

Door Schedule (Page # A-2-501) The following Doors on the Door Schedule calls out for either Wood and/or H. M., but does match with the Door material listed:

Door Schedule (Page # A-2-501) The following Doors call out for Door Elevation “H”, which shows a H. M. door, but the door material calls for Wood Door:

Door # 45

Elevation H indicates a Flush Solid Core Door as scheduled.

Company, Inc.

9/3/08

The following Door Elevations on the Door Schedule calls for either Flush door and/or door with lite kit, but Elevation and Door Material do not match:

Door Schedule (Page # A-1-601) Door # 60 & 68

Door Schedule calls for Elevation “M” which shows a Vision Kit, but

GRW Project No 3280-20 page 13 of 25

Door Material calls out for a Flush Door.

Company, Inc.

9/3/08

Door Schedule (Page # A-2-501) Door # 38, 39, 41 & 42

Door Schedule calls for Elevation “D” which shows a Flush, but Door Material calls out for a Door with Glass.

Door 38 and 39 is a Flush Solid Core Door.

Door 41 and 42 Revise to door type “E”.

Steve Hurst

Chapel Electric

Power Keynote 13 on Sheet E-2-201states to provide conduit and boxes for vehicle exhaust system controls. The bid documents do not include a specification section, wiring diagram, or other information regarding this system. Please provide wiring and control device information for the vehicle exhaust system.

The electrical contractor will furnish and install conduit and boxes for the power and controls. The electrical contractor shall also connect all controls. The wiring diagram will be provided by the successful vendor supplying the system.

David Davenport

Clark Construction Co.

9/3/08

There’s a confusing note on drawing C-200, Key Note 21, which reads, “…Add Alternate.”

To my knowledge, there are no “Alternate’s” on this bid (?)

Please see the bidding options and the Scope of Work as outlined in spec. section 02820.

Terry Wells

Ferguson

9/3/08

COULD YOU PLEASE INDICATE TO ME WHAT STYLE

NEENAH CASTINGS ARE TO BE USED ON THE STORM

AND SANITARY STRUCTURES?

I AM UNABLE TO FIND ON THE PLANS/SPECS

Storm sewer frame and grates shall meet section 2.02 of spec. section 02630 and will be Heavy Duty in all vehicle traffic areas.

Sanitary sewer frame and grates shall meet section 2.01 (K) of the spec.

section 02523 and will be Heavy Duty in all vehicle traffic areas.

Rusty Wintrow

I apologize for asking this question so late but I don't really have a choice. I cannot find anywhere in the specs what type and wall thickness of pipe you want on the specialty piping (all

See amendment to Specification Section 15410 Plumbing Piping.

GRW Project No 3280-20 page 14 of 25

Mechanical Systems of Dayton the piping coming off of the lube system). Also I wanted to let you know that the specs allow pvc sdr 21 and 26 on above ground domestic water and that is something I have to believe is a typo. That type of pipe is generally used in an underground application for yard irrigation. It also allows for CPVC which is fine but it doesn't call for a wall thickness and we could use schedule 40 but again typically it is schedule 80.

Brett Smith

DL Supply

9/3/08

The riser pipe leading to the Siamese fire connection shows 6” DIP should this be 4” flanged x threaded galvanized pipe? Not sure if 6” ductile can accommodate the threaded on Siamese connection?

Line sizes have been modified, see sheet F-1-501R. A 6” flanged connection to a 6” galvanized pipe is acceptable.

Brett Smith

DL Supply

9/3/08

The 6” wafer check valve w/ball drip is showing flanges. Is this a flanged check valve w/ball drip as shown verses wafer check valve as described?

Flanged check valve with ball drip is acceptable. Detail on sheet F-1- 501R has been modified.

Brett Smith

DL Supply

9/3/08

Please confirm the use of 3” DIP for the domestic service bypass line. I have found that 4” is more readily available and cheaper. Using a 4x3 reducer for the meter.

Line sizes have been modified, see sheet F-501R. 4” bypass is acceptable.

Brett Smith

DL Supply

9/3/08

Is the 3” strainer valve included with the meter and provided by the utility company or is the strainer valve separate and supplied by the contractor?

Strainer valve is separate and shall be provided by contractor.

GRW

Amendment

9/2/08

Drawing sheet C-200 See revised drawing C-200 included with this amendment. Widened concrete apron at exit of the FMS maintenance bay to 60’ and added additional concrete paving to widen the area.

GRW

Amendment

9/2/08

Drawing sheet C-200, specification section 02850 Provide (2) Rohn 25G towers at building corner points 1 and 7 indicated on C-200 grounded to the lightning protection system. With wall brackets just under roof line / gutter, etc. Provide a (2) 2 inch conduits from the antenna pad utilizing long radius elbows at transitions to turn up inside of exterior wall to above the ceiling in wall for coax entry point.

Provide caps until cable is installed.

GRW Project No 3280-20 page 15 of 25

GRW

Amendment

9/2/08

Drawing sheet C-300 See revised drawing C-300 included with this amendment. Grading changed to reflect the additional pavement at the FMS maintenance bay.

GRW

Amendment

9/2/08

Drawing sheet C-400R See revised drawing C-400 included with this amendment. Fire vaults at the FMS and AFRC have been removed. There is now only one fire vault adjacent to the HWY 794 entrance. The 10” water line has been reduced to an 8” line and the loops for the fire hydrants have been reduced to 6” lines. There is now a 4” potable water line to run to both the FMS and AFRC. Widening the pad at the FMS bay caused the OWS to be in the pavement as well as SS MH7. The geothermal well field was also moved south. Please review the drawing for all changes.

GRW

Amendment

9/2/08

Drawing sheet C-501 Revise Detail 6, Sheet C-501, Concrete Paving Detail:

Concrete Thickness shall be 5 inch minimum

Crushed Stone Base shall be 6 inch minimum

Concrete shall have a 28 day 4000 psi strength.

Amendment

9/2/08

Drawing sheet S-1-001 and S-2-001 The lintel schedules on these sheets are included as requirements for lintels that may or may not be specifically detailed in the construction documents and shall be included by the Contractor where required structurally. All steel is exposed at the exterior of the building shall be galvanized.

GRW

Amendment

9/2/08

Drawing sheet S-1-102 and A-1-103 Add an additional column (HSS 4x4x3/16, see detail 8 / S-1-202) at the 45 degree clerestory window. See 5 / A-1-314.

GRW

Amendment

9/2/08

Drawing sheet S-1-102, S-2-102, and S-2-103 Provide a 4x4x1/4 galvanized steel angle continuous where steel roof deck is not supported at the edge by a roof framing member. Bolt angles to cmu masonry at 24”OC with 1/2” dia. x 6” long masonry anchor bolts.

See revised detail 2/A-1-108 included in this amendment for typical

GRW Project No 3280-20 page 16 of 25 location of angle, adjust as required for each specific location.

GRW

Amendment

9/2/08

Blocking attachment at top of masonry walls. Provide ½” anchor bolts at 4’-0”OC see revised detail 2/A-1-108 included in this amendment for general location of bolts adjust for each specific location.

GRW

Amendment

9/2/08

Drawing sheet S-1-102 See revised drawing A-1-107R included with this amendment. Provide steel beams at corridor intersections described in revised key note.

GRW

Amendment

9/2/08

General Concrete. All vertical exposed to view concrete shall be rub finished within 12 hours following installation. Proposed finish sample (2’ tall 2’ wide 1’ thick w/ rustication joint) shall be installed and approved by the contracting officer prior to installation of concrete.

GRW

Amendment

9/2/08

Drawing sheet S-1-201 Detail 13 / S-1-201, coordinate also with floor finishes and kitchen drawings.

GRW

Amendment

9/2/08

Drawing sheet S-1-202 Detail 8 / S-1-202, provide one #5 bar vertical at each cell of the double stacked bond cmu piers shown on sheet A-1-314

GRW

Amendment

9/2/08

Drawing sheet A-1-101 Reverse the door swing direction of doors at door mark 47 located outside Supply Office 121C.

GRW

Amendment

9/2/08

Drawing sheet A-1-302 See revised drawing A-1-302R included with this amendment. The additional detail 4 shall be provided at all AFRC and FMS masonry to metal siding transitions.

GRW

Amendment

9/2/08

Drawing sheet A-1-104 Key Note 10. Exercise Equipment. These items are not in contract (NIC)

GRW Drawing sheet A-1-104 West walls of unisex toilet 110A. Revise wall type notes from W10

GRW Project No 3280-20 page 17 of 25

9/2/08

(metal stud) to W6 (cmu).

GRW

Amendment

9/2/08

Drawing sheet A-1-104 Wall type W2 references a wall section which indicates a gutter at the roof. Reference wall section for general cross section of the wall only.

Some walls noted as W2 have a parapet condition where the gutter is shown.

GRW

Amendment

9/2/08

Drawing sheet A-1-106 Detail 2 / A-1-106 provide blocking 1’ long 4’-0” OC minimum attached to concrete floor at along each edge of the wood base for attachment of wood base. All wood materials shall be fire retardant treated. Flame-spread rating less than 25.

GRW

Amendment

9/2/08

Drawing sheet A-1-107 AFRC Reflected Ceiling Plan See revised drawing A-1-107R included with this amendment. The revisions in this drawing supersede other direction throughout the construction documents concerning interior wall heights.

GRW

Amendment

9/2/08

Drawing sheet A-1-108 AFRC Roof Plan See revised drawing A-1-108R included with this amendment.

GRW

Amendment

9/2/08

Drawing sheet A-1-601 See revised drawing A-1-601R included with this amendment. Provide hardware sets and rated door assemblies in the AFRC as revised.

Revise closers at doors 3, 11, 34, and 64 to include a hold open function. Add door holder(s) and stop Rockwood No. 490 to doors 62, 63, and 65.

GRW

Amendment

9/2/08

Drawing sheet A-3-101 See revised drawing A-3-101R included with this amendment.

GRW

Amendment

9/2/08

Drawing sheet M-1-101 See revised drawing M-1-101R included with this amendment. Ductwork along Corridor B has been shifted East. Fire Dampers added to duct penetrations in west wall of Corridor B.

GRW

Drawing sheet F-2-501 Remove Fire Protection/Domestic Water Service Vault detail and section

GRW Project No 3280-20 page 18 of 25

9/2/08 A detail from sheet.

GRW

Amendment

9/2/08

Drawing sheet E-0-101 E-0-101: Add keynote for underground telecommunications service. Add site note for underground telecommunications service. See drawing included with this amendment.

9/2/08

Drawing sheet E-1-102 E-1-102: Remove keynote symbol “3” from Assembly 101. See drawing

9/2/08

Drawing sheet E-1-103 E-1-103: Remove motion sensor symbol from Arms Vault. See drawing

9/2/08

Drawing sheet E-1-201 E-1-201: Show only one 5 inch conduit sleeve for primary cable and extend primary conduit under generator to pad mounted transformer.

See drawing included with this amendment.

9/2/08

Drawing sheet E-1-202 E-1-202: Add keynotes and receptacles for screen and overhead projector. See drawing included with this amendment.

GRW Project No 3280-20 page 19 of 25

Amendment

9/2/08

Drawing sheet E-1-301 E-1-301: List of security and access control equipment has been totally revised. Extend cable tray west to matchline. See drawing included with this amendment.

9/2/08

Drawing sheet E-1-302 E-1-302: Add cable tray from main telecommunications room south above the Chair Storage Rooms and A/V Storage Room to the east/west cable tray above Corridor 128. Add provisions for speakers and controls to Assembly 101. Revise keynote references in Conference Room 127E.

9/2/08

Drawing sheet E-1-303 E-1-303: Add list of security and access control equipment. See drawing

9/2/08

Drawing sheet E-1-304 E-1-304: Add keynote for Hubbell equipment racks, CS1976H (three required). See drawing included with this amendment.

9/2/08

Drawing sheet E-1-401 E-1-401: Add keynote for fire alarm connection to eyewash station/deluge shower (one required). See drawing included with this amendment.

GRW Project No 3280-20 page 20 of 25

Amendment

9/2/08

Drawing sheet E-2-203 E-2-203: Change main breaker in Panel CC to 150 amp. See drawing

9/2/08

Drawing sheet E-2-301 E-2-301: Show quadraplex power outlet in Column “A” Detail. See drawing included with this amendment.

9/2/08

Drawing sheet E-1-601, 602, 603 E-1-601, 602, & 603: All panelboard schedules have been revised. See

9/2/08

Drawing sheet E-1-701 E-1-701: Revise Kitchen layout to include used equipment from National Guard. See drawing included with this amendment.

9/2/08

Drawing sheet E-1-801 E-1-801: Generator size should be 750 KW. See drawing included with this amendment.

9/2/08

Drawing sheet E-2-301 E-2-301: Show quadraplex receptacle in Column “A” Installation Detail.

GRW Project No 3280-20 page 21 of 25

9/2/08

Drawing sheet E-2-401 E-2-401: Add keynote for fire alarm connection to eyewash station/deluge shower (seven required). See drawing included with this amendment.

9/2/08

Drawing sheet E-2-402 E-2-402: Eliminate keynote in upper left-hand corner of sheet. See

9/2/08

Specification Section 02820 and drawing sheet C-300 Provide an additional for the East MEP Parking (labeled on C-301) provide an additional 107’ of 6’ fence, an additional 24’ sliding gate, and an additional pedestrian gate. Layout to be revised during the shop drawing submittals.

GRW

Amendment

9/2/08

Specification Section 01810 General Commissioning Requirements

Replace the Specification Section 01810 released previously with the Specification Section 01810 included in this amendment.

GRW

Amendment

9/2/08

Specification Section 01815 General Commissioning of HVAC Requirements

Delete paragraphs 1.04 Allowances and 1.05 Unit Prices.

GRW

Amendment

9/2/08

Specification Section 04810 Unit Masonry Assemblies Paragraph 2.02, D. Decorative Concrete Masonry Unit is clarified as follows:

Provide these units at the North, East, Southeast, South, and West interior walls of the AFRC Entrance Lobby 131. The back of the block facing rooms adjacent to the lobby shall be painted.

GRW

Amendment

Specification Section 06100 Rough Carpentry All wood materials shall be fire retardant treated. Flame-spread rating less than 25.

GRW Project No 3280-20 page 22 of 25

GRW

Amendment

9/2/08

Specification Section 06202 Interior Finish and 06402 Interior Architectural Woodwork

All finish plywood shall have fire retardant treated cores. Flame-spread rating less than 25.

GRW

Amendment

9/2/08

Specification Section 07412 Metal Wall Panels Generally Equivalents by other manufacturers are acceptable.

Paragraph 2.05, C. is amended as follows:

Standard horizontal flat panels by other manufacturers shall be acceptable provided:

The panel width is a minimum of 12” and can be stacked to meet the design requirements.

The horizontal panel will interface properly with vertical panels concerning issues of weather tightness.

Meets the other specification requirements for the vertical panels.

9/2/08

Specification Section 08380 Double Swing Doors Add Specification Section 08380 Double Swing Doors included with this amendment.

GRW

Amendment

9/2/08

Specification Section 09681 Carpet Tile Paragraph 2.01, A. is amended as follows:

Also to be included as an available product is 1663502500 ‘Kamala’ color 2945 Honshu as manufactured by InterfaceFLOR.

www.interfaceflor.com 1-877-605-1500.

GRW

Amendment

9/2/08

Specification Section 10431 Signage and Construction Drawings

Where there is signage that indicates Field Maintenance Shop or FMS the copy shall be revised to indicate Field Maintenance Shop / AMSA Shop or FMS / AMSA Shop.

GRW

Amendment

9/2/08

Specification Section 11400 Food Service Equipment Page 11400-29ITEM 50 DISH TABLE – CLEAN W/POT & PAN SINK --

ONE (1) REQUIRED.

Delete first sentence: This item is not included in this contract.

GRW Project No 3280-20 page 23 of 25

Amendment

9/2/08

Specification Section 15080 Piping Specialties Add to Part 2 a new Section 2.06, Totalizing Meters:

“2.06 Provide mechanical totalizing flow metered control handle suitable for each service as indicated. Material must be compatible with medium.

Coordinate required scale for each meter with Contracting Officer.

Minimum operating pressure 1000 PSI. 1/2" NPT connection, 4 GPM.

Provide units by Graco, Lincoln Industrial, or other acceptable manufacturers.”

GRW

Amendment

9/2/08

Specification Section 15410 Plumbing Piping To Section 2.01, Pipe: Add “Schedule 40” in the Domestic water, Unburied LINE, to the end of the line, following CPVC.”

Add the following to section 2.01, PIPE:

Grease Steel, black, schedule 40.

Anti-freeze Type L hard copper ATF Steel, black, schedule 40.

Engine Oil Steel, black, schedule 40.

Gear Oil Steel, black, schedule 40.

Return anti-freeze Type L hard copper.

Used oil Steel, black, schedule 40.

Add the following to section 2.02 FITTINGS:

Grease Screwed or welded Anti-freeze 95-5 solder ATF Screwed or welded Engine Oil Screwed or welded Gear Oil Screwed or welded Return anti-freeze 95-5 solder

Used oil Screwed or welded

Specification Section 15430 Plumbing Specialties Section 2.16 & 2.17, add the following to the end of each section:

Tanks in high groundwater areas must be weighted or provided with an anti-buoyancy device to prevent flotation as per the

GRW Project No 3280-20 page 24 of 25 manufacturer’s recommendation. Provide factory-designed anti-buoyancy devices capable of containing the vessel under local conditions. Buoyancy design calculations shall be performed by a licensed engineer and provided with the equipment submittal.

GRW

Amendment

9/2/08

Specification Section 15887 Carbon Monoxide Exhaust Systems

Section 2.04, Part A: Add the following to the end of the paragraph:

“ Coordinate tailpipe adapter with actual equipment exhausts and modify as needed at no expense to owner.”

Section 2.04, Add Part E:

E. Exhaust Fan Panel: provide 4-button panel allowing local operation of Fan. Buttons shall be labeled RAISE/LOWER exhaust hose and fan START/STOP.

GRW

Amendment

9/2/08

Specification Section 15887 Carbon Monoxide Exhaust Systems

Section 2.05, Part A: Add Quatrosense Environments sensor to list of acceptable manufacturers.

Part D lists hose length at 30’, which is of sufficient length to reach diesel stacks or under-body exhausts. Hose ends shall be coordinated to fit military vehicles to be serviced at this facility during the shop drawing submittal and provided by the Contractor at no additional cost to the Owner.

GRW

Amendment

9/2/08

Specification Section 15856 Gravity Ventilators Add Specification Section 15856 Gravity Ventilators included with this amendment.

GRW

Amendment

9/2/08

Specification Section 15950 Energy Management Systems Part I, Section “Control Equipment and Devices”, under “Sensors and Controllers”: Add the following:

“Carbon Monoxide Detectors- provide with EMS system. Refer to specification Section 15887, Section 2.05, for description.”

GRW

Amendment

Specification Section 16230 Stand By Power Generator Systems-Fixed

Make the following revisions:

Section 16230-2, 1.04 B: The automatic transfer switch should be rated

GRW Project No 3280-20 page 25 of 25

9/2/08 1,000 amperes instead of 1,200 amperes.

Section 16230-3, 2.01 A, 2: The generator shall be rated 750 KW, 938 KVA instead of 800 KW, 1,000 KVA.

Section 16230-10, 2.04 G: The emergency standby generator shall have one mounted main line circuit breaker.