REPAIR BUILDING 909 BUCKLEY AFB, COLORADO
Solicitation number
W9133L-16-R-0043
Issued by

About this file

Amendment 0004

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F6G3CE6036A001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT NO. CRWU 06-2003

Buckley Air Force Base, Aurora, CO

This amendment is issued to incorporate bid addendum 2 as described in Block 14 Continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9133L-16-R-0043

X 9B. DATED (SEE ITEM 11)

17-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jul-2016

CODE

NGB-AQ - W9133L

111 SOUTH GEORGE MASON DR

BLDG. 2, 4TH FLOOR

ARLINGTON VA 22204-1373

W9133L 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9133L-16-R-0043

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 04

CHANGES TO THE SOLICITATION

The following changes are made to the solicitation sections without reissuance.

1. Section 00110 SUBMISSION REQUIREMENTS AND INSTRUCTIONS, ADD Paragraph 2.1.1.1 Submit Volume 2, Part 1 and Part 2 in original and (3) three hard copies, in accordance with instruction contained herein.

2. Section 00110 SUBMISSION REQUIREMENTS AND INSTRUCTIONS, Paragraph 2.5.2.2. Subfactor 1:

Experience and Capability. At the end of the paragraph 2.5.2.2. ADD “Refer to Specification 010000, paragraph 1.51 for the minimum qualification requirement for key personnel."

3. Section 00120 PROPOSAL EVALUATIONS AND BASIS FOR AWARD. Paragraph 2.2.2.4 ADD the following sentence after the first sentence of the paragraph “See Section 010000 of the specifications, paragraph 1.51 for additional minimum qualifications requirements for key personnel.”

CHANGES TO THE SPECIFICATIONS

The following specification sections will be replaced with the revised sections, attached.

1. Section 010000, GENERAL REQUIREMENTS, REMOVE Section 010000 in its entirety and REPLACE with the new Section Dated July 2016. This section is replaced to include paragraph 1.51, Key Personnel.

2. Section 010600, SAFETY POLICIES AND PROCEDURES, REMOVE Section 010600 in its entirety and REPLACE with the new Section Dated July 2016. This section is replaced to revise the reference standards to OSHA 1926.

The following changes are made to the specification sections without reissuance.

1. Section 012300, OPTIONS, Paragraph 3.1. G. CHANGE “Option 7” TO “Option 7a.”

2. Section 012300, OPTIONS, Paragraph 3.1. H. CHANGE “Option 8” TO “Option 7b.”

3. Section 012300, OPTIONS, Paragraph 3.1. I. CHANGE “Option 9” TO “Option 7c.”

4. Section 012300, OPTIONS, Paragraph 3.1. J. CHANGE “Option 10” TO “Option 8.”

5. Section 014510, CONTRACTOR QUALITY CONTROL, Paragraph 3.2. B. 1. Add the following sentences to the end of this paragraph. “The CQC system manager may not multi-role as the site superintendent.”

6. Section 014510, CONTRACTOR QUALITY CONTROL, Paragraph 3.2. B.2. CQC System Manager: The

7. CQC system manager shall be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years of construction experience OR a construction person with a minimum of 10 years of experience working on projects similar in size and scope to this project. In addition to the above experience and education requirements, it is recommended the CQC system manager have completed the course entitled "Construction Quality Management for Contractors" prior to start of field work. For further information contact the USACE Omaha District (402-221-4269). The USACE Omaha District partners with the Rocky Mountain/ABC to offer this training course. For more information on these classes, please contact Karen Pavone at (303-832-5812) or kpavone@abcrmc.org”

8. Section 084113, ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS. ADD the following paragraph:

"3.5 STOREFRONT SCHEDULE

1. All interior are SF-01.

SF-01: WF-16, WF-17, WF-24, WF-25, WF-27

2. All North, South, and East elevations are SF-02.

SF-02: All other WF (not listed in 1 or 3)

3. The West elevation is SF-03.

SF-03: WF-06, WF-07, WF-07A, WF-08, WF-09, WF-10, WF-11"

9. Section 129300, SITE FURNISHINGS, paragraph 2.1. A. 4.a. - REMOVE the entire line “a. 14” Square Concrete Bollard”. RENUMBER lines b and c accordingly.

10. Section 12 93 00 para 2.1. A. 5.a. - REMOVE “a. 8” Diam. Aluminum Lightd Bollard” RENUMBER lines b., c. and d. accordingly.

CHANGES TO THE DRAWINGS

The following drawing will be replaced with the revised drawing, attached.

1. M003, REMOVE drawing M003 in its entirety and REPLACE with drawing M003 dated 7-19-16. This drawing is revised to incorporate Addendum (ADD) 2.

The following changes are made to the drawings without reissuance.

1. A011, PARTITION TYPE NOTES – ADD Note “17. Provide “Open Cell Spray Foam” in all Cavities of S4, S7, S9, and S10 wall type construction. USI, Soft polyurethane, open cell spray foam or similar are acceptable products. This is interior wall construction only.”

2. A111, A112, A113, A114, A121, A122, A123, and A124 - Floor Plan Notes DELETE 12 on all drawings.

3. A401, ROOM FINISH SCHEDULE, Room No. C123, Room Name ECM STG – DELETE Remark 10.

4. A551, Detail 2, Corner Guard, Typical – REPLACE "2X2 SS Corner Guard" WITH "2X2 SS Corner Guard - 8’ High".

5. M503, Detail 1, Ground Source Details, Geothermal Well Field Layout Diagram - ADD Note 3 as shown:

“3. Graduations are as follows: 3” for the first three wells, reduce to 2”, then reduce to 1 ¼’ after well six.

On the return, 1 ¼” for the first two wells, increase to 2” for the next three wells, then increase to 3” for the last three wells.”

(End of Summary of Changes)