Score_Sheet_2009_ED_LEED_Energy_EISA_v2010(1)_B909_B2_(003).pdf

PDF 53 KB Posted

Attached to
REPAIR BUILDING 909 BUCKLEY AFB, COLORADO
Solicitation number
W9133L-16-R-0043
Issued by

About this file

LEED Score Sheet - Reference Question 30

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Categories

Prereq 1 Construction Activity Pollution Prevention

USGBC

Prereq X Y

SWPPP required

Credit 1 Site Selection 1 1 Site meets requirements

Credit 2 Development Density & Community Connectivity

5 5 Housing and services are outside 1/2 mile radius

Credit 3 Brownfield Redevelopment 1 1 Asbestos abatement was performed during exterior renovation

Credit 4.1 Alternative Transportation, Public Transportation Access

6 6 No public transportation at this time

ANG Recommended. A-E must evaluate feasibility and achieve if applicable by project scope.

71 FTE (184 UTA) = 4 bikes; 1 shower (5 inc.)

Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles

3 3 Preferred parking provided for LEV/FEV (57 x 5% = 3 spaces

Credit 4.4 Alternative Transportation, Parking Capacity

2 2 Preferred parking provided for carpools (57 x 5% = 3 spaces)

Credit 5.1 Site Development, Protect or Restore Habitat

1 1 Restored landscape exceeds 50% of site area

Credit 5.2 Site Development, Maximize Open Space

1 1 Vegetated open space exceeds 2x building footprint (exemplary performance)

ANG Recommended. A-E must evaluate feasibility and achieve if applicable by project scope.

Reduced impervious area

ANG Recom.

(1 point)Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms

Sustainable Sites Possible Points: 26

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

1Credit 6.1 Stormwater Design, Quantity Control

ANG Recom.

(1 point)

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

ANG Recommended. A-E must evaluate project feasibility and achieve if applicable by project scope.

Not anticipated without detention basin ANG Recommended. A-E must evaluate project feasibility and achieve if applicable by project scope and budget.

SF of asphalt exceeds concrete ANG Required. A-E must ensure project achieves this point.

Low roof (SRI 9); high roof (SRI 94); vestibule roof (SRI 84+)

Credit 8 Light Pollution Reduction 1 1 Verify uplighting from apron flood lights

Prereq 1 Water Use Reduction USGBC Prereq X Y Low flow fixtures (WC-1.28, U-0.125, LAV- 0.35 metered, SK-0.5, SH-1.5) Credit 1 Water Efficient Landscaping 2 to 4 points

ANG Requirement. EPAct 2005 - Water Conservation. E.O. 13423 - Reduce Water Consumption. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

No irrigation

ANG Recommended. Avoid use of irrigation systems as project, location and climate allow.

No irrigation

Credit 2 Innovative Wastewater Technologies

2 2 No on-site water treatment

ANG

Required

Reduce by 50%

Credit 7.1 Heat Island Effect, Non-Roof

Water Efficiency Possible Points: 10

ANG Recom.

(2 points)

ANG Recom.

(1 point)

Credit 6.2 1Stormwater Design, Quality Control

Credit 7.2 Heat Island Effect, Roof 1

ANG

Required 2

ANG Recom.

(1 point)

No Potable Water Use or Irrigation

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

Credit 3 Water Use Reduction 2 to 4 points

ANG Requirement. EPAct 2005 - Water Conservation. E.O. 13423 - Reduce Water Consumption. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

See WEp1 ANG Recommended. A-E must evaluate project feasibility and achieve if applicable by project scope and budget.

See WEp1

40% Reduction 1 1 See WEp1 (20:80 ratio = 52%; exemplary)

Prereq 1 Fundamental Commissioning of Building Energy Systems

USGBC

Prereq X Y

Cx by A-E

Prereq 2 Minimum Energy Performance USGBC Prereq X Y See EAc1

Prereq 3 Fundamental Refrigerant Management

USGBC

Prereq X Y

Refrigerants comply

Credit 1 Optimize Energy Performance 1 to 19 Points

ANG Provisional Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

Energy model in progress

ANG Recom.

(1 point)35% Reduction

30% Reduction

12% New Buildings or 8% Existing Building Renovations

Energy & Atmosphere Possible Points: 35

ANG

Required (2 points)

ANG Prov.

Required (1 point)

1 1

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

ANG Provisional Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See note above ANG Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point even if resultant project exceeds EPAct 30% reduction.

See note above ANG Provisional Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See note above ANG Provisional Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See note above

20% New Buildings or 16% Existing Building Renovations 1

ANG Prov.

Required (1 point)

16% New Buildings or 12% Existing Building Renovations

ANG Prov.

Required (1 point)

14% New Buildings or 10% Existing Building Renovations

ANG Prov.

Required (1 point)

ANG Prov.

Required (1 point)

118% New Buildings or 14% Existing Building Renovations

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

ANG Provisional Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See note above ANG Provisional Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See note above ANG Provisional Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See note above ANG Provisional Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See note above

22% New Buildings or 18% Existing Building Renovations 1

ANG Prov.

Required (1 point)

ANG Prov.

Required (1 point)

28% New Buildings or 24% Existing Building Renovations

ANG Prov.

Required (1 point)

26% New Buildings or 22% Existing Building Renovations

ANG Prov.

Required (1 point)

24% New Buildings or 20% Existing Building Renovations

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

ANG Provisional Requirement. EPAct 2005 - 30% Energy Use Reduction. Federal Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See note above

32% New Buildings or 28%

34% New Buildings or 30%

36% New Buildings or 32%

38% New Buildings or 34%

40% New Buildings or 36%

42% New Buildings or 38%

44% New Buildings or 40%

46% New Buildings or 42%

48% New Buildings or 44%

1 1 See note above

30% New Buildings or 26% Existing Building Renovations

ANG Prov.

Required (1 point)

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

Credit 2 On-Site Renewable Energy 1 to 7 Points

ANG Recommended. EPAct 2005 and EISA 2007. Provide 30% domestic hot water via solar system if LCC effective. Provide roof mounted photovoltaic systems if LCC effective. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.

Bid option for PV + SHW ANG Recommended. EPAct 2005 and EISA 2007. Provide 30% domestic hot water via solar system if LCC effective. Provide roof mounted photovoltaic systems if LCC effective. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.

See note above ANG Recommended. EPAct 2005 and EISA 2007. Provide 30% domestic hot water via solar system if LCC effective. Provide roof mounted photovoltaic systems if LCC effective. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.

See note above

1 5% Renewable Energy ANG Recom.

(1 point)

3% Renewable Energy ANG Recom.

(1 point) 1

1% Renewable Energy ANG Recom.

(1 point) 1

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

ANG Provisional Recommendation - see above. EPAct 2005 and EISA 2007. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.

See note above ANG Provisional Recommendation - see above. EPAct 2005 and EISA 2007. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.

See note above ANG Provisional Recommendation - see above. EPAct 2005 and EISA 2007. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.

See note above ANG Provisional Recommendation - see above. EPAct 2005 and EISA 2007. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.

See note above

13% Renewable Energy ANG Prov.

Recom.

(1 point)

9% Renewable Energy ANG Prov.

Recom.

(1 point)

7% Renewable Energy ANG Prov.

Recom.

(1 point)

11% Renewable Energy ANG Prov.

Recom.

(1 point)

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

ANG Recommended. EPAct 2005 - Energy Conservation. E.O. 13423 - Energy Conservation. Federal Sustainable Buildings MOU. A-E must evaluate feasibility of project achieving this point as base bid item or option.

Cx by A-E ANG Recommended. E.O. 13423 - Reduction of Toxic and Hazardous Materials Acquired.

Federal Sustainable Buildings MOU. A-E must evaluate feasibility of project achieving this point as base bid item or option.

A-E Comment: Refrigerants comply ANG Requirement. EPAct 2005 - Metering of Utility with Smart Metering. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

Submeters provided; required post-occupancy M&V

Credit 6 Green Power 2 2 Not included in project scope

Also E.O. 13423 - Waste Prevention and Recycling Programs in Facilities.

Collection areas provided

Credit 1.1 Building Reuse, Maintain Existing Walls, Floors & Roof

1 to 3 Points

Maintain 55% of Existing Walls, Floors & Roof

1 1 Majority of structural elements are reused

Storage & Collection of Recyclables USGBC Prereq X

Credit 3 Enhanced Commissioning ANG Recom.

(2 points)

Materials & Resources Possible Points: 14

YPrereq 1

Credit 5

Credit 4 Enhanced Refrigerant Management ANG Recom.

(2 points)

Measurement & Verification ANG Required 3

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

Maintain 75% of Existing Walls, Floors & Roof

1 1 See note above

Maintain 95% of Existing Walls, Floors & Roof

1 1 See note above

Credit 1.2 Building Reuse, Maintain 50% of Interior Non-Structural Elements

1 1 Limited reuse of interior elements

Credit 2 Construction Waste Management 1 to 2 Points

ANG Requirement. E.O. 13423 - Increase Diversion of Solid Waste. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

Contractor requirement, include in specifications

ANG Requirement. E.O. 13423 - Increase Diversion of Solid Waste. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

See note above

Credit 3 Materials Reuse 1 to 2 Points

Reuse 5% 1 1 Not anticipated

Reuse 10% 1 1 Not anticipated

Credit 4 Recycled Content 1 to 2 Points

ANG Required. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

Contractor requirement, include in specifications

Divert 50% from Landfill

1ANG

Required

Divert 75% from Landfill

ANG

Required

10% (post-consumer + ½ pre-consumer) 1

1ANG

Required

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

20% (post-consumer + ½ pre-consumer)

1 1 See note above

Credit 5 Regional Materials 1 to 2 Points

ANG Required. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

Contractor requirement, include in specifications

20% Extracted, Processed & Manufactured Regionally

1 1 See note above

Credit 6 Rapidly Renewable Materials ANG Recommended. Federal Sustainable Buildings MOU. A-E must evaluate feasibility and achieve if applicable by project scope.

Not anticipated

Credit 7 Certified Wood ANG Recommended. Federal Sustainable Buildings MOU. A-E must evaluate feasibility and achieve if applicable by project scope.

Contractor requirement, include in specifications

Also Federal Sustainable Buildings MOU.

Ventilation system complies Also Federal, DoD and Air Force Regulation.

No smoking policy

Credit 1 Outdoor Air Delivery Monitoring 1 1 Included in ventilation design

Credit 2 Increased Ventilation 1 1 Negative impact to energy use

10% Extracted, Processed & Manufactured Regionally

ANG

Required 1 1

Prereq 1 Minimum IAQ Performance

ANG

Recom.

(1 point)

USGBC

Prereq

Environmental Tobacco Smoke (ETS) Control

USGBC

Prereq

Y

X

ANG

Recom.

(1 point)

X

Prereq 2

Indoor Environmental Quality Possible Points: 15

Y

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

ANG Required. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

Contractor requirement, include in specifications

ANG Requirement. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

Contractor requirement, include in specifications

ANG Required - If Applicable. E.O. 13423 - Reduction of Toxic and Hazardous Materials Acquired. Federal Sustainable Buildings MOU. A-E must achieve if applicable by project scope.

Contractor requirement, include in specifications

ANG Required - If Applicable. E.O. 13423 - Reduction of Toxic and Hazardous Materials Acquired. Federal Sustainable Buildings MOU. A-E must achieve if applicable by project scope.

Contractor requirement, include in specifications

ANG Required - If Applicable. E.O. 13423 - Reduction of Toxic and Hazardous Materials Acquired. Federal Sustainable Buildings MOU. A-E must achieve if applicable by project scope.

Contractor requirement, include in specifications

Credit 4.1 Low-Emitting Materials, Adhesives & Sealants

ANG

Required

Credit 3.2 Construction IAQ Management Plan, Before Occupancy

ANG

Required

Credit 4.2 Low-Emitting Materials, Paints & Coatings

ANG

Required 1

Low-Emitting Materials, Flooring Systems

ANG

RequiredCredit 4.3

Credit 3.1 Construction IAQ Management Plan, During Construction

ANG

Required 1

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

ANG Required - If Applicable. E.O. 13423 - Reduction of Toxic and Hazardous Materials Acquired. Federal Sustainable Buildings MOU. A-E must achieve if applicable by project scope.

Contractor requirement, include in specifications

Credit 5 Indoor Chemical & Pollutant Source Control

1 1 Not feasible in hangar bay, shops

ANG Required. EPAct 2005 - Energy Conservation. E.O. 13423 - Energy Conservation. Federal Sustainable Buildings MOU. A-E must ensure project achieves this point.

Coordinate with Base furniture package

Credit 6.2 Controllability of Systems, Thermal Comfort

1 1 1 Verify controls for 50% of workstations and 100% of multi-occupant spaces

ANG Recommended. Federal Sustainable Buildings MOU. A-E must achieve this point if applicable by project scope.

Complies with ASHRAE 55

Credit 7.2 Thermal Comfort, Verification 1 1 Requires action by Base ANG Required. Federal Sustainable Buildings MOU. A-E must ensure that project achieves this point. A7O project manager can waive requirement if A-E demonstrates that obtaining point is not possible due to project scope.

Analysis to verify

Credit 8.2 Daylight & Views, Views for 90% of Spaces

1 1 Not anticipated

ANG

Required 1

Credit 8.1 Daylight & Views, Daylight 75% of Spaces

ANG

Required 1

Credit 6.1 Controllability of Systems, Lighting

ANG

Required

Low-Emitting Materials, Composite Wood & Agrifiber Products

Credit 4.4

Credit 7.1 Thermal Comfort, Design

ANG

Recom.

(1 point)

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

Credit 1.1 Innovation in Design:

Exemplary SSc5.2

1 1 Vegetated open space exceeds 2x area of building footprint

Credit 1.2 Innovation in Design:

Exemplary WEc3

1 1 Water use reduction exceeds 45%

Credit 1.3 Innovation in Design:

Exemplary MRc2, 4, 5 or 7

1 1 Contractor to achieve exemplary performance for minimum of one MR credit

Credit 1.4 Innovation in Design:

TBD

1 1 TBD if required for Silver

Credit 1.5 Innovation in Design:

TBD

1 1 TBD if required for Silver

ANG Policy. EPAct 2005.

A-E must ensure project achieves this point.

Multiple LEED APs on team

Credit 1.1 Regional Priority:

SSc6.1 Stormwater Design, Quantity

1 1 Zip code: 80011

Credit 1.2 Regional Priority:

WEc1 Water Efficient Landscaping, No Potable / No Irrigation

1 1 See credit above

Credit 1.3 Regional Priority:

WEc3 Water Use Reduction, 40%

1 1 See credit above

Credit 1.4 Regional Priority:

EAc2 On-Site Renewable, 13%

1 1 See credit above

Credit 1.5 Regional Priority:

SSc2 Development Density -- -- --

4 pts max

1Credit 2 LEED® Accredited Professional

Innovation & Design Process Possible Points: 6

Regional Priority Possible Points: 4

1ANG

Required

LEED® - AP Project Comments:

Project Design

Point Cost Estimates

Project Num:

Project Title:

CRWU062003(A)

Repair Building 909

Point and Prereq.

Cost

Estimates

Design Status:

Project Design Points (Goals)

Credit Description Other

Design Points

Points Non

Achiev able

Points

ANG

Req.

Points Credit

Air National Guard Sustainable Design and Energy Conservation Score Sheet Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1)

Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Buckley Air Force Base, CO

Points and Point Cost Impact USGBC Project Registration Access #:

4/6/2015 Type B3

USGBC Project Title: Repair Building 909 1087333687162950Program FY:

Credit 1.6 Regional Priority:

EAc1 Energy Performance, 48% New or 44% Existing Building

4 pts max

Req.

Pts.

Oth.

Pts.

All Point Cost Est. X Pts. Proj.

Goal Proj. Goal Cost Est.

Points and Point Cost Impact Summary 110 32 23 $0 33 54 $0

Summary: Project LEED Score and Cost Estimate

USGBC Rating System:

ANG Category Requirements:

Cost: $0Score: 54

Vertical - USGBC Silver 50 to 59 points. Industrial - USGBC Silver 50 to 59 points.

Horizontal - 11-13 USGBC points. Utility - 9-10 USGBC points.

Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80+ points

File details come from the government source that posted it. Updated .