Pre-Proposal General Conference Slides
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL CONFERENCE
July 6, 2016
Buckley AFB, Aurora, CO
Repair Building 909
Buckley Air Force Base Aurora, Colorado
Sandra M. Kenzie: NGB-AQ- Contracting Officer
MSgt Noah Branscom: 140th MSG/MSC - Administrating Contracting Officer
Lt Col William Smith: Base Civil Engineer -COR
Lt Col Tom Nefe: Assistant Base Civil Engineer -
COR
Col Tom Niichel: Construction Manager - COR
Your Name
Company
Your Position in Company
Are you a Prime or Subcontractor?
Repair and Renovate Bldg 909 to include demolition of the interior. Project includes a base and eight (8) options
Magnitude - $10,000,000 - $25,000,000
One Firm-Fixed Price Contract will be awarded
100% Small Business Set-aside
NAICS Code 236220; Small Business Size $36.5M
Contract will be awarded using Best Value Trade off procedures
Evaluation Factors: Price, Technical & Past Performance
• A Bid Guarantee is required for this proposal
• Bid Guarantee shall be 20% of the proposal price OR $3M whichever is less
Best Lock Cores Delta Direct Digital Controls (DDC) AES Fire Alarm Radio Transceiver High Expansion Foam (HEF) Ansul
Jet X
On The Web - www.fbo.gov
Solicitation Exhibits Questions & Answers Document Amendments
Check Regularly & Refresh Web Page Plans & Specifications- Offerors must be registered with FedBizOpps and obtain a MPIN Password
Questions about this program or DD Form 2345 should be addressed to:
U.S./Canada Joint Certification Office DLA Logistics Information Services Federal Center, 74 Washington Ave., North Battle Creek, MI USA 49037-3084
Phone: (800) 352-3572 Email: jcp-admin@dla.mil
Export Controlled Materials Company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS)
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 320 calendar days for all work including all exercised options. The time stated for completion shall include final cleanup of the premises.
The following is a brief overview of the proposal requirements:
Offerors Are Strongly Cautioned To Carefully Read the Requirements of the
Solicitation and Comply Accordingly
The Government Intends to Award Without Discussion and There May Not Be An Opportunity for Discussions, Corrections or Revised Proposals
Section 00110 of the RFP details the required Information and Format for the proposal.
2 Volumes Are Required
VOLUME 1 – Price/Cost Proposal Pro forma documents Pricing information
VOLUME 2 – Two Parts Part 1- Technical Capability Proposal Part 2- Past/Present Performance Info
Offeror portion of SF1442
Section 00010 – Price/Cost Associated with the project line items
Section 00600 – Representations and Certifications (R&C)
Complete R&Cs in SAM (www.SAM.gov)
Complete and Return R&Cs in Section 00600
Complete & Include Supplemental Information - Section 00110 Paragraph 2.5.1.2
Part I-Technical Capability
Comprised of four (4) sub factors:
1. Experience & Capability
2. Construction Schedule (including Commissioning
Approach/Timeline)
3. Experience with Geothermal System Installations
4. Experience with High Expansion Foam (HEF)
Systems
Combined Technical/Risk Ratings
Blue: Outstanding
Purple: Good
Green: Acceptable
Yellow: Marginal
Red: Unacceptable
NOTE: See Section 00120 of the RFP for definitions
Exhibit A – Part 1 – Performance Relevancy Questionnaires Use Exhibit Format Complete not more than 3 forms for Relevant Contracts completed or substantially completed (70% or more) in the last five (5) years
Exhibit A – Part 2 – Additional Offeror Information – Complete One (1)
Send Questionnaires for the Exhibit C Projects to references Do this Early – Must be to Contracting Officer NLT
Closing Date of Proposal
If you do not have Relevant Past Performance and are using Experience of Key Personnel, Predecessor Companies or Subcontractors, be sure to state this clearly in your proposal Consideration of subcontractors must complete Exhibit B – Consent Form
Exhibit C – Past Performance References Questionnaires
- Due By The Closing Time And Date
• Send Reference Questionnaires Out As Soon As
Possible
• Return to Same Location as the RFP
Exhibit A = Relevancy Questionnaire PART 1 (Not to Exceed 3) Part 2 (1)
Exhibit B = Subcontractor Consent Form (if applicable)
Exhibit C = Past Performance Letter and Questionnaire (Send out to References)
Proposal Due: July 19, 2016, 2:00 PM local time Proposal Must be signed by an Officer of your company NO Facsimile or Electronic Offers Send or Deliver to:
USPFO Colorado – Purchasing & Contracting ATTN: Ms. Sandra M. Kenzie Contracting Officer 660 South Aspen Street, Bldg 1005, Rm 250 MS 66 Buckley Air Force Base, Aurora, CO 80011
Offerors must request access to the base
NO LATER THAN JULY 15, 2016 (FOUR
DAYS BEFORE DUE DATE)
Late proposals due to delays at the base entrance will not be an excusable delay.
Plan Accordingly For Base Access!
• Process Is Detailed in RFP Section 00120
• Carefully Review Section 00120 when preparing Proposal
• Comply with Section 00100 and 00110 requirements
• Failure to Furnish a Complete Proposal may result in elimination from consideration
• Award will be made based on the best overall (best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration give to the three (3) evaluation factors: Technical, Past Performance and Price
• The Technical Factor and Past/Present Performance are considered to be approximately equal in importance and when combined, the non-Price factors are approximately equal to the Price Factor.
• The firm that represents the Best Value to the Government will be selected for an award IAW FAR
15.1 Source Selection Processes and Techniques
• Contractor whose Proposal Provides:
Best Value to the Government – Read Section 00120 carefully
Non-Price Factors – Technical + Past/Present Performance are approximately = to Price
Best Value May Not be the Lowest Price
• Submit a complete proposal IAW Instructions – Use formats provided
• Award Without Discussions is Intended, you may NOT have an Opportunity to correct or revise your proposal
• FAR 52.219-14 Limitations on Subcontracting
– Small Business must perform 15% of cost of contract not including the cost of materials with its own employees
• When Using a Subcontractor to Obtain/Enhance Relevancy Provide Subcontractor Consent Form, Exhibit B, or the information will not be considered
• Lowest Price Proposal may not necessarily be awarded the contract
• Questions must be Submitted as show in Section 00100 Para 3. Email to:
• Sandra.M.Kenzie.civ@mail.mil
• usaf.mi.127-wg.mbx.ngbzcparc@mail.mil
• Subject Line: Solicitation No. W9133L-16-R-0043, Repair Building 909, Project No. CRWU 06-2003
• Submit Questions no later than the 5th day prior to solicitation closing
• Do NOT contact Government Engineering
Personnel or the Architect-Engineer – This will delay a response
• All Questions will be answered on a Non- Attribution Basis and the Answers will be posted to FBO
• If necessary any changes to the solicitation will be issued via an Amendment and will be posted to FBO
• Check the FBO Web Site Regularly
Reference Questionnaires are also due by closing date of proposal.
Send Reference Questionnaires out
EARLY!
Return to Contracting Officer via E-mail at:
• Sandra.M.Kenzie.civ@mail.mil
• usaf.mi.127-wg.mbx.ngbzcparc@mail.mil www.fbo.gov www.acquisition.gov www.sam.gov www.wdol.gov/wdol/scafiles/davisbacon/co.html
2:00 P.M.
July 19, 2016
*REMINDER* YOU MUST HAVE REFERENCES
SENT IN BY THIS TIME AND DATE
Important information to know before the site visit begins.