Proposal Worksheet FINAL419.xls

XLS spreadsheet 96 KB Posted

Attached to
F16 Weapons Systems Simulator Training & Support Federal contract opportunity
Solicitation number
W9133L-09-R-0010
Issued by
Department of the Army National Guard

About this file

These are the updated Proposal Worksheets (PW).Posted 22 April 2009

View the file

Other files for this federal contract opportunity

Other files attached to F16 Weapons Systems Simulator Training & Support, newest first.
File Type Posted
QUESTIONS 43009.doc DOC document
APPENDIX 4d UpdatedMAY7.doc DOC document
APPENDIX 5a attached.doc DOC document
RFP Price Proposal Worksheet FINAL 42809.xlsx XLSX spreadsheet
AMENDEMT 2.doc DOC document
F-16 FINAL QA 419 —
ANG Questions and answers 040209.doc DOC document
Tucson 2006 CBA.pdf PDF
W9133L09R0010_amended_final2.doc DOC document
AMENDMENT ONE.doc DOC document
WSSCAPPENDIX2TO9_amended_final2.doc DOC document
PROPOSALWORKSHEET FINAL.pdf PDF
Springfield CBA.doc DOC document
Kelly 2006 CBA.pdf PDF
Conference.doc DOC document
PROPOSALWORKSHEET.docx DOCX document
W9133L09R0010.doc DOC document
WSSCAPPENDIX2TO9.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tucson

PROPOSAL WORKSHEET
Tucson IAP, AZ
SERVICES OR SUPPLIES AND COSTS-PRICES
PERIOD OF PERFORMANCE 01 JUL 09 THROUGH 30 JUN 10
CLINNON-PERSONAL SERVICES OR SUPPLIESQNTYUNITUNIT PRICETOTAL AMT
0001MOBILIZATION (If required, from to )TBD
0002

0006 Reimbursable Contractor Training/Travel in Support of Training *Travel funds will be incorporated by unilateral modification as travel is required by the government. Proposals shall include G&A rate that would be applied to cost reimbursable travel expenses. This CLIN is not profit bearing.

0002ACProposed G & A________________
0002ACTUCSON IAP AZNTETBD
0006ACProposed G & A________________
0006ACUAE - BLK 60, TUCSON IAP AZNTETBD
0002F-16 Instructor/Subject Matter Expert - MISSION LOAD - TUCSON IAP, AZ

Academic Platform/Simulator Instruction and Operations to support flying training IAW SOW Para 2.2

0002AB9400HOURS12MO$ - 0
0002AB9860HOURS12MO
0002AB10320HOURS12MO
0002AB10780HOURS12MO
0002AB11240HOURS12MO
0002AB11700HOURSBEQ12MO
0002AB12160HOURS12MO
0002AB12620HOURS12MO
0002AB13080HOURS12MO
0002AB13540HOURS12MO
0002AB14000HOURS12MO
0002ABADDITIONAL I/SME SUPPORTHOURS150HR$ - 0$ - 0
0002TRAINING SUPPORT
0002ACTRAINING SUPPORT: Scheduling to include Flight, Mid-Range, Simulators, and Academic 152FS
IAW SOW Para 2.4 and workload in Appendix 312MO$ - 0
0002ACTRAINING SUPPORT: Scheduling to include Flight, Mid-Range, Simulators, and Academic 195FS
IAW SOW Para 2.4 and workload in Appendix 312MO
0002ACTRAINING SUPPORT: Training Evaluation & Analysis
IAW SOW para 2.312MO$ - 0
0002ACTRAINING SUPPORT: Publication Management
IAW SOW Para 1.1.412MO$ - 0
0002ACTRAINING SUPPORT: Learning Center Management
IAW SOW Para 2.612MO$ - 0
0002ACTRAINING SUPPORT: Security Management IAW SOW Para 5.012MO
0002ACTRAINING SUPPORT: Computer Repair; Information Technology Management & Maintenance; IAW SOW Para 2.912MO$ - 0$ - 0
0002COURSEWARE MAINTENANCE REVISION (ANG)
0002AAOngoing Maintenance-Continuous Update and currency courseware12MO$ - 0
0002COURSEWARE STRUCTURAL REVISIONS (ANG)
0002AATen (10) percent revision rate of MTI12MO
0002AATwenty (20) percent revision rate of MTI12MO
0002AAThirty (30) percent revision rate of MTI12MO
0002AAForty (40) percent revision rate of MTIBEQ12MO
0002AAFifty (50) percent revision rate of MTI12MO
0002AASixty (60) percent revision rate of MTI12MO
0002AASeventy (70) percent revision rate of MTI12MO
0002AAEighty (80) percent revision rate of MTI12MO
0002AANinety (90) percent revision rate of MTI12MO
0002AACompete (100) MTI revision12MO
0002SYLLABUS DEVELOPMENT & FINALIZATION (ANG)
0002AASyllabus Development
0002AASyllabus Finalization
0006F-16 Blk 60 UAE I/SME SUPPORT Academic Platform/Simulator Instruction and Operations to support flying training IAW SOW Para 2.2
0006AB3410HOURS12MO
0006AB3610HOURS12MO
0006AB3810HOURSBEQ12MO
0006AB4010HOURS12MO
0006AB4210HOURS12MO
0006ABADDITIONAL UAE BLK-60 I/SME SUPT150EA
0006UAE TRAINING SUPPORT
0006ACTRAINING SUPPORT: Scheduling to include Flight, Mid-Range, Simulators, and Academic IAW SOW Para 2.4 and workload in Appendix 312MO$ - 0
0006ACTRAINING SUPPORT: Training Evaluation & Analysis IAW SOW para 2.312MO$ - 0
0006ACTRAINING SUPPORT: Publication Management IAW SOW Para 1.1.412MO$ - 0
0006ACTRAINING SUPPORT: Learning Center Management
IAW SOW Para 2.612MO$ - 0
0006ACTRAINING SUPPORT: Security Management IAW SOW Para 5.012MO
0006ACTRAINING SUPPORT: Computer Repair; Information Technology Management & Maintenance; IAW SOW Para 2.912MO$ - 0$ - 0
0006COURSEWARE MAINTENANCE REVISION (UAE )
0006AAOngoing Maintenance-Continuous Update and currency courseware12MO
0006COURSEWARE STRUCTURAL REVISIONS (UAE)
0006AATen (10) percent revision rate of MTI12MO
0006AATwenty (20) percent revision rate of MTI12MO
0006AAThirty (30) percent revision rate of MTI12MO
0006AAForty (40) percent revision rate of MTIBEQ12MO
0006AAFifty (50) percent revision rate of MTI12MO
0006AASixty (60) percent revision rate of MTI12MO
0006AASeventy (70) percent revision rate of MTI12MO
0006AAEighty (80) percent revision rate of MTI12MO
0006AANinety (90) percent revision rate of MTI12MO
0006AACompete (100) MTI revision12MO
0006SYLLABUS DEVELOPMENT & FINALIZATION (UAE)
0006AASyllabus Development
0006AASyllabus Finalization
0002ACMISCELLANEOUS-NOT INCLUDED ABOVE (ITEMIZE)
******A SHEET MUST BE CREATED FOR EACH YEAR*******
PERIOD OF PERFORMANCE 01 JUL09 THROUGH 30 JUN 10 (BASE, I.E.001)
PERIOD OF PERFORMANCE 01 JUL 10 THROUGH 30 JUN 11 (Option 1, I.E. 1001)
PERIOD OF PERFORMANCE 01 JUL 11 THROUGH 30 JUN 12 (Option 2, I.E. 2001)
PERIOD OF PERFORMANCE 01 JUL 12 THROUGH 30 JUN 13 (Option 3, I.E. 3001)
PERIOD OF PERFORMANCE 01 JUL 13 THROUGH 30 JUN 14 (Option 4, I.E. 4001)
All interested offerors MUST submit a PROPOSAL WORKSHEET (PW) with their proposal package. A PW is requried for each SUB-CLINs AT ALL LOCATIONS. The proposal worksheet will be used to conduct price and cost analysis. The Contract Line Item Number (CLIN) and sub-CLIN on the PW should match the CLIN and sub-CLIN on the SOLICITATION. The Best Estimated Quantity (BEQ) amount is the amount that will be used for the CLIN price on the solicitation. EXAMPLE; CLIN 0001AA on Page 3 in the solicitation is a combination of (4) four different disciplines within the sub-CLIN. You will add the BEQ on courseware revision, the total on courseware devleopment these totals will be put in the solicitation CLIN 0001AA. Your worksheet will show the numbers used to derive the final total. AGAIN THIS WILL BE USED IN THE PRICE EVALUATION.

&LFINAL PW4/19/09&C&P&RATTACHMENT #3

Lackland

PROPOSAL WORKSHEET
Kelly Annex, Lackland AFB TX
SERVICES OR SUPPLIES AND COSTS-PRICES
PERIOD OF PERFORMANCE 01 JUL 09 THROUGH 30 JUN 10
CLINNON-PERSONAL SERVICES OR SUPPLIESQNTYUNITUNIT PRICETOTAL AMT
MOBILIZATION (If required, from to )TBD
0001Reimbursable Contractor Training/Travel in Support of Training

*Travel funds will be incorporated by unilateral modification as travel is required by the government. Proposals shall include G&A rate that would be applied to cost reimbursable travel expenses. This CLIN is not profit bearing.

Proposed G & A________________
0001ACKELLY ANNEX, LACKLAND AFB TXNTETBD
0001F-16 Instructor/Subject Matter Expert - MISSION LOAD - KELLY ANNEX, LACKLAND AFB, TX Courseware Development, Academic Platform/Simulator Instruction and Operations to support flying training IAW SOW Para 2.2
0001AB6700HOURS12MO
0001AB7160HOURS12MO
0001AB7620HOURS12MO
0001AB8080HOURS12MO
0001AB8540HOURS12MO
0001AB9000HOURSBEQ12MO
0001AB9460HOURS12MO
0001AB9920HOURS12MO
0001AB10380HOURS12MO
0001AB10840HOURS12MO
0001AB11300HOURS12MO
0001ABADDITIONAL I/SME SUPPORTHOURS150HR$ - 0
0001TRAINING SUPPORT
0001ACTRAINING SUPPORT: Scheduling to include Flight, Mid-Range, Simulators, and Academic
IAW SOW Para 2.4 and workload in Appendix 412MO$ - 0
0001ACTRAINING SUPPORT: Training Evaluation & Analysis
IAW SOW para 2.312MO$ - 0
0001ACTRAINING SUPPORT: Publication Management IAW SOW Para 1.1.412MO$ - 0
0001ACTRAINING SUPPORT: Learning Center Management
IAW SOW Para 2.612MO$ - 0
0001ACTRAINING SUPPORT: Security Management IAW SOW Para 5.012MO$ - 0
0001ACTRAINING SUPPORT: Computer Repair; Information Technology Management & Maintenance; IAW SOW Para 2.912MO$ - 0$ - 0
0001COURSEWARE MAINTENANCE REVISION
0001AAOngoing Maintenance-Continuous Update and currency courseware12MO$ - 0
0001COURSEWARE MAINTENANCE REVISION
0001AATen (10) percent revision rate of MTI12MO
0001AATwenty (20) percent revision rate of MTI12MO
0001AAThirty (30) percent revision rate of MTI12MO
0001AAForty (40) percent revision rate of MTIBEQ12MO
0001AAFifty (50) percent revision rate of MTI12MO
0001AASixty (60) percent revision rate of MTI12MO
0001AASeventy (70) percent revision rate of MTI12MO
0001AAEighty (80) percent revision rate of MTI12MO
0001AANinety (90) percent revision rate of MTI12MO
0001AACompete (100) MTI revision12MO
0001SYLLABUS FINALIZATION
0001AASyllabus Finalization
0001ACMISCELLANEOUS-NOT INCLUDED ABOVE (ITEMIZE)
******A SHEET MUST BE CREATED FOR EACH YEAR*******
PERIOD OF PERFORMANCE 01 JUL09 THROUGH 30 JUN 10 (BASE, I.E.001)
PERIOD OF PERFORMANCE 01 JUL 10 THROUGH 30 JUN 11 (Option 1, I.E. 1001)
PERIOD OF PERFORMANCE 01 JUL 11 THROUGH 30 JUN 12 (Option 2, I.E. 2001)
PERIOD OF PERFORMANCE 01 JUL 12 THROUGH 30 JUN 13 (Option 3, I.E. 3001)
PERIOD OF PERFORMANCE 01 JUL 13 THROUGH 30 JUN 14 (Option 4, I.E. 4001)
All interested offerors MUST submit a PROPOSAL WORKSHEET (PW) with their proposal package. A PW is requried for each SUB-CLINs AT ALL LOCATIONS. The proposal worksheet will be used to conduct price and cost analysis. The Contract Line Item Number (CLIN) and sub-CLIN on the PW should match the CLIN and sub-CLIN on the SOLICITATION. The Best Estimated Quantity (BEQ) amount is the amount that will be used for the CLIN price on the solicitation. EXAMPLE; CLIN 0001AA on Page 3 in the solicitation is a combination of (4) four different disciplines within the sub-CLIN. You will add the BEQ on courseware revision, the total on courseware devleopment these totals will be put in the solicitation CLIN 0001AA. Your worksheet will show the numbers used to derive the final total. AGAIN THIS WILL BE USED IN THE PRICE EVALUATION.

&LFINAL PW 4/19/09&C&P

&LFINAL PW 4/19/09&C&P&RATTACHMENT #3

Springfield

PROPOSAL WORKSHEET
Springfield-Beckley MPT, OH
SERVICES OR SUPPLIES AND COSTS-PRICES
PERIOD OF PERFORMANCE 01 JUL 09 THROUGH 30 JUN 10
CLINNON-PERSONAL SERVICES OR SUPPLIESQNTYUNITUNIT PRICETOTAL AMT
MOBILIZATION (If required, from to )TBD
0003Reimbursable Contractor Training/Travel in Support of Training

*Travel funds will be incorporated by unilateral modification as travel is required by the government. Proposals shall include G&A rate that would be applied to cost reimbursable travel expenses. This CLIN is not profit bearing.

Proposed G & A________________
0003AESPRINGFIELD ANGB OHNTETBD
0003F-16 Instructor/Subject Matter Expert - MISSION LOAD - SPRINGFIELD-BECKLEY MAP, OH Academic Platform/Simulator Instruction and Operations to support flying training IAW SOW Para 2.2
0003AB2800HOURS12MO
0003AB3100HOURS12MO
0003AB3400HOURS12MO
0003AB3700HOURS12MO
0003AB4000HOURS12MO
0003AB4300HOURSBEQ12MO
0003AB4600HOURS12MO
0003AB4900HOURS12MO
0003AB5200HOURS12MO
0003AB5500HOURS12MO
0003ABADDITIONAL I/SME SUPPORTHOURS150HR
0003TRAINING SUPPORT (SOW )
0003ACTRAINING SUPPORT: Scheduling to include Flight, Mid-Range, Simulators and Academic for the Dutch and US squadrons IAW SOW Para 2.4 and workload in Appendix 512MO$ - 0
0003ACTRAINING SUPPORT: Training Evaluation & Analysis
IAW SOW para 2.312MO$ - 0
0003ACTRAINING SUPPORT: Publication Management
IAW SOW Para 1.1.412MO$ - 0
0003ACTRAINING SUPPORT: Learning Center Management
IAW SOW Para 2.612MO$ - 0
0003ACTRAINING SUPPORT: Security Management IAW SOW 5.012MO$ - 0
0003ACTRAINING SUPPORT: Computer Repair; Information Technology Management & Maintenance; IAW SOW Para 2.912MO$ - 0$ - 0
0003COURSEWARE MAINTENANCE REVISION ( CWD )
0003AAOngoing Maintenance-Continuous Update and currency courseware12MO
0003SYLLABUS FINALIZATION
0003AASyllabus Finalization12MO
0003ACMISCELLANEOUS-NOT INCLUDED ABOVE (ITEMIZE)
******A SHEET MUST BE CREATED FOR EACH YEAR*******
PERIOD OF PERFORMANCE 01 JUL09 THROUGH 30 JUN 10 (BASE, I.E.001)
PERIOD OF PERFORMANCE 01 JUL 10 THROUGH 30 JUN 11 (Option 1, I.E. 1001)
PERIOD OF PERFORMANCE 01 JUL 11 THROUGH 30 JUN 12 (Option 2, I.E. 2001)
PERIOD OF PERFORMANCE 01 JUL 12 THROUGH 30 JUN 13 (Option 3, I.E. 3001)
PERIOD OF PERFORMANCE 01 JUL 13 THROUGH 30 JUN 14 (Option 4, I.E. 4001)
All interested offerors MUST submit a PROPOSAL WORKSHEET (PW) with their proposal package. A PW is requried for each SUB-CLINs AT ALL LOCATIONS. The proposal worksheet will be used to conduct price and cost analysis. The Contract Line Item Number (CLIN) and sub-CLIN on the PW should match the CLIN and sub-CLIN on the SOLICITATION. The Best Estimated Quantity (BEQ) amount is the amount that will be used for the CLIN price on the solicitation. EXAMPLE; CLIN 0001AA on Page 3 in the solicitation is a combination of (4) four different disciplines within the sub-CLIN. You will add the BEQ on courseware revision, the total on courseware devleopment these totals will be put in the solicitation CLIN 0001AA. Your worksheet will show the numbers used to derive the final total. AGAIN THIS WILL BE USED IN THE PRICE EVALUATION.

&LFINAL PW 4/19/09&C&P&RATTACHMENT #3

File details come from the government source that posted it. Updated .