These are the questions submitted and all responses.Posted 22 April 2009
Text of this file
Sheet1
| Question No. | Document | Page | Section | Topic | Question/Comment | General | Springfield | Lackland | Tucson |
| 1 | RFP | 62 | PWS | 6.1.20, 6.1.21, 6.1.22 | The PWS refers to a Training Development and Management Plan (TPDMP) in 6.1.20, a Quality Control Plan (QCP) in 6.1.21, and a Contractor Training and Certification Plan (TCP) in 6.1.22 as plans to be submitted in response to the RFP, and become part of the contract. |
| Section L Item A), Factor 1, does not refer to any of these plans. Are the TPDMP, the QCP, the TCP, a Security Plan, and resumes to be included in the 150 page limit? | These plans are to be submitted within 15 days of contract award. The contractor will coordinate with the government until they are final. | ||
| 2 | RFP | 62, | |
| 105 | PWS and Section L | 6.1.20 and Section | |
| L A) | Section L A) refers to a comprehensive Project Management and Oversight plan or Management Plan. The PWS refers to the TPDMP. |
| Are these two separate plans? | Yes, these are two separate documents | ||||||
| 3 | RFP | DD254 | Will the customer be providing a DD254 for security guidance? | This security will be iniated by the contracting office after award. | |||
| 4 | RFP | 103 | Section L | Volume II CDs | L.2.4 …submit one softcopy of volume II and one softcopy of the Auxiliary Cost Data. | ||
| What comprises the Auxiliary Cost Data since this is the only reference to the document? | The reference to "auxiliary Cost date" should be deleted, it does not apply. | ||||||
| 5 | RFP | 102, 103, 106, 107 | Section L 2.1, L.2.2, L.D), | ||||
| M 1.2 (a) | References to Technical Proposal and Specification | Guidelines indicate that "The Government will incorporate the Technical and Management proposal and PWS into the award." The proposal content listed in L.2.3 does not include a Technical Proposal. Please clarify. | This should have stated Technical Proposal. Technical Proposal includes Management Plan, Past performance, and Key Personnel. | ||||
| 6 | References to Technical Proposal and Specification | Paragraph 2.2 states: "However, the offeror shall state assumptions, conditions, and any exceptions that the offeror relied upon as a basis for the Technical and Specification proposal or the Price proposal." The proposal content listed in L.2.3 does not include a Technical Proposal or Specification. Please clarify. | This should have stated Technical proposal. | ||||
| 7 | References to Technical Proposal and Specification | D) Factor 4 (e) - Instructions state that "The price proposal shall include a basis of estimate, describe the rationale, and relate cost to the technical and specification proposal." A technical and specification proposal are not required; please clarify. | Should have stated Technical Factor. | ||||
| 8 | References to Technical Proposal and Specification | M 1.2(a) - The "Technical and Management Factor" is referenced. Should this be the "Management Plan and the Key Personnel Factors are" - please clarify reference. | This should state Management Factor. | ||||
| 9 | Section L | M 2.0 A) (d) | SOW Task to match Section M Criteria | We have not been able to identify a PWS task that corresponds to the criteria in M.1.(d) "research and analyze... marketing opportunities, as well as perform market analysis". Please clarify. | "Emerging Technologies" refers to information Technology (IT) | ||
| 10 | PWS | 52 | 2.4.2.1 | GFE Availability | Please clarify the availability of PEX as GFE. | PEX is a government software program what will be made available via .mil access | |
| 11 | Proposal Worksheet and PWS | PWS 68 | 5.0 | School Registrar | Three appears to be inconsistency between the Pricing Worksheet and the PWS with respect to the School Registrar. The Proposal Worksheet references the School Registrar in for Kelly, Lackland, in CLIN 0001 Training Support: "School Registrar, Security Management IAW SOW Para 5.0" and in Springfield, CLIN 0003 Training Support: "School Registrar, Security Management IAW SOW 5.0." |
| PWS paragraph 5.0 relates to Security Management - Protection of Resources and does not reference the School Registrar. The revised PWS does not include the previously published paragraph 2.4.2.4 entitled Registrar. Please clarify the requirement in the Pricing Worksheet. | The requirement for School Registrar has been removed at all three sites in the amended PWS. The reference to School Registrar in the Kelly and Springfield Proposal Worksheets should have been deleted. | IAW Appendix 2, Springfield does not request the contracted services of a Registrar. A military member is performing these duties. In looking at Appendix 5a, para 3, Registrar is still listed as well. These services are not required at Springfield. | The requirement for a School Registrar is no longer needed, hence the removal from the PWS. Proposal worksheets - CLINs 0001 and 0003; Training Support will be corrected to remove school registrar. | ||||||
| 12 | PWS Appdx 3c | 3 | 5.2 | LMS | Please identify the LMS to be used at the site(s). | N/A for Kelly Annex, Lackland AFB, refer to Tucson since this is only site with this requirement. | NxTrain | ||
| 13 | PWS Appdx 3c | 3 | 5.2 | LMS | Will the LMS that is going to be used be available as GFE? | N/A for Kelly Annex, Lackland AFB, refer to Tucson since this is only site with this requirement. | Yes, LMS is GFE. | ||
| 14 | PWS Appdx 3c | 3 | 5.2 | LMS | If an LMS is going to be used and is not provided as GFE, is the contractor to provide an LMS? | N/A for Kelly Annex, Lackland AFB, refer to Tucson since this is only site with this requirement. | No. LMS will be GFE | ||
| 15 | RFP | 90 | Sec. I | FAR 52.222-41 | With the inclusion of FAR 52.222-41 Service Contract Act of 1965, should a clause be included which allows for adjustments to contract prices as wage determination rates change, such as FAR 52.222-43 Fair Labor Standards Act and Service Contract Act Price Adjustment (Multiple Year & Option Contracts)? | Clause 52.222-43 has been added | |||
| 16 | CBAs | CBA | The Collective Bargaining Agreements (CBA) were included with Amendment 0001; however, for positions not covered in the CBA, please provide the applicable Service Contract Act (SCA) Wage Determinations or the SCA identification numbers, revision number and date for each site. | For portion not covered in the CBA, the contractor is to determine those positions. Not the government. | |||||
| 17 | PWS | Appx | |||||||
| 4a | 28 | Lackland Contract Estimates - FY09 | The Data in the “Sim Evt Yr”, “Sim Hr Yr” and “Pre/Post Brief” columns are calculated by multiplying the data in the “Sim Evts Stud” times “Number of Students/Yr” times “Number of Class/Yr”. |
| Should the “Number of Stud/Yr” column be “Number of Stud/Class” or are the totals incorrect? (This is inconsistent with the format of the other two sites.) | Lackland Appendix 4a "Contract Estimates - FY09" are correct as indicated. | No. The columns are correct. The # of Class/Yr is used as a multiplier for Acad Evts/Yr and Acad Hrs/Yr. If you have one student in a class or five students in class you only plan to teach a lesson once per class. The # of Stud/yr is a multiplier for Sim Evtrs/yr and Sim Hr/yr because each student will conduct the event individually. | |||||
| 18 | Appendix 4a | Pg 28 | The Total Lackland Contract Instruction Estimate for Academics and Simulator instruction based on BEQ only allows for 200 I/SME hours for the increased Block 30 courseware effort. Please verify | The Lackland BEQ is adjusted for expected courseware revision requirements | |||
| 19 | Appendix 5a | Pg 47 | The Total Springfield Contract Instruction Estimate for Academics and Simulator instruction is considerably higher than the Hours for BEQ on the Proposal Worksheet. Are Springfield BEQ hours consistent with current instructors required? | Appendix 5a pg 47, total Springfield Contract Instruction estimate for Academics and Sim instruction vs BEQ hours on the Proposal Work Sheet. The Appendix 5a was based on the absolute worst case scenario (every slot being filled that is available. This has never occurred at Springfield. The BEQ level that was selected (4300 Instructional hrs)is a more accurate estimate of what will actually occur at Springfield next year. | |||
| 20 | The hours for Contract Instructors at Tucson appears to be calculated for Academic and Training Devices, but no factor for the Subject Matter Expert (SME) work for the Courseware effort. Are we to assume that the hours for I/SME courseware support are in addition to the 11,700 hr Legacy and 3,810 UAE BEQ CLIN at Tucson? Should the SME courseware effort be included in the Courseware CLIN? Does this BEQ calculation include peak as well as average instructor load? | I/SME effort for Courseware should be accounted for in CLIN 0002 AA (ANG)/0006 AA (UAE), Courseware Maintenance Revision and Courseware Structural Revisions. On the Proposal Worksheet, the “Courseware Development” part of CLIN 0002/0006 AB should have been removed. AB is specific to Academic/Platform/Simulator Instruction and Operations to support flying training. | |||||
| 21 | Does the Computer Systems Analyst(CSA)/Computer Software Developer (CSD) requirement, RFP para 1.3.8, calls for three (3) CSAs that are currently on Site? There isn’t a tasking in the RFP that measures the amount of effort. We desire the number of CSAs required as full time level of effort or Full Time Equivalents (FTE’s) | Kelly Annex - not able to provide information. Contractor must determine level of effort required base upon workload identified in PWS and appendixes | The tasks are specified in the RFP. | ||||
| 22 | The hours for Contract Instructors at Kelly appear to be calculated for Academic and trainers with no allowance for the Courseware effort. Are we to assume that the hours for I/SME courseware support are in addition to the 4,000 hours BEQ at Kelly and should fall under the Courseware CLIN? | See question #20 | |||||
| 23 | Para 5.1.1.2.1 | Is there an estimated volume and type of classified materials to potentially handled by the Security Manager(s)? | Reference the MTI (appendix 3d, 4d & 5d) and RFP (Para. 8.2, Publications). | ||||
| 24 | Is Para 5.1.1.2.1 applicable to all sites | No, Kelly Annex - Lackland will not require contractor to store classified material. | |||||
| 25 | Please define “Conditions of Performance” and how it relates to this solicitation. FACTOR 3 PAST PERFORMANCE |
(d) Brief description of the contract work, location(s), and
| conditions of performance; | Conditions in relation to that particular contract and the type of work if not exact then analogous; In relation to the responses obtained from surveys on performances; . | ||
| 26 | The 0001, 0002, and 0003 AB series CLINs, Academic Instruction, states SME Courseware Review is to be performed under these CLINs | this has been updated | |
| 27 | The Proposal Worksheets for these CLINs further indicate I/SMEs proposed per the BEQ are to be responsible for Courseware Development in addition to their instructor/operations duties. | this has been updated | |
| 28 | The worksheets reference SOW Para 2.2 only. PWS Section 2.2, Training Device Instruction, does not address I/SME Support of Courseware development at all, while Section 2.5, Courseware Development, states only that the contractor shall supply SMEs to courseware development. | this has been updated | |
| 29 | The issue is further confused in Appendix 3a, 4a, and 5a, identifying Estimates for Academics and Simulator instruction, that when compared to the BEQ, provides for some SME time available for courseware support, but not enough to perform to the MTI revision rates identified. Rephrasing our questions: Are the I/SME Hours identified by the BEQ for the AB Series CLINs intended to provide all I/SME support hours to include Courseware development, or are additional I/SME hours to be proposed separately under AA Series CLINs to provide for Courseware development support? | Since this is a PWS, it is up to the contractor to submit proposals based on their research and information. i.e. if you determine you need more time state so in your proposal and show where you made this deduction. |
&LQ/A 4/19/09&C&P
&C&P
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QUESTIONS 43009.doc | DOC document | |
| APPENDIX 4d UpdatedMAY7.doc | DOC document | |
| APPENDIX 5a attached.doc | DOC document | |
| RFP Price Proposal Worksheet FINAL 42809.xlsx | XLSX spreadsheet | |
| Proposal Worksheet FINAL419.xls | XLS spreadsheet | |
| AMENDEMT 2.doc | DOC document | |
| AMENDMENT ONE.doc | DOC document | |
| WSSCAPPENDIX2TO9_amended_final2.doc | DOC document | |
| PROPOSALWORKSHEET FINAL.pdf | ||
| W9133L09R0010_amended_final2.doc | DOC document | |
| Springfield CBA.doc | DOC document | |
| Kelly 2006 CBA.pdf | ||
| ANG Questions and answers 040209.doc | DOC document | |
| Tucson 2006 CBA.pdf | ||
| Conference.doc | DOC document | |
| W9133L09R0010.doc | DOC document | |
| WSSCAPPENDIX2TO9.docx | DOCX document | |
| PROPOSALWORKSHEET.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .