Questions and Answers Q1 thru Q7.docx
DOCX document 15 KB Posted
- Solicitation number
- W9132T25RA001
About this file
This document is a Questions and Answers file for a U.S. Army Corps of Engineers solar shingle roof replacement project at Fort Riley, Kansas. The solicitation (W9132T25RA001) seeks a contractor to replace asphalt shingles on a historic, single-story building (Building 265) with Tesla photovoltaic (PV) solar shingles, with the goal of demonstrating solar technology efficiency and resilience. Key details include a 1,476 sq ft roof deck, no battery backup requirement, and excess power to be returned to the installation's grid.
Potential contractors must be registered in the System for Award Management (SAM), provide Tesla solar shingle installation certifications, and demonstrate relevant past performance. Responses are to be submitted via email to CERL-CT-Quotes@usace.army.mil by the specified date and time. An Independent Government Estimate has been prepared with funds available, though the exact budget was not disclosed. This is a new requirement with no incumbent contractor, and no specific pricing template was provided for the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers Q1 thru Q8.docx | DOCX document | |
| Questions and Answers Q1 thru Q6.docx | DOCX document | |
| Questions and Answers Q1.docx | DOCX document | |
| B08.02 WD KS20250049 13JUN2025.txt | TXT text file | |
| B08.02 Solicitation - W9132T25RA001.pdf | ||
| B08.02 PWS Attachment 1.pdf | ||
| B08.02 PWS Attachment 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
| Q1. | For this unit (1,476 sq ft ) filed area of roof deck, you want PV/Tesla Solar Singles not Asphalt Roof Shingles as what it currently has? If so, how many backup batteries would you like figured in as well? |
| A1. | The project is to install and demonstrate PV/Tesla Solar Singles. In the SOW, it states we do not want battery backup. All excess power goes back to the installation’s grid. |
| Q2. | Who is the Incumbent? |
| A2. | This is a new requirement, therefore there is no incumbent. |
| Q3. | Past Contract Award #? |
| A3. | This is a new requirement, therefore there is no prior contract award number. |
| Q4. | Has the budget been approved for this contract? |
| A4. | An Independent Government Estimate has been prepared and funds are available up to the amount of the estimate but it won’t be shared with potential offerors." |
| Q5. | Is there a scheduled site visit day, date and time? Apologize if I overlooked it. |
| A5. | The solicitation contains FAR 52.236-27 (pgs 40-41) that provides information for a point of contact that can set up a site visit with interested parties. |
| Q6. | Do you have the pricing template in an Excel, pdf or another form to submit back in a clean format? |
| A6. | There is no pricing template provided for this requirement. |
Q7. Would you want the offer to be mailed by sealed envelope or emailed?
A7. Offers should be submitted in accordance with the instructions in the SAM.gov posting description which states “Please provide responses to this notice no later than the date and time listed above to: