Specifications.pdf
PDF 11 MB Posted
- Solicitation number
- W912WJ25Q0038
About this file
This is a set of technical specifications for paint removal work at Buffumville Dam in Charlton, Massachusetts, issued by the US Army Corps of Engineers New England District. The specifications detail requirements for removing paint from concrete surfaces inside the Access and Operating Galleries, with the base scope covering the North Access and Operating Galleries (excluding operation panels) and an optional scope covering the Lower Basement of the Control House.
The work includes paint removal down to bare concrete, pressure injection repair of an actively leaking crack in the South Gallery wall, application of penetrating sealer/hardener, and recoating of metal surfaces that contain lead compounds. The contractor must provide proper containment, ventilation, and dust control measures during work. The magnitude is between $100,000-$250,000 and is set aside for small businesses under NAICS code 238320 ($19M size standard). The specifications include detailed requirements for surface preparation, crack repair methods, moisture testing, and coating application, with supporting appendices showing work areas, staging areas, as-built drawings, and lead testing results from April 2024. Contractors must protect all dam operation equipment and controls during work and ensure proper disposal of lead-containing debris.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ25Q0038-0004.pdf | ||
| Amendment W912WJ25Q0038-0003.pdf | ||
| As Built.pdf | ||
| Amendment W912WJ25Q0038-0002.pdf | ||
| Amendment W912WJ25Q0038-0001.pdf | ||
| Solicitation W912WJ25Q0038.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number:
W912WJ25x00xx
Spillway Dam Gallery Paint Removal
Buffumville Dam Charlton, Massachusetts
Technical Specifications and Appendices
December 2024
November 2024
TECHNICAL SPECIFICATIONS
Dam Gallery Paint Removal, Buffumville Lake, Charlton, MA
TECHNICAL SPECIFICATIONS TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
DIVISION 09 - FINISHES
09 97 02 PAINTING AND PAINT REMOVAL
-- End of Technical Specifications Table of Contents --
TECHNICAL SPECIFICATIONS TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 42 00 Page 1
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g., ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided.
AMERICAN CONCRETE INSTITUTE (ACI)
38800 Country Club Drive Farmington Hills, MI 48331-3439 Ph: 248-848-3800 Fax: 248-848-3701 Internet: https://www.concrete.org/
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
3640 Park 42 Drive Cincinnati, OH 45241 Ph: 513-742-2020 Fax: 513-742-3355 Email: customerservice@acgih.org Internet: https://www.acgih.org/
CENTERS FOR DISEASE CONTROL AND PREVENTION (CDC)
1600 Clifton Road Atlanta, GA 30329-4027 Ph: 800-232-4636
TTY: 888-232-6348
Internet: https://www.cdc.gov
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
1101 Wilson Blvd, Suite 1425 Arlington, VA 22209-1762 Ph: 703-525-1695 Fax: 703-528-2148 Internet: https://safetyequipment.org/
MASTER PAINTERS INSTITUTE (MPI)
2800 Ingleton Avenue
SECTION 01 42 00 Page 2
Burnaby, BC CANADA V5C 6G7 Ph: 1-888-674-8937 Fax: 1-888-211-8708 E-mail: info@paintinfo.com or techservices@mpi.net Internet: http://www.mpi.net/
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
Patriots Plaza 1 395 E Street, SW, Suite 9200 Washington, DC 20201 Ph: 800-232-4636 Fax: 513-533-8347 Internet: https://www.cdc.gov/niosh/
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
800 Trumbull Drive Pittsburgh, PA 15205 Ph: 877-281-7772 or 412-281-2331 Fax: 412-444-3591 E-mail: customerservice@sspc.org Internet: http://www.sspc.org
U.S. ARMY CORPS OF ENGINEERS (USACE)
CRD-C DOCUMENTS available on Internet:
http://www.wbdg.org/ffc/army-coe/standards Order Other Documents from:
Official Publications of the Headquarters, USACE E-mail: hqpublications@usace.army.mil Internet: http://www.publications.usace.army.mil/ or https://www.hnc.usace.army.mil/Missions/Engineering-Directorate/TECHINFO/
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
General Services Administration 1800 F Street, NW Washington, DC 20405 Ph: 1-844-472-4111 Internet: https://www.gsaelibrary.gsa.gov/ElibMain/home.do Obtain documents from:
Acquisition Streamlining and Standardization Information System
(ASSIST)
Internet: https://assist.dla.mil/online/start/ ; account registration required
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
8601 Adelphi Road College Park, MD 20740-6001 Ph: 866-272-6272 Internet: https://www.archives.gov/ Order documents from:
Superintendent of Documents U.S. Government Publishing Office (GPO) 732 N. Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 or 866-512-1800 Bookstore: 202-512-0132 Internet: https://www.gpo.gov/
SECTION 01 42 00 Page 3
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used
-- End of Section --
SECTION 01 42 00 Page 4
SECTION TABLE OF CONTENTS
DIVISION 03 - CONCRETE
SECTION 03 01 00
REHABILITATION OF CONCRETE
PART 1 GENERAL
1.1 SCOPE
1.2 DEFINITIONS
1.2.1 Delamination
1.2.2 Rehabilitation
1.2.3 Repair
1.2.4 Termination Joint
1.2.5 Unsound Concrete
1.3 REFERENCES
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 General Requirements
1.5.2 VOC Content for Concrete Penetrating Sealer
1.5.3 Material Safety Data Sheets (SDS)
1.5.4 Qualifications
1.5.4.1 Quality Control Personnel
1.5.4.2 Contractor Qualifications
1.5.4.3 Worker Qualifications
1.5.5 Pre-Construction Conference
1.6 WORK PLAN
1.7 ACCEPTANCE OF REHABILITATION WORK
1.7.1 General Requirements
PART 2 PRODUCTS
2.1 EQUIPMENT FOR CONCRETE PREPARATION
2.1.1 Equipment for Concrete Removal
2.1.2 Surface preparation and cleaning equipment
2.1.2.1 Low Pressure Water Cleaning
2.1.2.2 Other Cleaning Equipment
2.2 EPOXY
2.3 LIQUID PENETRATING HARDENERS AND SEALERS
2.4 MISCELLANEOUS MATERIALS AND EQUIPMENT
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Examination
3.1.2 Preparation
3.1.3 Protection
3.2 QUALITY CONTROL PLAN
3.2.1 Quality control of surface preparation
3.3 CLEAN UP
3.4 SAFETY
3.5 CRACK REPAIR
SECTION 03 01 00 Page 1
3.5.1 Application of Epoxy Injection
3.5.2 Quality Control
3.6 PENETRATING SEALER/HARDENER
SECTION 03 01 00 Page 2
SECTION 03 01 00
REHABILITATION OF CONCRETE
PART 1 GENERAL
1.1 SCOPE
This specification governs the rehabilitation of structural concrete.
1.2 DEFINITIONS
1.2.1 Delamination
A planar separation in a material that is roughly parallel to the surface of the material.
1.2.2 Rehabilitation
Repairing or modifying an existing structure to a desired useful condition.
1.2.3 Repair
The reconstruction or renewal of concrete parts of an existing structure for its maintenance or to correct deterioration, damage, or faulty construction of members or systems of a structure.
1.2.4 Termination Joint
The interface where a placement of repair material meets existing concrete, the edge of an expansion joint, or other existing surfaces.
1.2.5 Unsound Concrete
Concrete that is fractured, delaminated, spalled, deteriorated, defective, contaminated or otherwise damaged.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 503.7 (2007) Specification for Crack Repair by Epoxy Injection
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with procedures described in the Statement of Work.
SECTION 03 01 00 Page 3
SD-01 Preconstruction Submittals
Work Plan ; G, DO
Quality Control Plan ; G, RO
Equipment for Concrete Preparation
SD-03 Product Data
Epoxy ; G, DO
Liquid Penetrating Hardeners and Sealers ; G, DO
Miscellaneous Materials and Equipment
SD-07 Certificates
Qualifications
The Contrator shall submit Contractor and worker qualifications as described in Subpart 1.5.4 "Qualifications".
VOC Content for Concrete Penetrating Sealer
Material Safety Data Sheets (SDS)
SD-08 Manufacturer's Instructions
Miscellaneous Materials and Equipment
1.5 QUALITY ASSURANCE
1.5.1 General Requirements
To protect personnel from overexposure to toxic materials, conform to the applicable manufacturer's Safety data sheets or local regulations.
1.5.2 VOC Content for Concrete Penetrating Sealer
Submit certification for the concrete penetrating sealer that indicates the VOC content of the product.
1.5.3 Material Safety Data Sheets (SDS)
Submit Safety Data Sheets (SDS) for all materials that are regulated for hazardous health effects. SDS must be readily accessible during each work shift to employees when they are at the construction site.
1.5.4 Qualifications
The submittals must where applicable, identify agencies and individuals who will be working on this contract and their relevant experience. Do not make changes in approved agencies or personnel without prior approval of the Contracting Officer.
SECTION 03 01 00 Page 4
1.5.4.1 Quality Control Personnel
Field tests of repair materials required must be made by an ICRI Concrete Surface Repair Technician Tier 2. Submit resumes, pertinent information, past experience, training and education of all operators of specialized demolition equipment if needed for this and the three paragraphs above.
1.5.4.2 Contractor Qualifications
The contractor performing the repair work must have been involved in a minimum of five concrete repair projects similar in size and scope to this project for at least five years. Submit information, including name, dollar value, date, and point-of-contact for similar projects which demonstrates the required experience and/or training.
1.5.4.3 Worker Qualifications
Each worker engaged in the use of specialized removal or application equipment, including epoxy injection, Sealer/Hardener application, must have satisfactorily completed an instruction program and five years of experience in the operation of the equipment.
Regulatory Requirements
Perform all work in accordance with applicable Federal, State, and local safety, health, and environmental requirements. The Contractor is responsible for obtaining all permits required by Federal, State, and local agencies for the performance of the work.
1.5.5 Pre-Construction Conference
Conduct a pre-construction conference to discuss repair materials performance requirements, control provisions, and roles and responsibilities for the Work to ensure that the Contractor's personnel understand all aspects of the repair material, its properties and application procedures. The conference must include the Contracting Officer or authorized representative, the Contractor's field superintendent and foreman, and a competent Technical Representative of the material manufacturer, and other involved trades or supplier representatives. The Technical Representative must be fully qualified to perform the work.
1.6 WORK PLAN
Prepare a work plan describing the methods of concrete removal and repair, including methods, equipment and materials to be used for each feature.
Submit the work plan for approval at least 30 days prior to the start of the work. The plan must include, but not be limited to, repair materials to be used with specific information on products and/or constituents, and requirements for handling, storage, etc., equipment to be used, surface preparation, and requirements for placement, finishing, curing and protection specific to the materials used. Include a description of field demonstrations in the work plan. Do not commence work until the work plan and field demonstration representative of the type of work are approved.
SECTION 03 01 00 Page 5
1.7 ACCEPTANCE OF REHABILITATION WORK
1.7.1 General Requirements
a. Completed concrete rehabilitation work must conform to applicable requirements of Contract Document and this specification. The Contractor is responsible to bring Work into compliance with requirements of Contract Documents if the Concrete repair work fails to meet one or more requirements of Contract Documents.
b. Correct rejected repair work by removing and replacing or by strengthening with additional construction acceptable to the Contracting Officer. Use repair methods that meet applicable requirements for function, durability, dimensional tolerances, and appearance.
PART 2 PRODUCTS
Products or materials used must conform to the requirements included herein as well as the Contract Documents. The usage of other products or materials not covered by this requirement or specified in the Contract Documents are permitted upon approval by the Contracting Officer.
Additional information and submittals for products and materials not included in this document including product data, samples, design data, test reports, certificates, manufacturer's instructions, and field reports must be submitted as requested by the Contracting Officer.
2.1 EQUIPMENT FOR CONCRETE PREPARATION
Means and methods used for concrete removal and surface preparation must be selected and used such as to minimize damage to the structure and to the concrete substrate that remains.
2.1.1 Equipment for Concrete Removal
Removal equipment and techniques must be suitable to produce concrete surface profiles and level of cleanliness in designated areas as required by this specification and the contract Documents.
2.1.2 Surface preparation and cleaning equipment
2.1.2.1 Low Pressure Water Cleaning
Use equipment capable of delivering 1000 psi to to 5000 psi at 2 gal/min to 10 gal/min for cleaning loose material from repair areas.
2.1.2.2 Other Cleaning Equipment
Use equipment that delivers oil free air capable of cleaning loose material and debris from repair areas. If necessary to dry the concrete surface, gas-fired torches or clean, dry, compressed air may be used.
Also, use vacuums capable of removing loose material and debris.
2.2 EPOXY
Epoxy used for crack repair must meet the requirements of ACI 503.7 .
SECTION 03 01 00 Page 6
2.3 LIQUID PENETRATING HARDENERS AND SEALERS
a. Hardener must be a colorless aqueous solution containing a blend of inorganic silicate or siliconate material and proprietary components combined with a wetting agent; that penetrates, hardens, and densifies concrete surfaces. Submit manufactures instructions for placement of penetrating sealer/hardener.
b. Use concrete penetrating sealers with a low (maximum 100 grams/liter, less water and less exempt compounds) VOC content. Submit manufactures instructions for placement of sealers.
2.4 MISCELLANEOUS MATERIALS AND EQUIPMENT
a. Equipment designed specifically for the application of repair and removal materials must be used as required by the repair and removal material manufacturers and the referenced specification.
b. Equipment not listed in this specification but referenced or used for repair and removal must be clean and in good operating condition.
c. All supplies and equipment must be available in sufficient quantities to allow continuity in the installation project and quality assurance.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Examination
Examine concrete surfaces after removal of existing coating for its condition and cleanlyness, free of any deletirous substances that would inhibit the penetration of sealer/hardener into the concrete. Repairs any damages to the surfaces resulted from the coating removal operations.
Provide additional cleaning as necessary.
3.1.2 Preparation
Dry concrete surface after cleaning to the maximum moisture content stipulated by sealer/hardener manufacturer's printed instructions.
Conduct moisture testing of concrete at representative locations and intervals until desired dryness is achieved. Submit succesful test results to the COR for review and acceptance prior to commencing with application of sealer/hardener.
3.1.3 Protection
Protect mechanical, electrical, and plumbing equipment, project site, landscaping, and surrounding buildings from damage or injury resulting from concrete rehabilitation work.
a. Construct dust and debris barriers surrounding repair work perimeter to control dust and to protect and control construction traffic.
b. Dispose of runoff from wet demolition or surface preparation operations in accordance with all local ordinances. All construction waste whall be hauled off the Government property and legally disposed offsite.
SECTION 03 01 00 Page 7
c. Collect and neutralize alkaline wastes and acid wastes and dispose in accordance with local, state, and federal regulations.
d. Comply with local noise ordinances during demolition operations.
e. Perform demolition work and surface preparation work in a manner that minimizes disturbances of operations. Coordinate work with the Contracting Officer.
f. Submit a proposed protection plan for approval by owner representative and Licensed Design Professional.
3.2 QUALITY CONTROL PLAN
The Contractor shall submit a Quality Control Plan addressing all aspects of the work stated below.
3.2.1 Quality control of surface preparation
Evaluation of prepared substrate must be continuously monitored to assure that the prepared substrate surface meets project requirements.
3.3 CLEAN UP
Clean and remove all spills and leaks of injection adhesive and stains caused by the injection adhesives.
3.4 SAFETY
a. Provide Material Safety Data Sheets (MSDS) for products on site reviewing them before work begins.
b. Provide safety guards, maintenance, and warnings for all machinery and equipment.
c. Have personal protection equipment practice in place - eye protection and face guards.
d. Provide eyewash facilities on-site with location signage.
e. Have confined space procedures in place including adequate ventilation in closed spaces before operating equipment or using products that emit potentially dangerous or toxic exhaust, fumes, or dust.
f. Provide secured storage available for all hazardous or flammable materials.
g. Conduct safety meetings prior to beginning repair operations.
3.5 CRACK REPAIR
a. Clean all cracks in accordance with the paragraph titled Preparation.
b. Do not repair cracks when the temperature of the concrete is below freezing and moisture conditions indicate the possibility of ice on the internal surfaces of the crack.
c. For epoxy injection, apply a surface seal over all exterior faces of
SECTION 03 01 00 Page 8 the crack that can be reached to contain the injection adhesive in the crack.
3.5.1 Application of Epoxy Injection
a. Install the injection entry and venting ports using flush mounted or drilled fittings per proprietary manufacturer's instructions.
b. Space the ports at 8 in.
c. Inject the epoxy using material manufacturer's recommended equipment.
d. Apply recommended manufacturer's injection pressure.
e. For vertical or inclined cracks, apply injection by pumping epoxy into entry ports at the lowest elevation, cap, and move upward.
f. After 10 min., repeat injection procedure until all ports refuse injection.
g. Remove ports and remove the surface seal by heat, chipping, or grinding or other acceptable means after the injected epoxy has cured.
h. Clean repair area free of all remnants of injections. Plug port holes and sand smooth with surrounding concrete.
3.5.2 Quality Control
a. Conduct quality and control tests for metering accuracy and mixing effectiveness of the continuous mixing pump in accordance with
ACI 503.7 .
b. Qualify the test injection procedures in accordance with ACI 503.7 .
3.6 PENETRATING SEALER/HARDENER
Apply liquid-penetrating sealer/hardener where indicated after drying concrete surface. Dilute liquid hardener with water and apply in three coats. Apply first coat at one-third strength, second coat one-half strength, and third coat two-thirds strength. Apply each coat evenly and allow to dry 24 hours between coats.
Apply approved proprietary penetrating hardeners in accordance with manufacturer's directions.
Clean all areas after application of penetrating sealer/hardener from any residues or other debris from application activities.
Cure and dry surfaces as required following manufacturer's printed instructions. Maintain all mechanical ventilation and heat as required for proper curing. Confirm that sealer/hardener has appropriately set and dry before informing the operation personnel that the area is safe for use.
SECTION 03 01 00 Page 9
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 97 02
PAINTING AND PAINT REMOVAL
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Items not to be Painted
1.2 REFERENCES
1.3 SAFETY, HEALTH, AND ENVIRONMENTAL REQUIREMENTS
1.3.1 Safety
1.3.1.1 Abrasive Blasting
1.3.1.2 Workers Other Than Blasters
1.3.1.3 Cleaning Before and After Abrasive Blasting
1.3.1.4 Pretreatment of Concrete with Acids
1.3.1.5 Toxic Materials
1.3.2 Health
1.3.2.1 Air Monitoring
1.3.2.2 Medical Status
1.3.2.3 Change in Medical Status
1.3.3 Environmental Protection
1.3.3.1 Waste Classification, Handling, and Disposal
1.3.3.2 Containment
1.3.3.3 Visible Emissions Monitoring
1.3.3.4 TSP Monitoring
1.4 SUBMITTALS
1.5 QUALIFICATIONS
1.5.1 Environmental Protection
1.5.2 Lead Content
1.5.3 Chromate Content
1.5.4 Asbestos Content
1.5.5 Mercury Content
1.5.6 Silica
1.5.7 Human Carcinogens
1.5.8 Certified Environmental, Health, and Safety (EHS) Professionals
1.6 DELIVERY, STORAGE, AND HANDLING
1.7 AMBIENT CONDITIONS
PART 2 PRODUCTS
2.1 COATING PRODUCTS
2.1.1 Epoxy Primer/Sealer
2.1.2 Overcoat Product
2.1.3 Manufacturer's Product Data Sheets
PART 3 EXECUTION
3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED
3.1.1 Protection of Areas and Spaces not to be Painted
3.1.2 General Requirements
SECTION 09 97 02 Page 1
3.2 PREPARATION OF FERROUS SURFACES
3.3 PREPARATION OF CONCRETE SURFACES
3.4 COATING APPLICATION
3.4.1 General
3.4.2 Mixing
3.4.3 Time Between Surface Preparation and Coating
3.4.4 Method of Paint Application
3.4.5 Coverage
3.4.6 Progress of Painting Work
3.4.7 Protection of Painted Surfaces
3.4.8 Protection of Noncoated Items and Cleanup
3.5 INSPECTION
SECTION 09 97 02 Page 2
SECTION 09 97 02
PAINTING AND PAINT REMOVAL
PART 1 GENERAL
1.1 SUMMARY
This section includes the requirements for the removal of paint from concrete surfaces and the preparation and painting of ferrous surfaces of the stair railings, stair nosing, floor drain grates and frames, floor covering plate and frames, and related items.
1.1.1 Items not to be Painted
Do not paint the following unless indicated otherwise.
a. Surfaces concealed and made inaccessible by panelboards, control boards, machinery, and equipment fixed in place.
b. Hardware, fittings, and other factory finished items.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100 (2017; Suppl 2020) Documentation of the Threshold Limit Values and Biological Exposure Indices
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z87.1 (2020) Occupational and Educational Personal Eye and Face Protection Devices
ANSI/ISEA Z358.1 (2014; R 2020) American National Standard for Emergency Eyewash and Shower Equipment
CENTERS FOR DISEASE CONTROL AND PREVENTION (CDC)
Intelligence Bulletin 65 (2013) Occupational Exposure to Carbon Nanotubes and Nanofibers
MASTER PAINTERS INSTITUTE (MPI)
MPI ASM (2019) Architectural Painting Specification Manual
MPI MRM (2015) Maintenance Repainting Manual
SECTION 09 97 02 Page 3
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
NIOSH 2003-154 (2003; 4th Ed; Supple 3) NIOSH Manual of Analytical Methods
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Guide 6 (2021) Guide for Containing Surface Preparation Debris Generated During Paint Removal Operations
SSPC SP 1 (2015) Solvent Cleaning
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-313 (2018) Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.20 Access to Employee Exposure and Medical Records
29 CFR 1910.94 Ventilation
29 CFR 1910.134 Respiratory Protection
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1910.1000 Air Contaminants
40 CFR 50.12 National Primary and Secondary Ambient Air Quality Standards for Lead
40 CFR 58 Ambient Air Quality Surveillance
40 CFR 60 Standards of Performance for New Stationary Sources
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 262.22 Number of Copies
40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
SECTION 09 97 02 Page 4
49 CFR 171 General Information, Regulations, and Definitions
1.3 SAFETY, HEALTH, AND ENVIRONMENTAL REQUIREMENTS
Perform work in accordance with all applicable health, safety, and environmental requirements as well as EM 385-1-1 . Submit matters of interpretation of these requirements to the Contracting Officer for resolution before starting work. If no clarifications are sought, then the submittal is not necessary. Where the regulations conflict, the most stringent requirements apply. This paragraph supplements the health, safety, and environmental requirements of EM 385-1-1 .
1.3.1 Safety
Submit an Accident Prevention Plan in accordance with the requirements of the Statement of Work and EM 385-1-1 . Submit a Ventilation Assessment Plan complying with all applicable safety standards.
1.3.1.1 Abrasive Blasting
For abrasive blasting comply with the requirements in EM 385-1-1 . In addition to the requirements in EM 385-1-1 , use hoses and hose connections of a type to prevent shock from static electricity. Join hose lengths together by approved couplings of a material and type designed to prevent erosion and weakening of the couplings. The couplings and nozzle attachments must fit on the outside of the hose and be designed to prevent accidental disengagement.
1.3.1.2 Workers Other Than Blasters
Protect workers, other than blasting operators working in close proximity to abrasive blasting operations. Use MSHA/NIOSH-approved half-face or full-face air purifying respirators equipped with high-efficiency particulate air (HEPA) filters and eye protection meeting ANSI/ISEA Z87.1 .
Use hearing protectors (ear plugs and/or ear muffs) providing a noise reduction rating of at least 20 dBA or as needed to provide adequate protection. Provide personal protective equipment where required by 29 CFR 1910.146 and in accordance with 29 CFR 1910 , Subpart I.
1.3.1.3 Cleaning Before and After Abrasive Blasting
Cleaning with compressed air must be in accordance with EM 385-1-1 and personnel protected as specified in 29 CFR 1910.134 . When cleaning with solvents, provide ventilation where required by 29 CFR 1910.146 or where the concentration of solvent vapors exceeds 10 percent of the Lower Explosive Limit (LEL). Ventilation must be in accordance with 29 CFR 1910.94 , paragraph (c)(5).
1.3.1.4 Pretreatment of Concrete with Acids
Personnel must be protected in accordance with 29 CFR 1910 , Subpart I. In addition to the requirements of EM 385-1-1 , provide an eyewash in accordance with ANSI/ISEA Z358.1 , paragraph (6).
1.3.1.5 Toxic Materials
To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
SECTION 09 97 02 Page 5
a. The applicable manufacturer's Safety Data Sheets (SDS) or local regulation.
b. 29 CFR 1910.1000 .
c. ACGIH 0100 , threshold limit values.
Submit manufacturer's Safety Data Sheets for coatings, solvents, and other potentially hazardous materials, as defined in FED-STD-313 .
1.3.2 Health
Prepare and submit a Medical Surveillance Plan and a statement from the examining physician indicating the name of each employee evaluated and any limitations which will preclude the employee from performing the work required. The statement must include the date of the medical evaluation, the physician's name, signature, and telephone number.
Prepare and submit a Worker Protection Plan addressing all necessary aspects of worker protection. The plan must include air monitoring program, implementation schedule, work practice program, administrative controls, any necessary medical screening requirements, and jobsite inspections.
1.3.2.1 Air Monitoring
Prepare and submit an Air Monitoring Test Plan . Perform air sampling and testing as needed to assure that workers are not exposed to contaminants above the permissible exposure limit. In addition, provide the Contracting Officer with a copy of the Air Monitoring Test Report from the laboratory within five working days of the sampling date, including records of air monitoring plans and tests performed. Submit reports as soon as information is available. Also provide results from direct-reading instrumentation on the same day the samples are collected.
Prepare and submit an Airborne Sampling Plan detailing the NIOSH 2003-154 , Factory Mutual, or Underwriters Laboratories approved equipment, equipment calibration procedures, sampling methods, sampling to be performed, and analytical procedures to be used based on the type of work to be performed and anticipated toxic contaminants to be generated. Include the name of the accredited laboratory, listed by the American Industrial Hygiene Association (AIHA), that will be used to conduct the analysis of any collected air samples.
1.3.2.2 Medical Status
Prior to the start of work, and annually thereafter, submit a Report of Medical Status Records . This report will certify that Medical Status Records, in accordance with the requirements below are maintained for all required employees. The Contractor-maintained Medical Status Reports will document the medical evaluation of all employees working with or around paint systems, thinners, blast media, those required to wear respiratory protective equipment, and those who will be exposed to high noise levels for the particular type of exposure they may encounter. The Contractor-maintained Records must include the employee's name, the tests performed and the name of the physician responsible for performing the tests, and a physician's statement that medical status would permit specific task performance. Maintain medical records as required by 29 CFR 1910.20 . The evaluation must include:
SECTION 09 97 02 Page 6
a. Audiometric testing and evaluation of employees who will work in a noise environment with a time weighted average greater than or equal to 85 dBA.
b. Vision screening of employees who will require eye protection (employees who use full-facepiece respirators cannot wear contact lenses).
c. Medical evaluation of employees who will be required to wear respiratory protection must include, but is not limited to, the following:
(1) Medical history including, but not limited to, alcohol use, with emphasis on liver, kidney, and pulmonary systems, and sensitivity to chemicals to be used on the job.
(2) General physical examination with emphasis on liver, kidney, and pulmonary system.
(3) Determination of the employee's physical and psychological ability to wear respiratory protective equipment and to perform job-related tasks.
(4) Determination of baseline values of biological indices for later comparison to changes associated with exposure to paint systems and thinners or blast media, which include: liver function tests to include SGOT, SGPT, GGPT, alkaline phosphates, bilirubin, complete urinalysis, EKG (employees over age 40), blood urea nitrogen (bun), serum creatinine, pulmonary function test, FVC, and FEV, chest x-ray (if medically indicated), blood lead and ZPP (for individuals where it is known there will be an exposure to materials containing lead), other criteria that may be deemed necessary by the Contractor's physician.
1.3.2.3 Change in Medical Status
Any employee whose medical status has changed negatively due to work related chemical and/or physical agent exposure while working with or around paint systems and thinners, blast media, or other chemicals must be evaluated by a physician, and obtain a physicians statement as described in paragraph MEDICAL STATUS prior to allowing the employee to return to those work tasks. Maintain Change in Medical Status Records detailing any negative changes in employee medical status and the results of the physicians reevaluation statement. Submit a Change in Medical Status Report detailing the negative changes in medical status and a summary of the physician's reevaluation without including personal information of the impacted employee.
1.3.3 Environmental Protection
In addition to the requirements of Environmental Protection in the Statement of Work, prepare an Environmental Protection Plan incorporating the submittals for Containment Plan, Waste Disposal Plan, TSP Monitoring Plan, and Visible Emissions Monitoring Plan. The submitted plan must also address all aspects of establishing and demarcating regulated areas, ventilation/containment system performance verification, and reporting of accidental releases. Comply with the following environmental protection criteria.
SECTION 09 97 02 Page 7
1.3.3.1 Waste Classification, Handling, and Disposal
Prepare and submit a Waste Disposal Plan in accordance with the requirements of 40 CFR 261 and 40 CFR 262 including classification and handling. The Contractor is responsible for assuring the proper disposal of all hazardous and nonhazardous waste generated during the project.
Regardless of the results of 40 CFR 261 App II, Mtd 1311, all waste generated from abrasive blasting, lead-containing paints with recyclable steel or iron abrasives must be either disposed of as a hazardous waste or be stabilized with proprietary pre-blast additives . Where stabilization is preferred, employ a proprietary blast additive, that has been blended with the blast media prior to use. Place hazardous waste in properly labeled, closed containers shielded adequately to prevent dispersion of the waste by wind or water. Any evidence of improper storage is cause for immediate shutdown of the project until corrective action is taken. Store nonhazardous waste in closed containers separate from hazardous waste storage areas. Transport all hazardous waste by a licensed transporter in accordance with 40 CFR 263 and 49 CFR 171 , Subchapter C. Transport all nonhazardous waste in accordance with local regulations regarding waste transportation. In addition to the number of copies required by 40 CFR 262.22 , supply one copy of each Waste Manifest to the Contracting Officer prior to transportation.
1.3.3.2 Containment
Prepare a Containment Plan for containing debris generated during paint removal operations selected by the Contractor. Identify in detail the containment system and the method of securing it in place that will be sufficiently robust to support the proposed means of paint removal as well as the procedures for removing debris. Contain debris generated during paint removal operations in accordance with the requirements of SSPC Guide 6 . Where required, verify the containment air pressure by instrument.
1.3.3.3 Visible Emissions Monitoring
Prepare a Visible Emissions Monitoring Plan including the provisions for halting work and correcting the containment in the event unacceptable emissions are observed. General statements must not be used; specific methods, procedures, and details are required. Measure the time of emissions in accordance with 40 CFR 60 , App A, Mtd 22. Monitor visible emissions for not less than 15 minutes of every hour. Calculate visible emissions for each hour by extrapolation. Visible emissions must not extend greater than 150 feet in any direction horizontal from the containment. Notify the foreman whenever visible emissions exceed 200 seconds in a 1 hour period. Whenever visible emissions exceed 300 seconds in a 2 hour period notify the foreman, shut down the job, and take corrective action. If the total observed visible emissions from the containment exceeds 5 percent of the work day, shut down the job and take corrective action to prevent such an occurrence. Document each time that the work is halted due to a violation of the visible emissions criteria.
Documentation must include the cause for shutdown and the corrective action taken to resolve the problem.
1.3.3.4 TSP Monitoring
Prepare a TSP Monitoring Plan for monitoring emissions of Total Suspended Particulates (TSP) in compliance with the requirements of EPA regulation
SECTION 09 97 02 Page 8
40 CFR 50.12 and this paragraph. The plan must include provisions for halting work and correcting the containment in the event unacceptable emissions occur. Position the air monitoring equipment in accordance with 40 CFR 58 , App E, Subpart (8). A minimum of two TSP monitors must be used at the project site. Perform monitoring 4 of the first 8 days and on a regular basis thereafter for a sum total of 25 percent of the time surface preparation and debris cleanup are performed. If air quality regulatory limits are not met, require air monitoring to be repeated immediately after corrective actions have been taken. Also conduct preproject TSP monitoring. Conduct the preproject TSP monitoring a minimum of 2 weeks prior to the beginning of the project and continue the monitoring for a minimum of 3 days to establish background levels. Submit a TSP Test Report to the Contracting Officer within 48 hours including:
a. Name and location of jobsite.
b. Date of monitoring.
c. Time of monitoring (i.e., time monitoring begins and ends each day).
d. Identification and serial number of monitoring units.
e. Drawing showing specific location of monitoring units.
f. Drawing showing specific location of paint removal operation and the method of removal or work activity being performed.
g. Wind direction and velocity.
h. A flow chart verifying the rate of air flow across the filter throughout the sampling period.
i. Name and address of laboratory.
j. Laboratory test procedure.
k. Laboratory test results.
l. Signatures of field and laboratory technicians conducting the work.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the in accordance with the procedures described in the Statement of Work:
SD-01 Preconstruction Submittals
Safety, Health, and Environmental Requirements ; G, RO
Accident Prevention Plan ; G, RO
Airborne Sampling Plan ; G, RO
Ventilation Assessment Plan ; G, RO
SECTION 09 97 02 Page 9
Medical Surveillance Plan ; G, RO
Worker Protection Plan
Environmental Protection Plan ; G, RO
Waste Manifest
Waste Disposal Plan ; G, RO
Containment Plan ; G, RO
Visible Emissions Monitoring Plan ; G, RO
TSP Monitoring Plan ; G, RO
SD-03 Product Data
Manufacturer's Product Data Sheets ; G, RO
Manufacturer's Safety Data Sheets ; G, RO
SD-06 Test Reports
TSP Test Report
Medical Status Records
Change in Medical Status Report
Air Monitoring Test Plan ; G, RO
Air Monitoring Test Report
Inspection Reports
SD-07 Certificates
Certified EHS Professional
1.5 QUALIFICATIONS
1.5.1 Environmental Protection
In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction.
Notify Contracting Officer of any paint specified herein which fails to conform.
1.5.2 Lead Content
Do not use coatings having a lead content over 0.009 percent by weight of nonvolatile content.
1.5.3 Chromate Content
Do not use coatings containing zinc-chromate or strontium-chromate.
SECTION 09 97 02 Page 10
1.5.4 Asbestos Content
Provide asbestos-free materials.
1.5.5 Mercury Content
Provide materials free of mercury or mercury compounds.
1.5.6 Silica
Provide abrasive blast media containing no free crystalline silica.
1.5.7 Human Carcinogens
Provide materials that do not contain ACGIH 0100 confirmed human carcinogens (A1) or suspected human carcinogens (A2).
Carbon Based Fibers / Tubes
Materials must not contain carbon based fibers such as carbon nanotubes or carbon nanofibers. Intelligence Bulletin 65 ranks toxicity of carbon nanotubes on a par with asbestos.
Qualifications and experience must comply with the following.
1.5.8 Certified Environmental, Health, and Safety (EHS) Professionals
Provide a certificate for each Certified EHS Professional ; submit qualifications and experience of qualified and competent persons employed to provide preconstruction and onsite environmental, safety, and health services. Obtain acceptance of this submission prior to the submission of other required environmental, safety, and health submittal items. Utilize a qualified and competent person as defined in EM 385-1-1 , Section 01 to develop the required safety and health submittal and to provide onsite safety and health services during the contract period. The person must be a Certified Industrial Hygienist (CIH), an Industrial Hygienist (IH), or a Certified Safety Professional (CSP) with a minimum of 3 years of demonstrated experience in similar related work. The CIH, IH, or CSP may utilize other qualified and competent persons, as defined in EM 385-1-1 , to conduct on-site safety and health activities as long as these persons have a minimum of 2 years of demonstrated experience in similar related work and are under the direct supervision of the CIH, IH, or CSP.
1.6 DELIVERY, STORAGE, AND HANDLING
Process and package paints to ensure that within a period of one year from date of manufacture, they will not gel, liver, or thicken deleteriously, or form gas in the closed container. Paints, unless otherwise specified or permitted, must be packaged in standard containers not larger than 5 gal, with removable friction or lug-type covers. Each container of paint or separately packaged component thereof must be labeled to indicate the purchaser's order number, date of manufacture, manufacturer's batch number, quantity, color, component identification and designated name, and formula or specification number of the paint together with special labeling instructions, when specified. Paint must be delivered to the job in unbroken containers. Paints that can be harmed by exposure to cold weather must be stored in ventilated, heated shelters. All paints must be stored under cover from the elements and in locations free from sparks and flames.
SECTION 09 97 02 Page 11
1.7 AMBIENT CONDITIONS
Paint must be applied in accordance with the manufacturers written instructions or to the special requirements contained herein. Surfaces that are less than 5 degrees F above the dew point temperature must be monitored closely to assure that are completely free of moisture as determined by sight and touch. Paint must not be applied to surfaces upon which there is detectable frost or ice. Except as otherwise specified, paint must not be applied if the temperature of the surfaces to be painted and of air in contact therewith is less than 45 degrees F during paint application nor if the surfaces can be expected to drop to 32 degrees F or lower before the film has dried to a reasonably firm condition. Paint must not be applied to surfaces heated by sources to temperatures that will cause detrimental blistering, pinholing, or porosity of the film.
PART 2 PRODUCTS
2.1 COATING PRODUCTS
The coating products to be applied shall be an epoxy primer/sealer designed to be applied over marginally prepared steel as specified in Subpart 3.2 PREPARATION OF FERROUS SURFACES, with an overcoat of a compatible product from the same manufacturer.
2.1.1 Epoxy Primer/Sealer
The epoxy primer/sealer shall be a two-part, rust-inhibitive, pigmented, gloss, ultra high solids, penetrating epoxy primer sealer designed for use over poorly prepared steel and aged coatings. The product shall have excellent wetting properties, be highly flexible, have good chemical and solvent resistance, have the ability to pentrate tight rusted steel, and shall be capable of accepting a variety of overcoats (including acrylic, alkyd, epoxy, and polyurethane products) without the use of an intermediate coat, and shall provide firm anchorage for the overcoat. The product shall be capable of encapsulating the edges of existing coatings thereby reducing undercutting and peeling of the existing coatings.
The epoxy primer/sealer shall have the following additional properties:
Volatile Organic Compounds (VOC's) content: less than 85 g/L as supplied.
Abilty to cure from 40 to 120 degrees F and up to 85% relative humidity.
Dry heat resistance up to 175 degrees F.
Capable of application by brush or roller.
Maximum time for application of overcoat shall be at least 7 days.
2.1.2 Overcoat Product
The epoxy/primer sealer shall receive an overcoat product as recommended by the epoxy primer/sealer manufacturer, and as suitable for the application. Manufacturer recommendations for the application of the overcoat shall be followed. Both the epoxy primer/sealer and overcoat shall be compatible products from the same manufacturer. Color shall
SECTION 09 97 02 Page 12 closely match the original color of the items being painted. Minimum two coats of overcoat shall be applied.
2.1.3 Manufacturer's Product Data Sheets
The Contractor shall submit Manufacturer's Product Data Sheets for approval for the products (epoxy primer/sealer and overcoat product) to be used on this project.
PART 3 EXECUTION
3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED
3.1.1 Protection of Areas and Spaces not to be Painted
Prior to surface preparation and coating applications, remove, mask, or otherwise protect hardware, hardware accessories, machined surfaces, plates, lighting fixtures, and other such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, reinstall removed items by workmen skilled in the trades. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.
3.1.2 General Requirements
Remove dirt, splinters, loose particles, grease, oil, and other foreign matter and substances deleterious to coating performance as specified for each substrate before application of paint or surface treatments. Refer to MPI ASM and MPI MRM for additional more specific substrate preparation requirements.
3.2 PREPARATION OF FERROUS SURFACES
Ferrous Surfaces including Shop-coated Surfaces and Small Areas That Contain Rust, Mill Scale and Other Foreign Substances: Solvent clean in accordance with SSPC SP 1 to remove oil and grease. Scraping, blasting, or other surface preparation shall not be performed. Protect shop-coated ferrous surfaces from corrosion by treating and touching up corroded areas immediately upon detection.
Test existing finishes of ferrous surfaces for lead before sanding, scraping, or removing. If lead is present, refer to paragraph Toxic Materials.
3.3 PREPARATION OF CONCRETE SURFACES
Remove coating of all concrete surfaces by abrasive blasting or other methods chosen by the Contractor and approved by the Government. Methods of removal and selection of abrasive materials shall be selected by the Contractor that will successfully remove existing coating while preserving the concrete surface and structures.
Test panel for coating removal: Prepare a minimum of 4 feet by 4 feet test panel on proposed method of concrete coating removal. Test panel shall be chosen to encompass the field surface and at the chamfered construction joints to provide good representation of differing conditions that may be encountered. Location and actual size of test panel shall be proposed by the Contractor and agreed upon by the Government. Adjust as necessary the removal approach to achieve maximum result acceptable by the
SECTION 09 97 02 Page 13
Government.
Clean all surfaces which coating have been previously removed and prepare for application of penetrating sealer and hardener. Cleaning methods and product used shall be compatible with and will not impede the application of the penetrating sealer and hardener. If cleaning is conducted using water, dry surfaces to achieve moisture content recommended by the manufacturer's printed instructions of the proposed sealer and hardener.
Test moisture content of the concrete surfaces at multiple locations and submit to Goverment the testing results acheving the intended moisture content prior to the commencement of hardener and sealer application.
3.4 COATING APPLICATION
The coatings shall be applied in accordance with the manufacturer's instructions and the requirements of this specification. The final color of the overcoat in all areas shall match the color of the existing paint system on the bridge.
3.4.1 General
Application of the initial or subsequent coatings shall not commence until the Contracting Officer has verified that atmospheric conditions and the surfaces to be coated are satisfactory. Each coat shall be applied in a manner that will produce an even, continuous film of uniform thickness.
Edges, corners, crevices, seams, joints, welds, rivets, corrosion pits, and other surface irregularities shall receive special attention to ensure that they receive an adequate application of coating.
3.4.2 Mixing
Paints shall be thoroughly mixed and kept at a uniform composition and consistency during application. The paint may not be thinned. Paint that has been stored at low temperature shall be brought up to at least 70 degrees F before being mixed, and its temperature in the working container shall not fall below 60 degrees F during the application. Paint that has deteriorated in any manner to a degree that it cannot be restored to essentially its original condition by customary field-mixing methods shall not be used and shall be removed from the project site. Paint that is more than 1 year old shall not be used.
3.4.3 Time Between Surface Preparation and Coating
Surfaces that have been cleaned and/or otherwise prepared for coating shall be coated as soon as practicable after such preparation has been completed but, in any event, prior to any deterioration of the prepared surface.
3.4.4 Method of Paint Application
Unless otherwise specified, paint shall be applied by brush or roller in accordance with the manufacturer's recommendations. Special attention shall be directed toward ensuring adequate coverage of edges, corners, crevices, pits, rivets, bolts, welds, and similar surface irregularities, and ensuring paint is properly applied at the interface of areas of corrosion and remaining paint. Other methods of application shall be subject to the specific approval of the Contracting Officer.