As Built.pdf

PDF 5 MB Posted

Attached to
Spillway Dam Gallery Paint Removal, Buffumville Lake, Charlton, MA
Solicitation number
W912WJ25Q0038
Issued by

About this file

This is an as-built engineering drawing showing detailed specifications for miscellaneous metals at the Buffumville Dam in Massachusetts. The drawing includes technical details and dimensions for chain link fence and gate installations, steel ladders, timber stop logs, pipe railings, and stair/railing details for both the entrance way and control house sections. The drawing features multiple views and cross-sections including typical footings for chain link fence posts, pull bar specifications, and hand grab details. All components are precisely dimensioned and annotated with material specifications and installation requirements.

The drawing is labeled as a U.S. Army Corps of Engineers record drawing dated April 1956 and appears to be referenced as part of the documentation package for solicitation W912WJ25Q0038, which seeks paint removal and concrete surface treatment services at the Buffumville Dam spillway galleries. While this historical drawing provides reference information about the facility's construction, it primarily serves as supporting documentation (Appendix C) to help bidders understand the facility's configuration rather than specifying current work requirements.

View the file

Other files

File Type Posted
Amendment W912WJ25Q0038-0004.pdf PDF
Amendment W912WJ25Q0038-0003.pdf PDF
Amendment W912WJ25Q0038-0002.pdf PDF
Amendment W912WJ25Q0038-0001.pdf PDF
Specifications.pdf PDF
Solicitation W912WJ25Q0038.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .