Amendment W912WJ25Q0038-0002.pdf

PDF 401 KB Posted

Attached to
Spillway Dam Gallery Paint Removal, Buffumville Lake, Charlton, MA
Solicitation number
W912WJ25Q0038
Issued by

About this file

This is Amendment 0002 to solicitation W912WJ25Q0038, issued by the US Army Corps of Engineers New England District on February 28, 2025. The amendment provides responses to 8 industry questions and includes an additional attachment (As Built TH-1-1327-45.047).

Key clarifications include: complete paint removal from concrete is not required but should remove as much as possible; existing paint is 1-2 coats of unknown type; metal coating requirements are detailed in spec 09 97 02; specific metal items to be coated are listed from drawings TH-1-1304 and TH-1-1306; concrete coating should be a non-film forming breathable silane-siloxane penetrating sealer; the space is not considered confined; pull bars require strength testing before use; and if additional hazardous materials beyond known lead are found, contractors must notify the technical POC. The solicitation closing date remains March 12, 2025 at 5:00 PM Eastern.

View the file

Other files

File Type Posted
Amendment W912WJ25Q0038-0004.pdf PDF
Amendment W912WJ25Q0038-0003.pdf PDF
As Built.pdf PDF
Amendment W912WJ25Q0038-0001.pdf PDF
Specifications.pdf PDF
Solicitation W912WJ25Q0038.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to provide responses to questions from industry and to include an additional attachment (As Built TH-1-1327-45.047). Questions/responses #6- #8 are applicable to this amendment.

Closing remains March 12, 2025 at 5:00 PM Eastern.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Feb-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ25Q0038

X 9B. DATED (SEE ITEM 11)

20-Feb-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Feb-2025

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

jennifer.m.samela@usace.army.milEMAIL:978-318-8324TEL:

JENNIFER M SAMELA / ADDED BY UPASS

W912WJ25Q0038

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

REQUEST FOR INFORMATION

QUESTION 1: The specifications call for complete removal of existing coatings through abrasive blasting, which is achievable, but the word complete could result in more damage of the concrete substrate than required to blast off adherent coatings. Please confirm that the intent is to remove all coatings (adherent and non-adherent) from the concrete substrates.

RESPONSE 1: “Complete” removal of paint on concrete is not a requirement. Interested vendors are directed to the requirements stipulated in the Statement of Work paragraph A.2.a bullet #1, paragraph A.2.b, paragraph A.2.j and k. The intent is to remove as much of the existing coatings as possible. The Technical Point of Contact should be consulted in areas of uncertainty. Any damages to the concrete as a result of paint removal shall be repaired by the Contractor.

QUESTION 2: What is the existing coating system and thickness?

RESPONSE 2: The gallery, floors, stairs, and lower basement are currently painted with approximately one or two coats of paint. The exact paint type is unknown. Visual observation of the existing paint does not indicate it to be thick layer of coating like Tnemec or equivalent.

QUESTION 3: There is not a steel coating system referenced in the 09 97 02 spec section and the only surface preparation is SP-1. Please advise on a steel/ferrous metal coating system.

RESPONSE 3: Salient characteristics for epoxy primer/sealer for steel/metal coating is called out on Specification Section 09 97 02, paragraph 2.1 and all its sub-paragraphs.

QUESTION 4: The summary for 09 97 02 spec section has all included stair railings, stair nosing, floor drain grates and fames, floor covering plate and frames, and related items. Please provide more details and/or quantities of these ferrous steel items as there are no limits or quantities provided in the solicitation.

RESPONSE 4: The metal items are called out in the as-built references TH-1-1304 and TH-1-1306. The metal items included are only within the gallery and lower basement work areas as described in the scope of work. The metal items in the lower basement include: ceiling/crane access plate, 1 manhole, 1 grab bar above manhole, and 1 fall protection anchor. The staircase from the upper level is excluded. The metal items in the gallery include: all ceiling anchors, 4 rectangular floor grates and frames, 2 round drain grates, 4 staircase pipe railings, 1 manhole cover and frame, 1 sump pump cover, 1 sump pump valve, and 31 Wooster cast iron safety treads. All float well pipes and valves, light switches and cover plates, light fixtures, and electrical components are excluded.

QUESTION 5: There was not a specified approved concrete coatings product and only specs for a product, to allow for the most accurate pricing, please approve the attached product for concrete coatings. SW Macropoxy 5000

RESPONSE 5: The intent is for a non-film forming breathable silane-siloxane base concrete penetrating sealer/hardener. The product is a one-part aqueous solution that will be sprayed in multiple coats (2-min). The Government will not approve products during the solicitation phase.

W912WJ25Q0038

QUESTION 6: Is the Government considering this a Confined Space?

RESPONSE 6: No, the Government is not considering this a confined space.

QUESTION 7: Do you have As-Builts for the pull bars embedded in the ceiling of the gallery? Can

Contractors use them?

RESPONSE 7: The pull bar locations are detailed on record drawing included in the spec TH-1-1304.

Please refer to the pull bar details 49 in the attachment TH-1-1327. Contractors that intend to use the pull bars will be required to conduct strength testing for the bars and submission of the results to the Government prior to use.

QUESTION 8: As stated in the specification it is unknown if existing coatings contain other hazardous materials beyond those locations noted for the presence of lead. Please confirm if additional hazards are found to be present, they shall be addressed through equitable adjustment.

RESPONSE 8: If additional hazards are found to be present, the Contactor shall immediately notify the Technical Point of Contact. The Government will then determine the appropriate course of action regarding the continuation of work for identified areas.

(End of Summary of Changes)