Virtual SIte Visit_no video.pptx
PPTX presentation 1 MB Posted
- Attached to
- Gates 2 and 3 Replacement, Ball Mountain Dam Federal contract opportunity
- Solicitation number
- W912WJ20B0022
About this file
This document provides details for a federal contract solicitation to replace gates 2 and 3 at the Ball Mountain Dam in Jamaica, Vermont. The U.S. Army Corps of Engineers, Engineering District New England, is seeking to fabricate and replace two gates and two gate stems, as well as replace packings, o-rings, seals and gaskets. The contractor will also be required to fabricate stop logs and a lifting/grappling device for dewatering gate 2. Site access information and photos show the project office staging area, intake tower where the gates are located, and details of accessing the upper and lower levels of the intake tower. Relevant details include the solicitation number W912WJ20B0022 and description, and the federal agency issuing the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Bridge Access.MOV | MOV file | |
| Gate House Lower Level.mp4 | MP4 file | |
| Gate House Door Walkthrough.mp4 | MP4 file | |
| Gate Chamber.mp4 | MP4 file | |
| Drawings.pdf | ||
| Specifications.pdf | ||
| Solicitation W912WJ20B0022.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gates 2 and 3 Replacement ball mountain dam Jamaica, vt Adam Stewart Technical Lead Engineer New England District, Structural Section 26 August 2020 8/27/2020
Contracting Introduction
Project Overview Primary Items of Work:
Fabricate and Replace 2 Gates Fabricate and Replace 2 Gate Stems Replacement of Packings, O-Rings, Seals, and Gaskets Fabricate Stop Logs and Lifting/Grappling Device (required for dewatering Gate 2)
Site Access
Site Access - Overview
Project Office
Staging Area
Intake Tower (location of gates)
Site Access – Intake Tower (Upper)
See “Bridge Access.mov”
Site Access – Intake Tower (Lower)
Site Access – Intake Tower (Lower)
Site Access – Intake Tower (Lower)
Gate 2 Stop Log Slot
Staging Area
Staging Area
Must maintain right of way for canal staff
Intake Tower
Intake Tower - Entry
See “Gate House Door Walkthrough.mp4”
Intake Tower – Upper level interior
Intake Tower – Lower level 8/27/2020
Gate 2 Gate 1 (disassembled) See “Gate House Lower Level.mp4”
Intake Tower - Lower level 8/27/2020
Gate 3 See “Gate Chamber.mp4” image4.png image5.png image6.png image7.png image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image1.png image2.png image3.png
File details come from the government source that posted it. Updated .