Virtual SIte Visit_no video.pptx

PPTX presentation 1 MB Posted

Attached to
Gates 2 and 3 Replacement, Ball Mountain Dam Federal contract opportunity
Solicitation number
W912WJ20B0022
Issued by
Department of the Army Corps of Engineers Engineering District New England

About this file

This document provides details for a federal contract solicitation to replace gates 2 and 3 at the Ball Mountain Dam in Jamaica, Vermont. The U.S. Army Corps of Engineers, Engineering District New England, is seeking to fabricate and replace two gates and two gate stems, as well as replace packings, o-rings, seals and gaskets. The contractor will also be required to fabricate stop logs and a lifting/grappling device for dewatering gate 2. Site access information and photos show the project office staging area, intake tower where the gates are located, and details of accessing the upper and lower levels of the intake tower. Relevant details include the solicitation number W912WJ20B0022 and description, and the federal agency issuing the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Gates 2 and 3 Replacement, Ball Mountain Dam, newest first.
File Type Posted
Bid Abstract.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Bridge Access.MOV MOV file
Gate House Lower Level.mp4 MP4 file
Gate House Door Walkthrough.mp4 MP4 file
Gate Chamber.mp4 MP4 file
Drawings.pdf PDF
Specifications.pdf PDF
Solicitation W912WJ20B0022.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gates 2 and 3 Replacement ball mountain dam Jamaica, vt Adam Stewart Technical Lead Engineer New England District, Structural Section 26 August 2020 8/27/2020

Contracting Introduction

Project Overview Primary Items of Work:

Fabricate and Replace 2 Gates Fabricate and Replace 2 Gate Stems Replacement of Packings, O-Rings, Seals, and Gaskets Fabricate Stop Logs and Lifting/Grappling Device (required for dewatering Gate 2)

Site Access

Site Access - Overview

Project Office

Staging Area

Intake Tower (location of gates)

Site Access – Intake Tower (Upper)

See “Bridge Access.mov”

Site Access – Intake Tower (Lower)

Site Access – Intake Tower (Lower)

Site Access – Intake Tower (Lower)

Gate 2 Stop Log Slot

Staging Area

Staging Area

Must maintain right of way for canal staff

Intake Tower

Intake Tower - Entry

See “Gate House Door Walkthrough.mp4”

Intake Tower – Upper level interior

Intake Tower – Lower level 8/27/2020

Gate 2 Gate 1 (disassembled) See “Gate House Lower Level.mp4”

Intake Tower - Lower level 8/27/2020

Gate 3 See “Gate Chamber.mp4” image4.png image5.png image6.png image7.png image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image1.png image2.png image3.png