Drawings.pdf
PDF 13 MB Posted
- Attached to
- Gates 2 and 3 Replacement, Ball Mountain Dam Federal contract opportunity
- Solicitation number
- W912WJ20B0022
About this file
This document provides details on a federal solicitation opportunity and related file. Solicitation number W912WJ20B0022 from the Department of the Army Corps of Engineers Engineering District New England seeks to replace gates 2 and 3 at Ball Mountain Dam. The related file, Drawings.pdf, contains unspecified design documents to support the solicitation. The opportunity type is listed as a solicitation to replace two gates at the dam. No further information is provided on response dates, award timing, pricing terms, or set aside designations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Gate House Door Walkthrough.mp4 | MP4 file | |
| Gate House Lower Level.mp4 | MP4 file | |
| Gate Chamber.mp4 | MP4 file | |
| Amendment 0001.pdf | ||
| Bridge Access.MOV | MOV file | |
| Virtual SIte Visit_no video.pptx | PPTX presentation | |
| Specifications.pdf | ||
| Solicitation W912WJ20B0022.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
F
E
D
C
B
A
I I
I I. I I
I
US Army Corps of Engineers ®
New England District
2 I 3 I 4
GATES 2 AND 3 REPLACEMENT
BALL MOUNTAIN DAM
JAMAICA, VERMONT
06 /
WINDSO
( 20
�m.....:3 "_;1� h-91�
VERMONT 7{t10
LAREMONT
LONDONDERRY
CHESTER/ 11
lPRINGFIELD �
1(/J NEW
,.,.. � CHARLESTOWN /
�03
'==::::Ji
"-,q11 LJ'J,-, (121)__ , 2� HAMPSHIRE
RAWSONVILLE� - - -
. � AMAICA I __ P_R_O-JE_C __ T� ,;
LOCATION TOWNSHEND I
BELLOW
FALLS
BRATTLEBORO
VICINITY MAP
NOT TO SCALE
__j
PARKING
AREA
SOLICITATION NO.: W912WJ2080022
CONTRACT NO.:
ISSUE DATE: JULY 2020
ROTARY
I 5
SITE PLAN
NOT TO SCALE
I pw://COE-NAEPWP01 CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Flood Control/Upper Connecticut River Basin/Ball Mountain Lake/Gate 2 and 3 Replacement/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CA 8:14:27 A M 7/31/2020 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript.dscript
I 7
SHEET NO.
1 23 OF 86
2 31 OF 86
3 32 OF 86
4 33 OF 86
5 34 OF 86
6 35 OF 86
7 36 OF 86
8 39 OF 86
9 41 OF 86
10 42 OF 86
11 46 OF 86
12 57 OF 86
13 63 OF 86
14 64 OF 86
15 66 OF 86
16 Sheet2
17 Sheet 8
18 Sheet 9
19 N/A
20 N/A
21 N/A
22 N/A
23 N/A
24 N/A
25 N/A
26 N/A
27 N/A
28 N/A
29 N/A
I 8 I 9 I 10
INDEX TO DRAWINGS
SHEET NO. DESIGN FILE SHEET TITLE
DRAWING FILE
CT-1-4176
CT-1-4184
CT-1-4185
CT-1-4186
CT-1-4187
CT-1-4188
CT-1-4189
CT-1-4192
CT-1-4194
CT-1-4195
CT-1-4199
CT-1-4210
CT-1-4412
CT-1-4413
CT-1-4415
18G36 R/1
18640 R/1
18641 R/2
18644-A R/1
18644
B-3-01
B-3-02
SLG-4698-301.1
SLG-4698-401.1
SLG-4698-201.1
SLG-4698-402.1
SLG-4698-202.1
SLG-4698-302.1
SLG-4698.904.1
G-001 CON-BM-481_G-001.DGN COVER SHEET AND INDEX
S-301 CON-BM-481_S-301.DWG GENERAL SECTION AND ELEVATION VIEW
M-101 CON-BM-481_M-101.DGN MECHANICAL PLAN AND SECTION
M-501 CON-BM-481_M-501.DGN MECHANICAL DETAILS
M-502 CON-BM-481 M-502.DGN HYDRAULIC DETAILS
INDEX TO INFORMATION DRAWINGS
SHEET TITLE
OUTLET WORKS AND SPILLWAY PLAN AND SECTIONS
INTAKE TOWER PLAN AND SECTION
INTAKE TOWER PLAN AT ELEVATION 805.5 AND 826.0
INTAKE TOWER PLAN AT ELEV. 868.0 AND SECTIONS
INTAKE TOWER SECTIONS E. 799.5 70 EL. 868.0
INTAKE TOWER PLANS AT ELEVATIONS 1039.0 - 1052.5, 1068.5 AND 1085.5
INTAKE TOWER SECTIONS - ELEVATIONS 868.0 TO 1087.5
INTAKE TOWER AIR VENTS AND ACCESSORIES
INTAKE TOWER ARCHITECTURAL PLANS & DETAILS
INTAKE TOWER ARCHITECTURAL ELEVATION, SECTIONS & DETAILS
INTAKE TOWER VERTICAL SECTIONS STEEL REINFORCEMENT
TRANSITION AND TUNNEL CONCRETE SECTIONS NO.1
GENERAL ARRANGEMENT OF EQUIPMENT SECTIONS AND DETAILS
INTAKE TOWER GATE ASSEMBLY SECTIONS & DETAILS
INTAKE TOWER HYDRAULIC PIPING DIAGRAM GATE HANGER ARRANGEMENT & SUMP PUMP
SLUICE GATE HYDRAULIC CYLINDER DETAILS
SLUICE GATE LEAF AND SEAT
SLUICE GATE SEMI-AUTOMATIC HANGER
SLUICE GATE HYDRAULIC PIPING ASSEMBLY
SLUICE GATE HYDRAULIC PIPING ASSEMBLY
GENERAL ARRANGEMENT PLAN, PROFILE & ELEVATION
GENERAL ARRANGEMENT PLATFORM PLANS
GATE LEAF FABRICATION
GATE LEAF MACHINING - STAGE 1
GATE LEAF ASSEMBLY - PRIMARY
GATE LEAF MACHINIG - STAGE 2
GATE LEAF ASSEMBLY - FINAL
GATE LEAD FRAME SUB-ASSEMBLY
STEM NUT
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL
OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET
APPROVED FOR TECHNICAL ADEQUACY BY:
TECHNICAL LEAD ENGINEER DATE
REVIEWED BY:
CHIEF, GEOTECHNICAL/WATER RESOURCES BRANCH DATE
REVIEWED BY:
CHIEF, GEO-ENVIRONMENTAL ENGINEERING BRANCH DATE
APPROVAL RECOMMENDED BY:
CHIEF, DESIGN BRANCH DATE
APPROVED BY:
CHIEF, ENGINEERING DIVISION DATE
This project was designed by the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.
US Army Corps of Engineers® u.,j LO
0 "- 0 � ou a:, (.!),. � z ::;; - ID f-
S: ' LU
<( Z LU
0:: 0 I 0 U C/l
Cl z
Cl z
1-w w J:
0::
w
SHEET ID
G-001 z ii':
u
N/A
N/A
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
F
C
N -B
M -4
J A
M A
IC
A
V E
R M
O N
T
B A
L L M
O U
N T
A
IN
D
A M
G A
T E
S A
N D R
E P
L A
C E
M E
N T
W
W J
B 2 5
M-101
M E
C H
A N
IC
A L P
L A
N A
N D S
E C
T
IO
N
SHAFT
ACCESS
EQUIPMENT
C1
B6
SECTION AT GATE CHAMBER
FLOW
EL 805.5 (CONDUIT INVERT)
EL. 826.0
EL. 857.5
EL. 864.0
FIELD VERIFY ALL DIMENSIONS.
NOT ALL COMPONENTS SHOWN FOR CLARITY.
FIELD VERIFY ALL DIMENSIONS.
NOT ALL COMPONENTS SHOWN FOR CLARITY.
CYLINDER
GATE 3 HYDRAULIC
CYLINDER
GATE 2 HYDRAULIC
(NOT PART OF THIS CONTRACT)
GATE 1 HYDRAULIC CYLINDER
SUMP
FD
FD
MANHOLE (TYP OF 3)
FLOAT WELL
SCALE: 1/4" = 1'
0 4' 8'2'
KEY PLAN
VENT
AIR
VENT
AIR
VENT
AIR
SCALE: 1/4" = 1'
0 4' 8'2'
PIT
ELEVATOR
VENT
AIR
MANHOLE
(PIPING NOT SHOWN)
TRENCH FOR HYDRAULIC PIPING
BRACKET FOR POSITION INDICATOR
SAFETY STUD CAP: MARK 12 (DRAWING 18641 R/2)NEW SAFETY STUD: MARK 70 (SHEET M-501)
FASTENERS: MARK 16 (DRAWING 18636 R/1)
CYLINDER: MARK 1 (DRAWING 18636 R/1)
FASTENERS: MARK 21 (DRAWING 18636 R/1)
PACKING SEAT: MARK 8 (DRAWING 18636 R/1)
PISTON: MARK 6 (DRAWING 18636 R/1)
PISTON RING: MARK 15 (DRAWING 18636 R/1)
FASTENERS: MARK 20 (DRAWING 18636 R/1)
6" DIA. PACKING SEAT: MARK 5 (DRAWING 18636 R/1)
NEW STEM: MARK 22 (SHEET M-501)
NEW GATE LEAF DETAILS
AND SPECIFICATIONS FOR
SEE STRUCTURAL DRAWINGS
BONNET COVER (DRAWING UNAVAILABLE)
PLAN AT GATE CHAMBER EL. 826.0
SEMI-AUTOMATIC HANGER ASSEMBLY (DRAWING 18641 R/2)
(TRENCH NOT SHOWN)
NEW COMPONENTS
CALLOUTS THIS SIDE:
(WHERE MARK AND/OR DWG# INDICATED)
REFURBISHED COMPONENTS
CALLOUTS THIS SIDE:
NEW PACKING: MARK 13 (SHEET M-501)
NEW GASKET (O-RING): MARK 19 (SHEET M-501)
NEW GASKET (O-RING): MARK 19 (SHEET M-501)
NEW 6" DIA. OIL PACKING: MARK 11 (SHEET M-501)
NEW WATER PACKING: MARK 12 (SHEET M-501)
(FIELD VERIFY TYPE, DIMENSIONS)
NEW GASKET BETWEEN BONNET AND BONNET COVER
UNAVAILABLE)
BONNET (DRAWING
ASSEMBLY POSITION ON STEM
FIELD VERIFY THE ACTUAL
NEW TOP LEAF SPACER: MARK 3 (SHEET M-501)
POSITION AND ALL COMPONENTS
FIELD VERIFY ACTUAL ASSEMBLY
(SHEET M-501)
NEW BOTTOM LEAF NUT: MARK 4
FASTENERS: MARK 20 (SHEET M-501)
NEW LOWER 6" DIA. PACKING SEAT: MARK 5 (SHEET M-501)
STEM EXTENSION: MARK 23 (DRAWING 18636 R/1)
FASTENERS: MARK 18 (DRAWING 18636 R/1)
PACKING GLAND: MARK 9 (DRAWING 18636 R/1)
CYLINDER HEAD: MARK 2 (DRAWING 18636 R/1)
FASTENERS: MARK 17 (DRAWING 18636 R/1)
6" DIA. PACKING GLAND: MARK 7 (DRAWING 18636 R/1)
A N
S I
D :1
A P
R
IL
E
C H
IR
IA
C
A F
R
IS
IN
O
E
C H
IR
IA
C
J S
W A
L L E
Y
REFER TO THIS COMPONENT.
GATE STEM, AND PISTON ROD ALL
AND SPECIFICATIONS TO STEM,
NOTE THAT REFERENCE IN THE PLANS
-PROCEDURES TO DEAL WITH FASTENERS OR OTHER ASSEMBLY METHODS THAT ARE DETERIORATED OR OTHERWISE MALFUNCTIONING.
-PROCEDURES TO ENSURE COMPONENTS ARE RE-INSTALLED IN THE SAME ALIGNMENTS AS THEY ARE PRESENTLY ASSEMBLED.
TO MAINTAIN AND/OR ENSURE LEAK-FREE SEAL.
-REPLACEMENT OF THE GASKET BETWEEN THE BONNET AND THE BONNET COVER (OR ADDITION OF GASKET, IF NO GASKET IS PRESENT).
STRUCTURES IS MAINTAINED.
-METHOD OF REMOVAL AND REINSTALLATION TO ENSURE ACCURATE ALIGNMENT OF MACHINERY AND
DESIGN CONSIDERATIONS INCLUDE, BUT ARE NOT LIMITED TO:
AND SHALL PROPOSE METHODS AND MATERIALS FOR RE-INSTALLATION ONCE THE WORK IS COMPLETE.
CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS OF EACH HYDRAULIC CYLINDER ASSEMBLY
6. DURING DISASSEMBLY OF HYDRAULIC CYLINDER COMPONENTS FOR EXECUTION OF THIS WORK, REFURBISHED IN ACCORDANCE WITH THE SPECIFICATIONS.
THE EXISTING COMPONENT MARKS AND REFERENCE DRAWINGS INDICATE COMPONENTS THAT SHALL BE
5. REFER TO FOR INFORMATION ONLY DRAWINGS FOR ADDITIONAL EQUIPMENT INFORMATION. CALLOUTS TO
4. FIELD VERIFY ACTUAL CONDITIONS AND DIMENSIONS.
3. GATES ARE SHOWN IN THE FULLY CLOSED POSITION.
2. HYDRAULIC PIPING AND COMPONENTS ARE NOT SHOWN FOR CLARITY.
WORK SEQUENCES.
CONDITIONS AND SHALL COORDINATE WITH USACE TO DETERMINE SAFE AND APPROPRIATE
1. NOT ALL ITEMS SHOWN FOR CLARITY. CONTRACTOR SHALL BECOME FAMILIARIZED WITH ACTUAL SITE
SHEET NOTES:
B6
M-101
B6
M-101
PROFILE
1/16"= 1'-0"
ELEVATION
1/16"= 1'-0"
A
PLAN AT 864.0'
1/16"= 1'-0"
SCALE IN FEET
160 32
Project No. Date Revised
J D r a w i n g s W o r k i n g
D r a w i n g s
B d w g
Drawing
No.
M a r
P
M x
U L
L
S
C A
L E
Date Drawn Checked
CheckedDrawnDesigned
Revision No.
1871006
BALL MOUNTAIN
HYDROELECTRIC PROJECT
GENERAL ARRANGEMENT
PLAN, PROFILE & ELEVATION
BLUE HERON HYDRO, LLC
MORRISTOWN, NEW JERSEY
05-08-14
USACE REFERENCE DRAWINGS - INTAKE TOWER
SHEET NUMBER DRAWING TITLE
CT-1-4184 INTAKE TOWER - PLAN & SECTION
CT-1-4185 INTAKE TOWER AT ELEVATIONS 805.5' & 826.0'
CT-1-4186 INTAKE TOWER AT ELEVATION 868.0' & SECTIONS
CT-1-4187 INTAKE TOWER SECTIONS AT ELEVATIONS 799.5' TO 868.0'
CT-1-4188
INTAKE TOWER PLANS AT ELEVATIONS 1039.0', 1052.0', 1068.5' & 1085.5'
0 TLT PJWRELEASED FOR CONSTRUCTION 3-19-15
PLAN AT EL. 864.0'
3/16"= 1'-0"
PLAN AT EL. 882.5'
3/16"= 1'-0"
PLAN AT EL. 914.0'
3/16"= 1'-0"
BASELINE ABASELINE A
B A
S E
L I N
E
B
B-5-01
B A
S E
L I N
E
B
B-4-01
B A
S E
L I N
E
B
BASELINE A
B-4-01
3/8"= 1'-0"
LADDER LANDING - GRATING AND
HANDRAIL PLAN T.O.S. @ EL. 872.33'
3/8"= 1'-0"
LADDER LANDING
FRAMING PLAN T.O.S. @ EL. 872.33'
Project No. Date Revised
J D r a w i n g s W o r k i n g
D r a w i n g s
B d w g
Drawing
No.
M a r
P
M x
U L
L
S
C A
L E
Date Drawn Checked
CheckedDrawnDesigned
Revision No.
1871006
GENERAL ARRANGEMENT
PLATFORM PLANS
BALL MOUNTAIN DAM
HYDROELECTRIC PROJECT
BLUE HERON HYDRO, LLC
MORRISTOWN, NEW JERSEY
4-15-14
0 TLT PJWRELEASED FOR CONSTRUCTION 3-19-15
7.25 in OD x 6.75 in ID
Notes:
1. All welding per AWS D1.6
5.875-6 UN 2B
Major diameter: 5.9132 / 5.8750 Pitch diameter: 5.7809 / 5.7667 Minor diameter: 5.7251 / 5.6946
| CON-BM-481_G-001F.pdf |
| CON-BM-481_Final_Plans.pdf |
| CON-BM-481_Final_Plans |
| 001-Untitled |
| CON-BM-481_S-301 S-301 |
| 003-Untitled |
| 002-Untitled |
| 004-Untitled |
| CON-BM-481_Backcheck_Plans |
| CON-BM-481_BCOES_ITR_Plans.pdf |
| CON-BM-481_BCOES_ITR_Plans |
| CON-BM-468_Drawings.pdf |
| CON-BM-468_040318 |
| CT-1-4176-23.024 |
| CT-1-4184-31.032 |
| CT-1-4185-32.033 |
| CT-1-4186-33.034 |
| CT-1-4187-34.035 |
| CT-1-4188-35.036 |
| CT-1-4189-36.037 |
| CT-1-4192-39.040 |
| CT-1-4194-41.042 |
| CT-1-4195-42.043 |
| CT-1-4199-46.047 |
| CT-1-4210-57.058 |
| CT-1-4412-63.064 |
| CT-1-4413-64.065 |
| CT-1-4415-66.067 |
| CON-BM-455_REFERENCE DRAWINGS_6-22-2017 24 |
| CON-BM-455_REFERENCE DRAWINGS_6-22-2017 25 |
| CON-BM-455_REFERENCE DRAWINGS_6-22-2017 26 |
| CON-BM-455_REFERENCE DRAWINGS_6-22-2017 27 |
| CON-BM-455_REFERENCE DRAWINGS_6-22-2017 28 |
Pages from Hydro Plans Ball Mountain .pdf
Ball Mt - Shop Dwg Pkg - 20190222.pdf
| 2020-07-31T08:25:00-0400 | |
| STEWART.ADAM.TAYLOR.1454159914 |
| 2020-07-31T08:35:27-0400 | |
| TESSIER.MATTHEW.E.1377053253 |
| 2020-08-03T16:10:19-0400 | |
| MARGOLIS.DAVID.I.1228573805 |
File details come from the government source that posted it. Updated .