J-3 AHERA Asbestos Information_Osan ES.pdf
PDF 78 KB Posted
- Attached to
- DoDEA Total Maintenance Services
- Solicitation number
- W912UM19R0021
About this file
This memorandum from the U.S. Army Corps of Engineers confirms that no asbestos-containing building materials were used in the construction of the new Osan American Elementary School under Contract No. W912UM-13-C-0031 awarded by the Department of Defense Education Activity. The memorandum serves as a declaration from the Central Resident Office of the Far East District that the school building is asbestos-free, and includes the name of the accredited asbestos professional who verified this.
The solicitation seeks a firm-fixed price contract to provide comprehensive maintenance services for 8 schools and a District Superintendent's Office belonging to the Department of Defense Education Activity on the Korean peninsula. Services include preventative maintenance by original equipment manufacturers, on-demand and emergency repairs for items such as carpentry, plumbing, electrical work, HVAC, fire protection and roofing. The contractor must provide a 24/7 point of contact to respond within 1 hour to emergency calls. The base period of performance is one year with four optional one-year extensions. The contractor will furnish all labor, equipment, transportation and materials needed to maintain and repair the school facilities.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
FAR EAST DISTRICT, U.S. ARMY CORPS OF ENGINEERS
UNIT #15546
APO AP 96205-5546
CEPOF-CDC 18 Mar 2016
MEMORANDUM FOR DoDDS-Pacific Area
SUBJECT: Confirmation of Asbestos-Free School Building, Contract No. W912UM-13- C-0031, FY13 DoDEA, PA00020, Replace Elementary School, Osan AB
This memorandum serves as a Declaration and Confirmation from the Central Resident Office, Far East District, U. S. Army Corps of Engineers, which, to the best of our knowledge, no ACBM (Asbestos Containing Building Material) was used for the construction of new Osan American Elementary School.
Name of Asbestos Accredited Professional:
Chu, Chong-Mun, AHERA Asbestos Management Planner
Frank J. Meleton, PE Resident Engineer, Central Resident Office
MELETON.FRANCIS.J.12
30860315
Digitally signed by MELETON.FRANCIS.J.1230860315 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=MELETON.FRANCIS.J.1230860315 Date: 2016.03.18 14:09:39 +09'00'
File details come from the government source that posted it. Updated .