This document outlines requirements for a firm fixed price maintenance services contract. The Department of Defense Education Activity seeks a contractor to provide comprehensive preventative maintenance, inspections, and on-demand repair services for eight schools and a district office in the DoDEA school system. Services include carpentry, masonry, painting, plumbing, electrical work, HVAC, fire protection, metal work and roofing. The contractor must provide emergency response within one hour for all locations. The base period of performance is one year with four optional one-year extensions. The solicitation was released by the U.S. Army Corps of Engineers Far East District on behalf of the DoDEA.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quantities are approximate and not intended for abatement bidding purposes. 1 2018

Bldg.

No.

Homo.

Mtl.

No.

Material Description

AHERA

CAT Locations Quantity Friable Overall

Condition Type of Damage Accessibility Potential for

Air Erosion Potential for

Vibration Potential for

Damage EPA Ass.

CAT

Cleaning Required

Recommended Management Actions

Begin Date

End Date

Material Management Procedure Unit Cost Est. Qty.

(Unit) Est. Cost Comments

Number Date Result

Building: 3000

3000 026

RESILIENT

FLOOR

SHEETING,

BROWN,

YELLOW, GOLD,

AND TAN

PEBBLE DESIGN

WITH WHITE

PAPER BACKING MISC.

A117, A117A, A210, A224, A226, A227, A228 1,500 SF

1101-TAE-001

1101-TAE-001*

01-Nov-90 01-Nov-90

CH 10%

CH 11-13% NO UNDAMAGED NONE LOW LOW LOW

LOW

POTENTIAL 8 NO

1. NO IMMEDIATE ABATEMENT

REQUIRED.

2. CONSULT THE O&M MANUAL

CONCERNING SAFE CUSTODIAL

PROCEDURES FOR THIS

MATERIAL.

3. CONTINUE SURVEILLANCE

OF THIS MATERIAL UNDER THE

ASBESTOS MANAGEMENT PLAN.

RESILIENT FLOOR

TILE OR SHEETING $72.50 15 $1,087.50

*SAMPLE WAS ANALYZED

BY TEM AND RESULT WAS

>1% ASBESTOS. THIS

MATERIAL IS CONSIDERED

TO BE ACM. THIS

MATERIAL IS LOCATED

UNDER EXISTING

FLOORING MATERIALS AND

CABINETS IN LISTED

LOCATIONS. THE

ADHESIVE FOR THIS

MATERIAL IS MN 027.

3000 056

SHEET GASKET,

PINK, 4" - 6"

DIAMETER, ON

PIPE FLANGE

CONNECTIONS MISC. M101, M106 22 EA

0715-TAE-056A

0715-TAE-056B

0715-TAE-056C

15-Jul-93 15-Jul-93 15-Jul-93

CH 60-65%

CH 60-65%

CH 60-65% NO UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 NO

1. NO IMMEDIATE ABATEMENT

REQUIRED.

2. CONSULT THE O&M MANUAL

CONCERNING SAFE CUSTODIAL

PROCEDURES FOR THIS

MATERIAL.

3. CONTINUE SURVEILLANCE

OF THIS MATERIAL UNDER THE

ASBESTOS MANAGEMENT PLAN.

GASKET MATERIAL

AND FLEX

CONNECTORS $72.50 1.5 $108.75

THIS MATERIAL WAS NOT

ACCESSIBLE FOR

ADEQUATE INSPECTION

BECAUSE IT IS UNDER

SEALED BLACK FOAM

INSULATION.

3000 117

SHEET GASKET,

GRAY, ON 4" -

6" DIAMETER,

ON PIPE FLANGE

CONNECTIONS MISC. M101 16 EA

0597-TAE-117A

0597-TAE-117B

0597-TAE-117C

02-May-97 02-May-97 02-May-97

CH 20-25%

CH 60-65%

CH 60-65% NO UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 NO

1. NO IMMEDIATE ABATEMENT

REQUIRED.

2. CONSULT THE O&M MANUAL

CONCERNING SAFE CUSTODIAL

PROCEDURES FOR THIS

MATERIAL.

3. CONTINUE SURVEILLANCE

OF THIS MATERIAL UNDER THE

ASBESTOS MANAGEMENT PLAN.

GASKET MATERIAL

AND FLEX

CONNECTORS $72.50 1.5 $108.75

THIS MATERIAL WAS NOT

ACCESSIBLE FOR

ADEQUATE INSPECTION

BECAUSE IT IS UNDER

SEALED BLACK FOAM

INSULATION.

3000 235

FIRE DOOR

LINING, CORE

OF ELEVATOR

ENTRANCE

DOORS MISC. H103, H201 2 EA ASSUMED ACM 05-Jun-12 - NO UNDAMAGED NONE LOW LOW LOW

LOW

POTENTIAL 8 NO

1. NO IMMEDIATE ABATEMENT

REQUIRED.

2. CONSULT THE O&M MANUAL

CONCERNING SAFE CUSTODIAL

PROCEDURES FOR THIS

MATERIAL.

3. CONTINUE SURVEILLANCE

OF THIS MATERIAL UNDER THE

ASBESTOS MANAGEMENT PLAN. REMOVABLE ITEMS $72.50 1.5 $108.75

THIS MATERIAL WAS NOT

SAMPLED DUE TO

INACCESSIBILITY AND IS

THEREFORE ASSUMED TO

CONTAIN ASBESTOS. THIS

MATERIAL WAS NOT

ACCESSIBLE FOR

ADEQUATE INSPECTION

BECAUSE MATERIAL IS

LOCATED INSIDE METAL

DOOR.

3000 239

FIRE DOOR

LINING, CORE

OF ELEVATOR

CAB DOOR MISC. EL101.1 1 EA ASSUMED ACM 05-Jun-12 - NO UNDAMAGED NONE LOW LOW LOW

LOW

POTENTIAL 8 NO

1. NO IMMEDIATE ABATEMENT

REQUIRED.

2. CONSULT THE O&M MANUAL

CONCERNING SAFE CUSTODIAL

PROCEDURES FOR THIS

MATERIAL.

3. CONTINUE SURVEILLANCE

OF THIS MATERIAL UNDER THE

ASBESTOS MANAGEMENT PLAN. REMOVABLE ITEMS $72.50 1.5 $108.75

THIS MATERIAL WAS NOT

SAMPLED DUE TO

INACCESSIBILITY AND IS

THEREFORE ASSUMED TO

CONTAIN ASBESTOS. THIS

MATERIAL WAS NOT

ACCESSIBLE FOR

ADEQUATE INSPECTION

BECAUSE MATERIAL IS

LOCATED INSIDE METAL

DOOR.

Building: 3008

3008 177

ROOFING

SYSTEM,

BROWN

ASPHALTIC

SHINGLES MISC. ROOF 1,200 SF ASSUMED ACM 19-Oct-06 - NO UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 NO

1. NO IMMEDIATE ABATEMENT

REQUIRED.

2. CONSULT THE O&M MANUAL

CONCERNING SAFE CUSTODIAL

PROCEDURES FOR THIS

MATERIAL.

3. CONTINUE SURVEILLANCE

OF THIS MATERIAL UNDER THE

ASBESTOS MANAGEMENT PLAN.

EXTERIOR

WEATHERPROOFING

MATERIALS $72.50 6 $435.00

THIS MATERIAL WAS NOT

SAMPLED DUE TO

POTENTIAL DAMAGE TO THE

ROOF. ALL OF THE

COMPONENTS OF THIS

ROOFING SYSTEM SHOULD

BE SAMPLED PRIOR TO

RENOVATION OR REMOVAL

OF ANY PART OF THIS

ROOF.

Building: 3019

3019 201

SHEET GASKET,

4" - 6"

DIAMETER,

WHITE,

PAINTED RED

ON FIRE

SUPPRESSION

WATER PIPING MISC. M101 11 EA

KR09-TAE-201A

KR09-TAE-201B

KR09-TAE-201C

18-Aug-09 18-Aug-09 18-Aug-09

CH 10%

CH 10%

CH 10% NO UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 NO

1. NO IMMEDIATE ABATEMENT

REQUIRED.

2. CONSULT THE O&M MANUAL

CONCERNING SAFE CUSTODIAL

PROCEDURES FOR THIS

MATERIAL.

3. CONTINUE SURVEILLANCE

OF THIS MATERIAL UNDER THE

ASBESTOS MANAGEMENT PLAN.

GASKET MATERIAL

AND FLEX

CONNECTORS $72.50 1.5 $108.75

Table D-1 - Summary of Asbestos-Containing Materials for Daegu American School

Sample Information

File details come from the government source that posted it. Updated .