This addendum is issued prior to receipt of the bids and does hereby become a part of the contract documents and in case of conflict it shall supersede original project manual and drawings. Each bidder shall be responsible for issuing information contained herein to sub-contractors and suppliers to ensure that his/her proposal covers all work required by the contract documents including this addendum. Each bidder shall acknowledge receipt of this addendum on the proposal form where indicated.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F8N3CE0173A003 SZCQ089023
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Addendum U0005 is issued prior to receipt of the bids and does hereby become a part of the contract documents, and in case of conflict, it shall supersede original project manual and draw ings.Each bidder shall be responsible for issuing information contained herein to sub-contractors and suppliers to ensure that his/her proposal covers all w ork required by the contract documents including this addendum.Each bidder shall acknow ledge receipt of this addendum on the proposal form w here indicated.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Apr-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912TF-11-R-0502
X 9B. DATED (SEE ITEM 11)
09-Mar-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Apr-2011
CODE
FA6291 NEW HAMPSHIRE AIR NATIONAL GUARD
NGNH-PFO-PC JOINT CONTRACTING
302 NEWMARKET ST
PEASE ANGB
NEWINGTON NH 03803-0157
W912TF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912TF-11-R-0502
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT U0005
RESPONSES TO RFI QUESTIONS
1. Drawing EP101 shows mechanical item RF1 being fed from the MSB through a combination starter/disconnect switch. The one-line diagram, on Drawing EP501 does not reflect that same scenario. I scanned the panelboard schedule and was unable to find the power source for RF1.
Please advise.
Response 1: The power source for RF-1 is MSB. See changes to Sheet EP501 listed further below.
2. Spec Section 260533 discusses conduit types and their uses. Paragraph 3.2.G states that conduit and EMT to run concealed in ceiling, walls and floors. 3.2.I.5 states to change from ENT to GRC before rising above the floor. The spec does not address the use of ENT and normally PVC Sch
40 is used in the deck. That is not mentioned either. Please clarify what type of conduit is to be used in the slab. As this is a new building, running as much conduit in the deck would make for a lesser expensive project.
Response 2: Type EPC-40-PVC is to be used in the slab. See changes to Specification Section 260533 listed further below.
3. Spec no. 122413, Roller Window Shades, calls for manual and electrically operated roller shades.
The drawings are not clear which units are to be manually operated and which are to be electrically operated. Please advise.
Response 3: Electrically operated roller shades are not required. See changes to Specification
Section 122413 listed further below.
4. Light shelves are shown on the horizontal mullion on all secondary story windows. Are light filtering and room darkening roller shade to be installed below the light shelves as well as above them on all of these windows?
Response 4: The shades shall be installed above the light shelves and, when extended, fit between the glass and the light shelf. The light shelf shall be held off the glass to allow the shades to go between the back of the shelf and the glass.
5. Does the new building have a loading dock at this site, & can the base accept a 53’ trailer to bring the Briefing room auditorium seating in?
Response 5: The building will have a loading dock but may not be in a practical location in relation to the room requiring the seating. Yes, the base can accept a 53 foot trailer.
6. Drawing EP104 contains notes for the antenna system. The roof plan itself is not clear as to the location these antennae are to be installed. There are six (6) antennae required. It looks as though (8) will be installed. Please clarify.
Response 6: Provide six (6) antennas and supports for eight (8) antennas. The extra supports are meant to accommodate future growth. See 1/AE120 for location of support brackets.
a. The Keynotes on EP104 are confusing. Note 7 states to provide a NEMA 4 pullbox with a
2” conduit to Room 173 for antenna connections. Keynote 5 says to run a 2” from each antenna to Room 173. If that is true, what purpose does the pullbox and 2” conduit serve?
Response 6, a: The purpose of the pullbox and 2” conduit indicated by Keynote 7are for anticipated future use, not for antenna to be provided under this contract.
7. Ref Drawings MH101, MH102, MH103: Can a make, model # and specification be issued for the
"Constant Airflow Regulator" scheduled and indicated on MH101, MH102 & MH103. No other information is included in the bid documents.
Response 7: American Aldes CAR-ii. See changes to Specification Section 233300 listed further below.
8. The Insulation Specifications do not cover the condensate drain piping. Is this piping to be insulated? If so, what size?
Response 8: The specification section was changed as part of Amendment 4, posted April 14, 2011.
See “Specifications” section 7, b of that document.
9. The following pieces of equipment show up on the drawings, but are not scheduled: DB (Dryer
Booster Fan), TF-2 (Transfer Fan), RM-1 & 2 (Radiant Manifolds), HUM-1 (Presumably a humidifier), and RC-1, 1A, 2, & 2A (Refrigerant Concentrators). Please provide schedules.
Response 9:
The Dryer Booster serves a conventional residential dryer. Provide a plastic booster fan kit (Fantech DBF110, Directfan 110, Air King AIDB4Y, Deflecto TF4, or equivalent);
airflow in range of 125-200 cfm.
Provide Fan TF-2 with the same specification and capacity as TF-1
Radiant Manifolds RM1 and RM2: Specification Section 238316 includes the requirements for manifold construction. The assumed number of ports may be added up from the schedule on Sheet M602, but note that the supplier’s design submittal may vary this total slightly depending on their design parameters and approach. Coordinate with radiant design submittals.
The Humidifier is scheduled on M704.
RC units – See response to question below.
10. Please provide connection details for RC-1, 1A, 2, & 2A.
Response 10: The refrigerant concentrators (“RC-xx”) are part of the system to be submitted on by the VFR manufacturer, and will presumably be included in the distributor’s quote to the subcontractor. The number of refrigerant ports must be equal to or greater than the number of evaporators shown. Note that there is also another pair, 3 and 3A, in the corridor on sheet MP102.
Connections will be per the instruction requirements of the VRF manufacturer.
11. The following drawings include references to the south-east wing as being bid option 1: P106, P702, MH104, MP101 (Note refers to MH105 as being bid option 1). In addition, none of the equipment on MH105 is scheduled on M601 or M602. It is all scheduled on M704
Response 11: The south-east wing is part of the base bid. Some changes to Mechanical and
Plumbing Sheets were made as part of Amendment 1, posted March 22, 2011. For further changes to the drawings see further below.
12. Specification Section 00100 Instructions, Conditions, and Notices to Offerors page 12 of 62 paragraph 13 stated “List of Brand Name or Sole Source Justifications posted on the FBO:
NONE”. Yet in Amendment 1 we find this statement:
23. SECTION 223600, SOLAR THERMAL HEATING SYSTEM
a. Paragraph 2.1: Delete paragraphs A and B.
b. Add paragraph 2.1, A to read as follows: “System shall be manufactured by Solar
Panels Plus (SPP). No exceptions.”
Response 12: To work with existing systems on Base, some items are required to be Sole Source.
These items include, but are not necessarily limited to, the following:
Network Lighting Controls: Enclilium
Solar Thermal Heating System: Solar Panels Plus
Condensing Boilers: Lockinvar Knight
Locks: Best Systems
Security System: Advantor
SPECIFICATIONS
1. SECTIONS 084113, ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS; 084423,
STRUCTURAL-SEALANT-GLAZED CURTAIN WALLS; and 085113, ALUMINUM WINDOWS
a. Paragraph 2.8, A (Sections 084113 and 084423); Paragraph 2.8, B (Section 085113):
Change to read as follows: “High-Performance Organic Finish (Two-Coat Fluoropolymer):
Organic Coating: manufacturer's standard two-coat, thermocured system consisting of specially formulated inhibitive primer and fluoropolymer color topcoat containing not less than 70 percent polyvinylidene fluoride resin by weight. Prepare, pretreat, and apply coating to exposed metal surfaces to comply with AAMA 2605 and with coating and resin manufacturers' written instructions.”
2. SECTION 122413, ROLLER WINDOW SHADES
a. Delete paragraph 1.3, A, 2 in its entirety.
b. Paragraph 3.1, A: Delete “accurate locations of connections to building electrical system,”.
c. Delete paragraph 3.2, B in its entirety.
3. SECTION 233300, AIR DUCT ACCESSORIES
a. Add paragraph 1.3, A, 13 to read as follows: “Constant Volume Dampers (CAR)”
b. Add paragraph 2.16 to read as follows: “CONSTANT AIRFLOW REGULATORS”.
c. Add paragraph 2.16, A to read as follows: “Basis-of-Design: Subject to compliance with requirements, provide the following named product or an approved equivalent from another manufacturer.”
d. Add paragraph 2.16, A, 1 to read as follows: “Basis-of-Design Product: American Aldes
CAR-ii”
e. Add paragraph 2.16, B to read as follows: “Constant Airflow Regulator: Duct-mounted plastic constant-volume damper which maintains a constant airflow independent of duct static pressure.”
f. Add paragraph 2.16, B, 1 to read as follows: “Construction: ABS.”
g. Add paragraph 2.16, B, 2 to read as follows: “Installation: Integral elastomeric slip ring, inside diameter of duct.”
h. Add paragraph 2.16, B, 3 to read as follows: “Regulator: Aerofoil.”
i. Add paragraph 2.16, B, 4 to read as follows: “Flamespread: UL 2043 Listed.”
j. Add paragraph 3.1, R to read as follows: “Install constant airflow regulators (CAR) in runout ducts. Use CAR’s designed for positive and negative pressure operation for supply and exhaust ducts, respectively. Where diameter of CAR is different from that indicated for runout, provide transitions a minimum of 600mm (24 inches) from each end of the CAR, or as far as field conditions allow in shorter ducts.”
k. Add paragraph 3.3, A, 5 to read as follows: “Inspect constant airflow regulators (CAR) and verify tight slip fit at duct inlet and outlet. Do not allow hard ceiling installation below CAR until Testing and Balancing (TAB) work has verified airflow within acceptable tolerance of indicated value. Replace defective CAR units where TAB work shows airflow out of acceptable range.”
4. SECTION 260533, RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
a. Add paragraph 1.4, B to read as follows: “RNC: Rigid Nonmetallic Conduit.”
b. Add paragraph 1.5, C, 2 to read as follows: “LEED Submittals: Product data for credit IEQ
4.1: For solvent cements and adhesive primers, documentation including printed statement of VOC content.”
c. Add paragraph 2.5 to read as follows: “NONMETALLIC CONDUITS, TUBING, AND
FITTINGS”.
d. Add paragraph 2.5, A to read as follows: “Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:”
e. Paragraph 2.5, A: add the following list of manufacturers:
1. AFC Cable Systems, Inc.
2. Anamet Electrical, Inc.
3. Arnco Corporation.
4. CANTEX Inc.
5. CertainTeed Corp.
6. Condux International, Inc.
7. Electri-Flex Company.
8. Kraloy.
9. Lamson & Sessions; Carlon Electrical Products.
10. Niedax-Kleinhuis USA, Inc.
11. RACO; a Hubbell company.
12. Thomas & Betts Corporation.
f. Add paragraph 2.5, B to read as follows: “Listing and Labeling: Nonmetallic conduits, tubing, and fittings shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.”
g. Add paragraph 2.5, C to read as follows: “RNC: Type EPC-40-PVC, complying with NEMA TC 2 and UL 651 unless otherwise indicated.
h. Add paragraph 2.5, D to read as follows: “Fittings for RNC: Comply with NEMA TC 3;
match to conduit or tubing type and material.”
i. Add paragraph 2.5, E to read as follows: “Solvent cements and adhesive primers shall have a VOC content of 510 and 550 g/L or less, respectively, when calculated according to 40 CFR 59, Subpart D (EPA Method 24).”
j. Paragraph 3.2, I, 5: Change “ENT” to “RNC”.
DRAWINGS
1. MH104, MECHANICAL ROOF PLAN
a. Detail 1: At note at south-east (AFE) wing, change “OPTION 1” to “AFE WING”
2. MP101, FIRST FLOOR MECHANICAL PIPING PLAN SOUTH
a. Detail 1: At VEST 106, change “OPTION #1” to “AFE WING”.
3. SHEET P106, PLUMBING ROOF PLAN
a. Detail 1: At note pointing to bubble around south-east (AFE) wing, change “BID OPTION
1” to “AFE WING”.
4. SHEET P702, PLUMBING RISER DIAGRAM
a. Delete Keynote 1.
5. SHEET E001, ELECTRICAL SYMBOLS, ABBREVIATIONS, AND GEN NOTES
a. Add General Note 18 to read as follows: “RACEWAYS SHALL NOT BE EMBEDDED IN FIRE
RATED SLABS, REFER TO SHEET SP101 FOR LOCATIONS.”
6. SHEET EP501, ELECTRICAL ONE-LINE DIAGRAM
a. Add Drawing Note 2 to read as follows: “CIRCUIT BREAKERS IN SWITCHBOARD SHALL BE
3 POLE, 480V.”
b. Detail 1: Add a starter/disconnect switch between the 15A circuit breaker serving RF-1 and RF-1.
c. Detail 1: Add a starter/disconnect switch with Keynote 11 between the 15A circuit breaker serving HRV-1 and HRV-1.
d. Add Keynote 11 to read as follows: STARTER/DISCONNECT FURNISHED BY DIVISION 23.
INSTALLED BY DIVISION 26.”
7. SHEET FA501, FIRE ALARM RISER DIAGRAM
a. Detail 1: delete the interface devices for the tamper and flow switches. Connect switches to the zoned fire alarm control system. Connect tamper switches in Room 141 to one separate zone. Connect the flow switch in room 141 to one separate zone.
Connect the tamper switches for the Knox boxes to one separate zone.
b. Detail 1: delete the interface devices for the Elevator Recall System and the Elevator
Shunt Trip System. Connect the Elevator Recall System and Elevator Shunt Trip System to the fire alarm system and provide control for each system as indicated in
Specifications and on the Drawings.
c. Detail 1: Change “KLAXON STROBES” to “KLAXON APPLIANCES”. Klaxon appliances shall be a combination speaker with strobe and shall be as indicated in Specification 283176, paragraph 2.17.D. Provide raceways and wiring dedicated to the Klaxon System, separate from the fire alarm and mass notification system raceways and wiring.
d. Detail 1: change the room number of one (1) smoke detector from “102” to “201” for the smoke detectors shown to be connected to the elevator recall system (shown at the far left of the diagram).
e. Detail 1: Each fire alarm initiating device circuit shown shall be connected to a separate zone.
f. Provide separate, dedicated raceways and wiring for fire alarm initiating circuits.
g. Provide separate, dedicated raceways and wiring for fire alarm notification circuits.
h. Provide separate, dedicated raceways and wiring for signaling line circuits.
i. Provide separate, dedicated raceways and wiring for amber “Alert” strobe circuits.
j. Provide separate, dedicated raceways and wiring for clear “Fire” strobe circuits.
k. Provide separate, dedicated raceways and wiring for speaker circuits.
l. Provide separate, dedicated raceways and wiring for LOC circuits.
m. Provide separate, dedicated raceways and wiring for Text Sign circuits.
3. SCHEDULING
3.1. Normal base work hours for the Contractor will be between the hours of 6:00 AM through 5:00 PM, excluding Saturdays, Sundays, and Federal Holidays. No work will be performed on weekends and Federal Holidays.
(End of Summary of Changes)