Text version
F8N3CE0173A003 SZCQ089023
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment U0001 is issued prior to receipt of the bids and does hereby become a part of the contract documents, and in case of conflict, it shall supersede original project manual and draw ings. Each bidder shall be responsible for issuing information contained herein to sub contractors and suppliers to ensure that his/her proposal covers all w ork required by the contract documents including this addendum.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Mar-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912TF-11-R-0502
X 9B. DATED (SEE ITEM 11)
09-Mar-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Mar-2011
CODE
FA6291 NEW HAMPSHIRE AIR NATIONAL GUARD
NGNH-PFO-PC JOINT CONTRACTING
302 NEWMARKET ST
PEASE ANGB
NEWINGTON NH 03803-0157
W912TF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912TF-11-R-0502
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT U0001
Amendment U0001 Specifications
1. TABLE OF CONTENTS
a. Change title of Section 237202 to “Air‐to‐Air Energy Recovery Equipment.”
b. Change title of Section 260936.19 to “Standalone Multipreset Modular Dimming Controls.”
c. Delete “(Bid Option #1)” from title of Section 281600.
d. Change title of Section 329500 to “Vegetated Roof Assemblies (Bid Option #3).”
2. PART I, STATEMENT OF WORK
a. Paragraph IV, A:
i. Change “365” to “485.”
ii. Add paragraph IV, A, 1 to read as follows: “Phasing: There will be two phases to this project. There will be two (2) Notice to Proceed (NTP) letters issued. The first NTP will include the removal of Building 259 and the submittal and approval of all designated critical submittals. The second NTP will include the construction phase of the project and will not be issued until the work listed in the first NTP is complete. See Solicitation
W912TF‐11‐R‐0502, Section 00800, 10 for the list of designated critical submittals.”
3. PART II, GENERAL CONDITIONS
a. Paragraph 12, a, 5:
i. Delete “in the form of a credit to the contract.”
ii. Add “Contractor shall make payment to PSNH to be credited to the Government‟s account.” after “Contractor.”
b. Paragraph 27, a: Add “move or” between “not” and “alter.”
4. PART III, SPECIAL PROVISIONS
a. Paragraph 5:
i. Change the drawing title of Dwg No. SF106 to “PAVILION FND AND FRAMING PLANS –
BID OPTION #2.”
ii. Delete “‐BID OPTION #1” from the title of Dwg No. EP605.
5. SECTION 042113, BRICK MASONRY
a. Paragraph 2.2, D, 1: Replace “a comparable” with “an equivalent.”
b. Paragraph 2.2, E, 1: After “following,” add “named product or an equivalent product that matches aesthetically by another manufacturer.”
c. Paragraph 2.2, F, 1: After “following,” add “named product or an equivalent product that matches aesthetically by another manufacturer.”
d. Paragraph 2.2, E, 1, a: After “Smokey Quartz,” add “(S72).”
e. Paragraph 2.2, F, 1, a: Change “(W1581)” to “(WIS82).”
6. SECTION 061053, MISCELLANEOUS ROUGH CARPENTRY
a. Paragraph 1.3, A, 1: Delete subparagraph “1. Rooftop equipment boxes and support curbs.”
7. SECTION 077100, ROOF SPECIALTIES
a. Paragraph 2.4, A, 1: Change “comparable product by one of the following” to “an approved equivalent product from another manufacturer. Manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following.”
8. SECTION 083613, SECTIONAL DOORS
a. Paragraph 1.7, A, 2: Change “substantial completion” to “Final Acceptance.”
9. SECTION 085113, ALUMINUM WINDOWS
a. Paragraph 1.6, C: Change to read as follows: “Source Limitations: Aluminum windows, sunshades, and light shelves shall be designed, manufactured, and finished by window manufacturer. Obtain through one source from a single manufacturer.”
10. SECTION 085653, SECURITY WINDOWS
a. Paragraph 1.11, A, 2: Change “Substantial Completion” to “Final Acceptance.”
11. SECTION 086200, UNIT SKYLIGHTS
a. Paragraph 1.7, A, 2: Change “substantial completion” to “Final Acceptance.”
12. SECTION 099123, INTERIOR PAINTING
a. Add paragraph 2.11 WATER BASED VARNISHES.
b. Add paragraph 2.11, A to read as follows: “Varnish, water‐based, clear, semi‐gloss (gloss level
5).”
c. Add paragraph 2.11, A, 1 to read as follows: “Sherwin Williams: Wood classics waterborne polyurethane varnish A68 series; or approved equivalent.”
13. SECTION 101100, VISUAL DISPLAY SURFACES
a. Paragraph 1.10, A, 2: Change “Substantial Completion” to “Final Acceptance.”
14. SECTION 102219, DEMOUNTABLE PARTITIONS (BID OPTION #1)
a. Paragraph 2.2, A, 1: Change “by one of the following” to “from another manufacturer. Available manufacturers offering products that may be incorporated into the Work include, but are not limited, to the following:”
15. SECTION 102220, SYSTEMS FURNITURE (BID OPTION #1)
a. Paragraph 2.1, A:
i. Add “Subject to compliance with requirements, provide” before “Vivo with Intent by
Herman Miller”.
ii. Change “by one of the following” to “from another manufacturer. Available manufacturers offering products that may be incorporated into the Work include, but are not limited, to the following:”
16. SECTION 102800, TOILET, BATH AND LAUNDRY ACCESSORIES
a. Paragraphs 2.2, A; 2.3, A; 2.4, A; 2.6, A; and 2.7, A: Delete paragraphs in their entirety.
b. Paragraph 2.2, B; 2.3, B; 2.4, B; 2.5, A; 2.6, B; 2.7, B: Replace “on Drawings or comparable product by one of the following” with “or approved equivalent product from another manufacturer. Available manufacturers offering products that may be incorporated into the
Work include, but are not limited to the following:”
17. SECTION 111400, FALL PROTECTION SYSTEM (BID OPTION #3)
a. Paragraph 2.1, A: Replace “or a comparable product by one of the following manufacturers:”
with “or approved equivalent product from another manufacturer. Available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:”
18. SECTION 113100, RESIDENTIAL APPLIANCES
a. Paragraphs 2.1, A; 2.2, A; 2.3, A; 2.4, A: Replace “or a comparable product by one of the following manufacturers:” with “or approved equivalent product from another manufacturer.
Available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:”
19. SECTION 124130, ENTRANCE FLOOR MATS AND FRAMES
a. Paragraph 2.1, A: Replace “or a comparable product by one of the following manufacturers:”
with “or approved equivalent product from another manufacturer. Available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:”
20. SECTION 126100, FIXED AUDIENCE SEATING
a. Paragraph 2.2, A, 1: Replace “or a comparable product by one of the following manufacturers:”
with “or approved equivalent product from another manufacturer. Available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:”
21. SECTION 142100, ELECTRIC TRACTION ELEVATOR
a. Add paragraph 1.3, B, 7 to read as follows: “Division 23 Section “Commissioning of Building
Systems.””
22. SECTION 221119, DOMESTIC WATER PIPING SPECIALTIES
a. Part 2, 2.8: Add paragraph 2.8 WATER METER.
b. Add paragraph 2.8, A to read as follows: “Water meter shall be remote radio water meter with unencrypted register, compatible with DDC system with connection for remote monitoring and trending by the Government. Procure meter from local water utility, and coordinate installation requirements.”
c. Add paragraph 3.1, A to read as follows: “Procure Water Meter from local utility, and pay associated costs and fees. Coordinate installation with the utility. Facilitate owner contact with the utility for billing arrangements.”
23. SECTION 223600, SOLAR THERMAL HEATING SYSTEM
a. Paragraph 2.1: Delete paragraphs A and B.
b. Add paragraph 2.1, A to read as follows: “System shall be manufactured by Solar Panels Plus
(SPP). No exceptions.”
24. SECTION 224500 EMERGENCY PLUMBING FIXTURES
a. Add paragraph 3.3, E to read as follows: “Coordinate with requirements of Division 23 Section
“Commissioning of Building Systems” to provide support and logistics for building commissioning.”
25. DIVISION 23 CONTENTS SUMMARY SHEET
a. Change title of Section 237202 to “Air‐to‐Air Energy Recovery Equipment.”
26. SECTION 230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
a. Add paragraph 1.3, B to read as follows: “Related Sections.”
b. Add Paragraph 1.3, B, 1 to read as follows: “Division 23 Section “Commissioning of Building
Systems.””
c. Add Paragraph 3.3, E to read as follows: “Coordinate with requirements of Division 23 Section
27. SECTION 230900, INSTRUMENTATION AND CONTROL OF HVAC
a. Add Paragraph 2.1, F to read as follows: “BAS shall be interfaced with Lochinvar Knight boilers using Lonworks, to provide functionality as described in the sequence of operation.”
b. Paragraph 2.1, A: Replace current paragraph in its entirety with the following: “A. System shall be Invensys to match existing base‐wide system, or shall be other manufacturer which can show by submittal that equally compatible connectivity for control and monitoring will be achieved.”
c. Add paragraph 2.4, B, 10 to read as follows: “Airflow Monitoring Stations: Thermal dispersion airflow sensor system with aluminum tube probes in duct, and duct‐mounted sensor controller in factory enclosure. Controller output shall be compatible with inputs on associated DDC unitary controller for system served. Provide gaskets, conductors, accessories, and transformers required for field installation.”
d. Add paragraph 2.4, H to read as follows: “CO2 Sensor: Absortion Infrared type, wall or duct mounted as indicated, accuracy within 5 percent.”
e. Paragraph 3.4, D: Add the following sentence: “Coordinate with Government building controls personnel, and provide up to 25 trend logs, with parameters per Government direction.”
28. SECTION 231123, FACILITY NATURAL‐GAS PIPING
a. Part 2: Add paragraph 2.8 GAS METER.
b. Add paragraph 2.8, A to read as follows: “Pulser type, one pulse per cubic foot of gas, compatible with DDC system with connection for remote monitoring and trending by the
Government. Procure meter from Unitil and coordinate installation requirements.”
c. Add paragraph 3.1, C to read as follows: “Procure meter from local utility, and pay associated costs and fees. Coordinate installation with the utility. Facilitate owner contact with the utility for billing arrangements.”
29. SECTION 235216, CONDENSING BOILERS
a. Paragraph 2.1: Delete paragraphs A, B, and C.
b. Add paragraph 2.1, A to read as follows: “Boiler shall be Lockinvar Knight. No exceptions.”
c. Paragraph 2.4, A: Replace current paragraph in its entirety with the following: “A. Provide
Lonworks interface with license, and interface with Government‟s DDC system to provide remote monitoring and control of all system parameters, and as described in the sequence of operation.”
30. SECTION 237202, AIR‐TO‐AIR ENERGY RECOVERY EQUIPMENT
b. Add paragraph 1.3, B, 1 to read as follows: “Division 23 Section “Commissioning of Building
Systems.””
c. Add paragraph 3.4, F to read as follows: “Coordinate with requirements of Division 23 Section
31. SECTION 237413, PACKAGED, OUTDOOR, CENTRAL‐STATION AIR‐HANDLING UNITS
a. Part 2: Add paragraph 2.12 PACKAGED DX ROOFTOP UNITS.
b. Add paragraph 2.12, A to read as follows: “Packaged DX rooftop units shall be R407 or R410a, full economizer, Min 13 nominal EER.”
32. SECTION 238130, VARIABLE REFRIGERANT FLOW HEAT PUMP SYSTEM
a. Add paragraph 3.1, D to read as follows: “Refrigerant detection system shall be installed and tested prior to charging VRF system.”
33. SECTION 260923, LIGHTING CONTROL DEVICES
a. Add paragraph 1.3, B, 3 to read as follows: “Division 23 Section “Commissioning of Building
Systems.””
b. Add paragraph 3.5, D to read as follows: “Coordinate with requirements of Division 23 Section
34. SECTION 260936.19, STANDALONE MULTIPRESET MODULAR DIMMING
b. Add paragraph 1.3, B, 3 to read as follows: “Division 23 Section “Commissioning of Building
Systems.””
c. Add paragraph 3.4, F to read as follows: “Coordinate with requirements of Division 23 Section
35. SECTION 260943, NETWORK LIGHTING CONTROLS
a. Add paragraph 1.3, B, 2 to read as follows: “Division 23 Section “Commissioning of Building
Systems.””
b. Paragraph 2.1, A:
i. Delete “or comparable product by one of the following:” and the list of manufacturers.
ii. Add “No exceptions.” after “Encilium ECS Addressable Lighting Control and Management
System.”
c. Add Paragraph 3.3, E to read as follows: “Coordinate with requirements of Division 23 Section
36. SECTION 262713, ELECTRICITY METERING
a. Paragraph 2.1, A, 1: Change to read “Accuenergy Acuvim IIE.”
37. SECTION 265100, INTERIOR LIGHTING
a. Paragraph 2.6, B: Change color temperature from “4100K” to “3500K.”
DRAWINGS
1. SHEET L102, LANDSCAPE DEVELOPMENT PLAN
a. Clarification: Keynote 13 is typical of the ten trees (five each side) that border the northerly and southerly sides of the walkways between the building and the parking area.
2. SHEET C001, CIVIL LEGEND, NOTES AND ABBREVIATIONS
a. Civil Note 7: Delete note in its entirety. (Government to coordinate with Amerigas.)
b. Civil Note 9: Change note to read: “THE PROJECT WILL REQUIRE REMOVAL AND DISPOSAL OF
BURIED HIGH TEMPERATURE HOT WATER PIPING AND BURIED WATER PIPING. BASE BID ON
BURIED HIGH TEMPERATURE HOT WATER PIPE INSULATION CONTAINING ASBESTOS AND
BURIED WATER PIPING BEING TRANSITE (CONTAINING ASBESTOS). TEST FOR ASBESTOS
CONTAINING MATERIALS ON BURIED HIGH TEMPERATURE HOT WATER PIPE INSULATION AND
BURIED WATER PIPING AND PROVIDE A CREDIT TO THE GOVERNMENT IF ASBESTOS
CONTAINING MATERIAL IS NOT PRESENT ON ONE OR BOTH PIPING SYSTEM. REMOVAL AND
DISPOSAL OF ASBESTOS CONTAINING MATERIAL (IF REQUIRED) SHALL BE PERFORMED BY A
NEW HAMPSHIRE LICENSED ASBESTOS ABATEMENT CONTRACTOR.”
3. SHEET CD101, REMOVALS SITE PLAN
a. Keynote 7: Add the following sentence to the end of the keynote: “TURN SALVAGED TRANSFORMER OVER
TO GOVERNMENT.”
b. Keynote 9: Change keynote to read: “REMOVE EXISTING UNDERGROUND PROPANE PIPING.”
c. Keynote 28: Change keynote to read: “REMOVE EXISTING ABANDONED TELEPHONE CABLES.
SEE SITE DEMOLITION NOTE 5, THIS SHEET.”
d. Site Demolition Note 5: Change note to read: “THREE EXISTING ABANDONED TELEPHONE
CABLES RUN THROUGH THE STORM DRAIN BETWEEN EXISTING CATCH BASINS ECB14 AND
ECB15.”
e. See attached Sketch AD‐C1 for additional site removals.
4. SHEET CU101, SITE UTILITY PLAN
a. See attached Sketch AD‐C2 for additional site utilities.
b. Utility Note 1: Change note to read: “THE LINE LABELED “EUG” HAS BEEN INSTALLED IN
APPROXIMATELY THE LOCATION INDICATED. SEE CIVIL NOTE 8, SHEET C001.”
5. SHEET C506, SITE DETAILS
a. Detail 4: Add the following note: “PROVIDE THERMOSTATIC CONTROL FOR BLOCK HEATER
OUTLETS.”
6. SHEET SB501, FOUNDATION DETAILS
a. Detail 2: Add the following note: “OUTSTANDING LEGS OF VERTICAL REINFORCING TO BE
ALTERNATED AT FOOTING.”
b. Detail 6: Add the following notes:
i. “PROVIDE 13mm [1/2”] PREFORMED FILLER AND SEALANT BETWEEN SLAB AT
ELEVATION OF 30.30M [99.50‟] AND CONCRETE FOUNDATION WALL.”
ii. “VAPOR RETARDER AND COMPACTED DRAINAGE FILL TO BE PROVIDED UNDER SLAB
AT ELEVATION OF 30.30M [99.50‟].”
7. SHEET SB502, FOUNDATION DETAILS
a. Detail 6: Delete foundation drain to the left of 356mm [1‟‐2”] foundation wall.
8. SHEET SB503, FOUNDATION DETAILS
a. Detail 3: Add “AND SEALANT” after “FILLER” in the note “13mm [1/2”] PREFORMED FILLER
(TYP).”
9. SHEET SF205, BRACING CONNECTION SCHEDULE AND DETAILS
a. Detail 3: Add the following note: “FILLET WELD COLUMN TO PLATE ON BOTH SIDES.”
10. SHEET AE120, ROOF PLAN
a. Detail 1: Change “INSTALL „GOLF BALL‟ ANTENNA” to “REMOVE AND SALVAGE „GOLF BALL‟
ANTENNA FROM THE ROOF OF BUILDING 157, (APPROXIMATELY 200M [218 YARDS] TO THE
NORTH OF SITE). INSTALL SALVAGED „GOLF BALL‟ ANTENNA”.
11. SHEET AE622, WINDOW DETAILS
a. Delete sheet. Replace with Sheet AE622R, WINDOW DETAILS. Throughout drawing set change references from “AE622” to “AE622R”.
12. SHEET M001, MECHANICAL LEGENDS AND ABBREVIATIONS
a. Mechanical Symbols Legend: At five‐sided refrigerant detection zone symbol, change detail reference from “5/M501” to “9/M501.”
13. SHEET M002, MECHANICAL SYSTEM SCHEMATIC
a. Detail 1:
i. Change “FCU‐42A” to FCU 1‐42A.”
ii. Change “FCU‐42B” to “FCU 1‐42B.”
iii. Change “FCU‐42C” to “FCU 1‐42C.”
iv. Change FCU 1‐42A, B, and C from Heat pump terminal units to Fan coil units with compressor and integral refrigerant reheat.
14. SHEET MH102, FIRST FLOOR MECHANICAL DUCTWORK PLAN NORTH
i. At south end of Corridor 109, change “CAR‐D” to “FRD‐1 to CAR‐C for 25 LPS flow.”
ii. At the north end of Corridor 109, add a CAR‐C to the supply duct to FRD‐1.
15. SHEET MP101, FIRST FLOOR MECHANICAL PIPING PLAN SOUTH
a. Detail 1: Vestibule 101, delete one (1) condensate drain from FCU 1‐40.
16. SHEET M601, MECHANICAL SCHEDULES (SHEET 1 OF 2)
a. Pump Schedule: Change Total Pressure of units P‐B1 & B2 from “70 (25)” to “62 (20).”
b. Gas Boiler Schedule:
i. Lochinvar boilers shall be provided; No substitutions.
ii. Change Net I‐BR rating scheduled value from “590 (493)” to “145 (493).”
iii. Change Flue Size from “150(4)” to “100(4).”
iv. Change LPS Water Flow from “2.9(40)” to “2.5(40).”
17. SHEET M602, MECHANICAL SCHEDULES (SHEET 2 OF 2)
a. Split Ductless Heat Pump Terminal Unit (FCU) Schedule: Change CU designation of FCU 2‐11 from “CU‐1” to “CU‐5.”
b. Delete drawing note 1.
18. SHEETS P102, UNDERSLAB PLUMBING PLAN – NORTH and P104, FIRST FLOOR PLUMBING PLAN
NORTH
a. Add indirect waste, vent and access door for AC 1‐3 at Kitchen Store (Room 131).
19. SHEET M401, RADIANT FLOOR PART PLANS AND DETAILS
a. Detail 1: Delete the note regarding Radiant Heat Control.
20. SHEET M502, MECHANICAL DETAILS
a. Detail 1: Change detail reference from “4/M401” to “3/M401.”
b. Delete detail 11. For housekeeping pad, refer to sheet SB502, Detail 3.
21. SHEET M702, MECHANICAL CONTROL SEQUENCES
a. Detail 2: Revise Briefing Room Controls per Addenda Sketch AD‐M3.
22. SHEET M703, MECHANICAL CONTROL SEQUENCES
i. Revise Boiler Controls per Addenda Sketch AD‐M1.
ii. Other DDC Points: Add connection to Fire Alarm system, and note, “SHUT DOWN AIR
HANDLING EQUIPMENT, EXCEPT PAC‐1, IF FIRE ALARM IS ACTIVATED.” Applies also to systems shown on other M700 series sheets.
23. SHEET P108, PLUMBING PLANS AND SCHEDULES AFE WING
a. HW Temperature Maintenance Schedule: Change temperature from “49 [120]” to “46 [115].”
24. SHEET P403, ENLARGED PLUMBING PART PLANS
a. Drawing Note 1: Change “120 DEGREES F” to “46 DEGREES C (115 DEGREES F).”
25. SHEET P601, PLUMBING SCHEDULES
a. Mixing Valve Schedule: Change supply temperature from “49 [120]” to “46 [115].”
b. Solar Thermal Panel Schedule and Solar Heat Dissipating Schedule: Solar Panels Plus (SPP) system shall be provided; No substitutions.
26. SHEET P501, PLUMBING DETAILS
a. Detail 3: Change “REMOTE WATER METER READER” to “RADIO REMOTE METER READER, INTERFACE WITH DDC BUILDING CONTROLS SYSTEM.” Associated DDC point is shown on
Addenda Sketch AD‐M1.
b. Detail 7: Add BTU meter to solar supply/return piping upstream of first 3‐way valve. Refer to
Addenda Sketch AD‐M2 for location and associated controls requirements.
27. SHEET P702, PLUMBING RISER DIAGRAMS
a. Detail 1: Change “CAP OR PROVIDE UNDER BID OPTION 1 250 CFH” to “AFE WING CONNECTED
LOAD – 250 CFH.”
b. Detail 2: Change note at 3/P702 reference bubble from “FOR BID OPTION 1 REFER TO” to “AFE
WING, CONTINUED ON.”
c. Detail 3: Rename to “AFE WING SCHEMATIC PIPING DIAGRAM.”
28. SHEET P704, PLUMBING RISER DIAGRAMS
a. Detail 2: Add “‐AFE WING” to the title after “DIAGRAM.”
29. SHEET E001, ELECTRICAL SYMBOLS, ABBREVIATIONS, AND GEN NOTES
a. Electrical Symbols, Fire Alarm/Mass Notification Legend: Add “(RECESSED)” to the end of
“LOCAL OPERATIONS CONSOLE.”
30. SHEET EP101, FIRST FLOOR POWER PLANS – SOUTH
i. Briefing Room (Room 127): Move the quad receptacle on the south wall behind the front podium into the podium. Add Keynote 23.
ii. ARS (Room 134): Change the duplex receptacle on the west side of the western‐most systems furniture workstation to a quad receptacle.
b. Detail 3: Delete the “G” from the receptacle served by circuit EL1A‐3.
31. SHEET EP102, FIRST FLOOR POWER PLAN ‐ NORTH
a. Drawing Keynotes: Add Keynote 16 to read as follows: “PROVIDE POWER TO FIRE ALARM BELL.
COORDINATE WITH MECHANICAL TRADE.”
b. Keynote 7: Add “GOVERNMENT PROVIDED” between “WITH” and “DOCUMENT.” Delete final
“PROVIDED.”
c. Detail 1:
i. Battle Staff ICC (Room 171): Move the “R” receptacle on the east wall to the north.
Coordinate exact location with SIPRNET jack on sheet ET102.
ii. Intel Brief (Room 151):
1) West wall, delete two (2) center quad receptacles from circuit PL1C‐26. Add two (2) quad receptacles to circuit ER‐16. The two quad receptacles on circuit ER‐16 shall be red.
2) Delete the northern‐most floor quad receptacle from circuit PL1C‐52. Add floor quad receptacle to circuit ER‐16. The quad receptacle on circuit ER‐16 shall be red.
3) Add a duplex receptacle on north wall, adjacent to the SIPRNET outlet (refer to sheet ET102). Receptacle shall be part of circuit ER‐16. Receptacle shall be red.
iii. Above room 159, provide 120 volt connection for dryer booster plan, P/O circuit PL1C‐
11.
iv. Logistics (Room 164):
1) Shift the two (2) duplex receptacles in the systems furniture workstations on the east wall to the north, to coordinate with the two chair locations shown.
2) At the two systems furniture workstations on the west wall, move the duplex receptacles from the north panel to the west panel and move the quad receptacles from the west panel to the south panel.
v. Crew Comm (Room 165): Add keynote 15 to the floor mounted quad receptacle.
vi. Office (Room 166A): Move the duplex receptacle on the east wall to the south wall.
Coordinate exact location with NIPRNET jack on sheet ET102.
vii. Tactics (Room 167): Add two (2) duplex receptacles to the north wall and two (2) duplex receptacles to the west wall. Receptacles shall be red. Circuit the four (4) receptacles to ER‐20. Coordinate exact location with SIPRNET jacks on Sheet ET102.
viii. Stair (003): Delete receptacle and conduit/wiring between it and the receptacle in
Corridor (107).
d. Detail 2: Add a junction box on the west wall with homerun “EL1B‐8.” Add Keynote 16 at the junction box location
32. SHEET EP103, SECOND FLOOR POWER PLAN
i. Wait (Room 217): Add a floor mounted quad receptacle with Keynote 3. Add to circuit
PL2A‐34. Coordinate exact location with Contracting Officer.
ii. Conf (Room 229): Delete one (1) floor mounted quad receptacle and associated
Keynote 3. Relocate remaining floor mounted quad receptacle at the center of the table. Change the associated Keynote from “3” to “11.”
iii. ARMS (Room 235): Delete duplex receptacle on south wall and associated homerun
“PL2B‐36.”
iv. Flight Training (Room 231): Change homerun “PL2B‐34” serving four (4) duplex receptacles on north wall to “PL2B‐47.”
33. SHEET EP104, ROOF POWER PLAN
a. Keynote 3: Change each instance of “REINSTALL” to “REMOVE AND SALVAGE, AND INSTALL
SALVAGED.”
34. SHEET EP105, FIRST FLOOR POWER AND ROOF PLANS AFE WING
a. Detail 1, Loading Dock (Room A117): Shift “WP” duplex receptacle to the west, to just west of the overhead door.
35. SHEET EP602, PANELBOARD SCHEDULES
a. Panelboard Schedule EL1B, Circuit 8: Change description to “FIRE ALARM BELL.”
b. Panelboard Schedule ER:
i. Circuit 20: Change description to “REC‐RM 167.” Amperage shall be 6.
ii. Circuit 16: Change description to read “REC‐RM 151.” Amperage shall be 10.5.
c. Panelboard Schedule PL1C:
i. Circuit 26: Change amperage to 6.
ii. Circuit 52: Change amperage to 3.
36. SHEET EP603, PANELBOARD SCHEDULES
a. Panelboard Schedule EH1A, Circuit 6: Remove “(OPTION 1)” from description.
37. SHEET EP604, PANELBOARD SCHEDULES
a. Panelboard Schedule PL2A, Circuit 32: Change amperage to 7.5.
b. Panelboard Schedule PL2A, Circuit 34: Change amperage to 10.5.
38. SHEET EL101, FIRST FLOOR LIGHTING PLAN – SOUTH
a. Detail 1, STOR (Room 124): Change room name to “GREEN ROOM.”
39. SHEET EL102, FIRST FLOOR LIGHTING PLAN – NORTH
a. Drawing Keynote 5: Change keynote to read as follows: “EXISTING SSU WITH BACNET
INTERFACE. SSU SHALL BE CONNECTED TO ECU VIA BAS NETWORK.”
40. SHEET ET102, FIRST FLOOR TECHNOLOGY PLAN – NORTH
i. Intel Brief (Room 151): Change the four (4) NIPRNET outlets on the west wall to SIPRNET outlets.
ii. Tactics (Room 167): Add two (2) SIPRNET outlets on the north wall, and two (2) SIPRNET outlets on the west wall. Coordinate exact locations with systems furniture layout.
41. SHEET ET103, SECOND FLOOR TECHNOLOGY PLAN
a. Detail 1, Wait (Room 217): Add one (1) Core 1 outlet in a floor box with Keynote 2. Coordinate exact location with Contracting Officer.
42. SHEET EY103, FIRST FLOOR SECURITY PLAN – AFE WING
a. Detail 1: Delete motion sensors EXCEPT the one in Weapons/AMMO (Room A116).
43. SHEET FA102, FIRST FLOOR FIRE ALARM PLAN – NORTH
a. Detail 1: Mech Room (Room 141): Add HVAC control panel and RDP‐1 on east wall.
44. SHEET FA501, FIRE ALARM RISER DIAGRAM
a. Drawing Notes: Add note 4 to read as follows: “PROVIDE POWER TO FIRE ALARM BELL. REFER
TO SHEET EP102.”
End.
AMENDMENT U0001 ATTACHMENTS
ATTACHED REVISED DRAWINGS AND SKETCHES
1. Sheet AE622R
2. Sketch AD ‐C1
3. Sketch AD ‐C2
4. Sketch AD ‐M1
5. Sketch AD ‐M2
6. Sketch AD ‐M3
7. Sketch AD ‐M4
RFI ANSWERS #01
1) Specification Section, Part I, Statement of Work, Section IV, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, Item (c) states completion time in 356 Calendar Days. Form
1442, block 10 states 485 days. Please confirm completion time is 485 calendar days.
Answer:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 485 calendar days after notice to proceed, to include inspection and punch listed items. The time stated for completion shall include final cleanup of the premises.
**Note**
Period of Performance is 485 days total. This is a change and overrides the Period of Performance stated in the
Specification Part I, Statement of Work (IV)(A) which states ¯complete the entire work ready for use not later than
365 calendar days‖. This will now read: 485 calendar days. There will be two phases to this project. There will be two Notices to Proceed (NTP) letters issued; the first NTP will include demolition of the building and all critical submittals to be submitted and approved and the second NTP will include the construction phase of the project.
***Construction of the new building will not be approved to start until the work listed in the first NTP is complete.
2) Letters of Performance Evaluation, Exhibit C1, states “arrive NOT LATER THAN MARCH 23, 2011”. However, Page 16 of 62 of Solicitation, Section 3.4.3.10 states” no later than closing date”. Please confirm performance letters should be due same as bid date.
Answer:
Change Letters of Performance Evaluation, Exhibit C1 from: “arrive NOT LATER THAN MARCH 23, 2011” to: “no later than closing date”. A new C1 with the above information will be uploaded to Federal
Business Opportunities on March 18, 2011
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization has changed from
FA6291 NEW HAMPSHIRE AIR NATIONAL GUARD
157 MSG/MSC, BLDG 145, RM 213
PEASE ANG BASE
302 NEWMARKET ST
NEWINGTON NH 03803-0157
to
FA6291 NEW HAMPSHIRE AIR NATIONAL GUARD
NGNH-PFO-PC JOINT CONTRACTING
302 NEWMARKET ST
PEASE ANGB
NEWINGTON NH 03803-0157
(End of Summary of Changes)