018113. 13 LEEDChecklist.pdf
PDF 45 KB Posted
- Attached to
- Replace Squadron Operations Facility
- Solicitation number
- W912TF-11-R-0502
About this file
LEED Checklist
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEED for New Construction v 2.2 Registered Project Checklist
Last Modified: May 2008 1 of 4
Project Name:
Project Address:
Project Totals (Pre-Certification Estimates) 69 Points Yes ? No
Certified: 26-32 points Silver: 33-38 points Gold: 39-51 points Platinum: 52-69 points
Sustainable Sites 14 Points Yes ? No
Yes Prereq 1
Credit 1
Credit 2
Credit 3
Credit 4.1
Credit 4.2
Credit 4.3
Credit 4.4
Credit 5.1
Credit 5.2
Credit 6.1
Credit 6.2
Credit 7.1
Credit 7.2
Credit 8
Alternative Transportation, Low-Emitting & Fuel Efficient Vehicles 1
Required
Construction Activity Pollution Prevention
Site Selection
Development Density & Community Connectivity
Brownfield Redevelopment
Alternative Transportation, Public Transportation
Alternative Transportation, Bicycle Storage & Changing Rooms
Alternative Transportation, Parking Capacity
Site Development, Protect or Restore Habitat
Site Development, Maximize Open Space
Stormwater Design, Quantity Control
Stormwater Design, Quality Control
Heat Island Effect, Non-Roof
Heat Island Effect, Roof
Light Pollution Reduction
Water Efficiency 5 Points Yes ? No
Credit 1.1
Credit 1.2
Credit 2
Credit 3.1
Credit 3.2 1
1Water Efficient Landscaping, Reduce by 50%
Water Efficient Landscaping, No Potable Use or No Irrigation
Innovative Wastewater Technologies
Water Use Reduction, 20% Reduction
Water Use Reduction, 30% Reduction
Replace Squadron Operations Facilities
Pease Air National Guard Base, Newington, New Hampshire
45 1 23
GOLD
11 0 3
1 0 0
00 1
00 1
00 1
01 0
01 0
01 0
01 0
01 0
01 0
01 0
01 0
01 0
01 0
4 0 1
1 0 0
01 0
00 1
01 0
Last Modified: May 2008 2 of 4
Energy & Atmosphere 17 Points Yes ? No
Yes Prereq 1
Credit 1
Credit 2
Credit 3
Credit 4
Credit 5
Credit 6 Green Power 1
1 to 3
1 to 10
RequiredFundamental Commissioning of the Building Energy Systems
Optimize Energy Performance
On-Site Renewable Energy
Enhanced Commissioning
Enhanced Refrigerant Management
Measurement & Verification
Yes Prereq 1 RequiredMinimum Energy Performance
Yes Prereq 1 RequiredFundamental Refrigerant Management
*Note for EAc1: All LEED for New Construction projects registered after June 26, 2007 are required to achieve at least two (2) points.
10.5% New Buildings / 3.5% Existing Building Renovations
14% New Buildings / 7% Existing Building Renovations
17.5% New Buildings / 10.5% Existing Building Renovations
21% New Buildings / 14% Existing Building Renovations
24.5% New Buildings / 17.5% Existing Building Renovations
28% New Buildings / 21% Existing Building Renovations
31.5% New Buildings / 24.5% Existing Building Renovations
35% New Buildings / 28% Existing Building Renovations
38.5% New Buildings / 31.5% Existing Building Renovations
42% New Buildings / 35% Existing Building Renovations
2.5% Renewable Energy
7.5% Renewable Energy
12.5% Renewable Energy 3
1Credit 2.1
Credit 2.2
Credit 2.3
Credit 1.1
Credit 1.2
Credit 1.3
Credit 1.4
Credit 1.5
Credit 1.6
Credit 1.7
Credit 1.8
Credit 1.9
Credit 1.10
11 0 6
01 0
00 1
01 0
00 1
0 1
Last Modified: May 2008 3 of 4
Materials & Resources 13 Points Yes ? No
Yes Prereq 1
Credit 1.1
Credit 1.2
Credit 1.3
Credit 2.1
Credit 2.2
Credit 3.1
Credit 3.2
Credit 4.1
Credit 4.2
Credit 5.1
Credit 5.2
Credit 6
Credit 7
Materials Reuse, 5% 1
Required
Storage & Collection of Recyclables
Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
Building Reuse, Maintain 95% of Existing Walls, Floors & Roof
Building Reuse, Maintain 50% of Interior Non-Structural Elements
Construction Waste Management, Divert 50% from Disposal
Construction Waste Management, Divert 75% from Disposal
Materials Reuse, 10%
Recycled Content, 10% (post-consumer + 1/2 pre-consumer)
Recycled Content, 20% (post-consumer + 1/2 pre-consumer)
Regional Materials, 10% Extracted, Processed & Manufactured
Regional Materials, 20% Extracted, Processed & Manufactured
Rapidly Renewable Materials
Certified Wood
Indoor Environmental Quality 15 Points Yes ? No
Yes Prereq 1
Credit 1
Credit 2
Credit 3.1
Credit 3.2
Credit 4.1
Credit 4.2
Credit 4.3
Credit 4.4
Credit 5
Credit 6.1
Credit 6.2
Credit 7.1
Credit 7.2
Credit 8.1
Low-Emitting Materials, Paints & Coatings 1
Required
Minimum IAQ Performance
Outdoor Air Delivery Monitoring
Increased Ventilation
Construction IAQ Management Plan, During Construction
Construction IAQ Management Plan, Before Occupancy
Low-Emitting Materials, Adhesives & Sealants
Low-Emitting Materials, Carpet Systems
Low-Emitting Materials, Composite Wood & Agrifiber Products
Indoor Chemical & Pollutant Source Control
Controllability of Systems, Lighting
Controllability of Systems, Thermal Comfort
Thermal Comfort, Design
Thermal Comfort, Verification
Daylight & Views, Daylight 75% of Spaces
Yes Prereq 2 RequiredEnvironmental Tobacco Smoke (ETS) Control
Credit 8.2 1Daylight & Views, Views for 90% of Spaces
6 0 7
0 0 1
00 1
00 1
01 0
01 0
00 1
00 1
01 0
01 0
01 0
00 1
00 1
01 0
10 0 5
0 0 1
00 1
01 0
01 0
01 0
01 0
01 0
01 0
01 0
01 0
00 1
00 1
00 1
Last Modified: May 2008 4 of 4
Innovation & Design Process 5 Points Yes ? No
Credit 1.1
Credit 1.2
Credit 1.3
Credit 1.4
Credit 2 1
LEED® Accredited Professional
Innovation in Design:
Innovation in Design:
Innovation in Design:
Innovation in Design:
3 1 1
1 0 0
01 0
10 0
00 1
01 0
Provide Specific Title
Provide Specific Title
Provide Specific Title
Provide Specific Title
File details come from the government source that posted it. Updated .