018113. 13 LEEDChecklist.pdf

PDF 45 KB Posted

Attached to
Replace Squadron Operations Facility
Solicitation number
W912TF-11-R-0502
Issued by

About this file

LEED Checklist

View the file

Other files

File Type Posted
W912TF-11-R-0502 U0008.pdf PDF
W912TF-11-R-0502 U0007.pdf PDF
W912TF-11-R-0502 U0006.pdf PDF
W912TF-11-R-0502 U0005.pdf PDF
IF102.dwg DWG drawing
IF502.dwg DWG drawing
IF201.dwg DWG drawing
IF501.dwg DWG drawing
IF601.dwg DWG drawing
IF001.dwg DWG drawing
IF101.dwg DWG drawing
IF103.dwg DWG drawing
IF503.dwg DWG drawing
W912TF-11-R-0502 U0004.pdf PDF
RFI 4.11.2011.pdf PDF
AD-A2.pdf PDF
AD-M5.pdf PDF
W912TF-11-R-0502 U0003.pdf PDF
AD-A1.pdf PDF
W912TF-11-R-0502 U0002.pdf PDF
AD-S1.pdf PDF
Furniture CAD Files.zip ZIP file
QUESTIONS RECEIVED AS OF 0900 3.24.2011.pdf PDF
SBTeamingArrangements.ppt PPT presentation
Preproposal conference March 2011.ppt PPT presentation
Joint Ventures and SB Teaming.pdf PDF
W912TF-11-R-0502 BUISNESS CARDS PART 1.pdf PDF
W912TF-11-R-0502 SITE VIST BUISNESS CARDS PART 2.pdf PDF
W912TF-11-R-0502 SITE VISIT SIGN IN SHEETS.pdf PDF
W912TF-11-R-0502 U0001.pdf PDF
Amendment U0001 Drawings.pdf PDF
W912TF-11-R-0502 RFI No. 01.pdf PDF
Exhibit C REVISED MARCH 18 2011.docx DOCX document
Drawings Dated 08 Dec 2010 Part One.pdf PDF
Drawings Dated 08 Dec 2010 Part Two.pdf PDF
024116 FL - STRUCTURE DEMOLITION BLDG 259 HAZMAT REPORT.pdf PDF
SpecsSBD120810.pdf PDF
Exhibit B SSS Feb 11.docx DOCX document
W912TF-11-R-0502.pdf PDF
Exhibit A SSS Jan 11.docx DOCX document
Exhibit C SSS Feb 11.docx DOCX document
Exhibit D and F Feb 11.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED for New Construction v 2.2 Registered Project Checklist

Last Modified: May 2008 1 of 4

Project Name:

Project Address:

Project Totals (Pre-Certification Estimates) 69 Points Yes ? No

Certified: 26-32 points Silver: 33-38 points Gold: 39-51 points Platinum: 52-69 points

Sustainable Sites 14 Points Yes ? No

Yes Prereq 1

Credit 1

Credit 2

Credit 3

Credit 4.1

Credit 4.2

Credit 4.3

Credit 4.4

Credit 5.1

Credit 5.2

Credit 6.1

Credit 6.2

Credit 7.1

Credit 7.2

Credit 8

Alternative Transportation, Low-Emitting & Fuel Efficient Vehicles 1

Required

Construction Activity Pollution Prevention

Site Selection

Development Density & Community Connectivity

Brownfield Redevelopment

Alternative Transportation, Public Transportation

Alternative Transportation, Bicycle Storage & Changing Rooms

Alternative Transportation, Parking Capacity

Site Development, Protect or Restore Habitat

Site Development, Maximize Open Space

Stormwater Design, Quantity Control

Stormwater Design, Quality Control

Heat Island Effect, Non-Roof

Heat Island Effect, Roof

Light Pollution Reduction

Water Efficiency 5 Points Yes ? No

Credit 1.1

Credit 1.2

Credit 2

Credit 3.1

Credit 3.2 1

1Water Efficient Landscaping, Reduce by 50%

Water Efficient Landscaping, No Potable Use or No Irrigation

Innovative Wastewater Technologies

Water Use Reduction, 20% Reduction

Water Use Reduction, 30% Reduction

Replace Squadron Operations Facilities

Pease Air National Guard Base, Newington, New Hampshire

45 1 23

GOLD

11 0 3

1 0 0

00 1

00 1

00 1

01 0

01 0

01 0

01 0

01 0

01 0

01 0

01 0

01 0

01 0

4 0 1

1 0 0

01 0

00 1

01 0

Last Modified: May 2008 2 of 4

Energy & Atmosphere 17 Points Yes ? No

Yes Prereq 1

Credit 1

Credit 2

Credit 3

Credit 4

Credit 5

Credit 6 Green Power 1

1 to 3

1 to 10

RequiredFundamental Commissioning of the Building Energy Systems

Optimize Energy Performance

On-Site Renewable Energy

Enhanced Commissioning

Enhanced Refrigerant Management

Measurement & Verification

Yes Prereq 1 RequiredMinimum Energy Performance

Yes Prereq 1 RequiredFundamental Refrigerant Management

*Note for EAc1: All LEED for New Construction projects registered after June 26, 2007 are required to achieve at least two (2) points.

10.5% New Buildings / 3.5% Existing Building Renovations

14% New Buildings / 7% Existing Building Renovations

17.5% New Buildings / 10.5% Existing Building Renovations

21% New Buildings / 14% Existing Building Renovations

24.5% New Buildings / 17.5% Existing Building Renovations

28% New Buildings / 21% Existing Building Renovations

31.5% New Buildings / 24.5% Existing Building Renovations

35% New Buildings / 28% Existing Building Renovations

38.5% New Buildings / 31.5% Existing Building Renovations

42% New Buildings / 35% Existing Building Renovations

2.5% Renewable Energy

7.5% Renewable Energy

12.5% Renewable Energy 3

1Credit 2.1

Credit 2.2

Credit 2.3

Credit 1.1

Credit 1.2

Credit 1.3

Credit 1.4

Credit 1.5

Credit 1.6

Credit 1.7

Credit 1.8

Credit 1.9

Credit 1.10

11 0 6

01 0

00 1

01 0

00 1

0 1

Last Modified: May 2008 3 of 4

Materials & Resources 13 Points Yes ? No

Yes Prereq 1

Credit 1.1

Credit 1.2

Credit 1.3

Credit 2.1

Credit 2.2

Credit 3.1

Credit 3.2

Credit 4.1

Credit 4.2

Credit 5.1

Credit 5.2

Credit 6

Credit 7

Materials Reuse, 5% 1

Required

Storage & Collection of Recyclables

Building Reuse, Maintain 75% of Existing Walls, Floors & Roof

Building Reuse, Maintain 95% of Existing Walls, Floors & Roof

Building Reuse, Maintain 50% of Interior Non-Structural Elements

Construction Waste Management, Divert 50% from Disposal

Construction Waste Management, Divert 75% from Disposal

Materials Reuse, 10%

Recycled Content, 10% (post-consumer + 1/2 pre-consumer)

Recycled Content, 20% (post-consumer + 1/2 pre-consumer)

Regional Materials, 10% Extracted, Processed & Manufactured

Regional Materials, 20% Extracted, Processed & Manufactured

Rapidly Renewable Materials

Certified Wood

Indoor Environmental Quality 15 Points Yes ? No

Yes Prereq 1

Credit 1

Credit 2

Credit 3.1

Credit 3.2

Credit 4.1

Credit 4.2

Credit 4.3

Credit 4.4

Credit 5

Credit 6.1

Credit 6.2

Credit 7.1

Credit 7.2

Credit 8.1

Low-Emitting Materials, Paints & Coatings 1

Required

Minimum IAQ Performance

Outdoor Air Delivery Monitoring

Increased Ventilation

Construction IAQ Management Plan, During Construction

Construction IAQ Management Plan, Before Occupancy

Low-Emitting Materials, Adhesives & Sealants

Low-Emitting Materials, Carpet Systems

Low-Emitting Materials, Composite Wood & Agrifiber Products

Indoor Chemical & Pollutant Source Control

Controllability of Systems, Lighting

Controllability of Systems, Thermal Comfort

Thermal Comfort, Design

Thermal Comfort, Verification

Daylight & Views, Daylight 75% of Spaces

Yes Prereq 2 RequiredEnvironmental Tobacco Smoke (ETS) Control

Credit 8.2 1Daylight & Views, Views for 90% of Spaces

6 0 7

0 0 1

00 1

00 1

01 0

01 0

00 1

00 1

01 0

01 0

01 0

00 1

00 1

01 0

10 0 5

0 0 1

00 1

01 0

01 0

01 0

01 0

01 0

01 0

01 0

01 0

00 1

00 1

00 1

Last Modified: May 2008 4 of 4

Innovation & Design Process 5 Points Yes ? No

Credit 1.1

Credit 1.2

Credit 1.3

Credit 1.4

Credit 2 1

LEED® Accredited Professional

Innovation in Design:

Innovation in Design:

Innovation in Design:

Innovation in Design:

3 1 1

1 0 0

01 0

10 0

00 1

01 0

Provide Specific Title

Provide Specific Title

Provide Specific Title

Provide Specific Title

File details come from the government source that posted it. Updated .