W912TF-11-R-0502 RFI No. 01.pdf

PDF 121 KB Posted

Attached to
Replace Squadron Operations Facility
Solicitation number
W912TF-11-R-0502
Issued by

About this file

RFI 1 Answered.

View the file

Other files

File Type Posted
W912TF-11-R-0502 U0008.pdf PDF
W912TF-11-R-0502 U0007.pdf PDF
W912TF-11-R-0502 U0006.pdf PDF
W912TF-11-R-0502 U0005.pdf PDF
IF102.dwg DWG drawing
IF502.dwg DWG drawing
IF201.dwg DWG drawing
IF501.dwg DWG drawing
IF601.dwg DWG drawing
IF001.dwg DWG drawing
IF101.dwg DWG drawing
IF103.dwg DWG drawing
IF503.dwg DWG drawing
W912TF-11-R-0502 U0004.pdf PDF
RFI 4.11.2011.pdf PDF
AD-A2.pdf PDF
AD-M5.pdf PDF
W912TF-11-R-0502 U0003.pdf PDF
AD-A1.pdf PDF
W912TF-11-R-0502 U0002.pdf PDF
AD-S1.pdf PDF
Furniture CAD Files.zip ZIP file
QUESTIONS RECEIVED AS OF 0900 3.24.2011.pdf PDF
SBTeamingArrangements.ppt PPT presentation
Preproposal conference March 2011.ppt PPT presentation
Joint Ventures and SB Teaming.pdf PDF
W912TF-11-R-0502 BUISNESS CARDS PART 1.pdf PDF
W912TF-11-R-0502 SITE VIST BUISNESS CARDS PART 2.pdf PDF
W912TF-11-R-0502 SITE VISIT SIGN IN SHEETS.pdf PDF
W912TF-11-R-0502 U0001.pdf PDF
Amendment U0001 Drawings.pdf PDF
Exhibit C REVISED MARCH 18 2011.docx DOCX document
Drawings Dated 08 Dec 2010 Part One.pdf PDF
Drawings Dated 08 Dec 2010 Part Two.pdf PDF
024116 FL - STRUCTURE DEMOLITION BLDG 259 HAZMAT REPORT.pdf PDF
018113. 13 LEEDChecklist.pdf PDF
SpecsSBD120810.pdf PDF
Exhibit B SSS Feb 11.docx DOCX document
W912TF-11-R-0502.pdf PDF
Exhibit A SSS Jan 11.docx DOCX document
Exhibit C SSS Feb 11.docx DOCX document
Exhibit D and F Feb 11.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal Inquiry:

Replace Squadron Operations Facility

Question:

1) Specification Section, Part I, Statement of Work, Section IV, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, Item (c) states completion time in 365 Calendar Days. Form

1442, block 10 states 485 days. Please confirm completion time is 485 calendar days.

Answer:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 485 calendar days after notice to proceed, to include inspection and punch listed items. The time stated for completion shall include final cleanup of the premises.

**Note**

Period of Performance is 485 days total. This is a change and overrides the Period of Performance stated in the

Specification Part I, Statement of Work (IV)(A) which states ―complete the entire work ready for use not later than

365 calendar days‖. This will now read: 485 calendar days. There will be two phases to this project. There will be two Notices to Proceed (NTP) letters issued; the first NTP will include demolition of the building and all critical submittals to be submitted and approved and the second NTP will include the construction phase of the project.

***Construction of the new building will not be approved to start until the work listed in the first NTP is complete.

Question:

2) Letters of Performance Evaluation, Exhibit C1, states “arrive NOT LATER THAN MARCH 23, 2011”. However, Page 16 of 62 of Solicitation, Section 3.4.3.10 states” no later than closing date”. Please confirm performance letters should be due same as bid date.

Answer:

Change Letters of Performance Evaluation, Exhibit C1 from: “arrive NOT LATER THAN MARCH 23, 2011” to: “no later than closing date”. A new C1 with the above information will be uploaded to Federal

Business Opportunities on March 18, 2011.

Page 16 of 62 of Solicitation section 3.4.10 is correct (see below) “Inform references that completed Performance Questionnaire should be returned to the Contracting Officer via email at: scott.ballweg@us.army.mil so as to arrive not later than the closing date for receipt of proposals.

References may also be mailed to 302 Newmarket St, Bldg 145, Joint Contracting Office, Pease ANGB NH 03801-

0157. Offeror must not review the Past Performance Questionnaire prior to submission. They are to be submitted by the client/evaluator directly to the Contracting Officer. Offeror's should follow-up and encourage references to get the questionnaires to the Contracting Officer in a timely manner. “

File details come from the government source that posted it. Updated .