REPLACE SQUADRON OPERATIONS FACILITIES PEASE AIR NATIONAL GUARD BASE PROJECT NO. SZCQ089023 Specifications Dated December 8 2010
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE SQUADRON OPERATIONS FACILITIES
PEASE AIR NATIONAL GUARD BASE
PROJECT NO. SZCQ089023
December 8, 2010
Type B – Submission of Bid Documents
Volume 1 of 2
PREPARED FOR
UNITED STATES PROPERTY AND FISCAL OFFICER
NEW HAMPSHIRE NATIONAL GUARD
CONCORD NH 03301
PREPARED BY:
OAK POINT ASSOCIATES
85 MIDDLE STREET
PORTSMOUTH, NH 03801
NEW HAMPSHIRE AIR NATIONAL GUARD
HEADQUARTERS 157TH AIR REFUELING WING
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
TABLE OF CONTENTS 1
TABLE OF CONTENTS
VOLUME 1 OF 2
C O N T E N T S NO. OF PAGES
COVER PAGE 1
TABLE OF CONTENTS 6
PART I - STATEMENT OF WORK 2
PART II - GENERAL CONDITIONS 11
PART III - SPECIAL PROVISIONS 6
DIVISION 01 - GENERAL REQUIREMENTS
010010 General Errata 1 010100 Fire Protection General Conditions 4 010450 Cutting and Patching 2 011100 Bid Options 2 012010 Project Meetings 2 013000 Submittal Procedures 7 013010 Hazardous Material (HAZMAT) Usage 4 014200 References 12 014510 Contractor Quality Contol 6 017200 Project Record Documents 2 017400 Warranties 1 017490 Construction and Demolition Waste Management 6 017700 Closeout Procedures 2 017810 Operation and Maintenance Manuals 3
018113.13 Sustainable Design Requirements - LEED for New Construction and Major 15 Renovations 019113 General Commissioning Requirements 3
PART IV - TECHNICAL SPECIFICATIONS 1
DIVISION 02 – EXISTING CONDITIONS
024116 Structure Demolition 7
DIVISION 03 – CONCRETE
033000 Cast-In-Place Concrete 25
DIVISION 04 – MASONRY
042000 Masonry 16 042113 Brick Masonry 17 047200 Cast Stone Masonry 7
DIVISION 05 – METALS
051200 Structural Steel Framing 10 052100 Steel Joist Framing 6
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
TABLE OF CONTENTS 2
053100 Steel Decking 7 054000 Cold-Formed Metal Framing 11 055000 Metal Fabrications 9 055100 Metal Stairs 8 055213 Pipe and Tube Railings 11 055300 Metal Gratings 6 057300 Decorative Metal Railings 10
DIVISION 06 - WOOD, PLASTIC, AND COMPOSITES
061053 Miscellaneous Rough Carpentry 8
061600 Sheathing 5 064023 Interior Architectural Woodwork 16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
071326 Self-Adhering Sheet Waterproofing 8 072100 Thermal Insulation 6 072713 Modified Bituminous Sheet Air and Vapor Barriers 10 074213 Wall Panel System 11 075423 Thermoplastic Polyolefin (TPO) Roofing 13 076200 Sheet Metal Flashing and Trim 11 077100 Roof Specialties 7 077200 Roof Accessories 10 078100 Applied Fireproofing 8 078413 Penetration Firestopping 10 078446 Fire-Resistive Joint Systems 8 079200 Joint Sealants 13
DIVISION 08 – OPENINGS
081113 Hollow Metal Doors and Frames 11 081416 Flush Wood Doors 8 086200 Unit Skylights 8 083113 Access Doors and Frames 6 083473 Sound Control Door Assemblies 13 083613 Sectional Doors 11 084113 Aluminum-Framed Entrances and Storefronts 15 084423 Structural-Sealant-Glazed Curtain Walls 13 085113 Aluminum Windows 11 085653 Security Windows 10 087100 Door Hardware 37 088000 Glazing 14 088300 Mirrors 8 089000 Louvers and Vents 8
DIVISION 09 – FINISHES
092116.23 Gypsym Board Shaft Wall Assemblies 7
092216 Non-Structural Metal Framing 8 092900 Gypsum Board 12 093000 Tiling 15 095113 Acoustical Panel Ceilings 10 095123 Acoustical Tile Ceilings 6
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
TABLE OF CONTENTS 3
096400 Wood Flooring 6 096513 Resilient Base and Accessories 7 096517 Resilient Rubber Tile Flooring 7 096566 Resilient Athletic Flooring 6 096813 Tile Carpeting 11 096900 Access Flooring 8 099123 Interior Painting 11 099600 High-Performance Coatings 6
DIVISION 10 – SPECIALTIES
101100 Visual Display Surfaces 7 101400 Signage 9 102113 Toilet Compartments 6 102213 Wire Mesh Partitions 8 102219 Demountable Partitions (Bid Option #1) 12 102220 Systems Furniture (Bid Option #1) 13 102800 Toilet, Bath, and Laundry Accessories 10 104413 Fire Extinguisher Cabinets 5 104416 Fire Extinguishers 3 105113 Metal Lockers 9 105626 Mobile Storage Shelving 8 107113 Sun Control Devices 7
DIVISION 11 – EQUIPMENT
111300 Loading Dock Equipment 7
111400 Fall Protection System 6 111916 Detention Gun Lockers 7 113100 Residential Appliances 8 115213 Projection Screens 4
DIVISIONS 12 – FURNISHINGS
122413 Roller Window Shades 7 124130 Entrance Floor Mats and Frames 4 126100 Fixed Audience Seating 9
129300 Site Furnishings 9
DIVISION 14 - CONVEYING EQUIPMENT
142100 Electric Traction Elevators 12
VOLUME 2 OF 2
DIVISION 21 - FIRE SUPPRESSION
210548 Vibration and Seismic Controls for Fire-Suppression Piping and Equipment 8 211313 Wet-Pipe Sprinkler Systems 18
DIVISION 22 – PLUMBING
220516 Expansion Fittings and Loops for Plumbing Piping 8 220517 Sleeves and Sleeve Seals for Plumbing Piping 6 220519 Meters and Gages for Plumbing Piping 6 220523 General-Duty Valves for Plumbing Piping 7
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
TABLE OF CONTENTS 4
220533 Heat Tracing for Plumbing Piping 5 220553 Identification for Plumbing Piping and Equipment 6 220719 Plumbing Piping Insulation 13 221113 Facility Water Distribution Piping 11 221116 Domestic Water Piping 10 221119 Domestic Water Piping Specialties 12 221313 Facility Sanitary Sewers 9 221316 Sanitary Waste and Vent Piping 13 221319 Sanitary Waste Piping Specialties 9 221413 Facility Storm Drainage Piping 10 221423 Storm Drainage Piping Specialties 5 221429 Sump Pumps 5 221513 General-Service Compressed-Air Piping 11 221519 General-Service Packaged Air Compressors and Receivers 4 223600 Solar Thermal Heating System 8
224213.13 Commercial Water Closets 8
224213.16 Commercial Urinals 6
224216.13 Commercial Lavatories 7
224216.16 Commercial Sinks 10
224223 Commercial Showers, Receptors, and Basins 7 224500 Emergency Plumbing Fixtures 6 224713 Electric Water Coolers 5
DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING
230513 Common Motor Requirements for HVAC Equipment 3 230517 Sleeves and Sleeve Seals for HVAC Equipment 4 230518 Escutcheons for HVAC Piping 2 230519 Meters and Gauges for HVAC Piping 6
230523 General-Duty Valves for HVAC Piping 6 230529 Hangers and Supports for HVAC Piping and Equipment 10 230548 Vibration and Seismic Controls for HVAC Piping and Equipment 15 230553 Identification for HVAC Piping and Equipment 5 230593 Testing, Adjusting, and Balancing for HVAC 17
230713 Duct Insulation 15 230716 HVAC Equipment Insulation 16 230719 HVAC Piping Insulation 19 230800 Commissioning of Building Systems 30 230900 Instrumentation and Control for HVAC 18 231123 Facility Natural-Gas Piping 14 232113 Hydronic Piping 14 232123 Hydronic Pumps 6 233113 Metal Ducts 15 233300 Air Duct Accessories 14 233423 HVAC Power Ventilators 7 233600 Air Terminal Units 7 233713 Diffusers, Registers, and Grilles 5 235216 Condensing Boilers 8 237200 Air-to-Air Heat Recovery Ventilators 7 237201 Fixed Plate Energy Recovery Equipment 5 237202 Air-to-Air Energy Recovery Equipment 8
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
TABLE OF CONTENTS 5
237413 Packaged, Outdoor, Central-Station Air-Handling Units 12 238130 Variable Refrigerant Flow Heat Pump System 6 238216 Air Coils 4 238233 Convectors 5 238239 Unit Heaters 5 238316 Radiant-Hydronic Heating Pump 6 238413 Humidifiers 6
DIVISION 26 - ELECTRICAL
260513 Medium-Voltage Cables 7 260519 Low-Voltage Electrical Power Conductors and Cables 5 260523 Control-Voltage Electrical Power Cables 6 260526 Grounding and Bonding for Electrical Systems 8 260529 Hangers and Supports for Electrical Systems 5 260533 Raceway and Boxes for Electrical Systems 10
260543 Underground Ducts and Raceways for Electrical Systems 14 260544 Sleeves and Sleeve Seals for Electrical Raceways 5 260548 Vibration and Seismic Controls for Electrical Systems 9 260553 Identification for Electrical Systems 10 260923 Lighting Control Devices 9
260936.19 Standalone Multipreset Modular Dimming 6
260943 Network Lighting Controls 11 261200 Medium-Voltage Transformers 8 262200 Low-Voltage Transformers 7
262413 Switchboards 11 262416 Panelboards 11 262713 Electricity Metering 5 262726 Wiring Devices 9 262813 Fuses 4 262816 Enclosed Switches and Circuit Breakers 8 262913 Enclosed Controllers 9 263213 Engine Generators 20 263600 Transfer Switches 9 264113 Lightning Protection for Structures 5 264313 Surge Protection Devices 6 265100 Interior Lighting 9 265600 Exterior Lighting 10
DIVISIONS 27 – COMMUNICATIONS
270500 Common Work Results for Communications 2
270528 Pathways for Communications Systems 10 270536 Cable Trays for Communications Systems 8 270544 Sleeves and Sleeve Seals for Communications Pathways and Cabling 5 271100 Communications Equipment Room Fittings 8 271300 Communications Backbone Cabling 14
271500 Communications Horizontal Cabling 16 274133 Cable Television System 9
275123 Intercommunications and Program Systems 1
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
TABLE OF CONTENTS 6
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
280513 Conductors and Cables for Electronic Safety and Security 14
280528 Pathways for Electronic Safety and Security 11 280544 Sleeves and Sleeve Seals for Electronic Safety and Security Pathways and
Cabling 5 281300 Access Control 23
281600 Intrusion Detection (Bid Option #1) 15 282300 Video Surveillance 16
283176 Interior Fire Alarm and Mass Notification System 31
DIVISION 31 – EARTHWORK
311000 Site Clearing 5 312000 Earth Moving 13
DIVISION 32 - EXTERIOR IMPROVEMENTS
321216 Asphalt Paving 9 321313 Concrete Paving 14 321443 Porous Unit Paving 6 329200 Turf and Grasses 15 329300 Plants 18 329500 Vegetated Roof Assemblies 8
DIVISION 33 – UTILITIES
334100 Storm Utility Drainage Piping 9 334600 Subdrainage 6
DIVISION 48 – NOT USED
– END OF TABLE OF CONTENTS –
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART I
STATEMENT OF WORK
I. LOCATION:
A. The location of the work is inside the cantonment area of the Pease Air National Guard Base, Newington, New Hampshire. Specific work location is in at and around Building 259 on New Market Street.
II. DESCRIPTION OF WORK:
A. The work consists of furnishing labor, plant, materials, and equipment, and performing work necessary to provide a complete and functional installation as described below:
1. Remove existing one story, flat roof, approximately 7,095 square foot (655 sm)
Building 259.
2. Construction of a two story mixed use facility, and associated site work.
III. PRINCIPAL ELEMENTS:
A. The work to be performed includes the following principal elements:
1. Removal of existing Building 259.
2. Provide site, utility, landscape, foundation, steel, brick, rain screen wall panels, insulation, roofing, windows, doors, finishes, power, communication, fire alarm, mechanical, plumbing, fire suppression, and associated systems for a LEED Silver certified, two story, mixed-use facility.
IV. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
A. The contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the contractor receives notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after the required commencement of work.
B. Completion of work is defined as formal acceptance. Date of Substantial Completion or use/possession prior to Final Acceptance (Beneficial Occupancy) is not relevant to the completion date. The indicated performance period includes winter months and runs continuous.
V. GOVERNMENT PERFORMED WORK
A. The Government will perform the following:
1. The Contracting Officer will establish the boundary of Contractor’s work area including staging area, and the Government will limit its activities inside the work area to a minimum during the time the Contractor is at work.
B. The Government will furnish the following materials or equipment:
PART I - STATEMENT OF WORK 1
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART I - STATEMENT OF WORK 2
1. Four wall mounted LCD video screens.
END OF PART I
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART II
GENERAL CONDITIONS
TABLE OF CONTENTS
1. Tour of Job Site
2. Contract Documents
3. Performance
4. Pre-Construction Conference
5. Record Set of Project Manual
6. Mission-Essential Nature of the Base
7. Compliance with Base Regulations
8. Access to Work Site
9. Crossing Airfield Pavements
10. Work Schedule
11. Occupied Buildings
12. Utilities and Services
13. Fire Prevention and Protection
14. Safety and Accident Prevention
15. Registration of Contractor Vehicles and Personnel
16. Disposal of Waste Material
17. Environmental Impact
18. Prevention of Foreign Object Damage
19. Utility Outages
20. Identification of Equipment and Tools
21. Product Options and Substitutions
22. Transportation, Handling and Storage
23. Protection
24. Salvaged Materials
25. Contractor's Office, Storage Shed and Field Records
26. Unforeseen Utility Lines
27. Unforeseen Buried Artifacts/Remains
28. Verification of Existing Conditions
PART II - GENERAL CONDITIONS 1
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART II
GENERAL CONDITIONS
1. TOUR OF JOB SITE:
a. Prospective bidders are urged to attend the scheduled site visit at the time indication in the solicitation documents.
2. CONTRACT DOCUMENTS:
a. Full set of Contract Documents may be examined at the solicitation issuing office which would be either the Pease Air National Guard Base, Base Contracting Office, 157th MSG/MSC, 302 Newmarket Street, Bldg 145, Newington, NH, or the United States Property and Fiscal Office, Contracting Officer Building A, 1 Minuteman Way, Concord, New Hampshire.
3. PERFORMANCE:
a. Submission of Bid shall constitute prima facie evidence that the Contractor has examined the drawings and specifications and has satisfied himself/herself as to the nature, scope, and location of the work and other matters which could affect the work or cost thereof. Failure of the Contractor to acquaint himself/herself with available information, including a physical examination and survey of the proposed work area, will not relieve him/her from providing a complete and usable project.
4. PRE-CONSTRUCTION CONFERENCE
a. Attend a pre-construction conference at time and place designated by the Contracting Officer.
Invite representatives of major subcontract trades at the Contractor’s discretion.
b. The following is a sample listing of the type of subjects that will be discussed at the pre-construction conference:
1) Introduction of key personnel
2) Description of the chain of communication
3) Construction schedule
4) Security procedures and safety and fire prevention precautions
5) Submittal procedures
6) Features unique to this project
5. RECORD SET OF PROJECT MANUAL
a. Maintain record of as-built conditions as specified in Division 01 Section “Project Record
Documents.”
6. MISSION-ESSENTIAL NATURE OF THE BASE
a. In order to maintain the National Defense, Mission Essential nature of the aircraft operations at the Base, the Contractor shall coordinate the work and scheduling with the Contracting Officer.
b. The Government may order suspension of construction activities due to essential defense activities including real and practice alerts, security checks and the like. These suspensions shall not constitute reason for Contractor’s claim for extra compensation or extension of contract time unless cumulative delay during any 30-day period is longer in duration than 8 hours and the Contractor can demonstrate actual monetary damage or delay in construction schedule.
PART II - GENERAL CONDITIONS 2
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
7. COMPLIANCE WITH BASE REGULATIONS
a. The Contractor is expected to become fully acquainted with, and strictly adhere to Base regulations affecting the performance of this Contract. Parts of the regulations pertaining to fire prevention, driving safety, restricted areas, sanitation, disposal of debris and pollution control may apply to this project. A detailed briefing of applicable regulations will be conducted during the Pre-Construction Conference.
b. If required by the Contracting Officer, visit one or more of the following Base personnel:
1) Base Civil Engineer (Bldg 145 South, 1st floor): To review traffic and parking regulations, and to receive vehicle and personnel pass applications and, if the project involves excavation, digging permits.
2) Base Fire Chief (Bldg 243): To review fire safety requirements, burning permits, welding permits and any operation that may affect routing of fire apparatus.
3) Base Pass & ID Office (Bldg 244): To receive vehicle and personnel passes. See paragraph entitled "REGISTRATION OF CONTRACTOR VEHICLES AND PERSONNEL" herein for further details.
8. ACCESS TO WORK SITE:
a. The use of base roads will be subject to base regulations including speed limits and requirement to wear seat belts. The Contractor will be responsible for the prompt repair of all damage to base pavement surfaces due to his/her operations. The Contractor shall keep the base pavements cleaned of material spilled from vehicles.
9. CROSSING AIRFIELD PAVEMENTS:
a. The project may be located in, adjacent to, or near the flightline where aircraft are parked.
1) Do not enter the flightline areas, which include aircraft parking aprons, taxiways, and the runway, on foot or by vehicle without specific authorization of the Contracting Officer, who may also require Base personnel escort or wearing of badges issued by the Pease Development Authority.
10. WORK SCHEDULE:
a. Schedule normal work by Contractor and Subcontractor personnel between the hours of 7:00 AM and 4:30 PM, Monday through Friday, excluding Federal holidays. If the Contractor desires to work during periods other than above, submit a written request (e-mail is acceptable) for each such occurrence to the Contracting Officer at least 3 working days in advance of the proposed event, so that the Government may make special inspection and/or security arrangements. The Contracting Officer may decline approval. Contractor may have to work outside the normal work schedule in order to make utility connects; when this occurs, contractor shall adjust the work schedule or pay overtime. There will be no additional change to the contract associated with the change in schedule or overtime pay for work outside of the normal work hours.
PART II - GENERAL CONDITIONS 3
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
11. OCCUPIED BUILDINGS
a. If the Contract involves work in occupied building(s) where the portions of the building outside of the area of work under this Contract are in normal operation during the performance of this Contract, observe the following to prevent interference with each other’s activities:
1) Coordinate the schedule of work under this Contract with the Contracting Officer to mutually avoid interference with each others operation.
2) Confine construction activities, including storage of material, to areas designated by the
Contracting Officer.
3) Use of existing toilet rooms will not be permitted.
4) Use of Government telephone system will not be permitted. The Contractor may, at his/her expense, install a temporary telephone system upon approval of the Contracting Officer.
5) The officer in charge of the operation within the building may, in case of mission emergency, order construction work to be suspended. Follow such orders and immediately contact the Contracting Officer for further instructions.
12. UTILITIES AND SERVICES:
a. Water and electricity necessary for the accomplishment of the work, will be made available to the
Contractor at prorated monthly charge.
1) The Contractor will install water and electrical meters to monitor the usage of these utilities.
Contractor will rent a water meter from the Portsmouth Water Department and pay them directly for water used on the construction site.
2) Conserve utilities furnished. The Government may impose restrictions on the utility usage if wasteful practices are observed.
3) Install and maintain necessary temporary connections and distribution lines, in accordance with applicable code requirements and accepted standard trade practices in respect to safety that are satisfactory to the Contracting Officer, and remove the same prior to final acceptance of the work.
4) Utility rates will be reimbursed by the KWH for electrical. Actual utility rates will be stated at the pre-solicitation meeting.
5) The Government will be reimbursed at the end of the project for all utility usage by the Contractor in the form of a credit to the contract.
b. Provide heating necessary to maintain the construction site at specified temperature as part of the contract.
1) Use portable oil or gas fired heating devices only when approved by the Contracting Officer and the Base Fire Department and in a manner that will safeguard personnel and property.
c. Provide snow removal within the limits of contract including any existing or new roadway that are used exclusively for the construction activities. The Government will remove snow from public roadways that are used by the Government.
13. FIRE PREVENTION AND PROTECTION:
a. Comply with fire prevention measures prescribed in AFOSH 127-5, a copy of which is on file in the office of the Contracting Officer.
b. Obtain from the Base Fire Chief a written fire permit for use of high temperature heating devices, such as blow-torches, portable furnaces, tar kettles, gas and electric welding, or cutting and soldering equipment.
PART II - GENERAL CONDITIONS 4
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
c. The Contractor shall be liable for any fire loss to government property attributable to negligence on the part of the Contractor including failure to comply with fire prevention measures prescribed by terms of this contract.
d. Welding, cutting, and brazing operations shall be conducted in accordance with AFOSH Standard
91-5; Welding, Cutting and Brazing, and NFPA Standard 51; Welding and Cutting. When welding operations are conducted outside of an approved welding shop, AF Form 592, USAF Welding, Cutting, and Brazing Permit, will be issued by the Base Fire Department prior to the start of any operation. The Contractor is responsible for obtaining the AF Form 592 from the Base Fire Department. The Contractor is responsible for compliance with the precautions and instructions outlined on the permit and as directed by the fire prevention inspector. The Fire Prevention office--extension 2749/2700, shall be notified prior to starting any welding, cutting, brazing, or soldering operation and again upon completion of the operation.
e. Prior to beginning any welding operation, the Contractor shall ensure that combustible materials/vegetation within the area of the operation have been removed and the proper type/class of fire extinguisher is immediately available. Where the removal of combustible material is impractical, a suitable fire resistive shield or welding blanket shall be placed between the materials and the welding operation. A fire watch or Fire Department standby may be required.
Welding shall not be permitted in the vicinity of flammable or explosive materials until the possibility of fire or explosion has been eliminated. Before welding or cutting on flammable liquid tanks, cylinders, or containers which contained flammable liquids (compressed gas cylinders and pipelines are excluded), they shall be thoroughly washed, steamed, and filled with water or rendered inert with nitrogen. Extreme care shall be taken to eliminate the accumulation of vapors by proper venting or positioning of the container during the filling operation. To ensure an explosive mixture does not exist, the area or tank shall be sampled using a flammable/ explosive gas detector.
14. SAFETY AND ACCIDENT PREVENTION:
a. Comply with Public Law 91-596 and such occupational safety and health standards promulgated under the Act in accordance with General Provision entitled Accident Prevention (FAR 52.236- 13). Provide constant supervision to insure full and immediate compliance with pertinent provisions of those safety regulations and procedures which are in or may be put into effect at Pease ANGB during the course of performance of the work under the contract.
b. Contractors and Subcontractors will wear brightly colored safety vests at all times while on site.
c. Designate an employee of the Contractor to act as safety supervisor on work performed under the contract in order to provide safety controls for protection of the life and health of employees and other persons, for prevention of damage to property, materials, supplies, and equipment, and for avoidance of work interruptions in the performance of the contract.
d. Correct immediately any non-compliance with the foregoing provisions when notified, and as directed, by the Contracting Officer. Such notice, when delivered to the Contractor or his/her representative at the site of work, shall be deemed to be sufficient for this purpose.
e. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made subject of claim for additional compensation, damages or extension of contract time by the Contractor.
f. Exit doors in occupied facilities shall remain unlocked and unobstructed at all times.
g. Building exits shall be kept clear at all times. Do not obstruct exits or exit signs.
PART II - GENERAL CONDITIONS 5
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
h. Padlocks, chains, sliding bolts, or any device that retards the intended safety action of the panic hardware shall not be installed on doors.
i. Electrical services and installation shall conform to the NFPA Standard 70, National Electrical
Code.
j. Portable extension cords shall be equipped with nonconductive plugs and kept in good condition.
Extension cords shall not be used in lieu of permanent electrical wiring. Extension cords shall not be spliced or taped together or placed in a way that may subject the wiring to physical damage.
15. REGISTRATION OF CONTRACTOR VEHICLES AND PERSONNEL:
a. Contractor and subcontractor must obtain temporary gate passes from the Pease ANGB Pass and Identification Office, Bldg 244, telephone extension 2605, for their personnel and vehicles entering Pease ANGB on regular or recurring bases.
1) Submit, at least 10 working days before the start of work, a list containing the information listed below to the Contracting Officer and update the list whenever changes occur.
a) The List of Personnel:
i. Last name, first name, middle initial, and Social Security Number. (All individuals entering the Base must carry valid identifications bearing photographic likenesses.)
ii. Home address
iii. Weight, height, color of hair and eyes
iv. Driver or non-driver identification number
b) The List of Vehicles:
i. Vehicle make, body style, color and year.
ii. Name of the owner of record.
iii. Vehicle registration number (All vehicles must have valid State Registrations and inspection stickers.)
iv. Proofs of required insurance.
2) Follow the following procedure for obtaining vehicle pass:
a) Obtain vehicle pass application forms from the Contracting Officer or Base Civil
Engineer’s office (Bldg 145 South, Room 100).
b) Fill in required information and have each form signed by the Contracting Officer or an authorized member of the Base Civil Engineer’s office.
c) Take the completed and signed form(s) to the Base Pass and ID Office (Bldg 244) and present it with the vehicle registration and a valid driver's license.
16. DISPOSAL OF WASTE MATERIAL:
a. Material resulting from demolition or removal on a Government-owned facility, except those specifically designated to be salvaged, shall become the property of the Contractor. Dispose of such material off site and in manners complying with local, State and Federal laws and regulations. No sale or transfer of ownership of such material shall take place while the material is on the Government-owned premises.
PART II - GENERAL CONDITIONS 6
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
b. If material to be disposed of is classified as hazardous material, contact the Base Environmental Manager (Mr. David Nylund, Ex 2336) before the material is moved off Base, and follow his instructions.
c. Once off site, handle and dispose of hazardous material in strict compliance with federal, State and local laws and regulations at no additional cost to the Government.
d. Comply with the requirements of LEED Credit MR2.1 and 2.2, and Division 1 Section “Construction and Demolition Waste Management.”
17. ENVIRONMENTAL IMPACT
a. The Contractor and his Subcontractors are urged to utilize materials that will have a minimal environmental impact during installation and throughout the expected service life, and whose construction residues and wastes will not be classified as “hazardous waste.”
b. Submit material safety data sheets (MSDS) for all material used in this project for which MSDS’s exist.
c. For any hazardous material is to be brought onto the Base and kept overnight or longer, follow the record-keeping procedure specified in Division 01 Section “Hazardous Material (HAZMAT) Usage.”
18. PREVENTION OF FOREIGN OBJECT DAMAGE
a. Aircraft are susceptible to Foreign Object Damage (FOD) caused by small loose objects such as nuts, bolts, paper, cardboard, small pieces of wood, wire, sand, gravel, and glass. Most areas of Pease Air National Guard Base are susceptible to high wind. At all times, keep exterior work areas free of construction debris that may cause FOD to aircraft. The cost of repairing such damage to aircraft will be charged to the Contractor.
19. UTILITY OUTAGES:
a. Schedule utility outages through the Contracting Officer to accommodate the operational needs of the Government and, unless otherwise specified elsewhere, in accordance with the paragraph entitled herein “WORK SCHEDULE.” Utility outages require advance approval of the Contracting Officer. Submit requests for outages in writing, 72 hours in advance, to the Contracting Officer and Contracting Officer’s Representative to permit coordination with all affected activities.
b. Water mains and fire hydrants shall not be shut off at any time by Contractor personnel. Notify the Contracting Officer and the Base Fire Department (at least 48 hours in advance) of the need to disrupt a water supply.
20. IDENTIFICATION OF EQUIPMENT AND TOOLS:
a. Affix to Contractor- or Subcontractor-owned machinery, motor vehicles, equipment, and tools, clearly legible identification showing the Contractor‘s or Subcontractor’s name, address and telephone number, so as to distinguish them from Government-owned items, and can be returned to the rightful owner if inadvertently left on Government property.
21. PRODUCT OPTIONS AND SUBSTITUTIONS
a. Contractor’s Options: Contractor may furnish products to be incorporated into this project in accordance with the following ground rules:
PART II - GENERAL CONDITIONS 7
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
1) Products specified by reference standards or by description only: Any product meeting those standards needs no approval other than the submittals required in the technical sections.
2) Products specified by naming one or more manufacturer(s) and model identification(s) with an “Or Equal” statement: Submit a request for approval of substitution or of Equal product for any manufacturer not specifically named.
3) Products specified by naming one or more manufacturer(s) and model identification(s) with notation, “No Substitution”: No substitution will be allowed unless the Contractor submits evidence that the specified item is not available and submits a request for approval of substitution.
b. Approval Request:
1) Submit a request for approval for each substitution or Equal item in accordance with the requirements of Division 01 Section “Submittal Procedures.”
2) By submitting a request for approval of substitutions or Equal items, the Contractor warrants that the item being submitted:
a) is equal or superior to the item specified,
b) is in all respects compatible with the intent of the design,
c) will be covered by warranty, if one is specified, that is the same as or more extensive than the one specified,
d) will interface with related items in performance, physical size, color, texture and pattern.
e) will have service organization, where one is specified, within easy access, and
f) will not increase the cost to the Government.
3) Attach a letter to the submittal explaining in detail any exception to the above and discussing immediate and potential impact to the project because of such exceptions.
22. TRANSPORTATION, HANDLING AND STORAGE
a. Arrange for timely transportation, delivery, receiving and storage of material, tools and equipment necessary for execution of the project.
1) If construction material or equipment is to be delivered by the U.S. Postal Service, the delivery address shall be:
Contractor’s Name
302 Newmarket Street - Bldg ### Pease ANGB, NH 03803-0157
2) If construction material or equipment is to be delivered by a commercial common carrier, the delivery address shall be:
Contractor’s Name 302 Newmarket Street - Bldg ### Pease ANGB, NH 03803-0157
3) Arrange to have construction material and equipment delivered directly to the project site by noting appropriate building number on the address. Do not address packages to the general Base mailing address, which would cause packages to be delivered to the Base mail room or supply depot, unless the use of such address is authorized by the Contracting Officer in advance.
4) Arrange deliveries of products in accordance with the construction schedule to avoid delays on one hand and excessively long period of storage on site on the other.
5) Unload, transport and store products arriving on site in a manner to avoid damage, and at a location directed by the Contracting Officer.
PART II - GENERAL CONDITIONS 8
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
6) CQC Manager shall inspect immediately upon receipt to ascertain correctness of the type and quantities of shipped items and to discover factory and transit damages. Return incorrect or damaged products and replace with new correct and undamaged goods.
7) Store related component parts in a manner that will permit easy and sequential access as they are needed for installation or assembly.
8) Retain record of shipment, such as bills of lading or delivery tickets, and submit to the Contracting Officer if so requested.
9) Provide necessary protective material such as blankets, tarps, plastic sheets and sleepers to store delivered products well protected from elements and from accidental damages.
10) Replace any product damaged during unloading, on-site transportation, and storage with identical undamaged products at no additional cost to the Government.
b. Provide appropriate storage space for material, tools and equipment delivered to the site and not incorporated into the work.
1) Existing building space may be used for storage only if permitted by the Contracting Officer with concurrence of the building manager.
2) Where no space is available in a convenient existing building space, provide temporary storage structure(s) and place at a location as directed by the Contracting Officer.
3) If open outdoor storage is appropriate for the type of material, tools or equipment, provide adequate covering to protect the stored item from weather damages. Provide ventilation to avoid condensation damage.
4) Maintain storage space at temperature and humidity ranges appropriate for the item(s) stored.
5) Store loose granular materials on solid surfaces such as pavement, or provide plywood or sheet material to prevent mixing with foreign matter.
6) Take measures to prevent ground surface water from damaging stored material.
23. PROTECTION
a. Protect newly installed products to prevent damage from subsequent operations.
b. Protect existing items to remain from damage and soiling due to work under this contract.
c. Provide coverings, corner guards, barriers and other appropriate measures or devices to effect protection required above. Remove protective measures and devices when no longer needed and prior to completion of work.
24. SALVAGED MATERIALS
a. Store salvaged material and equipment that is specified to be reinstalled by the Contractor under this contract in a secure location in a manner that will prevent theft and damages. If material and equipment is lost, stolen or damaged, provide comparable product. If it is determined such loss or damage was due to Contractor negligence, provide replacement at no additional cost to the Government.
b. Deliver material specified to be salvaged and turned over to the Government to a location within the Base and neatly place in storage as directed by the Contracting Officer.
1) Notify the Contracting Officer at least 5 working days in advance of anticipated delivery date.
25. CONTRACTOR’S OFFICE, STORAGE SHED AND FIELD RECORDS
a. When required by the Contract Documents, provide a Contractor's office trailer and/or storage shed trailer with minimum requirements as specified below, unless otherwise specified.
PART II - GENERAL CONDITIONS 9
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
Additional furnishings, utility and equipment may be provided at the Contractor's option and at no additional cost to the Government.
1) Office Trailer:
a) Adequate size to house a desk with at least one file drawer, a desk chair, a drawing rack, a stand-up height drawing viewing table.
b) Equipped with adequate lighting, air conditioning, and heating and locks on windows and doors.
2) Storage Shed:
a) Adequate in size and layout for the intended use.
b. Maintain the following documents at the job site whenever the Contractor's work is in progress at the site:
1) Record set of Project Manual including specifications and drawings. Mark as-built conditions on this set, but otherwise keep this set clean and undamaged.
2) Field working set of Project Manual including specifications and drawings.
3) One copy each of approved submittals.
4) One copy of Field Superintendent’s daily log, recording as a minimum weather conditions, general progress of work by trade, deliveries and removal from site of material and equipment, and number of personnel on the job by trade.
c. If telephone is installed by the Contractor, make it available to the Contracting Officer and his/her representative (COR) for calls directly related to this project. They will use the Base telephone system for all other calls.
26. UNFORESEEN UTILITY LINES
a. If any utility line not shown on the drawings is found, notify the Contracting Officer and Base
Civil Engineer’s office immediately. Avoid damaging such line. Do not alter without Contracting Officer’s approval.
b. If an active line has been inadvertently damaged or broken, take actions necessary to safeguard personnel and property from immediate harm, including but not limited to physiological, physical and environmental damages. Otherwise take no action until directed by the Contracting Officer.
c. After disposition is determined and carried out, record on the Record Set the nature of the line, original location and any changes made to the line.
27. UNFORESEEN BURIED ARTIFACTS/REMAINS
a. If buried cultural artifacts or remains are found, notify the Contracting Officer and Base Civil Engineer’s office immediately. Avoid damaging such items. Do not alter without Contracting Officer’s approval.
28. VERIFICATION OF EXISTING CONDITIONS
a. Verify existing conditions, dimensions and elevations before any preparatory work such as building layout or shop drawings are started.
b. Report to the Contracting Officer, immediately upon discovery, any variance between the actual condition and the information given in the Contract Documents.
PART II - GENERAL CONDITIONS 10
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART II - GENERAL CONDITIONS 11
c. Do not proceed with work until potential problems caused by the variance are resolved and approved by the Contracting Officer.
d. Remove and replace, if directed by the Contracting Officer, any work carried out by the Contractor prior to such resolution and without specific directive or approval of the Contracting Officer.
END OF PART II
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART III
SPECIAL PROVISIONS
These Special Provisions supplement or modify provisions of the General Conditions. In general, provisions unique to this project are found in the Special Provisions while administrative provisions applicable to NHANG projects in general are found in the General Conditions.
1. SPECIAL OR UNUSUAL JOB CONDITIONS
1.1. At all times during the execution of the project, maintain the project site free of debris and other loose objects that could, if blown onto flightline area, be ingested into jet engines.
2. UTILITIES AND SERVICES
2.1. Water and electricity will be made available by the Government to the Contractor at prorated charge as specified in “Part II - General Conditions”, paragraph 12.
2.2. Provide two portable toilets and weekly cleaning services for the duration of the project. Use of existing toilet facilities will not be allowed.
3. CONTRACTOR’S OFFICE, STORAGE SHED AND FIELD RECORDS
3.1. Contractor's office and storage trailers are required for this project. Place them as directed by the Contracting Officer.
4. CONSTRUCTION SIGN
4.1. Construction sign and direction signs to the office trailer for deliveries are required for this project
5. LIST OF DRAWINGS
Dwg No Drawing Title
G001 COVER SHEET
G002 LIST OF DRAWINGS
G003 LEGEND, ABBREVIATIONS AND GENERAL NOTES
G101 CODE INFORMATION
G102 FIRST FLOOR EGRESS PLAN
G103 SECOND FLOOR EGRESS PLAN
G104 FIRST FLOOR FIRE RATINGS PLAN
G105 SECOND FLOOR FIRE RATINGS PLAN
C001 CIVIL LEGEND, NOTES AND ABBREVIATIONS
CX101 EXISTING CONDITIONS SITE PLAN
PART III - SPECIAL PROVISIONS 1
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART III - SPECIAL PROVISIONS 2
CD101 REMOVALS SITE PLAN
CS101 SITE PLAN
CS102 SITE/GRADING PLAN – OPTION 2
CL101 SITE LAYOUT PLAN
CU101 SITE UTILITY PLAN
CU102 OVERALL SITE UTILITY PLAN
CG101 GRADING, DRAINAGE AND EROSION CONTROL PLAN
C501 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
C502 SITE DETAILS
C503 SITE DETAILS
C504 SITE DETAILS
C505 SITE DETAILS
C506 SITE DETAILS
B001 SOIL TEST BORINGS
B002 SOIL TEST BORINGS AND PROBES
B003 TEST PIT LOGS
L101 HARDSCAPE DEVELOPMENT PLAN
L102 LANDSCAPE DEVELOPMENT PLAN
L501 HARDSCAPE DETAILS
L502 LANDSCAPE DETAILS
S001 STRUCTURAL NOTES, DESIGN LOADS AND ABBREVIATIONS
S002 DIMENSIONING PLAN
SB101 PARTIAL FONDATION PLAN – SOUTH
SB102 PARTIAL FOUNDATION PLAN – NORTH
SB103 PARTIAL FOUNDATION PLAN – AFE WING
SB104 FOUNDATION CONTROL JOINT LAYOUT PLAN
SB401 ENLARGED PIER PLANS
SB402 ENLARGED PIER PLANS
SB501 FOUNDATION DETAILS
SB502 FOUNDATION DETAILS
SB503 FOUNDATION DETAILS
SF101 FLOOR/ROOF FRAMING PLAN – SOUTH
SF102 FLOOR/ROOF FRAMING PLAN – NORTH
SF103 ROOF FRAMING PLAN
SF104 ATRIUM ROOF FRAMING PLAN
SF105 ROOF FRAMING PLANS – AFE WING
SF106 PAVILION FND AND FRAMING PLANA – AFE WING
SF201 BRACED FRAME ELEVATIONS
SF202 BRACED FRAME ELEVATIONS
SF203 BRACED FRAME ELEVATIONS
SF204 BRACED FRAME ELEVATIONS
SF205 BRACING CONNECTION SCHEDULE AND DETAILS
SF206 WINDOW SUBFRAME ELEVATIONS
SF207 STOREFRONT SUBFRAME ELEVATIONS AND DETAILS
SF401 ENLARGED PARTIAL FRAMING PLANS AND DETAILS
SF402 ENLARGED PARTIAL FRAMING PLANS AND DETAILS
SF403 ENLARGED CANOPY FRAMING PLAN AND DETAILS
SF501 STRUCTURAL DETAILS
SF502 STRUCTURAL DETAILS
SF503 STRUCTURAL DETAILS
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART III - SPECIAL PROVISIONS 3
SF601 COLUMN SCHEDULE
SF602 CONNECTION SCHEDULE AND DETAILS
SF603 COLUMN BASE PLATE SCHEDULE AND DETAILS
SF604 COLUMN AND CONN SCHEDULES AND DETAILS
SP101 FRAMING FIREPROOFING PLAN
SP501 FIREPROOFING DETAILS
AD101 BLDG 259 PLANS – REMOVALS
AD102 BLDG 259 ELEVATIONS AND WALL SECTIONS – REMOVALS
AD103 BLDG 259 WALL TYPES AND FINISH SCHEDULE – REMOVALS
AE001 WALL TYPES
AE002 WALL DETAILS
AE101 FIRST FLOOR PLAN
AE102 PARTIAL FIRST FLOOR PLAN (SOUTH) – DIMENSIONS
AE103 PARTIAL FIRST FLOOR PLAN (SOUTH) – NOTES
AE104 PARTIAL FIRST FLOOR PLAN (NORTH) – DIMENSIONS
AE105 PARTIAL FIRST FLOOR PLAN (NORTH) – NOTES
AE106 SECOND FLOOR PLAN – DIMENSIONS
AE107 SECOND FLOOR PLAN – NOTES
AE108 PARTIAL FIRST FLOOR PLAN AND RCP – AFE WING
AE109 PAVILION PLAN, ELEVATIONS, SECTION AND DETAILS
AE120 ROOF PLAN
AE201 EAST AND SOUTH ELEVATIONS
AE202 WEST AND NORTH ELEVATIONS
AE203 ELEVATIONS AND BUILDING SECTIONS – AFE WING
AE220 BUILDING SECTIONS
AE221 BUILDING SECTIONS
AE301 WALL SECTIONS
AE302 WALL SECTIONS
AE303 BRIDGE SECTION AND DETAILS
AE401 ENLARGED FIRST FLOOR PLAN
AE402 ENLARGED FIRST FLOOR PLAN
AE403 ENLARGED FIRST AND SECOND FLOOR PLANS
AE440 ENLARGED ELEVATOR FLOOR PLANS, SECTION AND DETAILS
AE460 ENLARGED STAIR PLANS
AE461 STAIR SECTIONS
AE501 PLAN DETAILS
AE502 PLAN DETAILS
AE520 ROOF DETAILS
AE521 ROOF DETAILS
AE522 CANOPY AND ROOF DETAILS
AE523 ROOF DETAILS
AE540 CASEWORK DETAILS
AE541 CASEWORK DETAILS
AE542 CASEWORK DETAILS
AE560 ACCESS FLOOR PLAN AND DETAILS
AE601 DOOR SCHEDULE AND DETAILS
AE602 DOOR SCHEDULE AND DETAILS
AE603 DOOR DETAILS
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART III - SPECIAL PROVISIONS 4
AE604 DOOR DETAILS
AE620 WINDOW TYPES
AE621 WINDOW TYPES AND DETAILS
AE622 WINDOW DETAILS
AE623 WINDOW DETAILS
AE640 ROOM FINISH SCHEDULE
AE641 COLOR KEY/MANUFACTURER GUIDE AND DETAILS
AE660 SIGNAGE SCHEDULE AND DETAILS
AE701 FIRST FLOOR REFLECTED CEILNIG PLAN – SOUTH
AE702 FIRST FLOOR REFLECTED CEILING PLAN – NORTH
AE703 SECOND FLOOR REFLECTED CEILING PLAN
AE740 INTERIOR ELEVATIONS
AE741 INTERIOR ELEVATIONS
AE742 INTERIOR ELEVATIONS
AE743 INTERIOR ELEVATIONS
AE744 INTERIOR ELEVATIONS
M001 MECHANICAL LEGEND AND ABBREVIATIONS
M002 MECHANICAL SYSTEM SCHEMATIC
MH101 FIRST FLOOR MECHANICAL PLAN – SOUTH
MH102 FIRST FLOOR MECHANICAL PLAN – NORTH
MH103 SECOND FLOOR MECHANICAL PLAN
MH104 MECHANICAL ROOF PLAN
MH105 MECHANICAL PLANS, DETAILS AND SCHEDULES – AFE WING
MP101 FIRST FLOOR MECHANICAL PIPING PLAN – SOUTH
MP102 FIRST FLOOR MECHANICAL PIPING PLAN – NORTH
MP103 SECOND FLOOR MECHANICAL PIPING PLAN
M401 RADIANT FLOOR PART PLANS AND DETAILS
M402 MECHANICAL PART PLANS AND DETAILS
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
M701 MECHANICAL CONTROL SEQUENCES
M702 MECHANICAL CONTROL SEQUENCES
M703 MECHANICAL CONTROL SEQUENCES
M704 SCHEDULE AND CONTROL SEQUENCES – AFE WING
P001 PLUMBING LEGEND, ABBREVIATIONS AND SYMBOLS
P101 UNDERSLAB PLUMBING PLAN – SOUTH
P102 UNDERSLAB PLUMBING PLAN – NORTH
P103 FIRST FLOOR PLUMBING PLAN – SOUTH
P104 FIRST FLOOR PLUMBING PLAN – NORTH
P105 SECOND FLOOR PLUMBING PLAN
P106 PLUMBING ROOF PLAN
P107 PLUMBING PLANS AND SCHEDULES – AFE WING
P108 PLUMBING PLANS AND SCHEDULES – AFE WING
P401 ENLARGED PLUMBING PART PLANS
P402 ENLARGED PLUMBING PART PLANS
P403 ENLARGED PLUMBING PART PLANS
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART III - SPECIAL PROVISIONS 5
P501 PLUMBING DETAILS
P502 PLUMBING DETAILS
P601 PLUMBING SCHEDULES
P701 PLUMBING RISER DIAGRAMS
P702 PLUMBING RISER DIAGRAMS
P703 PLUMBING RISER DIAGRAMS
P704 PLUMBING RISER DIAGRAMS
FX001 FIRE PROTECTION LEGEND, NOTED AND DETAILS
FX101 FIRST FLOOR FIRE PROTECTION PLAN – SOUTH
FX102 FIRST FLOOR FIRE PROTECTION PLAN – NORTH
FX103 SECOND FLOOR SPRINKLER PLAN
FX104 SPRINKLER PLAN – AFE WING
E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND GEN NOTES
ED101 FIRST FLOOR PLAN ELECTRICAL REMOVALS
EP101 FIRST FLOOR POWER PLAN – SOUTH
EP102 FIRST FLOOR POWER PLAN – NORTH
EP103 SECOND FLOOR POWER PLAN
EP104 ROOF POWER PLAN
EP105 FIRST FLOOR POWER PLANS – AFE WING
EP501 ELECTRICAL ONE-LINE DIAGRAM
EP601 PANEL SCHEDULES
EP602 PANEL SCHEDULES
EP603 PANEL SCHEDULES
EP604 PANEL SCHEDULES
EP605 PANEL SCHEDULES – BID OPTION #1
EL101 FIRST FLOOR LIGHTING PLAN – SOUTH
EL102 FIRST FLOOR LIGHTING PLAN – NORTH
EL103 SECOND FLOOR LIGHTING PLAN
EL104 FIRST FLOOR LIGHTING PLANS – AFE WING
EL105 ELECTRICAL SITE PLAN
EL701 LIGHTING FIXTURE SCHEDULE
ET101 FIRST FLOOR TECHNOLOGY PLAN – SOUTH
ET102 FIRST FLOOR TECHNOLOGY PLAN – NORTH
ET103 SECOND FLOOR TECHNOLOGY PLAN
ET104 PARTIAL FIRST FLOOR TECHNOLOGY PLAN – AFE WING
ET501 TECHNOLOGY DETAILS
ET502 COMMUNICATIONS DISTRIBUTION DIAGRAM
ET503 COMMUNICATIONS DETAILS AND DIAGRAMS
EY101 FIRST FLOOR SECURITY PLAN – SOUTH AND DETAILS
EY102 FIRST FLOOR SECURITY PLAN – NORTH AND MATRIX
EY103 FIRST FLOOR SECURITY PLAN – AFE WING
FA101 FIRST FLOOR FIRE ALARM PLAN – SOUTH
FA102 FIRST FLOOR FIRE ALARM PLAN – NORTH
FA103 SECOND FLOOR FIRE ALARM PLAN
FA104 FIRST FLOOR FIRE ALARM PLAN – AFE WING
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART III - SPECIAL PROVISIONS 6
FA501 FIRE ALARM RISER DIAGRAM
VOL 2
IF001 COVER SHEET
IF101 PARTIAL FIRST FLOOR PLAN – SOUTH
IF102 PARTIAL FIRST FLOOR PLANS
IF103 SECOND FLOOR PLAN & PARTIAL BUILDING SECTION
IF201 DEMOUNTABLE PARTITION ELEVATIONS
IF501 ENLARGED WORKSTATION PLANS
IF502 ENLARGED WORKSTATION PLANS
IF503 ENLARGED WORKSTATION PLANS
IF601 SCHEDULES & DETAILS
END OF PART III
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
PART IV
TECHNICAL SPECIFICATIONS
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
DIVISION 1
GENERAL REQUIREMENTS
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
DIVISION 01 - GENERAL REQUIREMENTS
010010 General Errata 010100 Fire Protection General Conditions 010450 Cutting and Patching 011100 Bid Options 012010 Project Meetings 013000 Submittal Procedures 013010 Hazardous Material (HAZMAT) Usage 014200 References 014510 Contractor Quality Contol 017200 Project Record Documents 017400 Warranties 017490 Construction and Demolition Waste Management 017700 Closeout Procedures 017810 Operation and Maintenance Manuals
018113.13 Sustainable Design Requirements - LEED for New Construction and Major Renovations 019113 General Commissioning Requirements
SZCQ089023 REPLACE SQUADRON OPERATIONS FACILITIES
SECTION 010010 - GENERAL ERRATA
PART 1 - GENERAL
1.1 DESCRIPTION OF CONTENT
A. Correct contents of the technical specification sections and drawings as described in this section.
1.2 EXTENT OF CORRECTIONS
A. The corrections described herein do not alter the uncorrected parts of the technical specification sections or drawings.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
3.1 CORRECTIONS
A. Wherever terms “architect” or “engineer”, without regard to case, appear in the specifications or on drawings, replace them with “Contracting Officer”, capitalized, (or abbreviated as KO) indicating the…
This is the start of the file's text. The full file is on GovTribe.