Slides from site visit arch 23 2011

View the file

Other files

File Type Posted
W912TF-11-R-0502 U0008.pdf PDF
W912TF-11-R-0502 U0007.pdf PDF
W912TF-11-R-0502 U0006.pdf PDF
W912TF-11-R-0502 U0005.pdf PDF
IF102.dwg DWG drawing
IF502.dwg DWG drawing
IF201.dwg DWG drawing
IF501.dwg DWG drawing
IF601.dwg DWG drawing
IF001.dwg DWG drawing
IF101.dwg DWG drawing
IF103.dwg DWG drawing
IF503.dwg DWG drawing
W912TF-11-R-0502 U0004.pdf PDF
RFI 4.11.2011.pdf PDF
AD-A2.pdf PDF
AD-M5.pdf PDF
W912TF-11-R-0502 U0003.pdf PDF
AD-A1.pdf PDF
W912TF-11-R-0502 U0002.pdf PDF
AD-S1.pdf PDF
Furniture CAD Files.zip ZIP file
QUESTIONS RECEIVED AS OF 0900 3.24.2011.pdf PDF
SBTeamingArrangements.ppt PPT presentation
Joint Ventures and SB Teaming.pdf PDF
W912TF-11-R-0502 BUISNESS CARDS PART 1.pdf PDF
W912TF-11-R-0502 SITE VIST BUISNESS CARDS PART 2.pdf PDF
W912TF-11-R-0502 SITE VISIT SIGN IN SHEETS.pdf PDF
W912TF-11-R-0502 U0001.pdf PDF
Amendment U0001 Drawings.pdf PDF
W912TF-11-R-0502 RFI No. 01.pdf PDF
Exhibit C REVISED MARCH 18 2011.docx DOCX document
Drawings Dated 08 Dec 2010 Part One.pdf PDF
Drawings Dated 08 Dec 2010 Part Two.pdf PDF
024116 FL - STRUCTURE DEMOLITION BLDG 259 HAZMAT REPORT.pdf PDF
018113. 13 LEEDChecklist.pdf PDF
SpecsSBD120810.pdf PDF
Exhibit B SSS Feb 11.docx DOCX document
W912TF-11-R-0502.pdf PDF
Exhibit A SSS Jan 11.docx DOCX document
Exhibit C SSS Feb 11.docx DOCX document
Exhibit D and F Feb 11.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace Squadron operations Facilities At Pease ANGB, Newington NH Pre-proposal conference March 23, 2011 USPFO for New Hampshire

SS 2011 Module 5

Replace Squadron operations Facilities At Pease ANGB, Newington NH

W912TF-11-R-0502

Introduction Contracting Officer MSgt Scott Ballweg – scott.ballweg@us.army.mil MSgt Regina Rockwood – regina.rockwood@us.army.mil

Base Civil Engineer Maj Gene Mozzoni

Deputy Base Civil Engineer Capt Autumn Ricker

Introduction Small Business Administration

Keith Waye – keith.waye@sba.gov

Ben Manzano – ben.manzano@sba.gov

Procurement Technical Assistance Program

Dave Pease – david.pease@dred.state.nh.us

Oak Point Associates Peter MacGovern

Synopsis Remove existing one story, flat roof, approximately 7,095 square foot (655 sm)

Construction of a two story mixed use facility, and associated site work.

A firm-fixed price contract will be awarded

Synopsis Notice of 100% small business set-aside

The contract will be awarded using Source Selection trade-off procedures

Evaluation factors – technical; past performance and price

Contract Period Construction period is 485 calendar days after receiving the notice to proceed *

Contract Period Period of Performance is 485 days total. This is a change and overrides the Period of Performance stated in the Specification There will be two phases to this project. There will be two Notice to Proceed (NTP) letters issued; the first NTP will include demolition of the building and all critical submittals to be submitted and approved and the second NTP will include the construction phase of the project. ***Construction of the new building will not be approved to start until the work listed in the first NTP is complete. See Section 0800 for the list of critical submittals.

Solicitation, Plans & Specifications

On The Web http://www.fbo.gov
Solicitation
Exhibits
Plans & specifications
Questions & answers document
Amendments
Check regularly & refresh web page

Invitation for Bid vs.

Request for Proposal

IFB
Open process
Public bid opening
Abstract releasable
No discussions
Only price considered
No revisions
Additive Bid Items (ABI)
Award to lowest responsive/responsible bidder
RFP
Closed process
No public opening
Limited info at award
Discussions allowable
Past Performance and other non cost factors considered with price
Revisions possible
Options
Award based on best value

What You Must Submit

Section 00110 of the RFP details the required information and format for the proposal
2 Volumes are required
VOL 1 – Price/Cost
To include Exhibit D – Option Periods
VOL 2 – Technical and Past Performance Proposals

Volume 1- Price/Cost

Offeror portion of SF 1442
Section 00010 – Pricing Info
Section 00600 – Representations and Certifications (R&C)
Complete R&Cs in ORCA on the web
Complete and return DoD R&Cs in Section 0600
Include supplemental information
Completed Exhibit D – Option execution period
If JV include Joint Venture Agreement

Volume 2 Past Performance

NO PRICES/COST IN THIS VOLUME

Exhibit A- Part 1- Performance Relevancy Questionnaires –
Prepare not more than 10 of these documents for projects completed or completed to 70% in the last five years
Select your projects carefully because the quality of the relevant performance is more important than the quantity of projects submitted
Do this early – reference send to KO by closing date – please follow-up

Volume 2 Past Performance Continued If you do not have relevant Past Performance and are using experience of key personnel, predecessor companies or subcontractors to obtain this ensure you clearly state this in the proposal

To be considered subcontractor must complete a consent form - Exhibit B

Volume 2 Past Performance Continued

If key personnel to be used on this project were not participants in Exhibit A projects include
Names of Project Mgr/Superintendent/QC Mgr
a resume or detailed summary of experience
Include letter of intent if not with company
Must be a member of prime contractors organization

Technical Capability Proposal

Discuss experience with building to United States Green Building Council (USGBC) LEED® standards. Indicate any previous projects that achieved USGBC LEED® certification, any level of recognition
Demonstrate that lead construction personnel have experience and required qualifications in assigned roles with building to USGBC LEED® standards
If no experience so state and indicate in detail how you plan to overcome this weakness.

Exhibits

Exhibit A = Relevancy Questionnaire
PART 1 (not more than 10)
PART 2 (1)
Exhibit B = Subcontractor Consent Form- if applicable
Exhibit C = Past Performance Letter and Questionnaire (send out to references)-do not put in proposal

Exhibits

Exhibit D = Option Execution Period (submit with Vol. 1, pricing info)
Exhibit F = Proposal Inquiry Form

Proposal Due Dates

Proposal due 1400 Hours (2:00 P.M.), 14 April, 2011
Proposal must be signed by officer of your company
No facsimile or electronic offers
Reference questionnaires are also due by this time and date
Send reference questionnaires out as soon as possible
Have returned to KO via mail or email

Proposal Evaluation

Process is detailed in RFP section 00120
Carefully review section 00120 when preparing proposal
Comply with section 00100 and 00110 requirements
Failure to furnish a complete proposal may result in elimination from consideration
Price proposed must be determined reasonable and realistic to be considered

Proposal Evaluation Technical Capability proposal must rate an acceptable

Proposals rated unacceptable will be removed from the competition

Award The contractor whose proposal provides the best value to the Government

Technical Acceptability and Past Performance is approximately equal to price
The best value may not be the lowest price

Important Reminders When using a subcontractor to obtain/enhance relevancy provide subcontractor consent form, Exhibit B, or the information will not be considered Limitations on Subcontracting Clause applies Must do 15% with own forces IAW clause requirements Award in this process does not necessarily mean the lowest price wins

How Questions Will Be Handled

Questions must be submitted in Exhibit F format via email to: Scott.ballweg@us.army.mil & regina.rockwood@us.army.mil
Submit questions NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing.
Questions received after may be held and addressed after RFP closing with those offerors determined to be in the competitive range if discussions are deemed necessary
Do not call technical personnel or A&E- this will delay getting an answer

Answers to Questions All questions, on a non-attribution basis, and the answers will be posted to the web site

https://www.fbo.gov
If necessary addendums, issued by an amendment, will also be posted
Check web site regularly and don’t forget to refresh web page

Helpful Websites

www.ccr.gov/
http://orca.bpn.gov/
http://www.gpo.gov/davisbacon/all states.html
https://www.fbo.gov

Questions