RTI_Solicitation.pdf
PDF 761 KB Posted
- Solicitation number
- W912SV-14-R-0001
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RTI_Amendment_6.pdf | ||
| Q A_Dated_25_June_2014.pdf | ||
| Q A_Dated_30_May_2014.pdf | ||
| RTI_Amendment_5.pdf | ||
| Q A_Dated_16_May_2014.pdf | ||
| Q A_Dated_16_May_2014.pdf | ||
| RTI_Amendment_4.pdf | ||
| Amendment_3.pdf | ||
| REVISED_EXHIBIT_H.xlsx | XLSX spreadsheet | |
| Q A_Dated_23_April_2014.pdf | ||
| PreProposal_Conference_SignIn_Sheet2_.pdf | ||
| PreProposal_Conference_SignIn_Sheet1.pdf | ||
| PreProposal_Conference_Slides_.pdf | ||
| Q A_Dated_15_April_2014.pdf | ||
| Amendment_2.pdf | ||
| Q A_Dated_7_April_2014.pdf | ||
| EXHIBIT_B_RTI.pdf | ||
| EXHIBIT_H.xlsx | XLSX spreadsheet | |
| EXHIBIT_F.pdf | ||
| RTI_Amendment_1.pdf | ||
| EXHIBIT_C_RTI.pdf | ||
| EXHIBIT_D_RTI.pdf | ||
| Exhibit_G_TEP_SAMPLE.pdf | ||
| EXHIBIT_A_RTI.pdf | ||
| RTI_Brand_Name_Justification_Revised.pdf | ||
| RTI_Brand_Name_Justification.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USPFO for MA, Regional Training Institute (RTI), Project Number 250095
Construction Contract for project 250095, Regional Training Institute (RTI) at Camp Edw ards, MA. Work w ill be performed in accordance w ith plans and technical specif ications. This project is being solicited as a Total Small Business Set-Aside. The North American Industry
Classif ication (NAICS) Code is 236220 and the Size Standard for Small Business is $33.5M of average annual receipts for the past 3 years.
Project Magnitude is betw een $10M and $25M. Persons intending on offering a proposal should attend the Pre-Proposal Conference See
Section 00100 for specif ic registration information and details. Solicitation and all information, notices, amendments for this solicitation w ill be posted at http://w w w .fbo.gov. Instructions for obtaining Plans for this solicitation are located in Section 00100. Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
02-Apr-2014
(RFP)
(IFB)
X
CALL:
Construction of Regional Training Institute
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________19 May 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
W912SV - USPFO FOR MASSACHUSETTS
ATTN: P & C BRANCH
2 RANDOLPH RD
HANSCOM AFB MA 01731-3001
W912SV
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
250095
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 339-202-3835 TEL: FAX:
W912SV-14-R-0001 64
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912SV-14-R-0001
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Base RTI
FFP
Construction of a Regional Training Institute (RTI) at Camp Edwards, MA;
Project Number 250095. The project will consist of constructing a new Regional
Training Institute (RTI) Building for the Massachusetts National Guard. The
Contractor will provide all labor, materials, equipment, and supervision necessary to perform all work required in strict accordance with the detailed requirements of the technical provisions. The project is a phased new construction of a Regional
Training Institute (RTI) building. Provide all materials, labor and equipment to construct one 25,913 square foot Educational Facility and one 32,125 square foot
Billeting Facility. The project is designed to secure a Leadership in Energy and
Environmental Design (LEED) "Silver" rating, at a minimum, from the US Green
Building Council (USGBC). This project includes Government Furnished
Equipment to include, but is not limited to, pre-wired workstations. The work of this project includes receiving, unloading, handling, storing, protecting, and installing the Government Furnished Equipment. For work requiring that existing items be relocated and includes, where required, all effort for disconnecting and dismantling, loading, and delivery to the site in addition to previously stated.
FOB: Destination
NET AMT
0002 1 Job Option 0001
FFP
Construct two parking lot access driveways along Turpentine Road as indicated within the Construction Documents labeled “Bid Option No.1”. Complete product and execution requirements are included in Divisions 31, 32 & 33. Driveway construction includes pavement removal of the existing southerly driveway, additional curb demolition along existing and proposed driveways, additional removal of asphalt sidewalk, asphalt pavement construction of two (2) Twenty Four
(24) foot driveways, additional concrete curb, accessible pedestrian curb ramps at proposed driveways, additional asphalt sidewalk, pavement markings, stop signs, drainage structures and piping, relocation of one hydrant and soil erosion and sediment control measures associated with Bid Option No. 1 improvements.
0003 1 Job Option 0002
FFP
Provide and install wood wall panels in Rooms 101, and portions of Rooms 122, 123 & 125, in Educational Building as indicated by details on the Drawings labeled
“Bid Option No. 2.” Complete product and execution requirements are included in
DIVISION 09, SECTION 098447 – Modular Wall System. Base Bid to include painted gypsum board with
½” metal reveals.
0004 1 Job Option 0003
FFP
Provide and install fabric wrapped wall panels in Room 113 and Corridor 123 as indicated by details on the Drawings labeled “Bid Option No. 3.” Complete product and execution requirements are included in DIVISION 09, SECTION 097723 –
Fabric Wrapped Panels.
0005 1 Job Option 0004
FFP
Remove overhead primary electrical conductors and install an underground electrical ductbank with primary electrical conductors. Provide utility poles with required accessories, conduit, conductors, manholes etc as indicated within the
Construction Documents labeled “Bid Option No.4” Complete product and execution requirements are included in Division 26. Contractor is responsible for all associated details to complete the work.
SECTION 00010
SECTION 00010 Solicitation Contract Form
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 - PRICING SCHEDULE, NOTES
SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 - CONTRACT CLAUSES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project # 250095 Dated March 2014
ATTACHMENT 2- WAGE DETERMINATION(S)- to be inserted at award. See section 00100 for solicitation.
ATTACHMENT 3- SOLICITATION QUESTIONS AND ANSWERS DOCUMENT DATED (to be inserted at award)
EXHIBIT A- Performance Relevancy Questionnaire
EXHIBIT B- Subcontractor Information and Consent Form
EXHIBIT C- Reference Questionnaire package
EXHIBIT D-Option information form
EXHIBIT E-Small Business Participation Plan Evaluation Form
SECTION 00010 NOTES
NOTES
1. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.
2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause
52.228-5 Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.
3. Reference DFARS Provision 252.236-7008, Contract Prices – Bidding Schedules. The term “Bidding
Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.
Funds IAW FAR Provision 52.232-18, Availability of Funds. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
CLINS 0002 through 0005 are Option Line Items. See FAR Provision 52.217-5 Evaluation of Options, Section 00100. The Government anticipates awarding options at time of award, however, reserves the right to award unexercised options after award within the time period provided in the awardee’s accepted proposal. (Reference Exhibit D). The Government reserves the right to include options exercised at time of award in the BASE CLIN 0001 to facilitate and simplify schedule and payment processing.
End of Section 00010
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 22-OCT-2015 1 JFHQ-MA
LTC THOMAS HARROP
2 RANDOLPH ST
HANSCOM AFB MA 01731
W13PAX
0002 22-OCT-2015 1 (SAME AS PREVIOUS LOCATION)
0003 22-OCT-2015 1 (SAME AS PREVIOUS LOCATION)
0004 22-OCT-2015 1 (SAME AS PREVIOUS LOCATION)
0005 22-OCT-2015 1 (SAME AS PREVIOUS LOCATION)
Section 00100 - Bidding Schedule/Instructions to Bidders
CLAUSES INCORPORATED BY REFERENCE
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004
52.217-5 Evaluation Of Options JUL 1990
52.222-5 Davis-Bacon Act--Secondary Site of the Work JUL 2005
52.236-28 Preparation of Proposals--Construction OCT 1997
52.252-5 Authorized Deviations In Provisions APR 1984
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance
Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
3.6% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to
Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract
Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Massachusetts, Barnstable County, Camp Edwards.
52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (FEB 2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act-- Construction Materials Under
Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American Act, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause
52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from (1)
Protest to the independent review authority shall be filed at:
Office of Chief Counsel
ATTN: NGB Protest Decision Authority
111 South George Mason Dr.
Bldg. 2
Arlington, VA 22204-1373
FAX (703) 607-3684 or -3682
OR
(2) Protest to the Contracting Officer shall be filed at:
CW2 Erika Reinikainen-Rovinelli
USPFO for MA, Contracting Division
Massachusetts Arny National Guard
2 Randolph Road
Hanscom AFB, MA 01731
ONLY WRITTEN PROTESTS WILL BE CONSIDERED.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the
GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
April 17, 2014 at 10:00 a.m.
(c) Participants will meet at--
Camp Edwards Welcome Center
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil http://www.acq.osd.mil/dpap/dars/dfars/index.htm
(End of provision
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
None
SECTION 00100
Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. SCOPE
http://farsite.hill.af.mil/ http://www.acq.osd.mil/dpap/dars/dfars/index.htm
1.1. You are invited to submit a proposal in response to our Request for Proposal (RFP)
W912SV-14-R-0001entitled “Regional Training Institute (RTI)”, Project Number 250095, at Camp
Edwards. As a result of this solicitation, the Government intends to award a single Firm Fixed Price
(FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
1.2. This solicitation is set-aside 100% for small businesses.
2. NOTICE OF PRE-PROPOSAL CONFERENCE
2.1.1. A pre-proposal conference will be conducted on April 14, 2014 at 10:00 a.m. for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation.
This conference will be held at the Welcome Center, Building 1805 at Camp Edwards, MA. Interested
Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.
2.1.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email name of individuals who will attend to MAJ Jonathan Carney and Mr. Bill Pettingell at the following addresses: jonathan.w.carney.mil@mail.mil and william.r.pettingell.nfg@mail.mil.
2.1.3. This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
2.1.4. Visitors must wait at the main gate in order to be escorted to location. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers
License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable.
Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
2.1.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
2.1.6. A record of the conference shall be made and furnished to all prospective offerors via posting to http://www.fbo.gov . The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
3.1. Submit all questions by email to the contracting office at the address shown below.
Contacting anyone other than the below POCs via email will either delay receipt of your questions or result in your questions not being received.
mailto:jonathan.w.carney.mil@mail.mil mailto:william.r.pettingell.nfg@mail.mil http://www.fbo.gov/
Subject Line: Reference No. W912SV-14-R-0001
Email: erika.l.reinikainenrovinelli.mil@mail.mil and shawn.m.brown4.mil@mail.mil
INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING
INFORMATION.
Date of Proposal Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Phone Number: _____________________________ Fax Number:______________________________
Email address: ________________________________________________________________________
Proposal Inquiry: Be specific as to part of solicitation you are questioning.
3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
3.3. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing.
OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS
PROCESS.
3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to our web site at:
http://www.fbo.gov.
3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions
(on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.
FedBizOpps registration requires the following information:
3.4.2.1. The solicitation and associated information and the plans and specifications will be available only from the Federal Business Opportunities (FedBizOpps) website on-line at https://www.fbo.gov/ . FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information: Marketing
Partner Identification Number (MPIN), 2) DUNS Number and CAGE Code, 3) Telephone Number, 4)
Email address. Registration instructions can be found on the FedBizOpps website at mailto:erika.l.reinikainenrovinelli.mil@mail.mil mailto:shawn.m.brown4.mil@mail.mil https://www.fbo.gov/ https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. (Please note the registration for access to the secure site takes approximately 15 business days. PLAN ACCORDINGLY) Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents.
Contractors who do not already have a MPIN are advised that the normal processing is 7 to 15 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on FBO. See video in vendor guide at 3.3 on advanced functions for other information. . Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation with their MPIN. Bidders/Offerors cannot log into the FedBizOpps home page and search for data.
3.4.2.2. Effective May 29, 2012 Government systems such as CCR and ORCA (on-line representations and certifications) migrated to in System for Award Management (SAM). Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register. Instructions for registering are on the web page.
4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS
4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary.
Such amendments, if any, will be announced by an amendment or amendments to this Request for
Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted on the following website: http://www.fbo.gov
4.2. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the lasted information.
5. HAND CARRIED PROPOSALS/INVITATIONS
5.1. A bid repository is provided for hand carried proposals and is located at 2 Randolph Road, Hanscom AFB, MA. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.
5.2. Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined in paragraph 5.3 for entry. Delays are probable at the entry point and should be accommodated for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
5.3. Offerors must provide the below information to the provided emails in paragraph 3.1 above at least 72 hours in advance of base entry.
Firm Name
Individuals Name/Number in Party
Estimated Time of Arrival
6. WAGE DETERMINATION
https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf https://www.sam.gov/portal/public/SAM/
6.1. Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are General Decision Number MA140001, Modification Number 3 dated 03/28/2014 for Barnstable County.
In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of this solicitation, it is the offeror’s responsibility to insure the most recent determination is used in preparing the proposal. An Amendment will not be issued prior to closing to change Wage Determination dates and/or numbers. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage
Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c)(4) will apply.
6.2. Applicable wage rates can be found at
http://www.wdol.gov/wdol/scafiles/davisbacon/MA1.dvb?v=3
7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
8. REMOVAL OF SECTIONS AT TIME OF AWARD
Sections 00100, 00110, 00120, 00600 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
9. DISPOSITION OF UNSUCCESSFUL PROPOSALS
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals.
The Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.
10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES
It has been determined that all temporary utilities shall be the responsibility of the contractor. The contractor will pay all charges (hook up fees, metering, monthly usage, etc.) resulting from temporary utilities. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-
14, Availability and Use of Utility Services)
11. EXCEPTIONS
11.1. If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00800) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but http://www.wdol.gov/wdol/scafiles/davisbacon/MA1.dvb?v=3 shall only include information relevant to exceptions taken to the solicitation requirements.) The
Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
12. CLAUSES
12.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
12.2. Clauses and provisions in this document may not appear in consecutive order.
13. List of Brand Name or Sole Source Justifications posted on FBO
13.1. The Brand Name items contained in the plans and/or specifications and ensuing justification document are included in order to meet and avoid compatibility and continuity issues. The “Best
Cormax” patented system (7 pin, Type A2, Keyway X10W, Keystamp KS717, Finish 626) door locks are the only lock set on Camp Edwards. These keys cannot be copied by any outside locksmiths and/or hardware stores and is needed to maintain 100% key control access. The AES Intellinet Transreceiver is the only device that operates within the dedicated fire alarm radio frequency controlled by Camp
Edwards. Although these items are Brand Name specific they can be provided and or installed by varying manufacturers, vendors and installers which promotes competition. Please see the Brand Name
Justification document posted with this solicitation on FedBizOpps for additional information.
End of Section 00100
SECTION 00110
SECTION 00110 SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. PROPOSAL PREPARATION INSTRUCTIONS
1.1. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section
00100, FAR Provision 52.215-1, Instruction to Offerors – Competitive Acquisition.
1.2. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure the submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award.
2. RESERVED
3. PROPOSAL CONTENT
3.1. Prospective offerors shall submit the following volumes in two separate packages:
3.1.1. Submit Volume 1, Price proposal, pro forma documents, in original and (3) three hard copies, in accordance with instructions contained herein and;
3.1.2. Volume 2, (Part 1) Technical Capability Proposal and (Part 2) Past/Present Performance information in original and three (3) hard copies and one (1) CD/DVD.
3.1.3. Offerors are cautioned to carefully review the proposal requirements for these Volumes and ensure a complete proposal is submitted.
3.2. PROPOSAL DUE DATE SCHEDULE
3.2.1. The entire proposal (Volumes 1 and 2 and the CD/DVD copy) are due by the date and time set for the receipt of proposals shown in Block 13 of the SF 1442. Past performance references should provide questionnaire responses to the Contracting Officer not later than the closing date.
3.2.2. After compiling all required information, submit original and specified number of copies to the issuing office listed in Block 7 of the SF 1442. Mark the front of the envelope/box with the following:
“PROPOSAL No. W912SV-14-R-0001, DO NOT OPEN--- Competitive Acquisition”.
3.3. PROPOSAL FORMAT
3.3.1. Purpose: These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposed data. The proposal shall include all of the information requested in the specific instructions. Failure to include all information requested may adversely affect the evaluation.
3.3.2. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
3.3.3. Offerors are cautioned to submit enough information to enable the evaluators to fully ascertain each offeror’s capability to perform all of the requirements contemplated by this solicitation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.
3.3.4. Written proposals shall be prepared on standard 8.5 x 11 inch paper (charts may be landscaped but must be on 8.5 x 11 inch paper) and shall be in a legible font size (10). All pages of each proposal shall be appropriately numbered, and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required. Type size for graphics, charts, diagrams and tables shall be of an appropriate font and size for the application, and must be clearly readable without magnification assistance to the normal eye. Text lines will be no less than single-space. To the maximum extent practicable, proposal submission shall be double sided.
3.3.5. Binding: Elaborate format and binding are neither necessary nor desirable. All binders will be capable of lying flat when opened. Three ring binders are preferred. The cover and spine of each binder will clearly identify the offeror’s name, Project number, RFP number, RFP title and copy number, (e.g. copy 2 of 3). The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages.
3.3.6. Indexing: Each binder will contain a “Table of Contents” for that volume. The “Table of
Contents” will identify major areas, paragraphs and subparagraphs by number and title, as well as by page number and volume locations. Tab indexing will be used to identify Sections as appropriate.
3.3.7. Electronic Copy: Provide one (1) electronic copy of all Volume 2 of the proposal information and the introductory page in Volume 1. Electronic copies shall be submitted on CD/DVD saved in Microsoft Word format or Adobe Acrobat. (“Read Only” files are acceptable). All disks shall be virus checked prior to submission.
3.3.8. If revised proposals are requested, all proposal revisions shall be submitted on colored paper as page changes with each page identified by date and page number. Revised pages shall be printed on one side and punched with a 3-hole punch along the left margin. The number of revised copies to be submitted is the same as the initial proposal.
3.3.9. Offeror may, at the discretion of the Government, be asked to provide clarifications regarding their proposals in accordance with FAR 15.306 (a). Requests for such information do not constitute discussions.
3.3.10. The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.
3.4. PROPOSAL VOLUME CONTENTS: Each offeror’s proposal shall be submitted as set forth below and all information shall be confined to the appropriate part to facilitate independent evaluation. Proposals, which do not include the requested minimum information, may be eliminated from further consideration for award.
3.4.1. VOLUME 1, PRICE/COST INFORMATION AND PRO FORMA DOCUMENTS
3.4.1.1. Offerors shall provide all price/cost information necessary to provide a meaningful basis for
Government's analysis and evaluation of price/cost for the project set forth in Section 00120 of this solicitation.
The Government is not, and does not intend on, requesting certified cost or pricing data. Offerors may be required during the evaluation process to provided sufficient price/cost information that will enable the Government to perform a meaningful evaluation. If an offeror proposes an unusually low price, the offeror should also provide rationale to justify the price. Detailed requirements follow:
3.4.1.2. Provide an introductory page to include Cage Code, DUNS Number, Tax Identification
Number (TIN), points of contact, authorized negotiators, contact phone, facsimile numbers, and email addresses.
Also, include your business socioeconomic status, e.g. small business, woman-owned small business, HUBZone small business, etc.
3.4.1.3. Offer and Section 00010 – Complete in its entirety the “Offeror” portion of the Standard Form
(SF) 1442. An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF 1442 is required to have an original signature.
3.4.1.4. Section 00010 – Insert the price/cost associated with the project in the line items. All line items (CLINs) must be priced to be considered.
3.4.1.5. Section 00010- Insert pricing in Forward Pricing Schedule (Exhibit F) All offerors shall provide pricing for the Forward Pricing Schedule. Failure to provide prices for all line items and or the
Forward Pricing Schedule shall make the proposal non-compliant with the solicitation requirements and eliminated from the competition, without further evaluation.
3.4.1.6. Representations and Certifications- Section 00600- insert the required certifications and representations and return only those shown in section 00600. Return the entire Section 00600 with your proposal.
All other required representations and certifications are to be completed on line in “ORCA”.
3.4.1.7. Effective May 29, 2012 Government systems such as CCR and ORCA (on-line representations and certifications) migrated to System for Award Management (SAM). Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number http://www.sam.gov/portal/public/SAM/ register. Instructions for registering are on the web page. Complete annual Representations and Certifications on line at “SAM” if you have not already done so. You are not required to provide a copy of the Representations and
Certifications completed in ORCA with your written proposal. DO include any Representations and Certifications and other statements of offerors contained in Section 00600 of this solicitation, which are in addition to the annual certifications on ORCA. Information provided on your introductory page will assist us in locating and verifying your data in (CCR) and ORCA.
3.4.1.8. Provide on Exhibit D the number of days after the Notice to Proceed (NTP) is issued that
Options #1 through # 4 can be exercised and not affect contract price or performance period given a notice to proceed (NTP) on or about 21 October 2014. The information provided will be incorporated in any unexercised options at time of contract award and will be used as a basis for exercising of options after award. (Exhibit D information is provided for informational purposes only and not for evaluation, however the Government reserves the right to negotiate the acceptance period with the apparent successful offeror, if in the Government’s interest).
3.4.1.9. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the
Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the Central Contractor Registration (CCR) database.
Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1).
Submit with the proposal any size determination for the Joint Venture entity received from the Small Business
Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business
Administration ( IAW FAR 19.302 (b)) to determine eligibility. Note that there were significant changes in 2011 to the SBA requirements for a Joint venture agreement. Ensure that you have the most up to date regulations from the
Small Business Administration. All questions regarding this must be directed the Small Business Administration and not the Contracting Officer.
3.4.2. VOLUME 2, PART 1, OFFEROR TECHNICAL CAPABILITY PROPOSAL
3.4.2.1. Volume 2 Part 1 is obtained for the purposes of evaluating an offeror’s technical capability to perform a project of this size and complexity. This factor is comprised of two (2) subfactors.
Subfactor 1 Contractor Experience and Capability and Subfactor 2: LEED® Experience and Capability United States
Green Building Council (USGBC) LEED® standards. The technical capability proposal (Volume 2 Part 1) is limited to 10 pages excluding tabs, indexes, and resumes.
3.4.2.1.1. Subfactor 1: Demonstrate offerors technical experience and capability to perform a project of this magnitude and complexity. Discuss and provide experience of key construction personnel including, but not limited to, Project Manager, Site Superintendent(s), Quality Assurance Manager/CQC System
Manager (on site), Site engineering personnel. Discuss any previous projects that are similar to this project in terms of scope, size and complexity. If no experience so state and indicate in detail how you plan to overcome this lack of experience. The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience. (Resumes or experience cut sheets are limited to 2 pages each and are not part of the page count.) In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered.
3.4.2.1.2. Subfactor 2: Discuss company experience with building to United States Green
Building Council (USGBC) LEED® standards. Indicate any previous projects that achieved USGBC LEED® certification, any level of recognition. Additionally, indicate the key construction personnel and demonstrate they have experience and required qualifications in assigned roles with building to USGBC LEED® standards. If no experience so state and indicate in detail how you plan to overcome this lack of experience. The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience. (Resumes or experience cut sheets are limited to 2 pages each and are not part of the page count.) In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered.
3.4.3. VOLUME 2, PART 2 OFFEROR PAST/PRESENT PERFORMANCE INFORMATION
3.4.3.1. Volume 2 Part 2 is obtained for the purpose of evaluating Past/Present Performance.
Past/Present Performance includes current/on-going performance that is complete to 75% or greater. Volume 2 includes the offeror’s Performance Relevancy Questionnaire, Exhibit A Parts 1 and 2; and any discussion and or additional information, awards, letters, etc. concerning past/present performance the offeror includes.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .