B07_-_Pre-Proposal_Meeting_Minutes.pdf

PDF 300 KB Posted

Attached to
MUNITION LOAD CREW TRAINING FACILITY Federal contract opportunity
Solicitation number
W912R1-19-B-5002
Issued by
Department of the Army National Guard National Capital Region Integrated Air Defense System

View the file

Other files for this federal contract opportunity

Other files attached to MUNITION LOAD CREW TRAINING FACILITY, newest first.
File Type Posted
B07_-_W912R119B5002_Questions_Answers2___pond_responses_13_Aug_19_revisions.docx DOCX document
3029_AUG2009_COMM.pdf PDF
07_54_19.pdf PDF
07_42_63.pdf PDF
DCANG_Geotech_Comb_Report.pdf PDF
B07_-_CONTRACTOR_SPREADSHEET_FOR_BASE_ENTRY-.xlsx XLSX spreadsheet
Amendment_0003.pdf PDF
B07_-_CONTRACTOR_SPREADSHEET_FOR_BASE_ENTRY_-.xlsx XLSX spreadsheet
B07_-_W912R119B5002_Questions_Answers.pdf PDF
JBAB_Map.pdf PDF
B07_Pre-Solicitation_Presentation_MLCTF.pptx PPTX presentation
B07_-_Pre-Proposal_Sign-In_Sheet.pdf PDF
General_Civil_and_Telecommunications_10-4-17_(2)DCANG.pdf PDF
General_Civil_and_Telecommunications_10-4-17(3)DCANG.pdf PDF
General_Civil_and_Telecommunications_10-4-17_(1)DCANG.pdf PDF
ARCH_SET_10-2-17_DCANG_Pages_1-9_.pdf PDF
ARCH_SET_10-2-17_DCANG_Pages_19-35.pdf PDF
ARCH_SET_10-2-17_DCANG_Pages_10-18.pdf PDF
MECH_SET_9-29-17_DCANG.pdf PDF
FP_SET_9-27-17_DCANG.pdf PDF
W912R119B5002FINAL.pdf PDF
PL_SET_9-29-17_DCANG.pdf PDF
MLCT_Specification_Vol_1.pdf PDF
A02_-_JA_Other_than_Full__Open__MTL_(JA)_Redacted.pdf PDF
STR_SET_9-29-17_DCANG.pdf PDF
MLCT_Specification_Vol_2.pdf PDF
ELEC_SET_10-2-17_DCANG.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRICT OF COLUMBIA NATIONAL GUARD

UNITED STATES PROPERTY AND FISCAL OFFICE

189 POREMBA COURT SW, BUILDING 350

JOINT BASE ANACOSTIA-BOLLING

WASHINGTON, DC 20373-5814

NGDC-PFO-P&C 26 July 2019

MEMORANDUM FOR RECORD

SUBJECT: MINUTES OF PRE-PROPOSAL CONFERENCE AND SITE VISIT, SOLICITATION

W912R1-19-B-5002, MUNITION LOAD CREW AND TRAINING FACILITY

25 JULY 2019/0930/1100/90 Minutes

1. The list of contractors attending the meeting is shown on the attached sign-in sheet. The following Government representatives attended the subject meeting:

Name Position SMSgt. Jeffrey Earle Contract Specialist LtCol. Brian Jackson Base Civil Engineer Major Marcus Hunt Depty Base Civil Engineer/COR Mr. Paul McDonald Contracting Officer Representative (COR)

2. The following items were discussed during the Pre-proposal Conference:

a. The Contract period is 545 days. This includes all work to include cleanup and punch list. We anticipate award of the contract in mid-September. Following receipt and approval of bonds we will hold a pre-construction conference and issue NTP.

b. Interested offerors must be registered in SAM. To register go to:

https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register.

3. A power point slide presentation on the project specifics and the selection process was provided to all attendees. (Attached).

4. Questions must be submitted in writing via email, especially technical question to to ng.dc.dcarng.mbx.pc-requirement-request@mail.mil. DO NOT CONTACT the Designing Engineers or the Government Engineers. All questions must be routed through the Contracting Office. All Contractor questions when answered will be posted to the FBO (www.fbo.gov) website. If a question arises that will result in a change to the plans or specifications, an official amendment will be issued. All correspondence, questions and answeres, amendments etc. will be issued or posted at www.fbo.gov. Reminder, All questions or concerns will be submitted five working days prior to proposal due date (07 August 2019).

5. Attendees walked or drove to the project site where they walked the footprint of the project and took pictures.

6. Question: Will there be a separate gate or entrance for the project? The main gate entrance to the base will be the Pearl Harbor gate and there is a separate gate to the flightline to the project. Four people will be required to get a special badge as escorts to be used to enter the separate gate to the flightline. These four individuals can escort up to 7 people. More information will be provided to awardee at pre-construction meeting.

http://www.sam.gov/portal/public/SAM/ mailto:ng.dc.dcarng.mbx.pc-requirement-request@mail.mil http://www.fbo.gov/ http://www.fbo.gov/

SUBJECT: MINUTES OF PRE-PROPOSAL CONFERENCE AND SITE VISIT, SOLICITATION

W912R1-19-B-5002, MUNITION LOAD CREW AND TRAINING FACILITY

7. Question: Will there be water available? Water and Electric will be made available at no cost.

8. Any amendments that are issued will be posted to the webtsite. Contractors were advised to check the website frequently.

9. The pre-proposal conference and site visit concluded at 1100 hours.

Approved JAMES O. ROBINSON, LTC

CONTRACTING OFFICER

Attachements Sign-In Sheet Power Point Slides Joint Base Anacostia-Bolling Base Map

2019-07-28T15:43:41-0400
ROBINSON.JAMES.OSCAR.1059280631

File details come from the government source that posted it.