07_54_19.pdf
PDF 90 KB Posted
- Attached to
- MUNITION LOAD CREW TRAINING FACILITY Federal contract opportunity
- Solicitation number
- W912R1-19-B-5002
About this file
Specification Section 07 54 19 - Polyvinyl-Chloride Roofing
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DCANG Muni t i ons Cr ew Loadi ng Faci l i t y 1170032 Type B. 3 Submi t t al AJXF039040
SECTI ON 07 54 19
POLYVI NYL- CHLORI DE ROOFI NG
02/13
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN NATI ONAL STANDARDS I NSTI TUTE ( ANSI )
ANSI / SPRI ES- 1 ( 2003) Wi nd Desi gn St andar d f or Edge Syst ems Used wi t h Low Sl ope Roof i ng Syst ems
AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)
ASCE 7 ( 2017) Mi ni mum Desi gn Loads f or Bui l di ngs and Ot her St r uct ur es
AMERI CAN SOCI ETY OF SAFETY PROFESSI ONALS ( ASSP)
ASSP A10. 24 ( 2014) Roof i ng - Saf et y Requi r ement s of Low- Sl oped Roof s
ASTM I NTERNATI ONAL ( ASTM)
ASTM D4434/ D4434M ( 2015) St andar d Speci f i cat i on f or Pol y( Vi nyl Chl or i de) Sheet Roof i ng
ASTM D6754/ D6754M ( 2010) St andar d Speci f i cat i on f or Ket one Et hyl ene Est er Based Sheet Roof i ng
ASTM E108 ( 2011) Fi r e Test s of Roof Cover i ngs
FM GLOBAL ( FM)
FM 4470 ( 2010) Si ngl e- Pl y, Pol ymer - Modi f i ed Bi t umen Sheet , Bui l t - up Roof ( BUR) , and Li qui d Appl i ed Roof Assembl i es f or Use i n Cl ass 1 and Noncombust i bl e Roof Deck Construction
FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/
I NTERNATI ONAL CODE COUNCI L ( I CC)
I CC I BC ( 2018) I nt er nat i onal Bui l di ng Code
NATI ONAL ROOFI NG CONTRACTORS ASSOCI ATI ON ( NRCA)
NRCA 3619 ( 2004) Qual i t y Cont r ol Gui del i nes f or Appl i cat i on of Pol ymer - Modi f i ed Bi t umen Roofing
SECTI ON 07 54 19 Page 1
NRCA 3740 ( 2005) The NRCA Wat er pr oof i ng Manual
U. S. DEPARTMENT OF ENERGY ( DOE)
Ener gy St ar ( 1992; R 2006) Ener gy St ar Ener gy Ef f i c i ency Label i ng Syst em ( FEMP)
UNDERWRI TERS LABORATORI ES ( UL)
UL 790 ( 2004; Repr i nt Jul 2014) St andar d Test Met hods f or Fi r e Test s of Roof Cover i ngs
1. 2 SUMMARY
Adher ed pol yvi nyl - chl or i de ( PVC) r oof membr ane syst em appl i ed over r ecover y boar d subst r at e. I ncor por at e ai r bar r i er i n t he r oof assembl y as speci f i ed i n Sect i on 07 22 00 ROOF AND DECK I NSULATI ON.
1. 3 ASSEMBLY REQUI REMENTS
Pr ovi de r oof i ng membr ane sheet wi dt hs consi st ent wi t h membr ane at t achment met hods and wi nd upl i f t r equi r ement s, and as l ar ge as pr act i cal . I n or der t o mi ni mi ze j oi nt s and 3- way over l aps, pr ef abr i cat ed sheet s ar e not accept ed. Pr ovi de membr ane whi ch i s f r ee of def ect s and f or ei gn mat er i al .
Coor di nat e f l ashi ng wor k t o per mi t cont i nuous r oof - sur f aci ng oper at i ons.
I nst al l i nsul at i on and weat her pr oof ed pl anned sect i ons on t he same day.
1. 3. 1 Fi r e Resi st ance
Compl et e r oof syst em assembl y:
a. Cl ass A r at ed i n accor dance wi t h ASTM E108, FM 4470, or UL 790; and
b. Be l i s t ed as Cl ass I r oof deck const r uct i on i n FM APP GUI DE.
FM or UL appr oved component s of t he r oof cover i ng assembl y must bear t he appr opr i at e FM or UL l abel .
1. 3. 2 Wi nd Upl i f t Resi st ance
Pr ovi de a compl et e r oof syst em assembl y t hat i s r at ed and i nst al l ed t o r esi st wi nd l oads i ndi cat edcal cul at ed i n accor dance wi t h ASCE 7 and val i dat ed by upl i f t r esi st ance t est i ng i n accor dance wi t h Fact or y Mut ual ( FM) t est pr ocedur es. Do not i nst al l non- r at ed syst ems, except as appr oved by t he Cont r act i ng Of f i cer . Submi t Engi neer i ng cal cul at i ons, s i gned, seal ed, and dat ed by a Regi st er ed Engi neer val i dat i ng t he wi nd r esi st ance per ASCE 7, and ANSI / SPRI ES- 1 of non- r at ed r oof syst em. Base wi nd upl i f t measur ement s on a desi gn wi nd speed of as i ndi cat ed on t he st r uct ur al drawings mph i n accor dance wi t h ASCE 7 and ot her appl i cabl e bui l di ng code requirements.
1. 3. 3 Sol ar Ref l ect ance I ndex ( SRI )
SRI measur es t he r oof ' s abi l i t y t o r ej ect sol ar heat , def i ned such t hat a st andar d bl ack ( r ef l ect ance 0. 05, emi t t ance 0. 90) i s 0 and a st andar d whi t e ( r ef l ect ance 0. 80, emi t t ance 0. 90) i s 100. Use r oof i ng mat er i al s havi ng mi ni mum appr opr i at e SRI f or mor e t han 75 per cent of r oof sur f ace ( l ow sl ope ( l ess t han 2: 12) SRI gr eat er t han 78; hi gh s l ope ( gr eat er t han 2: 12) SRI
SECTI ON 07 54 19 Page 2 gr eat er t han 29) .
1. 4 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Section 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Det ai l Dr awi ngs; G
Roof Pl an; G
SD- 03 Pr oduct Dat a
PVC Roof i ng Membr ane; G
Ener gy St ar Label f or r oof membr ane; S
Heat I s l and Reduct i on; S
Bondi ng Adhesi ve
Flashing
Membr ane Fast ener s and Pl at es
Roof I nsul at i on
Pr ot ect i on Mat
Pr e- Manuf act ur ed Accessor i es
Wat er Cut of f s
I nf or mat i on Car d
SD- 05 Desi gn Dat a
Wi nd Upl i f t Resi st ance; G
SD- 07 Cer t i f i cat es
Qual i f i cat i on of Manuf act ur er
Qual i f i cat i ons of Appl i cat or
Qual i f i cat i on of Engi neer of Recor d
Wi nd Upl i f t Resi st ance
Fi r e Resi st ance cl assi f i cat i on
Mi ni mum Pol ymer Thi ckness
SECTI ON 07 54 19 Page 3
Sample War r ant y; G
SD- 08 Manuf act ur er ' s I nst r uct i ons
Appl i cat i on Met hod; G
Membr ane Fl ashi ng; G
Per i met er At t achment
Auxi l i ar y Fast ener s
Pr ot ect i on Mat
Pr e- Manuf act ur ed Accessor i es
Col d Weat her ; G
SD- 11 Cl oseout Submi t t al s
Warranty ; G
I nf or mat i on Car d; G
I nst r uct i ons t o Gover nment Per sonnel ; G
1. 5 QUALI TY ASSURANCE
1. 5. 1 Qual i f i cat i on of Manuf act ur er
Pol yvi nyl - Chl or i de sheet r oof i ng syst em manuf act ur er must have a mi ni mum of 5 year s exper i ence i n manuf act ur i ng PVC r oof i ng pr oduct s.
1. 5. 2 Qual i f i cat i ons of Appl i cat or
Roof i ng syst em appl i cat or must be appr oved, aut hor i zed, or l i censed i n wr i t i ng by t he PVC sheet r oof i ng syst em manuf act ur er and have a mi ni mum of f i ve year s exper i ence as an appr oved, aut hor i zed, or l i censed appl i cat or wi t h t hat manuf act ur er and be appr oved at a l evel capabl e of pr ovi di ng t he speci f i ed war r ant y. Suppl y t he names, l ocat i ons and cl i ent cont act i nf or mat i on of f i ve pr oj ect s, wi t hi n t he pr evi ous t hr ee year s, of s i mi l ar s i ze and scope t hat t he appl i cat or has const r uct ed usi ng t he manuf act ur er ' s r oof i ng pr oduct s submi t t ed f or t hi s pr oj ect .
1. 5. 3 Qual i f i cat i on of Engi neer of Recor d
Engi neer of Recor d must be cur r ent l y l i censed wi t hi n t he j ur i sdi ct i on of t he pr oj ect .
Engi neer of Recor d must suppl y t he names and l ocat i ons of f i ve pr oj ect s of s i mi l ar s i ze and scope f or whi ch he has pr ovi ded engi neer i ng cal cul at i ons usi ng t he manuf act ur er ' s pr oduct s submi t t ed f or t hi s pr oj ect wi t hi n t he pr evi ous t hr ee year s. Engi neer of Recor d must pr ovi de cer t i f i ed engi neer i ng cal cul at i ons f or :
Wi nd upl i f t r equi r ement s i n accor dance wi t h Local and St at e codes
ASCE 7, i n accor dance wi t h I CC I BC.
SECTI ON 07 54 19 Page 4
Sei smi c r equi r ement s per l ocal and st at e bui l di ng codes
Sei smi c r equi r ement s per I CC I BC Chapt er 16, Sect i on 1613
Snow l oad r equi r ement s per I CC I BC Chapt er 16 Sect i on 1608 and Sect i on 7 of
ASCE 7
1. 5. 4 Conf or mance and Compat i bi l i t y
Pr ovi de an ent i r e r oof i ng and flashing syst em t hat i s i n accor dance wi t h speci f i ed and i ndi cat ed r equi r ement s, i ncl udi ng f i r e and wi nd r esi st ance.
1. 5. 5 Pr er oof i ng Conf er ence
Af t er appr oval of submi t t al s and bef or e per f or mi ng r oof i ng and i nsul at i on syst em i nst al l at i on wor k, hol d a pr er oof i ng conf er ence t o r evi ew t he following:
a. Dr awi ngs, i ncl udi ng r oof pl an, speci f i cat i ons and submi t t al s r el at ed t o t he r oof wor k. Fi el d i nspect i on and ver i f i cat i on of al l exi st i ng condi t i ons, i ncl udi ng al l f i r e saf et y i ssues, exi st i ng st r uct ur e, and exi st i ng mat er i al s, i ncl udi ng conceal ed combust i bl es, whi ch may r equi r e addi t i onal pr ot ect i on dur i ng i nst al l at i on.
b. Roof syst em component s i nst al l at i on;
c. Pr ocedur e f or t he r oof manuf act ur er ' s t echni cal r epr esent at i ve' s onsi t e i nspect i on and accept ance of t he r oof i ng subst r at e, and r oof i ng subst r at e, t he name of t he manuf act ur er ' s t echni cal r epr esent at i ves, t he f r equency of t he onsi t e v i s i t s, di st r i but i on of copi es of t he i nspect i on r epor t s f r om t he manuf act ur er ' s t echni cal r epr esent at i ve t o r oof manuf act ur er ;
d. Cont r act or ' s pl an f or coor di nat i on of t he wor k of t he var i ous t r ades i nvol ved i n pr ovi di ng t he r oof i ng syst em and ot her component s secur ed t o t he r oof i ng; and
e. Qual i t y cont r ol ( NRCA 3619) pl an f or t he r oof syst em i nst al l at i on;
f . Saf et y r equi r ement s.
Coor di nat e pr er oof i ng conf er ence schedul i ng wi t h t he Cont r act i ng Of f i cer .
The conf er ence must be at t ended by t he Cont r act or , t he Cont r act i ng Of f i cer ' s desi gnat ed per sonnel , per sonnel di r ect l y r esponsi bl e f or t he i nst al l at i on of r oof i ng and i nsul at i on, f l ashi ng and sheet met al wor k, ot her t r ades i nt er f aci ng wi t h t he r oof wor k, desi gnat ed saf et y per sonnel t r ai ned t o enf or ce and copy wi t h ASSP A10. 24, and a r epr esent at i ve of t he r oof i ng mat er i al s manuf act ur er . Bef or e begi nni ng r oof i ng wor k, pr ovi de a copy of meet i ng not es and act i on i t ems t o al l at t endi ng par t i es. Not e act i on i t ems r equi r i ng r esol ut i on pr i or t o st ar t of r oof wor k.
1. 6 DETAI L DRAWI NGS
Submit r oof pl an depi ct i ng wi nd l oads and boundar i es of enhanced per i met er and cor ner at t achment s of r oof syst em component s, l ocat i on of per i met er hal f - sheet s, spaci ng of per i met er , cor ner , and i nf i el d f ast ener s, as appl i cabl e. Pr ovi de dr awi ngs t hat r ef l ect t he pr oj ect r oof pl an of each
SECTI ON 07 54 19 Page 5 r oof l evel and condi t i ons i ndi cat ed. Submi t bi ds wi t h appr oved det ai l dr awi ngs and speci f i cat i ons appr oved and f ur ni shed by t he PVC membr ane manufacturer.
1. 7 DELI VERY, STORAGE, AND HANDLI NG
1. 7. 1 Delivery
Del i ver mat er i al s i n t he manuf act ur er ' s or i gi nal , unopened cont ai ner s and r ol l s wi t h l abel s i nt act and l egi bl e. Mar k and r emove wet or damaged mat er i al s f r om t he s i t e. Wher e mat er i al s ar e cover ed by a r ef er enced speci f i cat i on number , t he cont ai ner must bear t he speci f i cat i on number , t ype, c l ass, and shel f l i f e expi r at i on dat e wher e appl i cabl e. Del i ver mat er i al s i n suf f i c i ent quant i t y t o al l ow wor k t o pr oceed wi t hout interruption.
1. 7. 2 Storage
Pr ot ect mat er i al s agai nst moi st ur e absor pt i on and cont ami nat i on or ot her damage. Avoi d cr ushi ng or cr i nkl i ng of r ol l mat er i al s. St or e r ol l mat er i al s on end on c l ean r ai sed pl at f or ms or pal l et s one l evel hi gh i n dr y l ocat i ons wi t h adequat e vent i l at i on, such as an encl osed bui l di ng or c l osed t r ai l er . Do not st or e r ol l mat er i al s i n bui l di ngs under const r uct i on unt i l concr et e, mor t ar , and pl ast er wor k i s f i ni shed and dr y. Mai nt ai n r ol l mat er i al s at t emper at ur es above 50 degr ees F f or 24 hour s i mmedi at el y bef or e appl i cat i on. Do not st or e mat er i al s out door s unl ess appr oved by t he Cont r act i ng Of f i cer . Compl et el y cover f el t s st or ed out door s, on and of f r oof , wi t h wat er pr oof canvas pr ot ect i ve cover i ng. Do not use pol yet hyl ene sheet as a cover i ng. Ti e cover i ng secur el y t o pal l et s t o make compl et el y weat her pr oof . Pr ovi de suf f i c i ent vent i l at i on t o pr event condensat i on. Do not st or e mor e mat er i al s on r oof t han can be i nst al l ed t he same day and r emove unused mat er i al s at end of each days wor k. Di st r i but e mat er i al s t empor ar i l y st or ed on r oof t o st ay wi t hi n l i ve l oad l i mi t s of t he r oof construction.
a. Mai nt ai n a mi ni mum di st ance of 35 f oot f or al l s t or ed f l ammabl e mat er i al s, i ncl udi ng mat er i al s cover ed wi t h shr i nk wr aps, cr af t paper or t ar ps f r om al l t or ch/ wel di ng appl i cat i ons.
b. I mmedi at el y r emove wet , cont ami nat ed or ot her wi se damaged or unsui t abl e mat er i al s f r om t he s i t e. Damaged mat er i al s may be mar ked by t he Cont r act i ng Of f i cer .
1. 7. 3 Handling
Pr event damage t o edges and ends of r ol l mat er i al s . Do not i nst al l damaged mat er i al s i n t he wor k. Sel ect and oper at e mat er i al handl i ng equi pment t o pr event damage t o mat er i al s or appl i ed r oof i ng.
1. 8 ENVI RONMENTAL REQUI REMENTS
Do not i nst al l r oof i ng syst em when ai r t emper at ur e i s bel ow 40 degr ees F, dur i ng any f or m of pr eci pi t at i on, i ncl udi ng f og, or when t her e i s i ce, f r ost , moi st ur e, or any ot her v i s i bl e dampness on t he r oof deck. Fol l ow manuf act ur er ' s pr i nt ed i nst r uct i ons f or Col d Weat her I nst al l at i on.
1. 9 SEQUENCING
Coor di nat e t he wor k wi t h ot her t r ades t o ensur e t hat component s whi ch ar e
SECTI ON 07 54 19 Page 6 t o be secur ed t o or st r i pped i nt o t he r oof i ng syst em ar e avai l abl e and t hat per manent f l ashi ng and count er f l ashi ng i n accor dance wi t h NRCA 3740, ar e i nst al l ed as t he wor k pr ogr esses. Ensur e t empor ar y pr ot ect i on measur es ar e i n pl ace t o pr ecl ude moi st ur e i nt r usi on or damage t o i nst al l ed mat er i al s.
Appl y r oof i ng i mmedi at el y f ol l owi ng appl i cat i on of i nsul at i on as a cont i nuous oper at i on. Coor di nat e r oof i ng oper at i ons wi t h i nsul at i on wor k so t hat al l r oof i nsul at i on appl i ed each day i s cover ed wi t h r oof membr ane i nst al l at i on t he same day.
1. 10 WARRANTY
Pr ovi de r oof syst em mat er i al and wor kmanshi p war r ant i es. Pr ovi de r evi s i on or amendment t o st andar d membr ane manuf act ur er war r ant y as r equi r ed t o compl y wi t h t he speci f i ed r equi r ement s. Pr ovi de a manuf act ur er ' s war r ant y t hat has no dol l ar l i mi t , cover s f ul l syst em wat er - t i ght ness, and has a mi ni mum dur at i on of 20 year s. Submi t sample cer t i f i cat e.
1. 10. 1 Roof Membr ane Manuf act ur er War r ant y
Fur ni sh t he r oof membr ane manuf act ur er ' s 20- year , no dol l ar l i mi t r oof syst em mat er i al s and i nst al l at i on wor kmanshi p war r ant y, i ncl udi ng f l ashi ng, i nsul at i on, and accessor i es necessar y f or a wat er t i ght r oof syst em const r uct i on. Pr ovi de war r ant y di r ect l y t o t he Gover nment and commence war r ant y ef f ect i ve dat e at t i me of Gover nment ' s accept ance of t he r oof wor k. The war r ant y must st at e t hat :
a. I f wi t hi n t he war r ant y per i od t he r oof syst em, as i nst al l ed f or i t s i nt ended use i n t he nor mal c l i mat i c and envi r onment al condi t i ons of t he f aci l i t y , becomes non- wat er t i ght , shows evi dence of moi st ur e i nt r usi on wi t hi n t he assembl y, spl i t s , t ear s, cr acks, del ami nat es, separ at es at t he seams, or shows evi dence of excessi ve weat her i ng due t o def ect i ve mat er i al s or i nst al l at i on wor kmanshi p, t he r epai r or r epl acement of t he def ect i ve and damaged mat er i al s of t he r oof syst em assembl y and cor r ect i on of def ect i ve wor kmanshi p ar e t he r esponsi bi l i t y of t he r oof membr ane manuf act ur er . Al l cost s associ at ed wi t h t he r epai r or r epl acement wor k ar e t he r esponsi bi l i t y of t he r oof membr ane manufacturer.
b. When t he manuf act ur er or hi s appr oved appl i cat or f ai l t o per f or m t he r epai r s wi t hi n 72 hour s of not i f i cat i on, emer gency t empor ar y r epai r s per f or med by ot her s does not voi d t he war r ant y.
1. 10. 2 Roof i ng Syst em I nst al l er War r ant y
The r oof syst em i nst al l er must war r ant f or a mi ni mum per i od of t wo year s t hat t he r oof syst em, as i nst al l ed, i s f r ee f r om def ect s i n i nst al l at i on wor kmanshi p, t o i ncl ude t he r oof membr ane, f l ashi ng, i nsul at i on, accessor i es, at t achment s, and sheet met al i nst al l at i on i nt egr al t o a compl et e wat er t i ght r oof syst em assembl y. Wr i t e t he war r ant y di r ect l y t o t he Gover nment . The r oof syst em i nst al l er i s r esponsi bl e f or cor r ect i on of def ect i ve wor kmanshi p and r epl acement of damaged or af f ect ed mat er i al s.
The r oof syst em i nst al l er i s r esponsi bl e f or al l cost s associ at ed wi t h t he r epai r or r epl acement wor k.
1. 10. 3 Cont i nuance of War r ant y
Repai r or r epl acement wor k t hat becomes necessar y wi t hi n t he war r ant y per i od must be appr oved, as r equi r ed, and accompl i shed i n a manner so as t o r est or e t he i nt egr i t y of t he r oof syst em assembl y and val i di t y of t he
SECTI ON 07 54 19 Page 7 manuf act ur er war r ant y f or t he r emai nder of t he manuf act ur er war r ant y per i od.
PART 2 PRODUCTS
2. 1 MATERIALS
Coor di nat e wi t h ot her speci f i cat i on sect i ons r el at ed t o t he r oof wor k.
Fur ni sh a combi nat i on of speci f i ed mat er i al s t hat compr i se a r oof syst em accept abl e t o t he r oof membr ane manuf act ur er and meet i ng speci f i ed r equi r ement s. Pr ot ect mat er i al s pr ovi ded f r om def ect s and make sui t abl e f or t he ser vi ce and cl i mat i c condi t i ons of t he i nst al l at i on.
2. 1. 1 PVC Roof Membr ane
Pr ovi de a mi ni mum pol ymer t hi ckness 0. 072 i nch r ei nf or ced PVC as speci f i ed her ei n. Pr ovi de PVC syst em capabl e of obt ai ni ng 20 year war r ant i es and as l i s t ed i n t he appl i cabl e wi nd upl i f t and f i r e r at i ng c l assi f i cat i on listings.
Submi t Dat a as r equi r ed by Sect i on 07 22 00 ROOF AND DECK I NSULATI ON t oget her wi t h r equi r ement s of t hi s sect i on. Pr ovi de dat a t hat i ncl udes wr i t t en accept ance by t he r oof membr ane manuf act ur er of t he i nsul at i on and ot her pr oduct s and accessor i es t o be pr ovi ded by and war r ant ed under t he f ul l syst em guar ant ee of t he r oof membr ane manuf act ur er .
a. Coor di nat e wi t h ot her speci f i cat i on sect i ons r el at ed t o t he r oof wor k.
Fur ni sh a combi nat i on of speci f i ed mat er i al s t hat compr i se a r oof syst em accept abl e t o t he r oof membr ane manuf act ur er and meet i ng speci f i ed r equi r ement s. Pr ovi de mat er i al s f r ee of def ect s and sui t abl e f or t he ser vi ce and cl i mat i c condi t i ons of t he i nst al l at i on. Pr ovi de war r ant ed r oof syst em i n whi ch al l component s ar e sour ced f r om t he PVC r oof membr ane manuf act ur er , i ncl udi ng but not l i mi t ed t o al l i nsul at i on, cover boar ds, accessor i es, adhesi ves and edge met al .
b. For each r oof , f ur ni sh a t ypewr i t t en i nf or mat i on car d f or f aci l i t y r ecor ds and a car d l ami nat ed i n pl ast i c and f r amed f or i nt er i or di spl ay at r oof access poi nt , or a phot oengr aved 0. 032 i nch t hi ck al umi num car d f or ext er i or di spl ay. Pr ovi de car d t hat i s 8 1/ 2 by 11 i nches mi ni mum. On t he i nf or mat i on car d i dent i f y f aci l i t y name and number ;
l ocat i on; cont r act number ; appr oxi mat e r oof ar ea; det ai l ed r oof syst em descr i pt i on, i nc l udi ng deck t ype, membr ane, number of pl i es, met hod of appl i cat i on, manuf act ur er , i nsul at i on and cover boar d syst em and t hi ckness; pr esence of t aper ed i nsul at i on f or pr i mar y dr ai nage, pr esence of vapor r et ar der ; dat e of compl et i on; i nst al l i ng Cont r act or i dent i f i cat i on and cont act i nf or mat i on; membr ane manuf act ur er war r ant y expi r at i on, war r ant y r ef er ence number , and cont act i nf or mat i on.
I nst al l car d at r oof t op or access l ocat i on as di r ect ed by t he Cont r act i ng Of f i cer and pr ovi de a paper copy t o t he Cont r act i ng Of f i cer .
2. 1. 2 Ener gy St ar
Pr ovi de a r oof membr ane t hat i s Ener gy St ar l abel ed. Pr ovi de dat a identifying Ener gy St ar l abel f or r oof membr ane pr oduct .
2. 1. 3 Ener gy Per f or mance
I nst al l a r oof syst em t hat meet s an over al l per f or mance as speci f i ed on t he dr awi ngs or by i nsul at i on speci f i ed i n ot her sect i ons. The r oof i ng syst em wi l l need t o meet t he cr i t er i a f or Cool Roof Pr oduct s. Pr ovi de emi t t ance
SECTI ON 07 54 19 Page 8 and r ef l ect ance per cent ages, sol ar r ef l ect ance i ndex val ues, and sl opes, t o meet sust ai nabl e t hi r d par t y cer t i f i cat i on r equi r ement s f or Heat I s l and Reduction .
2. 1. 4 Bondi ng Adhesi ve
Pr ovi de PVC membr ane manuf act ur er ' s r ecommended adhesi ve, as suppl i ed by r oof membr ane manuf act ur er , and r ecommended by t he manuf act ur er ' s pr i nt ed dat a f or bondi ng of PVC membr ane mat er i al s t o accept abl e i nsul at i on, wood, met al , concr et e or ot her accept abl e subst r at e mat er i al s. Do not use bondi ng adhesi ve t o bond membr ane mat er i al s t o each ot her .
2. 1. 5 Wat er Cut of f Mast i c/ Wat er Bl ock
As suppl i ed by t he r oof membr ane manuf act ur er and r ecommended by t he manuf act ur er ' s pr i nt ed dat a.
2. 1. 6 Membr ane Fl ashi ng
Pr ovi de membr ane f l ashi ng, i ncl udi ng sel f - adher i ng membr ane f l ashi ng, per i met er f l ashi ng, f l ashi ng ar ound r oof penet r at i ons and pr ef abr i cat ed pi pe seal s, of a mi ni mum pol ymer t hi ckness 0. 072 i nch r ei nf or ced PVC f or 20 year war r ant i es, and ut i l i zed as r ecommended and suppl i ed by t he r oof membr ane manuf act ur er or mi ni mum 0. 072 i nch t hi ck r ei nf or ced PVC r oof membr ane and f l ashi ngs f or 20 year war r ant i es. Submi t cer t i f i cat i on f r om PVC membr ane manuf act ur er t hat t he pr oposed PVC membr ane r oof i ng pr oduct meet s t he mi ni mum pol ymer t hi ckness speci f i ed.
2. 1. 7 Membr ane Fast ener s and Pl at es
Coat ed, cor r osi on- r esi st ant f ast ener s as r ecommended and suppl i ed by t he PVC r oof membr ane manuf act ur er and meet i ng t he r equi r ement s of FM 4470 and FM Roof Nav ( www. r oof nav. com) or FM APP GUI DE f or Cl ass I r oof deck const r uct i on and t he wi nd upl i f t r esi st ance speci f i ed. Fast ener s and pl at es t o be suppl i ed and war r ant ed f or t he subst r at e t ype( s) by PVC membr ane manuf act ur er and r ecommended by PVC membr ane manuf act ur er ' s pr i nt ed dat a.
2. 1. 7. 1 St r ess Pl at es, Bar or Rai l f or Fast ener s
Ut i l i ze cor r osi on- r esi st ant st r ess pl at es as r ecommended by t he r oof membr ane manuf act ur er ' s pr i nt ed i nst r uct i ons and meet i ng t he r equi r ement s of FM 4470. St r ess pl at es t o be suppl i ed by PVC r oof membr ane manuf act ur er . For m st r ess pl at es t o pr event di shi ng or cuppi ng.
Manuf act ur er - suppl i ed anchor i ng bar or r ai l s may be ut i l i zed f or hi gh wi nd conditions.
2. 1. 7. 2 Auxi l i ar y Fast ener s
Pr ovi de cor r osi on r esi st ant scr ews, nai l s, or anchor s sui t abl e f or i nt ended at t achment pur pose and be r ecommended and suppl i ed f or use by t he PVC r oof membr ane manuf act ur er .
2. 1. 8 Pr e- manuf act ur ed Accessor i es
Pr ovi de pr e- manuf act ur ed accessor i es shal l be manuf act ur er ' s st andar d f or i nt ended pur pose, must compl y wi t h appl i cabl e speci f i cat i on sect i on, be compat i bl e wi t h t he membr ane r oof syst em and appr oved f or use and suppl i ed by t he PVC r oof membr ane manuf act ur er .
SECTI ON 07 54 19 Page 9
2. 1. 9 Roof I nsul at i on
Pr ovi de i nsul at i on syst em and f acer mat er i al compat i bl e wi t h membr ane appl i cat i on speci f i ed and be appr oved and suppl i ed by t he PVC membr ane r oof manuf act ur er and as speci f i ed i n Sect i on 07 22 00 ROOF AND DECK I NSULATI ON.
2. 1. 10 Wood Pr oduct s
As speci f i ed i n Sect i on 06 10 00 ROUGH CARPENTRY, except t hat f i r e r et ar dant t r eat ed mat er i al s must not be i n cont act wi t h PVC membr ane or PVC accessor y pr oduct s, unl ess appr oved by t he membr ane manuf act ur er and t he Cont r act i ng Of f i cer .
2. 2 Rei nf or ced, PVC Membr ane
Pr ovi de r ei nf or ced pol yvi nyl chl or i de ( PVC) membr ane cont ai ni ng f i ber s or scr i m, and compl yi ng wi t h ASTM D4434/ D4434M, Type I I , Gr ade I or Type I I I or Type I V, f l eece backed, or ASTM D6754/ D6754M, and i n al l cases pr ovi de
0. 072 i nch mi ni mum t hi ckness f or adher ed combi nat i on adher ed/ pr ot ect ed membr ane appl i cat i on. Not wi t hst andi ng t he ASTM st andar ds r ef er enced, pr ovi de r ei nf or ced PVC r oof membr anes havi ng t he mi ni mum, l abel ed t hi ckness speci f i ed. PVC membr ane t hi ckness speci f i ed her ei n i s excl usi ve of backi ng mat er i al on t he bot t om of f l eece- backed membr ane. Pr ovi de pr i nci pal pol ymer used i n manuf act ur e of t he membr ane sheet as PVC, wi t h wi dt h and l engt h of PVC membr ane r oof i ng sheet consi st ent wi t h membr ane at t achment met hods and wi nd upl i f t r equi r ement s, and sheet s i ze as l ar ge as pr act i cal . I n or der t o mi ni mi ze j oi nt s and 3- way over l aps, pr ef abr i cat ed sheet s ar e not accept ed. Maxi mum r ei nf or ced PVC membr ane r oof i ng sheet di mensi ons t o be t he maxi mum wi dt h obt ai nabl e f r om PVC membr ane r oof manuf act ur er i n or der t o mi ni mi ze seams i n t he f i el d of t he r oof .
PART 3 EXECUTI ON
3. 1 EXAMINATION
Ensur e t hat t he f ol l owi ng condi t i ons exi st pr i or t o appl i cat i on of t he r oof i ng mat er i al s:
a. Do not i nst al l i t ems t hat show vi sual evi dence of bi ol ogi cal gr owt h.
b. expansi on j oi nt s, per i met er wal l s, r oof penet r at i ng component s, and equi pment suppor t s ar e i n pl ace.
c. Sur f aces ar e r i gi d, c l ean, dr y, smoot h, and f r ee f r om cr acks, hol es, and shar p changes i n el evat i on.
d. Subst r at e i s s l oped t o pr ovi de posi t i ve dr ai nage.
e. Wal l s and ver t i cal sur f aces ar e const r uct ed t o r ecei ve count er f l ashi ng, and wi l l per mi t mechani cal f ast eni ng of t he base f l ashi ng mat er i al s .
f . Tr eat ed wood nai l er s ar e i n pl ace on non- nai l abl e sur f aces, t o per mi t nai l i ng of base f l ashi ng at mi ni mum hei ght of 8 i nches above f i ni shed r oof i ng sur f ace.
g. Pr essur e- pr eser vat i ve t r eat ed wood nai l er s ar e f ast ened i n pl ace at eaves, gabl e ends, openi ngs, and i nt er sect i ons wi t h ver t i cal sur f aces f or secur i ng of membr ane, edgi ng st r i ps, at t achment f l anges of sheet
SECTI ON 07 54 19 Page 10 met al , and r oof f i x t ur es. Embedded nai l er s ar e f l ush wi t h deck sur f aces. Sur f ace- appl i ed nai l er s ar e t he same t hi ckness as t he r oof insulation.
h. PVC mat er i al s ar e not i n cont act wi t h f i r e r et ar dant t r eat ed wood, except as appr oved by t he PVC membr ane r oof manuf act ur er and Cont r act i ng Of f i cer .
i . Exposed nai l heads i n wood subst r at es ar e pr oper l y set . War ped and spl i t boar ds sheet s have been r epl aced. Ther e ar e no cr acks or end joints 1/ 4 i nch i n wi dt h or gr eat er .
j . I nsul at i on boar ds ar e i nst al l ed smoot hl y and evenl y, and ar e not br oken, cr acked, or cur l ed. Ther e ar e no gaps i n i nsul at i on boar d j oi nt s exceeding 1/ 4 i nch i n wi dt h. I nsul at i on i s at t ached as speci f i ed i n Section 07 22 00 ROOF AND DECK I NSULATI ON. I nsul at i on i s bei ng r oof ed over on t he same day t he i nsul at i on i s i nst al l ed.
3. 2 APPLI CATI ON METHOD
Appl y ent i r e PVC membr ane r oof i ng ut i l i z i ng adher ed appl i cat i on met hods.
Appl y r oof i ng mat er i al s as speci f i ed her ei n unl ess appr oved ot her wi se by t he Cont r act i ng Of f i cer . Submi t i nst r uct i ons i ncl udi ng pat t er n and f r equency of mechani cal at t achment s r equi r ed i n t he f i el d f or r oof , cor ner s, and per i met er s t o pr ovi de f or t he speci f i ed wi nd r esi st ance
3. 2. 1 Speci al Pr ecaut i ons
a. Do not di l ut e coat i ngs or seal ant s unl ess speci f i cal l y r ecommended by t he mat er i al manuf act ur er ' s pr i nt ed appl i cat i on i nst r uct i ons. Do not t hi n l i qui d mat er i al s or c l eaner s used f or c l eani ng PVC sheet .
b. Keep l i qui ds i n ai r t i ght cont ai ner s, and keep cont ai ner s c l osed except when r emovi ng mat er i al s.
c. Use l i qui d component s, i ncl udi ng adhesi ves, wi t hi n t hei r shel f l i f e per i od. St or e adhesi ves at 60 t o 80 degr ees F pr i or t o use. Avoi d excessi ve adhesi ve appl i cat i on and adhesi ve spi l l s , as t hey can be dest r uct i ve t o some t her mopl ast i c sheet s and i nsul at i ons; f ol l ow adhesi ve manuf act ur er ' s pr i nt ed appl i cat i on i nst r uct i ons. Mi x and use l i qui d component s i n accor dance wi t h l abel di r ect i ons and manuf act ur er ' s pr i nt ed i nst r uct i ons.
d. Pr ovi de c l ean, dr y c l ot hs or pads f or appl y i ng membr ane cl eaner s and cl eani ng of membr ane.
e. Do not use heat guns or open f l ame t o expedi t e dr y i ng of adhesi ves or primers.
f . Requi r e wor kmen and ot her s who wal k on t he membr ane t o wear c l ean, sof t - sol ed shoes t o avoi d damage t o r oof i ng mat er i al s.
g. Do not use equi pment wi t h shar p edges whi ch coul d punct ur e t he PVC membr ane r oof i ng sheet .
h. Shut down ai r i nt akes and any r el at ed mechani cal syst ems and seal open vent s and ai r i nt akes when appl y i ng sol vent - based mat er i al s i n t he ar ea of t he openi ng or i nt ake. Coor di nat e shut downs wi t h t he Cont r act i ng Officer.
SECTI ON 07 54 19 Page 11
3. 2. 2 PVC Roof i ng Membr ane
Pr ovi de a wat er t i ght r oof membr ane sheet f r ee of cont ami nant s and def ect s t hat mi ght af f ect ser vi ceabi l i t y . Pr ovi de a uni f or m, st r ai ght , and f l at edge. Pr ovi de and i nst al l onl y f el t - backed membr ane di r ect l y on concr et e deck or ot her har d sur f ace whi ch may ot her wi se damage t he membr ane, absent t he f el t backi ng. Do not pl ace non- f el t - backed PVC membr ane r oof i ng sheet di r ect l y on concr et e deck or ot her har d sur f ace whi ch may damage t he membr ane. Pr ovi de membr ane over l ap of a mi ni mum of 3 i nches at s i des f or adher ed appl i cat i ons and 5. 5- 7 i nches f or mechani cal l y f ast ened appl i cat i ons and mi ni mum 4 i nches at ends. Di r ect i on of l aps must al l ow wat er t o f l ow over and not agai nst t he l ap. I nst al l membr ane j oi nt s t hat ar e f r ee of wr i nkl es and f i shmout hs. Dur i ng t he day of i nst al l at i on, pr obe t he ent i r e l engt h of hot - ai r - wel ded seams and cor r ect any def i c i enci es.
Rewel d def ect i ve ar eas. Cut out any f i shmout hs, or damaged ar eas and cover t he ar ea wi t h membr ane usi ng a cont i nuous hot - ai r - wel ded seam on al l s i des. Pr obe t est r epai r s f or cont i nui t y. Hot - ai r - wel ded seams ar e t o be accompl i shed i n accor dance wi t h t he PVC membr ane r oof i ng manuf act ur er ' s publ i shed r equi r ement s.
3. 2. 2. 1 Nailing
Fast en membr ane t o nai l er s i n accor dance wi t h t he membr ane manuf act ur er ' s appr oved i nst r uct i ons. Unl ess ot her wi se speci f i ed, st agger nai l s on 4 i nch cent er s maxi mum; st agger scr ews f or sheet met al on 8 i nch cent er s maxi mum;
and i nst al l r ows of f ast ener s at l east 1/ 2 i nch f r om edges of sheet met al .
3. 2. 2. 2 Flashing
Fl ash al l r oof edges, pr oj ect i ons t hr ough t he r oof and changes i n r oof pl anes. Seal t he seam a mi ni mum of 3 i nches beyond t he f ast ener s whi ch at t ach t he membr ane t o nai l er s. Secur e t he i nst al l ed f l ashi ng at t he t op of t he f l ashi ng a maxi mum of 12 i nches on cent er s under t he count er f l ashi ng or cap. Wher e possi bl e, i nst al l pr ef abr i cat ed component s f or pi pe seal s and f l ashi ng accessor i es.
3. 2. 2. 3 Expansi on Joi nt s
Cover expansi on j oi nt s usi ng Pr ef abr i cat ed cover s or el ast omer i c f l ashi ng i n accor dance wi t h t he r ecommendat i ons of t he manuf act ur er .
3. 2. 2. 4 Cutoffs
I f wor k i s t er mi nat ed pr i or t o weat her pr oof i ng t he ent i r e r oof , seal t he membr ane t o t he r oof deck. Al so, seal f l ut es i n met al decki ng al ong t he cut of f edge. Pul l t he membr ane f r ee or cut t o expose t he i nsul at i on when r esumi ng wor k and r emove t he cut i nsul at i on sheet s used f or f i l l - i n. Do not use asphal t or coal - t ar pr oduct s f or seal i ng.
3. 2. 2. 5 Walkways
I nst al l wal kways on a l oose- l ai d pad of t he membr ane mat er i al ext endi ng at least 1 i nch beyond t he wal kway mat er i al , and as speci f i ed by t he manuf act ur er . Do not pl ace st one bal l ast bel ow or above wal kways.
3. 2. 3 Adher ed Membr ane Appl i cat i on
Layout membr ane and si de l ap adj oi ni ng sheet s i n accor dance wi t h membr ane
SECTI ON 07 54 19 Page 12 manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Al l ow f or suf f i c i ent membr ane t o f or m pr oper membr ane t er mi nat i ons. Remove dust i ng agent s and di r t f r om membr ane and subst r at e ar eas wher e bondi ng adhesi ves ar e t o be appl i ed. Appl y speci f i ed adhesi ve evenl y and cont i nuousl y t o subst r at e and under si de of sheet s at r at es r ecommended by t he r oof membr ane manuf act ur er ' s pr i nt ed appl i cat i on i nst r uct i ons. When adhesi ve i s spr ay appl i ed, r ol l wi t h a pai nt r ol l er t o ensur e pr oper cont act and cover age.
Do not appl y bondi ng adhesi ve t o sur f aces of membr ane i n seam or l ap ar eas. Al l ow adhesi ve t o f l ash of f or dr y t o consi st ency pr escr i bed by manuf act ur er bef or e adher i ng sheet s t o t he subst r at e. When adhesi ve i s peel and st i ck r el ease paper - act i vat ed, f ol l ow manuf act ur er ' s pr i nt ed i nst r uct i ons. Rol l each sheet i nt o adhesi ve s l owl y and evenl y t o avoi d wr i nkl es; br oom or r ol l t he membr ane t o r emove ai r pocket s and f i shmout hs and t o ensur e adequat el y uni f or m bondi ng of sheet t o subst r at e. For m f i el d hot - ai r - wel ded l aps or seams as speci f i ed and ensur e t hat hot - ai r wel ded di mensi on i s at wi dt h r equi r ed by t he membr ane manuf act ur er ' s i nst al l at i on i nst r uct i ons. Check al l seams and cont i nuous hot - ai r - wel d of al l seams and l ap seal s.
3. 2. 4 Per i met er At t achment
Adhesi ve bond or mechani cal l y secur e r oof membr ane sheet at r oof per i met er i n a manner t o compl y wi t h wi nd r esi st ance r equi r ement s and i n accor dance wi t h membr ane manuf act ur er ' s pr i nt ed appl i cat i on i nst r uct i ons. When adhesi vel y bondi ng a mechani cal l y f ast ened syst em i n per i met er ar eas, t he per i met er boundar y of t he adhesi ve bond must be t he same as t he boundar y r equi r ed f or addi t i onal per i met er mechani cal f ast eni ng t o meet wi nd r esi st ance r equi r ement s.
3. 2. 5 Secur ement at Base Ti e- I n Condi t i ons
Mechani cal l y f ast en t he r oof membr ane at penet r at i ons, at base of cur bs and wal l s, and at al l l ocat i ons wher e t he membr ane t ur ns and angl es gr eat er t han 4 degr ees ( 1: 12) . Space f ast ener s a maxi mum of 12 i nches on cent er , except wher e mor e f r equent at t achment i s r equi r ed t o meet speci f i ed wi nd r esi st ance or wher e r ecommended by t he r oof membr ane manuf act ur er . Cover over f ast ener s wi t h a l ayer of f l ashi ng mat er i al . Hot - ai r - wel d al l seams of f l ashi ng mat er i al as r ecommended by t he r oof membr ane manuf act ur er ' s pr i nt ed dat a.
3. 3 FLASHINGS
Pr ovi de f l ashi ngs i n t he angl es f or med at wal l s and ot her ver t i cal sur f aces and wher e r equi r ed t o make t he wor k wat er t i ght , except wher e met al f l ashi ngs ar e i ndi cat ed.
3. 3. 1 General
Pr ovi de a one- pl y f l ashi ng membr ane, as speci f i ed f or t he syst em used, and i nst al l i mmedi at el y af t er t he r oof i ng membr ane i s pl aced and pr i or t o f i ni sh coat i ng wher e a f i ni sh coat i ng i s r equi r ed. Fl ashi ngs must be st epped wher e ver t i cal sur f aces abut s l oped r oof sur f aces. Pr ovi de sheet met al r egl et i n whi ch sheet met al cap f l ashi ngs ar e i nst al l ed of not mor e than 16 i nch nor l ess t han 8 i nch above t he r oof i ng sur f aces. Exposed j oi nt s and end l aps of f l ashi ng membr ane must be made and seal ed i n t he manner r equi r ed f or r oof i ng membr ane.
SECTI ON 07 54 19 Page 13
3. 3. 2 Membr ane Fl ashi ng
3. 3. 2. 1 Installation
I nst al l f l ashi ng and f l ashi ng accessor i es as t he r oof membr ane i s i nst al l ed. Appl y f l ashi ng t o c l eaned sur f aces and as r ecommended by t he r oof membr ane manuf act ur er and as speci f i ed. Ut i l i ze cur ed PVC membr ane f l ashi ng and pr ef abr i cat ed accessor y f l ashi ngs t o t he maxi mum ext ent r ecommended by t he r oof membr ane manuf act ur er . Li mi t uncur ed f l ashi ng mat er i al t o r ei nf or c i ng i nsi de and out s i de cor ner s and angl e changes i n pl ane of membr ane, and t o f l ashi ng scupper s, pour abl e seal er pocket s, and ot her f or med penet r at i ons or unusual l y shaped condi t i ons as r ecommended by t he r oof membr ane manuf act ur er wher e t he use of cur ed mat er i al i s i mpr act i cal . Ext end base f l ashi ng not l ess t han 8 i nch above r oof i ng sur f ace and as necessar y t o pr ovi de f or seami ng over l ap on r oof membr ane as r ecommended by t he r oof membr ane manuf act ur er .
3. 3. 2. 2 Sealing
Seal f l ashi ng membr ane f or a mi ni mum of 3 i nch on each si de of f ast eni ng devi ce used t o anchor r oof membr ane t o nai l er s. Compl et el y adher e f l ashi ng sheet s i n pl ace. Seam f l ashi ng membr ane i n t he same manner as r oof membr ane, except as ot her wi se r ecommended by t he membr ane manuf act ur er ' s pr i nt ed i nst r uct i ons and appr oved by t he Cont r act i ng Of f i cer . Rei nf or ce al l cor ner s and angl e t r ansi t i ons by appl y i ng uncur ed membr ane t o t he ar ea i n accor dance wi t h r oof membr ane manuf act ur er r ecommendat i ons.
Mechani cal l y f ast en t op edge of base f l ashi ng wi t h manuf act ur er r ecommended t er mi nat i on bar f ast ened at maxi mum 12 i nch on cent er . I nst al l sheet met al f l ashi ng over t he t er mi nat i on bar i n t he compl et ed wor k. Mechani cal l y f ast en t op edge of base f l ashi ng f or al l ot her t er mi nat i ons i n a manner r ecommended by t he r oof membr ane manuf act ur er . Appl y membr ane l i ner over t op of exposed nai l er s and bl ocki ng and t o over l ap t op edge of base f l ashi ng i nst al l at i on at cur bs, par apet wal l s, expansi on j oi nt s and as ot her wi se i ndi cat ed t o ser ve as wat er pr oof l i ni ng under sheet met al f l ashi ng component s.
3. 4 CORRECTI ON OF DEFI CI ENCES
Wher e any f or m of def i c i ency i s f ound, t ake addi t i onal measur es as deemed necessar y by t he Cont r act i ng Of f i cer t o det er mi ne t he ext ent of t he def i c i ency and pr ovi de cor r ect i ve act i on r ecommendat i ons. Per f or m cor r ect i ve act i on as di r ect ed by t he Cont r act i ng Of f i cer .
3. 5 PROTECTI ON OF APPLI ED ROOFI NG
At t he end of t he day' s wor k and when pr eci pi t at i on i s i mmi nent , pr ot ect appl i ed membr ane r oof i ng syst em f r om wat er i nt r usi on.
3. 5. 1 Wat er Cut of f s
St r ai ght en i nsul at i on l i ne usi ng l oose- l ai d cut i nsul at i on sheet s and seal t he t er mi nat ed edge of t he r oof membr ane syst em i n an ef f ect i ve manner .
Seal of f f l ut es i n met al decki ng al ong t he cut of f edge. Remove t he wat er cut - of f s t o expose t he i nsul at i on when r esumi ng wor k, and r emove t he i nsul at i on sheet s used f or f i l l - i n.
3. 5. 2 Tempor ar y Fl ashi ng f or Per manent Roof i ng
Pr ovi de t empor ar y f l ashi ng at dr ai ns, cur bs, wal l s and ot her penet r at i ons
SECTI ON 07 54 19 Page 14 and t er mi nat i ons of r oof i ng sheet s unt i l per manent f l ashi ngs can be appl i ed. Remove t empor ar y f l ashi ng bef or e appl y i ng per manent f l ashi ng.
3. 5. 3 Tempor ar y Wal kways, Runways, and Pl at f or ms
Do not per mi t st or i ng, wal k i ng, wheel i ng, and t r ucki ng di r ect l y on appl i ed r oof i ng syst em. Pr ovi de t empor ar y wal kways, r unways, and pl at f or ms of smoot h c l ean boar ds, mat s or pl anks as necessar y t o avoi d damage t o appl i ed r oof i ng mat er i al s, and t o di st r i but e wei ght t o conf or m t o l i ve l oad l i mi t s of r oof const r uct i on. Use r ubber - t i r ed equi pment f or r oof i ng wor k.
3. 6 FI ELD QUALI TY CONTROL
3. 6. 1 Const r uct i on Moni t or i ng
Dur i ng pr ogr ess of t he r oof wor k, make vi sual i nspect i ons as necessar y t o ensur e compl i ance wi t h speci f i ed par amet er s. Addi t i onal l y, ver i f y t he following:
a. Equi pment i s i n wor ki ng or der . Met er i ng devi ces ar e accur at e.
b. Mat er i al s ar e not i nst al l ed i n adver se weat her condi t i ons.
c. Subst r at es ar e i n accept abl e condi t i on, i n compl i ance wi t h speci f i cat i on, pr i or t o appl i cat i on of subsequent mat er i al s.
( 1) Nai l er s and bl ocki ng ar e pr ovi ded wher e and as needed.
( 2) I nsul at i on subst r at e i s smoot h, pr oper l y secur ed t o i t s subst r at e, and wi t hout excessi ve gaps pr i or t o membr ane appl i cat i on.
( 3) The pr oper number , t ype, and spaci ng of f ast ener s ar e i nst al l ed.
( 4) Mat er i al s compl y wi t h t he speci f i ed r equi r ement s.
( 5) Al l mat er i al s ar e pr oper l y st or ed, handl ed and pr ot ect ed f r om moi st ur e or ot her damages. Li qui d component s ar e pr oper l y mi xed pr i or t o appl i cat i on.
( 6) Adhesi ves ar e appl i ed uni f or ml y t o bot h mat i ng sur f aces and checked f or pr oper set pr i or t o bondi ng mat i ng mat er i al s.
Mechani cal at t achment s ar e spaced as r equi r ed, i nc l udi ng addi t i onal f ast eni ng of membr ane i n cor ner and per i met er ar eas as required.
( 7) Membr ane i s pr oper l y over l apped.
( 8) Membr ane seami ng i s as speci f i ed by PVC membr ane manuf act ur er .
Al l seams ar e checked at t he end of each wor k day.
( 9) Appl i ed membr ane i s i nspect ed and r epai r ed as necessar y pr i or t o paver i nst al l at i on.
( 10) Membr ane i s adher ed wi t hout r i dges, wr i nkl es, k i nks, f i shmout hs.
( 11) I nst al l er adher es t o speci f i ed and det ai l ed appl i cat i on parameters.
( 12) Associ at ed f l ashi ng' s and sheet met al ar e i nst al l ed i n a t i mel y
SECTI ON 07 54 19 Page 15 manner i n accor d wi t h t he speci f i ed r equi r ement s.
( 13) Paver bal l ast i s wi t hi n t he speci f i ed wei ght r ange.
( 14) Tempor ar y pr ot ect i on measur es ar e i n pl ace at t he end of each wor k shi f t .
3. 6. 2 Manuf act ur er ' s I nspect i on
Manuf act ur er ' s t echni cal r epr esent at i ve must v i s i t t he s i t e a mi ni mum of 3 t i mes dur i ng t he i nst al l at i on f or pur poses of r evi ewi ng mat er i al s i nst al l at i on pr act i ces and adequacy of wor k i n pl ace. I nspect i ons must occur dur i ng t he f i r st 20 squar es of membr ane i nst al l at i on, at mi d- poi nt of t he i nst al l at i on, and at subst ant i al compl et i on, at a mi ni mum. Addi t i onal i nspect i ons need not exceed one f or each 100 squar es of t ot al r oof ar ea wi t h t he except i on t hat f ol l ow- up i nspect i ons of pr evi ousl y not ed def i c i enci es or appl i cat i on er r or s must be per f or med as r equest ed by t he Cont r act i ng Of f i cer . Af t er each i nspect i on, a r epor t , s i gned by t he manuf act ur er ' s t echni cal r epr esent at i ve t o t he r oof i ng Cont r act or and t hen t o t he Cont r act i ng Of f i cer wi t hi n 3 wor ki ng days. Wi t hi n t he r epor t st at e t he over al l qual i t y of wor k, def i c i enci es and any ot her concer ns, and r ecommended cor r ect i ve act i on.
3. 7 CLEAN UP
Remove debr i s, scr aps, cont ai ner s and ot her r ubbi sh and t r ash r esul t i ng f r om i nst al l at i on of t he r oof i ng syst em f r om j ob s i t e each day.
3. 8 I NSTRUCTI ONS TO GOVERNMENT PERSONNEL
Fur ni sh wr i t t en and ver bal i nst r uct i ons on pr oper mai nt enance pr ocedur es t o desi gnat ed Gover nment per sonnel . Fur ni sh i nst r uct i ons by a compet ent r epr esent at i ve of t he r oof membr ane manuf act ur er and i ncl ude a mi ni mum of 4 hour s on mai nt enance and emer gency r epai r of t he membr ane. I ncl ude a demonst r at i on of membr ane r epai r , and gi ve sour ces of r equi r ed speci al t ool s. Fur ni sh i nf or mat i on on saf et y r equi r ement s dur i ng mai nt enance and emer gency r epai r oper at i ons. I nc l ude copi es of Saf et y Dat a Sheet s f or mai nt enance/ r epai r mat er i al s.
- - End of Sect i on - -
SECTI ON 07 54 19 Page 16
| 07 54 19 - POLYVINYL-CHLORIDE ROOFING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUMMARY |
| 1.3 ASSEMBLY REQUIREMENTS |
| 1.3.1 Fire Resistance |
| 1.3.2 Wind Uplift Resistance |
| 1.3.3 Solar Reflectance Index SRI |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 Qualification of Manufacturer |
| 1.5.2 Qualifications of Applicator |
| 1.5.3 Qualification of Engineer of Record |
| 1.5.4 Conformance and Compatibility |
| 1.5.5 Preroofing Conference |
| 1.6 DETAIL DRAWINGS |
| 1.7 DELIVERY, STORAGE, AND HANDLING |
| 1.7.1 Delivery |
| 1.7.2 Storage |
| 1.7.3 Handling |
| 1.8 ENVIRONMENTAL REQUIREMENTS |
| 1.9 SEQUENCING |
| 1.10 WARRANTY |
| 1.10.1 Roof Membrane Manufacturer Warranty |
| 1.10.2 Roofing System Installer Warranty |
| 1.10.3 Continuance of Warranty |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 PVC Roof Membrane |
| 2.1.2 Energy Star |
| 2.1.3 Energy Performance |
| 2.1.4 Bonding Adhesive |
| 2.1.5 Water Cutoff Mastic/Water Block |
| 2.1.6 Membrane Flashing |
| 2.1.7 Membrane Fasteners and Plates |
| 2.1.7.1 Stress Plates, Bar or Rail for Fasteners |
| 2.1.7.2 Auxiliary Fasteners |
| 2.1.8 Pre-manufactured Accessories |
| 2.1.9 Roof Insulation |
| 2.1.10 Wood Products |
2.2 Reinforced, PVC Membrane
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.2 APPLICATION METHOD |
| 3.2.1 Special Precautions |
| 3.2.2 PVC Roofing Membrane |
| 3.2.2.1 Nailing |
| 3.2.2.2 Flashing |
| 3.2.2.3 Expansion Joints |
| 3.2.2.4 Cutoffs |
| 3.2.2.5 Walkways |
| 3.2.3 Adhered Membrane Application |
| 3.2.4 Perimeter Attachment |
| 3.2.5 Securement at Base Tie-In Conditions |
| 3.3 FLASHINGS |
| 3.3.1 General |
| 3.3.2 Membrane Flashing |
| 3.3.2.1 Installation |
| 3.3.2.2 Sealing |
| 3.4 CORRECTION OF DEFICIENCES |
| 3.5 PROTECTION OF APPLIED ROOFING |
| 3.5.1 Water Cutoffs |
| 3.5.2 Temporary Flashing for Permanent Roofing |
| 3.5.3 Temporary Walkways, Runways, and Platforms |
| 3.6 FIELD QUALITY CONTROL |
| 3.6.1 Construction Monitoring |
| 3.6.2 Manufacturer's Inspection |
| 3.7 CLEAN UP |
| 3.8 INSTRUCTIONS TO GOVERNMENT PERSONNEL |
File details come from the government source that posted it.