Amendment 0002 DoDEA FTC CSO Roof and RTUs (P2 517619)-Bid Schedule_CMTA 12.1.25.pdf

PDF 506 KB Posted

Attached to
FTC CSO DoDEA Roof and RTU Replacement
Solicitation number
W912QR-52803153
Issued by

About this file

This document is a Solicitation Contract Form for a Department of Defense Education Activity (DoDEA) project at Fort Campbell, Kentucky, involving roof and Rooftop Unit (RTU) replacements. The solicitation includes a base bid and four optional work items: 1) Roof Replacement, 2) New BAS-DDC HVAC Controls, 3) Exterior Awning and Door Replacement, and 4) New Lightning Protection System. Each option requires design and construction work, with design for options 1-3 included in the base CLIN 0001 and design for Option 4 included in CLIN 0006. The government will evaluate offers based on lowest price by adding the total price for all options to the base requirement price, with all options potentially exercisable within 90 calendar days of the Notice to Proceed, though exercising options will not extend the Task Order's period of performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P2#: 517619 DoDEA FT Campbell CSO Roof and RTUs FT Campbell, KY

SECTION 00 10 00

Certified Final Submittal

SECTION 00 10 00 – SOLICITATION CONTRACT FORM

SECTION 00 10 00 – Solicitation Contract Form

PRICE BREAKOUT SCHEDULE

OFFEROR’S NAME:

BID SCHEDULE

ITEM

NUMBER Description UNIT AMOUNT

BASE Design for RTU Replacement 0001 All work, labor, and materials required to design the Base and Options 1,2,and 3 work as described in this RFP

JOB $ __

0002 All work, labor, materials, and equipment required to construct RTU replacement as described in this RFP JOB $ _ _

TOTAL PROJECT BASE PROPOSAL $ __

OPTION 1 Construction of Roof Replacement 0003 All additional work, labor, and materials required to replace the roof system as described in this RFP. JOB $ __

OPTION 2 Construction of New BAS-DDC HVAC Controls

0004 All additional work, labor, materials, and equipment required to replace the BAS-DDC HVAC controls as described in this

RFP. JOB $ __

OPTION 3 Construction of Exterior Awning and Exterior Door Replacement

0005 All additional work, labor, and materials required to replace the exterior awning and exterior door replacement as described in this RFP. JOB $ __

OPTION 4 Design and Construction of New Lightning Protection System

0006 All additional work, labor, materials, and equipment required to design and construct new lightning protection system as described in this RFP. JOB $ __

TOTAL ALL OPTIONS PROPOSAL $_ __

Total All CLINs $_ __

*** AMENDMENT 0002***

P2#: 517619 DoDEA FT Campbell CSO Roof and RTUs FT Campbell, KY

SECTION 00 10 00

Certified Final Submittal

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items including options of the CLIN schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated by lowest price. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement.

Evaluation of options will not obligate the government to exercise the option(s).

NOTE NO. 4. CLINs 0003 through 0006 are for the additional costs associated with increasing the project construction scope as described in the request for proposal.

NOTE NO. 5. All options may be exercised within 90 calendar days from issuance of Notice to Proceed. Exercising any, or all, of the options will not extend the Task Order period of performance.

NOTE NO. 6. Design for options 1,2,and 3 should be included in the base

CLIN 0001.

NOTE NO. 7. Design for Option 4 should be included in CLIN 0006.